2. What I have been doing
• Since last production diary I have done a great many tasks. Last time I stated that I had chosen my final
images, made my contact sheets and made improvements to my blog.
• Since then I have gone through the spreadsheet and sought out what I had not yet done. I also wanted to
improve some of the tasks and get them from a 3 to a 4.
• Tasks that I have done recently include: Processes, Sketches (uploading them), Model Releases (uploading
them), creating a survey to get some feedback on my 2nd Draft which I have also uploaded and to collect and
display the results that I got from it. I have also been making minor and drastic improvements and changes
to my music magazine. I have also finished off all the Evaluation Questions and put them into Multimedia
Formats.
• Lately I have been thinking about what I could do to promote my magazine further and think about things
not on the spreadsheet. I came up with the idea of creating 3 separate subscriber magazines, each with a
different band member on the front, and I also created an album front and back cover for my band. I have
mentioned the album in the article in my magazine and so the audience will be waiting for something like
this to come out. I created the album on Microsoft Powerpoint and Photoshop Elements at home, and I
used the programs InDesign and Photoshop CS6 to create the subscriber magazines.
3.
4. What next?
• I have pretty much finished everything
now for G321. The only tasks that I have
left to do is to get some of the tasks up
from a 3 to a 4 which will hopefully
require little improvements, finish off the
magazine which is practically
done, upload my finished draft and redo
part of my first evaluation question as I
have made new changes to my magazine
and so it needs to be updated.