SlideShare a Scribd company logo
1 of 3
Download to read offline
06-10-2010                                                          st-coal-india-chh-or




            Coal-Fired Plants in India -
              Chhattisgarh & Orissa




                                                                           Hirakud Smelter
                                                                                                                                 Jharsuguda CPP
                                                                            Location: Orissa
                           Bhilai                                                                                                 Location: Orissa
                                                                   Operator: Hindalco Industries Ltd
                 Location: Chhattisgarh                                                                                 Operator: Vedanta Resources plc
                                                               Configuration: 1 X 67.5 MW, 3 X 100 MW
        Operator: NTPC-SAIL Power Co (P) Ltd                                                                                 Configuration: 9 X 135 MW
                                                                         Operation: 1994-2008
               Configuration: 2 X 250 MW                                                                                        Operation: 2008-2010
                                                                               Fuel: coal
                  Operation: 2008-2009                                                                                                Fuel: coal
                                                               Boiler supplier: ISGEC John Thompson,
                         Fuel: coal                                                                                           Boiler supplier: Shanghai
                                                                    ThyssenKrupp Industries India
                  Boiler supplier: BHEL                                                                                        T/G supplier: Shanghai
                                                                          T/G supplier: BHEL
                   T/G supplier: BHEL                                                                                             EPC: SEPCO-III
                                                             Quick facts: The Hirakud smelter and power
                        EPC: BHEL                                                                             Quick facts: In Feb 2004, Lanco Amarkantak Power
                                                         complex is located in Sambalpur Dist on the banks
 Quick facts: This plant was built to supply electricity                                                      issued an RFQ for the EPC contract for its proposed
                                                           of the world’s longest earthen dam, the 25.8km
   to the Bhilai Steel Works and other SAIL units.                                                             250-MW coal-fired plant at Pathadi village in Korba
                                                           Hirakud Dam spanning the Mahanadi river. The
  Excess output is sold into India's Western Grid.                                                                District. In the event, two 300-MW sets were
                                                          Hirakud smelter, set up by Indal in 1959, was the
 Unit-1 went commercial on 22 Apr 2009, followed by country’s second aluminium smelter operating on             ordered from Dongfang. The first unit came online
                 Unit-2 on 21 Oct 2009.                                                                        about 2yrs past the original schedule. Total cost of
                                                          power sourced from the hydro power station of the
                                                                                                                 Phase-I was about $275mn. The project has a
                                                          Hirakud Dam. In 1993, Indal built India’s first CFB
      Photograph courtesy of NTPC-SAIL Power Co (P) Ltd                                                         400kV switchyard and a 32km, 400kV tie-line to
                                                          captive power plant. Three more steam sets were
                    Posted 14 Feb 2010                                                                          PGCIL’s 400kV Korba-Seepat line. Phase-II is to
                                                         added starting about 10yrs later, each supplied by
                                                                                                                    consist of 2 X 660 MW supercritical sets.
                                                                           three CFB boilers.
                                                                                                                         Photograph by painkiller416 (Panoramio)
                                                                      Photograph courtesy of Power
                                                                                                                                   Posted 3 Oct 2010
                                                                          Posted 11 Nov 2009




                                                                                                                                       O P Jindal
                  Jharsuguda Sterlite                                                                                            Location: Chhattisgarh
                    Location: Orissa                                                                                           Operator: Jindal Power Ltd
              Operator: Sterlite Energy Ltd                                                                                    Configuration: 4 X 250 MW
                                                                          Kharagprasad
               Configuration: 4 X 600 MW                                                                                          Operation: 2007-2008
                                                                          Location: Orissa
                  Operation: 2010-2011                                                                                                  Fuel: coal
                                                                Operator: Nava Bharat Ventures Ltd
                       Fuel: coal                                                                                                 Boiler supplier: BHEL
                                                                     Configuration: 1 X 30 MW
                 Boiler supplier: Harbin                                                                                           T/G supplier: BHEL
                                                                          Operation: 2003
                 T/G supplier: Dongfang                                                                                          EPC: BHEL, Punj Lloyd
                                                                              Fuel: coal
                    EPC: SEPCO-III                                                                                 Quick facts: This is the largest coal-fired IPP in
                                                                         Boiler supplier: ??
 Quick facts:On 21 Aug 2010, Shri Naveen Patnaik ,                                                               India. A second phase with 4 X 600-MW units is on
                                                                          T/G supplier: ??
  Chief Minister of Orissa, dedicated this IPP to the                                                            order. The plant is named after Om Prakash Jindal,
                                                         Quick facts: The plant supplies a ferro-alloys plant
 People of Orissa. The total project cost is estimated                                                          the late founder of O P Jindal Group. The associated
                                                           and sells surplus power to a local distribution
 to be Rs8,200cr. The Sterlite project has India’s first                                                         mine is the largest in the private sector and it has a
                                                         company. A 64-MW unit is being added to the site.
  hydrid ESP with baghouse, four 150m natural draft                                                                 6mn tpy coal washery, also the largest in the
     cooling towers and two 275m stacks. Sterlite            Photograph courtesy of Nava Bharat Ventures Ltd       country. The facility has a 7km overland covered
  Energy is a subsidiary of Sterlite Industries, India's                  Posted 22 Jun 2007                     conveyor from the mine facility, the longest in India.
   largest non-ferrous metals and mining company,                                                                  The tie-line to the grid is a 258km, double-circuit
  and in turn a subsidiary of Vedanta Resources plc.                                                            400kV installation built in 1.5yrs. It was built without
                                                                                                                        any joint-venture with PowerGrid Corp.
           Photograph courtesy of www.indiacsr.in


industcards.com/st-coal-india-chh-or.…                                                                                                                             1/3
06-10-2010                                                                      st-coal-india-chh-or
                        Posted 3 Oct 2010                                                                                       Photograph courtesy of Jindal Steel and Power Ltd
                                                                                                                                              Posted 31 Oct 2009




                          Pathadi-I
                   Location: Chhattisgarh
      Operator: Lanco Amarkantak Power Pvt Ltd                                                                                             Rourkela Phase-II
                 Configuration: 2 X 300 MW                                                                                                   Location: Orissa
                    Operation: 2009-2010                                                 Raigarh                                Operator: NTPC-SAIL Power Co (P) Ltd
                          Fuel: coal                                              Location: Chhattisgarh                                Configuration: 2 X 60 MW
                  Boiler supplier: Dongfang                                 Operator: Jindal Steel and Power                              Operation: 1987-1988
                   T/G supplier: Dongfang                                 Configuration: 2 X 21 MW, 2 X 55 MW                                    Fuel: coal
           EPC: MMC Corp, Shapoorji Palonji                                       Operation: 1994-2004                                    Boiler supplier: Rafako
 Quick facts: In Feb 2004, Lanco Amarkantak Power                                    Fuel: waste coal                                      T/G supplier: BHEL
 issued an RFQ for the EPC contract for its proposed                              Boiler supplier: BHEL                     Quick facts: This is the second phase of a captive
  250-MW coal-fired plant at Pathadi village in Korba                           T/G supplier: BHEL, DDIT                    power plant at Rourkela Steel Works. Operations
      District. In the event, two 300-MW sets were                                                                           were taken over by NTPC-SAIL power in March
   ordered from Dongfang. The first unit came online                    Photograph courtesy of Jindal Steel and Power Ltd                          2001.
  about 2yrs past the original schedule. Total cost of                                Posted 1 Feb 2004
     Phase-I was about $275mn. The project has a                                                                               Photograph courtesy of NTPC-SAIL Power Co (P) Ltd
   400kV switchyard and a 32km, 400kV tie-line to                                                                                            Posted 14 Feb 2010
   PGCIL’s 400kV Korba-Seepat line. Phase-II is to
       consist of 2 X 660 MW supercritical sets.

            Photograph by V A Chakrarthy (Panoramio)
                       Posted 2 Jun 2010




                                                                                       Talcher STPS
                                                                                      Location: Orissa
                                                                        Operator: National Thermal Power Corp Ltd
                                                                                 Configuration: 6 X 500 MW
                                                                                    Operation: 1995-2006
                                                                                    Fuel: bituminous coal
                                                                                Boiler supplier: Stein, BHEL
                                                                                 T/G supplier: ABB, BHEL
                                                                                EPC: Fouress, Tata Projects
                                                                     Quick facts: This is India's second largest power
                                                                   plant. Fuel is mainly from Coal India Ltd’s Mahanadi
                                                                    Coalfield Ltd. Talcher was originally established by
                                                                   the Government of Orissa and subsequently sold to
                                                                     NTPC. However, the entire power generated from
                                                                              TTPS is dedicated to the State.

                                                                                  Photograph courtesy of BHEL
                                                                                      Posted 25 Jun 2007




 Abbreviations

 Data: industcards, Platts UDI World Electric Power Plants Data Base


 Updated 10/03/10

 Home

industcards.com/st-coal-india-chh-or.…                                                                                                                                              2/3
06-10-2010                               st-coal-india-chh-or




industcards.com/st-coal-india-chh-or.…                          3/3

More Related Content

What's hot

Camco CRIF presentation public sector 12 oct 2011
Camco CRIF presentation public sector 12 oct 2011Camco CRIF presentation public sector 12 oct 2011
Camco CRIF presentation public sector 12 oct 2011crifcambs
 
End User Conf. Japan
End User Conf. JapanEnd User Conf. Japan
End User Conf. JapanJasbir Singh
 
Nuclear Power India Sample
Nuclear Power   India   SampleNuclear Power   India   Sample
Nuclear Power India Samplevandalmax
 
Ambata Presentation
Ambata PresentationAmbata Presentation
Ambata PresentationHitReach
 
Vogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean AirVogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean Airandrewbouldin
 
Form 8835-Renewable Electricity, Refined Coal, and Indian Coal Production Credit
Form 8835-Renewable Electricity, Refined Coal, and Indian Coal Production CreditForm 8835-Renewable Electricity, Refined Coal, and Indian Coal Production Credit
Form 8835-Renewable Electricity, Refined Coal, and Indian Coal Production Credittaxman taxman
 
UKPVC 2010 Philip Wolfe the fi ts for the uk explained
UKPVC 2010 Philip Wolfe   the fi ts for the uk explainedUKPVC 2010 Philip Wolfe   the fi ts for the uk explained
UKPVC 2010 Philip Wolfe the fi ts for the uk explainedPaul van der Linden
 
What is Cambridshire's potential for renewable energy? – Duncan Price, Camco
What is Cambridshire's potential for renewable energy? – Duncan Price, CamcoWhat is Cambridshire's potential for renewable energy? – Duncan Price, Camco
What is Cambridshire's potential for renewable energy? – Duncan Price, Camcocrifcambs
 
Renewable Energy Storage Devices [互換モード]
Renewable Energy Storage Devices [互換モード]Renewable Energy Storage Devices [互換モード]
Renewable Energy Storage Devices [互換モード]Martin Supancic
 
REC & RPO update April 2012 - General Carbon
REC & RPO update   April 2012 - General CarbonREC & RPO update   April 2012 - General Carbon
REC & RPO update April 2012 - General Carbongeneralcarbon
 
Rec & Rpo Update April 2012 General Carbon
Rec & Rpo Update   April 2012   General CarbonRec & Rpo Update   April 2012   General Carbon
Rec & Rpo Update April 2012 General Carbonsatishkashyap
 
CRIF Final Presentation, Camco
CRIF Final Presentation, CamcoCRIF Final Presentation, Camco
CRIF Final Presentation, Camcocrifcambs
 
2011 GMC Sierra 1500 Brochure Rochester
2011 GMC Sierra 1500 Brochure Rochester2011 GMC Sierra 1500 Brochure Rochester
2011 GMC Sierra 1500 Brochure RochesterBob Hastings Buick GMC
 
Wind farm offshore projects in France, Denmark, Spain, Germany
Wind farm offshore projects in France, Denmark, Spain, GermanyWind farm offshore projects in France, Denmark, Spain, Germany
Wind farm offshore projects in France, Denmark, Spain, GermanyRadu Oleniuc
 
Smahtrfor4thapnef17jun10
Smahtrfor4thapnef17jun10Smahtrfor4thapnef17jun10
Smahtrfor4thapnef17jun10srgreene
 
Line Upgrade Deferral Scenarios for Distributed Renewable Energy Resources
Line Upgrade Deferral Scenarios for Distributed Renewable Energy ResourcesLine Upgrade Deferral Scenarios for Distributed Renewable Energy Resources
Line Upgrade Deferral Scenarios for Distributed Renewable Energy ResourcesIain Sanders
 
Tolly210137 Force10 Networks E1200i Energy
Tolly210137 Force10 Networks E1200i EnergyTolly210137 Force10 Networks E1200i Energy
Tolly210137 Force10 Networks E1200i EnergyChris O'Neal
 

What's hot (20)

Prudent Energy at Intersolar2012
Prudent Energy at Intersolar2012Prudent Energy at Intersolar2012
Prudent Energy at Intersolar2012
 
Wang Workshop on Modelling and Simulation of Coal-fired Power Generation and ...
Wang Workshop on Modelling and Simulation of Coal-fired Power Generation and ...Wang Workshop on Modelling and Simulation of Coal-fired Power Generation and ...
Wang Workshop on Modelling and Simulation of Coal-fired Power Generation and ...
 
Camco CRIF presentation public sector 12 oct 2011
Camco CRIF presentation public sector 12 oct 2011Camco CRIF presentation public sector 12 oct 2011
Camco CRIF presentation public sector 12 oct 2011
 
End User Conf. Japan
End User Conf. JapanEnd User Conf. Japan
End User Conf. Japan
 
Nuclear Power India Sample
Nuclear Power   India   SampleNuclear Power   India   Sample
Nuclear Power India Sample
 
Ambata Presentation
Ambata PresentationAmbata Presentation
Ambata Presentation
 
Vogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean AirVogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean Air
 
Form 8835-Renewable Electricity, Refined Coal, and Indian Coal Production Credit
Form 8835-Renewable Electricity, Refined Coal, and Indian Coal Production CreditForm 8835-Renewable Electricity, Refined Coal, and Indian Coal Production Credit
Form 8835-Renewable Electricity, Refined Coal, and Indian Coal Production Credit
 
UKPVC 2010 Philip Wolfe the fi ts for the uk explained
UKPVC 2010 Philip Wolfe   the fi ts for the uk explainedUKPVC 2010 Philip Wolfe   the fi ts for the uk explained
UKPVC 2010 Philip Wolfe the fi ts for the uk explained
 
What is Cambridshire's potential for renewable energy? – Duncan Price, Camco
What is Cambridshire's potential for renewable energy? – Duncan Price, CamcoWhat is Cambridshire's potential for renewable energy? – Duncan Price, Camco
What is Cambridshire's potential for renewable energy? – Duncan Price, Camco
 
2010 Dave Arbogast Conversion Vans Yukon Troy OH
2010 Dave Arbogast Conversion Vans Yukon Troy OH2010 Dave Arbogast Conversion Vans Yukon Troy OH
2010 Dave Arbogast Conversion Vans Yukon Troy OH
 
Renewable Energy Storage Devices [互換モード]
Renewable Energy Storage Devices [互換モード]Renewable Energy Storage Devices [互換モード]
Renewable Energy Storage Devices [互換モード]
 
REC & RPO update April 2012 - General Carbon
REC & RPO update   April 2012 - General CarbonREC & RPO update   April 2012 - General Carbon
REC & RPO update April 2012 - General Carbon
 
Rec & Rpo Update April 2012 General Carbon
Rec & Rpo Update   April 2012   General CarbonRec & Rpo Update   April 2012   General Carbon
Rec & Rpo Update April 2012 General Carbon
 
CRIF Final Presentation, Camco
CRIF Final Presentation, CamcoCRIF Final Presentation, Camco
CRIF Final Presentation, Camco
 
2011 GMC Sierra 1500 Brochure Rochester
2011 GMC Sierra 1500 Brochure Rochester2011 GMC Sierra 1500 Brochure Rochester
2011 GMC Sierra 1500 Brochure Rochester
 
Wind farm offshore projects in France, Denmark, Spain, Germany
Wind farm offshore projects in France, Denmark, Spain, GermanyWind farm offshore projects in France, Denmark, Spain, Germany
Wind farm offshore projects in France, Denmark, Spain, Germany
 
Smahtrfor4thapnef17jun10
Smahtrfor4thapnef17jun10Smahtrfor4thapnef17jun10
Smahtrfor4thapnef17jun10
 
Line Upgrade Deferral Scenarios for Distributed Renewable Energy Resources
Line Upgrade Deferral Scenarios for Distributed Renewable Energy ResourcesLine Upgrade Deferral Scenarios for Distributed Renewable Energy Resources
Line Upgrade Deferral Scenarios for Distributed Renewable Energy Resources
 
Tolly210137 Force10 Networks E1200i Energy
Tolly210137 Force10 Networks E1200i EnergyTolly210137 Force10 Networks E1200i Energy
Tolly210137 Force10 Networks E1200i Energy
 

Similar to Power Plants Chhatisgarh - For Sealing Compounds for Power Stations Call +91-891-2564393

Power plant list
Power plant listPower plant list
Power plant listKanda Velan
 
Vocational training in NTPC
Vocational training in NTPCVocational training in NTPC
Vocational training in NTPCMohindra
 
Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...haxxo24
 
report on adani UPCL
report on adani UPCLreport on adani UPCL
report on adani UPCLAquib Nadaf
 
INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)apurv rathore
 
coal handling
coal handling coal handling
coal handling ssoniii
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...IPPAI
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar Dilip kumar
 
Ntpc(btps) report
Ntpc(btps) reportNtpc(btps) report
Ntpc(btps) reportAlok Tiwari
 
Copperbelt energy eep presentation
Copperbelt energy   eep presentationCopperbelt energy   eep presentation
Copperbelt energy eep presentationBusiness Finland
 
Ndola 10 mw biomass power project feasibility study (in partnership with eep)
Ndola 10 mw biomass power project feasibility study (in partnership with eep)Ndola 10 mw biomass power project feasibility study (in partnership with eep)
Ndola 10 mw biomass power project feasibility study (in partnership with eep)Business Finland
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
 
kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar hariom nagar
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...Navin Pathak
 

Similar to Power Plants Chhatisgarh - For Sealing Compounds for Power Stations Call +91-891-2564393 (20)

Mou List
Mou ListMou List
Mou List
 
Power plant list
Power plant listPower plant list
Power plant list
 
Vocational training in NTPC
Vocational training in NTPCVocational training in NTPC
Vocational training in NTPC
 
Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...
 
report on adani UPCL
report on adani UPCLreport on adani UPCL
report on adani UPCL
 
INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)
 
coal handling
coal handling coal handling
coal handling
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
 
Training chp
Training chpTraining chp
Training chp
 
Ntpc report
Ntpc reportNtpc report
Ntpc report
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
Ntpc(btps) report
Ntpc(btps) reportNtpc(btps) report
Ntpc(btps) report
 
Power distribution
Power distribution Power distribution
Power distribution
 
Copperbelt energy eep presentation
Copperbelt energy   eep presentationCopperbelt energy   eep presentation
Copperbelt energy eep presentation
 
Ndola 10 mw biomass power project feasibility study (in partnership with eep)
Ndola 10 mw biomass power project feasibility study (in partnership with eep)Ndola 10 mw biomass power project feasibility study (in partnership with eep)
Ndola 10 mw biomass power project feasibility study (in partnership with eep)
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar
 
steam turbine presentations
steam turbine presentationssteam turbine presentations
steam turbine presentations
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
 
Case Study_Trident Group
Case Study_Trident GroupCase Study_Trident Group
Case Study_Trident Group
 

More from Project Sales Corp

PSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdfPSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdfProject Sales Corp
 
Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024Project Sales Corp
 
PSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made EasyPSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made EasyProject Sales Corp
 
PSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdfPSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdfProject Sales Corp
 
PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024Project Sales Corp
 
PSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdfPSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdfProject Sales Corp
 
PSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - GlobalPSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - GlobalProject Sales Corp
 
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024Project Sales Corp
 
PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024Project Sales Corp
 
PSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety ToolsPSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety ToolsProject Sales Corp
 
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrabGasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrabProject Sales Corp
 
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdfMan-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdfProject Sales Corp
 
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdfPSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdfProject Sales Corp
 
PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023Project Sales Corp
 
PSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdfPSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdfProject Sales Corp
 

More from Project Sales Corp (20)

PSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdfPSC Dropped Objects Prevention Guidebook.pdf
PSC Dropped Objects Prevention Guidebook.pdf
 
Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024Managing Suspended Loads Presentation- 2024
Managing Suspended Loads Presentation- 2024
 
PSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made EasyPSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
PSC Gulf FZCO Dubai - Global Sourcing Now Made Easy
 
PSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdfPSC Ropes Soaps Dopes Guidebook 2024.pdf
PSC Ropes Soaps Dopes Guidebook 2024.pdf
 
PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024PSC India Workplace Safety Guidebook 2024
PSC India Workplace Safety Guidebook 2024
 
PSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdfPSC India - Rig Spares Supplied - Examples .pdf
PSC India - Rig Spares Supplied - Examples .pdf
 
PSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - GlobalPSC Supplier Partners List 2024 - Global
PSC Supplier Partners List 2024 - Global
 
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
PSC SPECIALITY LUBRICANTS GUIDEBOOK 2024
 
PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024PSC India Sealing Compounds Guidebook 2024
PSC India Sealing Compounds Guidebook 2024
 
PSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety ToolsPSC Guide-it SlingGrab Hand Safety Tools
PSC Guide-it SlingGrab Hand Safety Tools
 
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrabGasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
 
MOTORS IN STOCK.pdf
MOTORS IN STOCK.pdfMOTORS IN STOCK.pdf
MOTORS IN STOCK.pdf
 
RING GASKETS IN STOCK.pdf
RING GASKETS IN STOCK.pdfRING GASKETS IN STOCK.pdf
RING GASKETS IN STOCK.pdf
 
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdfMan-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
Man-Made-Mineral-Fibre-MMMF-Filter-Masks from PSC.pdf
 
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdfPSC TASK SPECIFIC GLOVE GUIDE-BOOK  (3).pdf
PSC TASK SPECIFIC GLOVE GUIDE-BOOK (3).pdf
 
PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023PSC Hands-Free Safety Tools 2023
PSC Hands-Free Safety Tools 2023
 
PSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdfPSC Hands-Free Safety Range 2023.pdf
PSC Hands-Free Safety Range 2023.pdf
 
Stock - Filters.pdf
Stock - Filters.pdfStock - Filters.pdf
Stock - Filters.pdf
 
Stock - Ballasts.pdf
Stock - Ballasts.pdfStock - Ballasts.pdf
Stock - Ballasts.pdf
 
Stock - Junction Boxes.pdf
Stock - Junction Boxes.pdfStock - Junction Boxes.pdf
Stock - Junction Boxes.pdf
 

Recently uploaded

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 

Recently uploaded (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 

Power Plants Chhatisgarh - For Sealing Compounds for Power Stations Call +91-891-2564393

  • 1. 06-10-2010 st-coal-india-chh-or Coal-Fired Plants in India - Chhattisgarh & Orissa Hirakud Smelter Jharsuguda CPP Location: Orissa Bhilai Location: Orissa Operator: Hindalco Industries Ltd Location: Chhattisgarh Operator: Vedanta Resources plc Configuration: 1 X 67.5 MW, 3 X 100 MW Operator: NTPC-SAIL Power Co (P) Ltd Configuration: 9 X 135 MW Operation: 1994-2008 Configuration: 2 X 250 MW Operation: 2008-2010 Fuel: coal Operation: 2008-2009 Fuel: coal Boiler supplier: ISGEC John Thompson, Fuel: coal Boiler supplier: Shanghai ThyssenKrupp Industries India Boiler supplier: BHEL T/G supplier: Shanghai T/G supplier: BHEL T/G supplier: BHEL EPC: SEPCO-III Quick facts: The Hirakud smelter and power EPC: BHEL Quick facts: In Feb 2004, Lanco Amarkantak Power complex is located in Sambalpur Dist on the banks Quick facts: This plant was built to supply electricity issued an RFQ for the EPC contract for its proposed of the world’s longest earthen dam, the 25.8km to the Bhilai Steel Works and other SAIL units. 250-MW coal-fired plant at Pathadi village in Korba Hirakud Dam spanning the Mahanadi river. The Excess output is sold into India's Western Grid. District. In the event, two 300-MW sets were Hirakud smelter, set up by Indal in 1959, was the Unit-1 went commercial on 22 Apr 2009, followed by country’s second aluminium smelter operating on ordered from Dongfang. The first unit came online Unit-2 on 21 Oct 2009. about 2yrs past the original schedule. Total cost of power sourced from the hydro power station of the Phase-I was about $275mn. The project has a Hirakud Dam. In 1993, Indal built India’s first CFB Photograph courtesy of NTPC-SAIL Power Co (P) Ltd 400kV switchyard and a 32km, 400kV tie-line to captive power plant. Three more steam sets were Posted 14 Feb 2010 PGCIL’s 400kV Korba-Seepat line. Phase-II is to added starting about 10yrs later, each supplied by consist of 2 X 660 MW supercritical sets. three CFB boilers. Photograph by painkiller416 (Panoramio) Photograph courtesy of Power Posted 3 Oct 2010 Posted 11 Nov 2009 O P Jindal Jharsuguda Sterlite Location: Chhattisgarh Location: Orissa Operator: Jindal Power Ltd Operator: Sterlite Energy Ltd Configuration: 4 X 250 MW Kharagprasad Configuration: 4 X 600 MW Operation: 2007-2008 Location: Orissa Operation: 2010-2011 Fuel: coal Operator: Nava Bharat Ventures Ltd Fuel: coal Boiler supplier: BHEL Configuration: 1 X 30 MW Boiler supplier: Harbin T/G supplier: BHEL Operation: 2003 T/G supplier: Dongfang EPC: BHEL, Punj Lloyd Fuel: coal EPC: SEPCO-III Quick facts: This is the largest coal-fired IPP in Boiler supplier: ?? Quick facts:On 21 Aug 2010, Shri Naveen Patnaik , India. A second phase with 4 X 600-MW units is on T/G supplier: ?? Chief Minister of Orissa, dedicated this IPP to the order. The plant is named after Om Prakash Jindal, Quick facts: The plant supplies a ferro-alloys plant People of Orissa. The total project cost is estimated the late founder of O P Jindal Group. The associated and sells surplus power to a local distribution to be Rs8,200cr. The Sterlite project has India’s first mine is the largest in the private sector and it has a company. A 64-MW unit is being added to the site. hydrid ESP with baghouse, four 150m natural draft 6mn tpy coal washery, also the largest in the cooling towers and two 275m stacks. Sterlite Photograph courtesy of Nava Bharat Ventures Ltd country. The facility has a 7km overland covered Energy is a subsidiary of Sterlite Industries, India's Posted 22 Jun 2007 conveyor from the mine facility, the longest in India. largest non-ferrous metals and mining company, The tie-line to the grid is a 258km, double-circuit and in turn a subsidiary of Vedanta Resources plc. 400kV installation built in 1.5yrs. It was built without any joint-venture with PowerGrid Corp. Photograph courtesy of www.indiacsr.in industcards.com/st-coal-india-chh-or.… 1/3
  • 2. 06-10-2010 st-coal-india-chh-or Posted 3 Oct 2010 Photograph courtesy of Jindal Steel and Power Ltd Posted 31 Oct 2009 Pathadi-I Location: Chhattisgarh Operator: Lanco Amarkantak Power Pvt Ltd Rourkela Phase-II Configuration: 2 X 300 MW Location: Orissa Operation: 2009-2010 Raigarh Operator: NTPC-SAIL Power Co (P) Ltd Fuel: coal Location: Chhattisgarh Configuration: 2 X 60 MW Boiler supplier: Dongfang Operator: Jindal Steel and Power Operation: 1987-1988 T/G supplier: Dongfang Configuration: 2 X 21 MW, 2 X 55 MW Fuel: coal EPC: MMC Corp, Shapoorji Palonji Operation: 1994-2004 Boiler supplier: Rafako Quick facts: In Feb 2004, Lanco Amarkantak Power Fuel: waste coal T/G supplier: BHEL issued an RFQ for the EPC contract for its proposed Boiler supplier: BHEL Quick facts: This is the second phase of a captive 250-MW coal-fired plant at Pathadi village in Korba T/G supplier: BHEL, DDIT power plant at Rourkela Steel Works. Operations District. In the event, two 300-MW sets were were taken over by NTPC-SAIL power in March ordered from Dongfang. The first unit came online Photograph courtesy of Jindal Steel and Power Ltd 2001. about 2yrs past the original schedule. Total cost of Posted 1 Feb 2004 Phase-I was about $275mn. The project has a Photograph courtesy of NTPC-SAIL Power Co (P) Ltd 400kV switchyard and a 32km, 400kV tie-line to Posted 14 Feb 2010 PGCIL’s 400kV Korba-Seepat line. Phase-II is to consist of 2 X 660 MW supercritical sets. Photograph by V A Chakrarthy (Panoramio) Posted 2 Jun 2010 Talcher STPS Location: Orissa Operator: National Thermal Power Corp Ltd Configuration: 6 X 500 MW Operation: 1995-2006 Fuel: bituminous coal Boiler supplier: Stein, BHEL T/G supplier: ABB, BHEL EPC: Fouress, Tata Projects Quick facts: This is India's second largest power plant. Fuel is mainly from Coal India Ltd’s Mahanadi Coalfield Ltd. Talcher was originally established by the Government of Orissa and subsequently sold to NTPC. However, the entire power generated from TTPS is dedicated to the State. Photograph courtesy of BHEL Posted 25 Jun 2007 Abbreviations Data: industcards, Platts UDI World Electric Power Plants Data Base Updated 10/03/10 Home industcards.com/st-coal-india-chh-or.… 2/3
  • 3. 06-10-2010 st-coal-india-chh-or industcards.com/st-coal-india-chh-or.… 3/3