NEIGHBOURHOOD PLANNING STUDIO
PLANNING AND DESIGNING LAB III
111514003 AISHWARYA ASHOKAN
111514004 VAISHNAVI ALHAT
111514006 KALYANI BHADANE 111514029 SHIVANAND NALGIRE
1115140042 ISHRAT SAYYAD111514008 SOHEL FAKIR
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29, 42
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
GROUND SCENARIO :
Influx of IT has boosted up the residential demand in Pune especially
areas surrounding Hinjewadi, Wakad, Pashan.
Hinjewadi & Tathavade vicinity (around lavale) is developing as Educational
hub.
Reputed campuses like Symbiosis International University, Flame University,
Bharati Vidyapeeth Group of Institutes are located in the vicinity.
Nestled in the hills on one side, Lavale is an upcoming attraction to IT
professionals and stakeholders.
PULL FACTORS OF THE TOWNSHIP :
Scenic beauty of hills along with peaceful surrounding nature.
Hinjewadi Rajiv Gandhi IT park at just 8 km.
At 10 km from Kothrud and 8 km from Pashan.
Balewadi Stadium at just 7 km distance.
Oxford Golf Resort at 2 km.
Flame University Campus at walkable distance.
Symbiosis International University at just 2 km.
3 km away from Bharati Vidyapeeth Group of Institutes.
Proximity to Mumbai - Pune Expressway.
33 IT companies in 8 km radius.
SITE
Vidya Valley School
International School of Business
Symbiosis International
University
Lavale
Universal
Solutions
Pvt. Ltd.
Niasa
College
Suryadatta
College of
Management
ABM Institute
VIT's PVP School
of Architecture
Bharati
Vidyapeeth Group
of Institutes
Symbiosis Institutes
of Technology
Nande
Chande
Bavdhan
Gaon
Sunarwadi
Mumbai-PuneExpressway
AH47(AsianHighway)
ToMumbai(100km)
Hinjewadi-PirangutRoad
High Energy
Research Lab
Manas Lake
And Resort
Bhare
Mulkhed
Hinjewadi Lake
Balewadi
Stadium
Pashan
Kothrud
Oxford Golf
Resort
Balewadi Stadium
Mula River
Bharati Vidyapeeth
Hinjewadi Rajiv Gandhi IT Park
Manas Lake
Natural Hills & Forest Area
Mumbai - Pune Expressway
Infotech Park
Flame University
REGIONAL CONTEXT
Megapolis
Township
TCS
SCALE: 1:40400
NEIGHBOURHOOD PLANNING : REGIONAL CONTEXT
8/12/16 1:40400 1
Lake
Mercedes Benz
Institute
Hinjewadi
Hospital
Mulshi Road
LavaleRoad
Ichigo
SOURCE: SITE VISIT & GOOGLE EARTH
Site Location
KEY MAP
SCALE: 1:90000
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
South - West
Monsoon Winds
Summer sun path
Winter wind path
Climate AnalysisContour Map Of Proposed Site
Contour Map Range :
600 m - 655 m
NEIGHBOURHOOD PLANNING : PROPOSED SITE
2
> Location of the site : Bavdhan, on the boundary of Mulshi Taluka
> Area of the site : 195.77 acres
> Latitude : 18.5415
> Longitude : 73.7305
> Climate Zone : Tropical (Moderate)
> Wind information : Southwest monsoon winds throughout the year
> Average Rainfall : 2841 mm
> Temperature information :
Average annual temperature : 24.3 deg.C
Highest average temperature : 28.1 deg.C
Lowest average temperature : 21.3 deg.C
Site Details
0 3500 7000 10500 14000 17500
GRAPHICAL SCALE :
SCALE 1 : 10000
SOURCES :
- The District Environment
Atlas (DEA) of Pune District
- www.mpcb.gov.in
SCALE 1 : 3500
Site Boundary
Contour lines
LEGEND
Building Orientation -
> North & south facing vertical walls receive least amount of radiation.
> East, southwest & northwest walls will receive same amount of radiation
& the west walls will receive the most.
> Windows facing east would admit the sun in the morning.
Roofs & Walls -
> East and especially west walls should be massive whereas north &
south walls should be of light weight construction.
> To limit heat during strong sunshine hours & store heat during cool
period, high thermal capacity structures shall be used. eg: 200 mm
concrete slab.
Air Flow & Openings -
> Solar heat gain is governing the orientation of windows.
> Deciduous trees should be planted in this tropical zone since wilting of
leaves takes place during winter & hence maximum sunlight can be
received.
> In summer, deciduous trees shall help to block the incident solar
radiations & hence should be planted near the living room.
Orientation of buildings on a sloping land -
> For prevailing hot winds, trees would act as a buffer.
> Openings of the buildings would be so placed so as to absorb cooler
winds.
> Good views shall be obtained by placing longer sides of the walls
towards the water body side.
> Vegetation shall be done in order to block the unwanted hot winds
on the upland area.
> Double roofs shall be provided to minimize the intensity of trapped
solar radiations on the roof.
Ichigo
8/12/16
Site Location
KEY MAP
SCALE: 1:90000
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
650
645
605
610
615
620
625
630
635
640
645
655
650
650
645
605
610
615
620
625
630
635
640
645
Scale 1 : 10000
Scale 1 : 10000
A
B
Y Z
SECTION AB
SECTION YZ
Proposed Site Soil Map :
Scale 1 : 10000 Pune District Soil Map ( Not to scale )
> The area is with steep slopes, highly erosion prone with shallow soils.
> The soil is acidic in nature.
> It has low electrical conductivity, organic carbon and phosphorous content.
> It has a very high potash content.
> It has sufficient amount of copper, manganese and zinc but is deficient in iron.
> The soil thickness ranges from 1 to 7.5 cm.
> For such a type of soil, to impart strength to the building, deep foundation is required.
> Pile foundation :
Among various types of deep foundations, pile foundation is suitable for this
site as the load bearing capacity of the soil is very low.
Source : Pune DEA Report 2008
Class VII : Extremely shallow soil
Scale 1 : 6800 Non-developable Land
Very Flat
8/12/16 3
Steep
8 %
Flat
FIG. NO. 1 : Slope Analysis Pie Chart
TABLE NO. 1
VERTICAL SECTION
HORIZONTAL SECTION
Horizontal distance
Horizontaldistance
Very Steep
Slope Analysis of the Site :
Developable
Land
5 - 10 % Slope
10 - 25 % Slope
92 %
NEIGHBOURHOOD PLANNING : SITE ANALYSIS
> 25 % Slope
2 - 5 % Slope
8 %
29 %
27 %
36 %
Feasible for Building
Construction
(63 %)
Feasible for Open Spaces
& Services (29 %)
Ichigo
Site Location
KEY MAP
SCALE: 1:90000
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29, 42
SIGN LOGO
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
8/12/16 4
NEIGHBOURHOOD PLANNING : TOWNSHIP THEME
ORGANIC FARMING
And the overall feasible Solution is ...
Urban agriculture is an industry located within ( intra-urban ) or on the fringe
( peri-urban ) of a town, a city or a metropolis, that grows and raises, processes
and distributes a diversity of agricultural products from both plants and animals,
using human, land and water resources, products and services found in and
around that urban area.
Ensures safe & healthy
world for future
generation
Boosts immune
system
Prevents immature
aging
Tastes better than
non - organic food
Reduces risk of
heart diseases
Promotes animal
welfare
Prevents cancer
Reduces presence
of pesticides
Vermi -
compost
Animal Husbandry
Manure
Crop
Rotation
Biofertilizers
Biological
Management
Green-leaf Manure
Organic
Farming
The climate and the soil
typology on the site,
favours growth of
following crops using
organic farming methods :
1. Vegetables like tomato,
brinjal, cabbage,
cauliflower, onion, peas,
leafy vegetables, etc.
2. Fruits like Japanese
strawberry ( Ichigo ),
grapes, etc.
3. Floriculture
EVOLUTION OF THEME ...
Aim : To develop a healthy township in terms of physical and mental health
of the residents, and the natural environment .
Important Health Statistics of Pune :
0
10
20
30
40
50
60
70
80
90
100
Heart
Problem
s
Hyperlipidem
iaHypertension
Obesity
Diabetes
54
21
7778
38
Fig. No. 1 : Major prevalent diseases
PercentofPopulation
Some of the major factors responsible for
these health issues are :
- Stressful city life
- Polluted environment
- Improper lifestyle habits
- Consumption of conventional farm
products
Thus, the township should be based
on such a theme that would solve the above
problems.
Source : State Bureau of Health Intelligence
and Vital Statistics, Pune
Fig. no. 3 : Organic Farming
Fig. no. 4 : Benefits of Organic
FarmingFig. no. 2 : Benefits of Urban Agriculture
URBAN AGRICULTURE
Site Location
KEY MAP
Ichigo
SCALE: 1:90000
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29, 42
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
8/12/16
NEIGHBOURHOOD PLANNING : CONCEPT PLAN
HIGH INCOME GROUP :
Reasons for the allotted position of HIG :
Lakeview
Proximity to the entrance, hence enhanced
accessibility.
View of the hills and the horticulture.
Proximity to the golf course.
Proximity to the garden.
Tucked away from the crowd that might be present
in the commercial zone.
OPEN SPACES
(GARDEN) :
Reasons for the allotted
position of garden:
Centrally placed so
that it is accessible
to all.
Closest to the HIG
and HMIG so that
it provides a
calming ambience
to their residences.
PUBLIC - SEMI PUBLIC
SERVICES :
Reasons for the allotted
position of PSP :
Placed so that it is
accessible to all income
groups.
LOW INCOME GROUP :
Reasons for the allotted position of LIG:
Proximity to potential workplace (urban
agricultural land).
Affordable land prices.
Proximity to Lavale village (workplace,
educational institution).
MIDDLE INCOME GROUP :
Reasons for allotted position of MIG :
Reasonably close to the entrance.
Proximity to the garden.
Proximity to the PSP services provided.
HIG
HIG
MIG
MIG
LIG
PSP
PSP
SERVICES
CO
M
M
ERCIAL
LAKE
HORTICULTURE
FARM
LAND
OPEN
SPACE
CONCEPT PLAN
URBAN AGRICULTURAL LAND:
Reasons for the allotted position of urban agricultural
land:
Land is undevelopable or developable at very
high cost due to very steep slopes.
Provides a natural boundary on one side of the
township.
C:UsersLenovoDesktopUntitled.jpg
C:UsersLenovoDesktopimages.png
C:UsersLenovoDesktop5024010.jpg
C:UsersLenovoDesktopdownload.png
C:UsersLenovoDesktopimages (1).png
ENTRANCE
1:38800 5
View of lake
View of
Horticulture
650
645
CONTOUR MAP
SCALE 1 : 38800
Summer sun path
Winter wind path
N
South - west Monsoon
Winds
SCALE; 1:1330
Symbiosis University
Flame University
Oxford Golf Resort
Ichigo
O
pen
Land
Site Location
KEY MAP
SCALE: 1:90000
:
> Should have sufficiently a wide means
(not less than 18 m wide).
> Should be one continuous unbroken
and uninterrupted & in any case should
not be less than 40 Ha (100 acres) at
one place.
The area will be notified as 'special
township' by government in Urban
Development Department according to
section 20 read with section 18 of the
MRTP Act 1966.
ENVIRONMENT :
> Should not involve topographical changes,
changes in alignment, etc.
> It should have parks / gardens / playgrounds, etc.
SPECIAL CONCESSIONS :
(a) N. A. Permission -
Non - agriculture permission will be automatic.
(b)
Stamp duty rates should be 50% of prevailing rates of
Mumbai Stamp Act.
(c)
Any special government land falling under township area
is granted on terms & conditions.
(d)
The condition that only the agriculturist is eligible to buy
the agriculture land is not applicable.
(e)
Concessions for Star Category Hotels, Hospitals &
Multiplexes / Property Tax shall be provided.
COLLEGE OF ENGINEERING, PUNE
E
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29, 42
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGN
NG
N
R
U
HU
SIGN
S
T
G
R
T
E
H
T T
E
A
N
E
C
LOGO
R
D
NEIGHBOURHOOD PLANNING : REGULATIONS
N
INFRASTRUCTURE FACILITIES :
Water supply -
> To develop source for drinking water other than groundwater and
to meet daily requirement of minimum 140 litres per capita per
day.
> Storage capacity of it should be at least 1.5 times of actual
required quantity.
Drainage and Garbage disposal -
> Suitable and environment friendly arrangements for disposal and
treatment of sewage and solid waste.
Power -
> To draw power from existing supply system or arrangement of
captive power generation.
6
GENERAL NORMS FOR DIFFERENT LAND
USES :
(a) Residential -
> Out of the total floor area, at least 60% may be used for
residential development.
> 10% of it shall be used for residential tenements having built up
area up to 40 sq.m.
(b) Commercial -
> Should be properly distributed in hierarchical manner like
convenience shopping, community centre, etc.
(c) Parks, Gardens & Play Grounds -
> 20% of the total area is for Parks/ Gardens/ Playgrounds.
> Should be distributed in all residential clusters and kept open to
general public.
(d) Transport and Communication -
> Roads should be developed as per standard and road widths as:
(i) Classified Roads as prescribed.
(ii) Main road/ Ring road- 18 to 24 m. wide.
(iii) Internal road- as per prevailing bye-laws & of minimum width 9 m.
F. S. I & FLOATING F. S. I :
> Total built - up area / F.S.I of the special
township in Residential Zone will be
1.00.
> F. S. I for Agriculture / No Development
Zone shall be 0.5.
> The F. S. I of any uncovered plot can
be used anywhere in the township as
floating F. S. I.
8/12/16
Source : MR & TP Act 1996
SPECIAL
TOWNSHIP
SCHEME FOR
PUNE REGION
AS PER MRTP
ACT 1996
Ichigo
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
E
NIGNE
NG
S
T
R
E
N
G
T H
T R U T H
E
C
N
ARUDNE
KEY MAP
NEIGHBOURHOOD PLANNING: CALCULATIONS
Ichigo
Total site area :
195.77acres = 792, 253.082 sq.m.
SITE BOUNDARY
SCALE: 1:1330
SITE DETAILS:
Total site area : 195.77 acres = 792, 253.082 sq.m.
Total built up area : 176.13 acres = 712, 772.822 sq.m.
Population : 22,382
Transportation
Residential
Agricultural
Open spaces
BUILT-UP
AREA (%)
Public Semi-public
Commercial
Services
LAND USE
50
20
6
10
77
2
GROUND
COVERAGE (%)
GROUND
COVERAGE (SQ.M.)
548, 835
BUILT-UP
AREA (SQ.M.)
0
0
0
Higher Middle Income Group (HMIG)
20Higher Income Group (HIG) 109,767
Middle Income Group (MIG)
Low Income Group (LIG)
Economically Weaker Section (EWS)
32,930
30
40
6
4
BUILT-UP
AREA
(%)
BUILT-UP
AREA
(SQ.M.)
50%
5%
20%
164,650
219,534
10%
21,954
9.4%
2%
3.6%
Residential
Agricultural
Open spaces
Transportation
Public Semi-public
Commercial
Services
GROUND
COVERAGE
(%)
GROUND
COVERAGE
(SQ.M.)
TABLE NO. 1 : LAND USE DISTRIBUTION
FIG. NO. 1 :
LAND USE DISTRIBUTION
LEGEND
APARTMENTS:
Therefore, total built up area for apartments :
109,767 - 7500 = 102,267 sq.m.
Built up area excluding 20% area for common spaces :
102,267 - 20,453 = 81,814 sq.m.
Built up area of one flat : 120 sq.m.
No. of flats : 81,814 / 120 = 682 flats
Ground coverage for HIG flats (excluding bungalows) :
40% (Ground Coverage for HIG) = 40% of 71,725 sq.m. = 28,690 sq.m.
Permissible no. of floors :
Total built up area for flats / Ground coverage = 102,267 / 28,690 = 4 floors
Each floor has 4 flats
Therefore, no. of floors required : 682 / 4 = 170.5
Each building has 4 floors
Hence, no. of buildings : 170.5 / 4 = 43 buildings
396,126
20
30
40
6
4
79,225
118,837
158,450
23,768
15,845
TABLE NO. 2 : DISTRIBUTION OF BUILT UP AREA
HIGHER MIDDLE INCOME GROUP (HMIG):
Total built up area : 164,650 sq.m.
Ground coverage : 118,837 sq.m.
Population belonging to HMIG :
No. of dwelling units x 4.5 = (1318) x 4.5 = 5931
Built up area excluding 20% area for common spaces :
164,650 - 32,930 = 131,720 sq.m.
Built up area of one flat : 100 sq.m.
No. of flats : 131,720 / 100 = 1318 flats
Ground coverage for HMIG flats :
40% (Ground Coverage for HMIG) = 40% of 118,837 sq.m. = 47,535 sq.m.
Permissible no. of floors :
Total built up area for flats / Ground coverage = 164,650 / 47,535 = 4 floors
Each floor has 4 flats
Therefore, no. of floors required : 1318 / 4 = 329.5
Each building has 4 floors
Hence, no. of buildings : 329.5 / 4 = 82 buildings
HIGHER INCOME GROUP (HIG):
Total built up area : 109,767 sq.m.
Ground coverage : 79,225 sq.m.
Population belonging to HIG :
No. of dwelling units x 4.5 = (30+682) x 4.5 =3204
BUNGALOWS:
No. of bungalows : 30
Built up area of one bungalow : 250 sq.m.
Total built up area of all bungalows : 250 x 30 = 7500 sq.m.
INCOME GROUPS
Higher Income Group (HIG) : FLAT
Higher Middle Income Group (HMIG)
Middle Income Group (MIG)
Low Income Group (LIG)
Economically Weaker Section (EWS)
120
100
85
60
40
AREA OF DWELLING
UNIT (SQ.M.)
TABLE NO. 3 : SIZE OF DWELLING UNITS
INCOME GROUPS
Higher Income Group (HIG) : BUNGALOW 250
158,450
39,613
79,225
15,845
74,400
20,500
9.4
2.6
15
5
3
0
0
0
106,916
35,639
21,383
RESIDENTIAL :
SCALE: 1:90000
8/12/16
Site location
7
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
OL
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
NEIGHBOURHOOD PLANNING: CALCULATIONS
Ichigo
Total site area :
195.77acres = 792, 253.082 sq.m.
SITE BOUNDARY
SCALE: 1:1330
MIDDLE INCOME GROUP (MIG):
Total built up area : 219,534 sq.m.
Ground coverage : 158,450 sq.m.
Population belonging to MIG :
No. of dwelling units x 4.5 = (2066) x 4.5 = 9297
Built up area excluding 20% area for common spaces :
219,543 - 43,907 = 175,627 sq.m.
Built up area of one flat : 85 sq.m.
No. of flats : 175,627 / 85 = 2066 flats
Ground coverage for MIG flats :
40% (Ground Coverage for MIG) = 40% of 158,450 sq.m. = 63,380 sq.m.
Permissible no. of floors :
Total built up area for flats / Ground coverage = 219,534 / 63,380 = 4 floors
Each floor has 4 flats
Therefore, no. of floors required : 2066 / 4 = 516.5
Each building has 4 floors
Hence, no. of buildings : 516.5 / 4 = 129 buildings
LOWER INCOME GROUP (LIG):
Total built up area : 32,930 sq.m.
Ground coverage : 23,768 sq.m.
Population belonging to LIG :
No. of dwelling units x 4.5 = (439) x 4.5 = 1975
Built up area excluding 20% area for common spaces :
32,930 - 6586 = 26,344 sq.m.
Built up area of one flat : 60 sq.m.
No. of flats : 26,344 / 60 = 439 flats
Ground coverage for LIG flats :
40% (Ground Coverage for LIG) = 40% of 23,768 sq.m. = 9507 sq.m.
Permissible no. of floors :
Total built up area for flats / Ground coverage = 32,930 / 9507 = 4 floors
Each floor has 6 flats
Therefore, no. of floors required : 439 / 6 = 73.16
Each building has 4 floors
Hence, no. of buildings : 73.16 / 4 = 18 buildings
ECONOMICALLY WEAKER SECTIONS (EWS):
Total built up area : 21,954 sq.m.
Ground coverage : 15,845 sq.m.
Population belonging to EWS :
No. of dwelling units x 4.5 = (439) x 4.5 = 1975
Built up area excluding 20% area for common spaces :
21,954 - 4391 = 17,563 sq.m.
Built up area of one flat : 40 sq.m.
No. of flats : 17,563 / 40 = 439 flats
Ground coverage for EWG flats :
40% (Ground Coverage for EWS) = 40% of 15,845 sq.m. = 6338 sq.m.
Permissible no. of floors :
Total built up area for flats / Ground coverage = 21,954 / 6338 = 4 floors
Each floor has 6 flats
Therefore, no. of floors required : 439 / 6 = 73.16
Each building has 4 floors
Hence, no. of buildings : 73.16 / 4 = 18 buildings
PUBLIC AND SEMI-PUBLIC (PSP) :
Multipurpose Community Hall
Amenities Count Total Area Required (Sq.m.)Area Required (Sq.m.)
Primary Schools
Senior Secondary Schools
Dispensary
Community Room
Religious Center
4
2
2
4
4
4000
18,000
900
2000
750
1600
16,000
36,000
1800
4000
3000
6400
74,400
COMMERCIAL :
Amenities Count Total Area Required (Sq.m.)Area Required (Sq.m.)
Convenience Shopping Centres
Local Area Shopping Centres
Banks
5
2
5
2000
5000
100
10,000
10,000
500
20,500
Pre-primary Schools / Nursery 800 9 7200
2
TABLE NO. 4 : AMENITIES PROVIDED IN PSP
TABLE NO. 5 : AMENITIES PROVIDED IN COMMERCIAL
KEY MAP
SCALE: 1:90000
Site location
8/12/16 8
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
8/12/16
Site Location
Key Map
Not to Scale
NEIGHBOURHOOD PLANNING : MASTER PLAN
Ichigo
JAPANESE GARDEN
COMMERCIAL
VEGETABLE MARKET
TOWN HALL
PRIMARY SCHOOL
DISPENSARY
TRAINING CENTRE
LOCALSHOPPINGCENTRE
URBAN
AGRICULTURE
LAND
U.A.
UTILITY
LAND
SPO
RTS
FIELD
VEGETABLE MARKET
SCHOOL
PRIMARY SCHOOL
COMMUNITY HALL
RELIGIOUS CENTRE
DISPENSARY
COMMERCIAL
E.S.R.
G.S.R.
STORM
W
ATER
TREATM
ENT
PLANT
CONVENIENT
SHOPPING
CENTRE
1:2500
SCALE :1:2500
RESIDENTIAL
OPEN SPACE
COMMERCIAL
PSP
SERVICES
AGRICULTURAL
LAND
LEGEND
TRANSPORTATION
50%
5%
20%
10%
9.4%
2%
3.6%
FIG. NO. 1 :
LAND USE DISTRIBUTION
Transportation
Residential
Agricultural
Open spaces
Public Semi-public
Commercial
Services
396,126
158,450
39,613
79,225
15,845
74,400
20,500
LAND USE AREA (SQ M)
TABLE NO. 1 :
LAND USE DISTRIBUTION
MASTER
PLAN
TOTAL SITE AREA : 792, 253.082 sq.m. 18 M
W
IDE
ROAD
TOWARDS LAVLE NANDED ROAD
ENTRANCE
12M
W
IDE
ROAD
9
M
W
IDE
ROAD
12
M
W
IDE
RO
AD
12
M
W
IDE
RO
AD
18 M WIDE ROAD
9 M WIDE ROAD
9
Sr no. Legend Dimensions
1) W1 1.6 m x 0.23 m
2) W2 0.7 m x 1.2 m
3) W3 0.8 m x 1.2 m
4) D1 1.2 m x 2 m
5) D2 1.0 m x 2 m
6) D3 0.8 x 2 m
7) D4 0.7 x 2 m
8) D5 2.1 x 2 m
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
W = Window , D = Door
ROW HOUSE PLAN :
STAIRCASE DESIGN
CALCULATIONS :
Height of step (Riser) : 0.15 m
Width of step (Tread) : 0.25 m
No. of stairs in staircase : 20
Floor height : 3 m
Table No. 1 :
Ichigo
KEY MAP
KITCHEN
(3.3 X 4 m)
DINING ROOM
(3.3 X 4.8 m)
BEDROOM
(4.5 X 3.65 m)
LIVING ROOM
(5.3 X 4 m)
W.C
(1.2 X 2.15 m)
FAMILY ROOM
(3.3 X 4.8 m)
CHILDREN'S
BEDROOM
(3.2 X 4.1 m)
DRY BALCONY
(1.25 X 2 m)
WASHROOM
(1.25 X 2 m)
MASTER
BEDROOM
(4.9 X 4.5 m)
W.C
(1.2 X 2.15 m)
PUJA ROOM
(4 X 2.2 m) GYM
(4 X 2.2 m)
WASHROOM
(1.2 X 2 m)
WASHROOM
(2.15 X 1.2 m)
BALCONY
(5.2 X 3.8 m)
BALCONY
(4.4 X 3.1 m)
UP
DOWN
ENTRANCE
GROUND FLOOR PLAN FIRST FLOOR PLAN
D1
D2
W1
W2
D3
D3
W1
W3
W1
W1
W2
D1
D4
D4
W2
W2
D4
D4
W1
W3
D2
D3
D5
W1
W1
W2
D4
D3
W1
Scale = 1: 40
8/12/16 1: 40
NEIGHBOURHOOD PLANNING : ROW HOUSE PLAN
Location of row houses
Scale 1 : 1330
UP
DOWN
DOWN
11
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
OL
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
NEIGHBOURHOOD PLANNING : UNIT DESIGN
Ichigo
DIMENSIONSSCHEDULE OF ITEMSSR.NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
LIVING ROOM 4.6 x 4.0
BALCONY 3.9 x 1.1
KITCHEN
DINING AREA
3.1 x 2.4
2.7 x 2.2
DRY BALCONY
BEDROOM 1
1.5 x 1.3
4.4 x 4.0
BEDROOM 2
4.2 x 3.5
WASHROOM 2
BEDROOM 3
WASHROOM 3
PLUMBING DUCT 1
1.9 x 1.8
4.2 x 3.5
1.8 x 1.5
3.9 x 0.8
PLUMBING DUCT 2 3.8 x 0.8
GARBAGE DUCT 2.4 x 0.5
LIFT CAR 2.0 x 1.5
STAIRCASE
WINDOW 1
3.8 x 3.1
3.1 x 2.0
WINDOW 2
WINDOW 3
WINDOW 4
1.8 x 1.2
0.7 x 0.6
1.2 x 0.8
DOOR 1
2.0 x 1.1
2.0 x 0.9
DOOR 2
DOOR 3
2.0 x 1.3
LEGEND
WASHROOM 1
1.9 x 1.8
GD
LC
SC
W1
W2
W3
W4
D1
D2
D3
PD 1
PD 2
W2
W3
W3
W2
W2
W3
W4
W1
D2
D2 D2
D2
D2
D3
D1
D3
LIVING ROOM(DINING) 5.7 x 4.0
3.5 X 3.5
4.0 X 3.0
3.3 X 2.8
4.0 X 3.0
2.3 X 1.6
1.5 X 1.2
1.5 X 1.4
2.7 X 1.5
3.8 X 0.6
4.3 X 0.6
2.0 X 2.0
4.2 X 3.0
3.3 X 1.0
1.7 X 0.5
2.0 X 1.0
2.0 X 0.7
2.2 X 2.0
1.5 X 1.2
0.7 X 0.7
DIMENSIONSSCHEDULE OF ITEMSSR.NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
KITCHEN
BEDROOM 1
BEDROOM 2
WASHROOM 2
BEDROOM 3
LIFT CAR
STAIRCASE
WINDOW 1
WINDOW 2
DOOR 1
DOOR 2
DOOR 3
LEGEND
WASHROOM 1
LC
SC
W1
W2
D1
D2
D3
PD
FOYER
BALCONY 1
BALCONY 2
BALCONY 3
PLUMBING DUCT
PRESSURIZATION DUCTPRD
FLOOR PLAN OF 3BHK
Scale: 1:110 Area: 120 sq.m.
Floor to floor height: 3.6 m.
No. of floors : 4
LIVING
ROOM
4.6 x 4.0
FLOOR PLAN OF 2.5 BHK DWELLING UNIT
SCALE: 1:130
FLOOR PLAN OF 2.5BHK
Scale: 1:190 Area: 100 sq.m.
Floor to floor height: 3.6 m.
No. of floors : 4
D1
D2
FLOOR PLAN OF 3 BHK DWELLING UNIT
SCALE: 1:80
BEDROOM 2
4.2 x 3.5
DINING AREA
2.7 x 2.2
BALCONY
2.7 x 1.5
BEDROOM 1
4.4 x 4.0
KITCHEN
3.1 x 2.4
W1
BALCONY
3.9 x 1.1
W1
W1
D1
W1
D2
W2
D1
D3
BED-
ROOM 2
4.0 x 3.0
W2
LIVING ROOM
(DINING)
5.7 x 4.0
BED-
ROOM 3
3.3 x 2.8
KITCHEN
3.5 x 3.5
BED-
ROOM 1
4.0 x 3.0
BALCONY
3.8 x 0.6
BALCONY
4.3 x 0.6
BEDROOM 3
4.2 x 3.5
D1
D1
3 BHK UNIT DESIGN
2.5 BHK UNIT DESIGN
SCALE: 1:1330
KEY MAP
LOCATION OF HIG HOUSING
LOCATION OF HMIG HOUSING
TABLE NO. 1
TABLE NO. 2
D1
8/12/16 12
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
2 BHK FLOOR DESIGN:
SCALE 1 : 100
Living room (L)
Master Bedroom (M)
Bedroom (B)
Kitchen (K)
Washroom (WR)
1)
2)
3)
4)
5)
Sr. No. Rooms Dimensions
Sr no. Legend Dimensions
1) W1 1.5 m x 1.2 m
2) W2 0.6 m x 1.2 m
3) D1 1 m x 2 m
4) D2 0.8 m x 2 m
5) D3 2 m x 2 m
6) B1 1 m x 3 m
7) PD 2.8 m x 2.5 m
3.7 x 4.2 m
1.5 x 2 m
5.2 x 4 m
4.2 x 4 m
4.6 x 4.2 m
8) B2 2.5 m x 1 m
TABLE NO. 3
TABLE NO. 4
STAIRCASE DESIGN CALCULATIONS:
Height of step (Riser) : 0.15 m
Width of step (Tread) : 0.25 m
No. of stairs in staircase : 20
Floor height : 3 m
Passage SCALE 1 : 40
SCALE 1 : 100
Ichigo
KEY MAP
Legend
NEIGHBOURHOOD PLANNING : UNIT DESIGN
Living room
(3.7 x 4.2)
Kitchen
(5.2 x 4)
Bedroom
(4.2 x 4)
MasterBedroom
(4.6x4.2)
Balcony
(3 x 1)
Dry Balcony
(2.5 x 1)
Balcony
(3 x 1)
8/12/16 13
Site Location
Scale 1 : 1330
D2
B1
1 BHK FLOOR DESIGN:
Living room (L)
Bedroom (B)
Kitchen (K)
Washroom (WR)
1)
2)
3)
4)
Sr. No. Rooms Dimensions
3.6 x 5.3 m
2.3 x 1.2 m
3.4 x 5.2 m
4.8 x 3.1 m
W1
D1
D2
W2
1)
2)
3)
4)
Sr. No. Legends Dimensions
1.2 x 1.2 m
0.6 x 1.2 m
0.8 x 2 m
1 x 2 m
5)
6)
B1
B2
1 x 2.5 m
4.5 x 1 m
W1
W1
D1
D1
D2
W2
Living room
(3.6 x 5.3)
(WR)
TABLE NO. 1
TABLE NO. 2
7) PD (Plumbing Duct) 2.2 x 1.4 m
PD
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
STAIRCASE DESIGN CALCULATIONS:
Height of step (Riser) : 0.15 m
Width of step (Tread) : 0.25 m
No. of stairs in staircase : 20
Floor height : 3 m
Passage
SCALE 1 : 115
SCALE 1 : 115
SCALE 1 : 35
Ichigo
UNIT FLOOR PLAN:
B2
W1
Legend
NEIGHBOURHOOD PLANNING : UNIT DESIGN
Kitchen
(3.4 x 5.2)
Bedroom
(4.8x3.1)
Balcony
(4.5x1)
8/12/16 14
KEY MAP
Site Location
Scale 1 : 1330
B
Sr no. Legends Rooms Dimensions
1) Living room (L) 3.4 x 4.7 m
2) Kitchen (K) 4.0 x 4.7 m
3) Washroom (WR) 1.2 x 2.0 m
W2
D1
D1
B2
B1PD
1
D1
D1
PD
2
W1
W1
W1
W1
D1
D1
W2
D2
D2
W2
D2
D2
W1
W1
D1
D1
B4
Sr no. Legend Dimensions
1) W1 0.6 m x 1.2 m
2) W2 1.2 m x 1.2 m
3) D1 0.6 m x 2 m
4) D2 0.8 m x 2 m
5) D3 0.9 m x 2 m
6) B 0.9 x 3.5 m
7) PD 0.8 x 2.5 m
W2
W2
D1
D1
B2
B1
PD
1
D1
D1
PD
2
W1
W1
W1
W1
D1
D1
W2
D2
D2
W2
D2
D2
W1
W1
D1
D1
B4
W2
WR
WR
WRWR
WR WR
WRWR
D2
PD
W1
WR
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
W2
W2
W2
W2 W2
W2
W2
W2
D2
B
D1 D1
D2
D2
D3 D3
D1
D1
D2
D1
D1
D2
B
B
B
B
PD
PD PD
W1 W1
W1
W1
W1
W1
K
WR
WR
WR
WR
W - Window , D - Door , B - Balcony , PD - Plumbing Duct
1 RK FLOOR DESIGN:
STAIRCASE DESIGN CALCULATIONS:
Height of step (Riser) : 0.15 m
Width of step (Tread) : 0.25 m
No. of stairs in staircase : 20
Floor height : 3 m
Passage
TABLE NO. 1
TABLE NO. 2
SCALE 1:80
SCALE 1 : 95
SCALE 1 : 25
Ichigo
UNIT FLOOR PLAN:
Living room
(3.4 x 4.7)
Kitchen
(4 x 4.7)
Balcony
(3.5 x 0.9)
8/12/16 15
KEY MAP
Site Location
Scale 1 : 1330
NEIGHBOURHOOD PLANNING : UNIT DESIGN
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29, 42
SIGN LOGO
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
NEIGHBOURHOOD PLANNING : ROW HOUSE
KEY MAP
Ichigo
SITE PLAN OF A ROW HOUSE LANDSCAPE PLAN OF A ROW HOUSE
1.5
0.23
2
2
2.5
30.5
1.15
4.73
12.5
20
Down
Down
Up
Up
Entrance
CURRY
LEAVES
CUCUMBER
CORIANDER
CABBAGE
GREEN
CHILLIES
TOMATO
1
2
Side View of the Swing
Stilt Parking Elevation
Size of Plot : 12.5 m x 20 m
PAVERS
LAWN
8/12/16 16
SCALE 1 : 50
Entrance
Location of row houses
Scale 1 : 1330
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
OL
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
T
R
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
NEIGHBOURHOOD PLANNING : SITE PLAN OF HIG
Ichigo
PARKING CALCULATIONS FOR PART A
No. of flats per building : 16
Parking demand per building : 32
Parking demand for part A : 96
Adding 10% for visitors' parking,
total parking demand : 106
Size of a parking bay : 5.0 m x 2.5 m
No. of bays in stilts of one building : 23
Total no. of parking bays : 69
Hence, no. of bays in surface parking : 106-69 = 37
PARKING CALCULATIONS FOR PART B
No. of flats per building : 16
Parking demand per building : 32
Parking demand for part B : 32 x 9 = 288
Adding 10% for visitors' parking, total parking demand : 317
Size of a parking bay : 5.0 m x 2.5 m
No. of bays in stilts of one building : 23
Hence, no. of bays in surface parking : 317 - (23 x 9) = 110
Surface parking cannot accommodate 110 bays.
Therefore, basement parking is provided.
Area of basement parking : 12,264 sq.m.
No. of parking bays in the basement : 12, 264 / 35 = 350
19.3861
14.2721
14.5050
7.0201
7.1011
17.0697
14.8333
16.0361
15.2077
7.0211
6.2468
7.3915
7.7647
7.6117
9.6075
22.2826
8.4128
1.015
1.1074
7.8402
12.0647
12.8518
9.1311 11.6441
8.3066
9 m. wide road
12
m
. wide
road
6 m. wide road
PLAN AND ELEVATION OF STILT PARKING
ELEVATION OF BASEMENT PARKING
SITE PLAN OF
HIGHER INCOME GROUP HOUSING
SCALE: 1:500
ALL DIMENSIONS ARE IN METRES
SCALE: 1:310
SCALE: 1:200
3.6 M
3.6 M
SCALE: 1:1330
KEY MAP
LOCATION OF HIG HOUSING
SOURCE: IRC STANDARDS FOR PARKING
8/12/16 17
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
NEIGHBOURHOOD PLANNING: LANDSCAPE PLAN (HIG)
Ichigo
LANDSCAPE PLAN FOR HIGHER INCOME GROUP HOUSING
LANDSCAPE PLAN FOR HIGHER INCOME
GROUP HOUSING
SCALE: 1:1330
KEY MAP
LOCATION OF HIG HOUSING
ELEVATION OF SWING-SLIDE SET
DOG PARK
ELEVATION OF
SUNBATHING CHAIR
SKATING PARK
9 M. WIDE ROAD
6 M. WIDE ROAD
12
M
.W
ID
E
R
O
AD
CYCLING
TRACK
ENTRANCE TO
BASEMENT
ELEVATION OF
PERGOLA & SEATING AREA
CLUB
HOUSE
GREEN
HOUSE
ELEVATION OF FOUNTAIN
8/12/16 18
SCALE: 1:420
INDEX
Gulmohar tree
Neem tree
Arjun tree
Coconut tree
Green ash tree
Periwinkle shrub
Rose shrub
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
E
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
O
U
L
L
E
G
C
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R T H
E
N
AR
UDNE
A6
A1
A
A3
A5
B4
B1
B6
A4
B3
B2
B5
C2
C1
C3
SCALE 1:350
PARKING CALCULATIONS :
1. Requirements of one dwelling unit or flat : 1 car and 1
two-wheeler
2. Total dwelling in units in study sector : 32 x 15 = 480 dwelling units
3. Total parking requirement (In terms of no. of cars ) : 480 x 1 +
480 x 0.5 = 720
4. Providing 10% for visitors parking = 720 x 10
100=72
5. Total car parking requirement = 800
Parking Management :
Stilt parking :
a.15 cars in one building footprint
b. Total cars in Stilt parking : 225
Underground Parking:
c. Remaining cars 800 - 225 = 575 cars
d. Area required for 575 cars in underground parking = 575 x 35 =
20125 sq.m
e. Setback for underground parking area = 3 m
f. Area availabale after setback for parking = 23100sq.m
g. Ramp Design : 1:10 gradient ( 3m floor height )
Runway required : 30 m
0 1700 3400 8500
Scale:
Scale:
5100 6800
Elevation AB
Ichigo
BUILDING SETBACK
Building Type Setback
A3-A4 and B1-B2 8.75 M
A4-A5 and B5-B6 7 M
C1-C2-C3 9 M
Not to the Scale
B
D
Scale: 1:400
C 18
m
W
ide
road
12m
W
ideroad
12m
W
ideroad
ENTRY
Elevation CD
EXIT FROM BASEMENT PARKING
30 M
Scale: 1:100
Section of Ramp: (EF)
RAMP
RAMP
DOW
N
UP
E
F
Basement Level
(Underground Parking)
Ground Level
NEIGHBOURHOOD PLANNING : SITE PLAN (HMIG)
Towards
Japanese
garden
10m
6m
SITE PLAN FOR
HIGHER MIDDLE
INCOME GROUP
Ground Level
Basement Level
(Underground Parking)
Basement parking area
SCALE: 1:1330
KEY MAP
LOCATION OF HMIG HOUSING
Setback boundary of
parking area
8/12/16 19
RAMP
PLANTING DETAILS
SR.
NO.
NAME BOTANICAL NAME HEIGHT CANOPY SPACING NATURE
1 Ashoka Polyalthia longifolia 9 - 10 m 0.8 - 0.9 m 0.7m Evergreen
2 Rose Rosa 0.5 - 1 m 0.5 - 1 m Continuos Ornamental
3 Arjun Temilania arjuna 25- 30 m 2 - 3 m Patches Ornamental
4 Periwinkle Contarantus 1 - 2 m 0.5 - 1 m Continuos Ornamental
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
LEGEND
Ashoka
Rose
Arjuna
Periwinkle
Gulmohor
MATERIALS
1 Paver Blocks
2 Brick stone welches
3 Wooden Garden Benches
Ichigo
RAMP
R1.8
5
1.0
0
1.4
5
1.4
5
1.0
0
1.0
0
1.4
5
0.7
0
1.4
5
1.0
0
R4
.08
ENTRY
EXIT
ENTRY
Structural Design of Fountain:
Structural Design of Interior Garden:
Garden Area: 650
sq.m.
Central Fountain: 15
sq.m.
Each Large
Quadrant Area: 130
sq.m.
Each Smaller
Quadrant Area: 30
sq.m.
Central pathway
Width: 2 m
Secondary pathway
width: 1 m
Structural Design of Playground:
Playground Playground Area:
1500 sq.m.
0 3000 6000 15000
Scale:
Scale:
9000 12000
SCALE: 1:350
There are fountains of
three hierarchy, 90sq.m,
50sq.m and 15 sq.m.
LANDSCAPE PLAN
FOR HIGHER MIDDLE
INCOME GROUP
18
m
W
ide
road
12
m
W
ide
Road
Towards Main
gate of township
12
m
W
ide
Road
Tow
ards
japanese
garden
NEIGHBOURHOOD PLANNING : LANDSCAPE FOR HMIG
SCALE: 1:1330
KEY MAP
LOCATION OF HMIG HOUSING
8/12/16 20
SCALE: 1:200
ELEVATION OF FOUNTAIN
ENTRANCE
EN
TR
AN
CE
EN
TR
AN
CE
EN
TR
AN
CE
ENTRANCE
EN
TR
AN
CE
EN
TR
AN
CE
EN
TR
AN
CE
EN
TR
AN
CE
VEGETATION
Vegetation
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENI
GNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
1
3.0
5.5
6
3.8
24
0.8
4
6.2 5.5
65
28
16
5.9
5
11
8
12
15.6
7.5
7.7
6.7
2.3
4.4
4
6
7.4
12.96
32
5.8
ENTRANCE
GARDEN
Children play area
Sitting
park
8
7.73
6
6
5.54
6.1
5.4
2.7
PARKING CALCULATION
Consider 1 car for 1 dwelling unit of MIG.
4 flats on 1 floor and 4 floors in 1 building.
Total no. of buildings = 10
Therefore, total no. of dwelling units = 160.
No. of cars = 160.
10% visitors parking for residential = 10
100*160 = 16 cars.
Total no. of cars = 160 + 16 = 176 cars.
Therefore, 176 cars is the parking demand for the site.
For stilt parking, the parking bay is 2.5 x 5.
18 bays on the ground floor of 1 building.
Thus, total no. of bays = 18 x 10 = 180.
By norms, parking calculation according to built up area .
Built up area = 13600 m2.
ECS = 100 M2 and FSI = 1.
the total parking demand = 13600* 1
100 = 136.
10 % visitors parking = 10
100 * 136 = 13.6.
the total parking demand is 136 + 14 = 150 cars.
4 m wide road
12 m
wide road
6 m wide road
3
Baby pool
Swimming
pool
Security
room
ELEVATION OF STILT PARKING
SITE PLAN FOR MIG
Ichigo
NEIGHBOURHOOD PLANNING : SITE PLAN
SCALE : 1 : 500
ALL DIMENSIONS ARE IN METERS
Site Location
KEY MAP
EN
TR
AN
CE
Scale 1 : 90000
Source : IRC Standards for Parking Area
Entrance
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29, 42
SIGN LOGO
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENI
GNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
NEIGHBOURHOOD PLANNING : MIG LANDSCAPE PLAN
KEY MAP
Ichigo
INDEX
Gulmohar tree
Neem tree
Periwinkle
Coconut tree
Palm tree
3 m
Security
room
Garden
Children play area
Sitting park
4 m wide road
12 m
wide road
6 m wide road
Baby pool
Swimming
pool
Fountain
13,44
17,28
Elevation of Dino climber
Elevation of sitting place
Elevation of slider
Elevation of swing
Top view of swing
LANDSCAPE PLAN :
MIDDLE INCOME
GROUP
Ornamental tree
Ashoka tree
Ornamental tree
Bushes
Sitting place
1 m buffer
3 m buffer
E.
ED
D.
C.
B.
A.
A
B
C
B.
Entrance
SCALE : 1 : 500
Scale : 1 :1330
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29, 42
SIGN LOGO
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENI
GNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
8/12/16
NEIGHBOURHOOD PLANNING : LIG LANDSCAPING
KEY MAP
Ichigo
INDEX
Gulmohar tree
Shrubs
Rose
Palm tree
Neem tree
Pavers
135,41
134,78
16,44
76,26
Plan of a large swing
Side elevation of a large swing
Front elevation of a large
swing Side elevation of a short swing
104,63
117,76
Front elevation of a swing
70,67
C.
Entrance
LANDSCAPE PLAN : LOW INCOME
GROUP HOUSING
A
B
C
B. A.
Seating
spaces
65
Scale = 1: 270
1:270
Scale = 1: 1330
24
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29, 42
SIGN LOGO
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
E
NIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
ARUDNE
8/12/16
NEIGHBOURHOOD PLANNING :JAPANESE GARDEN
Ichigo
PLANTS USED IN
PARKING
SYMBOL NAME OF PLANT
GREEN ASH TREE
ZELKOVA
PLANTS USED IN
ORNAMENTAL TREE
FOREST
SYMBOL NAME OF PLANT
RING CUPED OAK
MOCHINOKI
PLANTS USED IN
SAHIO-JI GARDEN
SYMBOL NAME OF PLANT
UBAMEGASHI
PINE
PLANTS USED AS
BUFFER
SYMBOL NAME OF PLANT
CYPTOMERA
DEODAR CEDAR
SOURCE: ACCORDING TO NHB
REPORT THESE TREES GROW
ON SITE. CLIMATE AND SOIL
REPORT FROM FAO
18 M
W
IDE
ROAD
12
M
W
ID
E
R
O
AD
18
M
W
IDE
ROAD
12
M
W
IDE
RO
AD
The area of garden = 10 acres.
Total cost of garden = 6 crore.
Total water requirement = minimum
3000 lit. per day ( as per water audit
of Chandigarh Japanese garden
Sector 31).
Maintenance cost = 1.2 crore per
year.
Maintenance cost is gained from the
entry fees and the members of garden
committee which are residents of the
township.View pointStone Lantern
Rock Garden
Entrance gate
Bridge on lake
Ornamental tree
garden
Meditation areaHill as natural element
Sahiho - Ji
garden
Parking
area
Security
room
Flower
garden
Bonsai and
showcase
garden
Elements of Traditional Japanese Garden
1. Water.
2. Rocks and sand.
3. Garden bridges.
4. Stone lanterns and water basins.
5. Garden fences, gates, and devices.
6. Trees and flowers.
7. Fish.
Location of Garden
Entrance
JAPANESE GARDEN
Scale: 1:1330
1:660
645
GARDEN
JAPANESE GARDEN
COMMERCIAL
VEGETABLE MARKET
SCHOOL
PRIMARY SCHOOL
DISPENSARY
TOWN HALL
TRAINING CENTRE
LOCALSHOPPINGCENTRE
URBAN
AGRICULTURE
LAND
SPO
RTS
FIELD
VEGETABLE MARKET
SCHOOL
PRIMARY SCHOOL
COMMUNITY HALL
DISPENSARY
COMMERCIAL
SERVICES
640
640
645
645
650
645650
645
645
655
650
640
645
645
650
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
Ichigo
URBAN AGRICULTURE
LANDSCAPE ...
NEIGHBOURHOOD PLANNING : URBAN AGRICULTURE
HORTICULTURE LANDSCAPE
KEY MAP 1
KEY MAP 2
SCALE 1:1330
SCALE 1:1330
LEGEND
ANIMAL
SHED
Neem tree
Grape Vineyard
8/12/16 27
Vermicompost
Strawberry
Marigold
Scale = 1 : 500
Scale = 1 : 650
VERMICOMPOST
AND ANIMAL SHED
Seating Space
Grape Vineyard
Strawberry garden
Grape Vineyard
Marigold
garden
Bilke Area
Strawberry garden
PLAN OF GAZEBO
Fountain
Seatings
Strawberry pathway
9 M
9 M
Store
Room (SR)
(SR)
(SR)
(SR)
N
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENI
GNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
Uses
Per Capita
Requirement
Residential 135 lit.
Public spaces 45 lit.
Fire demand 20 lit
Loss demand 25 lit.
80% of water supply = sewer produced = 4050000 lit.
Total sewerage produced in township in a day = 405000 lit.
Total sewerage produced in township in a month = 121500000 lit.
Total sewerage produced in township in a year = 1458000000 lit.
500 mm from mainline
running along.
250 mm from main
line to collector road.
150 mm from collector
to local road.
NEIGHBOURHOOD PLANNING: INFRASTRUCTURE
KEY MAP
Ichigo
SEWERAGE SYSTEM CALCULATIONS
Water tank
Services
E.S.R.
G.S.R.
WATER SUPPLY CALCULATIONS
Water requirement of a person per day = 225 lit.
Water requirement of a person for a year = 82125
lit.
Water requirement of township = 82125 x 222500 =
1847812500 lit.
According to Special Township Scheme, water
reservoir should be 1.5 times of requirement .
Water reservoir capacity = 2771718750 lit.
1 lit. = 0.0001 m3.
Water reservoir capacity = 2771718.750 m3.
According to URDPFI, water treatment plant of
2771718.750 m3 capacity requires 0.8 hectare.
Sewerage System based on
hierarchy of sewer lines.
ESR CALCULATIONS
Population = 22500
per capacity water demand = 225 lpcd.
per day water requirement = 22500 x 225 lpcd
= 5062500 litre is the water requirement of the day.
The ESR should have 100% capacity of 1 day demand.
Capacity of ESR = 5062500 lit. = 5062.5000 cu.m.
The depth of ESR is 7m.
Required areavof reservoir is 5062.500/7 = 723.2 sq.m..
The ESR is of circular shape.
Interval radius of ESR = (723.2/3.142)^1
2 = 15.17.
Therefore. the diameter of ESR is 30 m .
Township requires 2 such ESR.
1 M0.6 M
SECTION OF 12 M ROAD
WATER SUPPLY LINE
SEWER
LINE
PIPE CONTAINING
ELECTRIC WIRES
Bharegaon
Substation
Water supply line
Sewer line
Electric supply line
Storm water supply line
12 m wide road
Water System based on
hierarchy of sewer lines.
From Mulshi Dam
500 mm dia sewer line
250 mm dia sewer line
100 mm dia sewer line
Mig sector
WATER, SEWER AND
ELECTRIC WATER SYSTEM
Scale 1 : 90000
Site Location
Source : Maharashtra Water Supply and Sewerage Board
Water source located at a distance of
17 kms from the site
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
S
R
COLLEGE OF ENGINEERING, PUNE
G
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
N
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENI
GNE
NG
T
E
N
T H
T R U T H
E
C
N
AR
UDE
Ichigo
KEY MAP
LEGENDS
Site Boundary
Drainage Line
Contour Lines
Rainwater Harvesting
Plant
A Detailing Sector
(A) TOTAL AREA: 112159.5 sq.m.
Diameter of drainage line = ( nQ/As^1
2 )^3
2
A
SECTOR "A" :
DRAINAGE LINE DESIGNED NETWORK:
DRAINAGE SYSTEM
CALCULATIONS
TYPE FLOOR AREA NO. OF BUILDINGS
HIG 250 and 43 30 and 129 res.
HMIG 429.0800 82
MIG 370.5400 129
LIG 536.72 and 423.24 10 and 8 res.
EWS 410.5000 18
RAINWATER HARVESTING
CALCULATIONS :
TOTAL RAINWATER COLLECTION:
By using rational formula for
calculation:
Q = CiA
where,
Q = Run off,
C = Run off coefficient
i = Intensity of Rainfall
A = Area
Taking C value as 0.8 for the road.
Hence total rainwater = 08 x 2.841
x 112149.5 = 254916.100 cubic.m.
SCALE: 1:4000
(mm)
SCALE: 1:2100
(mm)
RAINWATER HARVESTING PLANT
DETAILS:
AREA REQUIRED FOR PLANT: (URDPFI)
DRAINAGE SYSTEM (ROAD HIERARCHY BASED)
Road Width Drainage Line Drainage Line Hierarchy
18m Both Side 500 mm
12m Both Side 250 mm
6m or insite One side 150 mm
According to URDPFI guideline area of rainwater harvesting plant for 0.25
million of "Q" is = 0.1 Ha. (1000 sq.m)
DRAINAGE LINE
SCALE: 1:120
(mm)
where. s =slope gradient, A=Area, Q=Capacity, n=Manning's coefficient
Site Location Scale: 1:90000
Very Flat
Steep
Flat
Very Steep
5 - 10 % Slope
10 - 25 % Slope
> 25 % Slope
2 - 5 % Slope
(250 mm diameter)
12 m
Demand and supp;y
analysis:
Daily 60000
litres of water is required
for landscaping purpose of
various gardens etc. and
our harvested water
satisfies need for
landscaping for more than
2 years. And hence
remaining water in a year
we use for other purposes
like Urban agriculture.
.
Source: URDPFI
guidelines
Source:Council Of
Architecture
Quantity of Materials
1. Brickwork :
Quantity of brickwork = 29.6093 cu. m
No. of bricks are 500/cu. m
Total no. of bricks = 29.6093 x 500 = 14805
Quantity of mortar = 30% of brickwork = 0.3 x 29.6093
= 8.8828 cu. m
Ratio of cement mortar = 1:6
Quantity of cement = 8.8828 / 7 = 1.269 cu. m
Quantity of cement in a cement bag = 0.035 cu. m
Total no. of cement bags = 1.269 / 0.035 = 37
Total quantity of sand = 6 x quantity of cement
= 6 x 1.269 = 7.614 cu. m
2. Plastering :
Quantity of plastering = 360.9886 sq. m
Dry cement mortar for 1 sq. m plastering = 0.02 cu. m
Total dry mortar required = 0.02 x quantity of plastering
= 0.02 x 360.9886 = 7.22 cu. m
Ratio of cement mortar = 1:5
Quantity of cement = 7.22 / 6 = 1.2033 cu. m
Quantity of cement in a cement bag = 0.035 cu. m
Total no. of cement bags = 1.2033 / 0.035 = 35
Total quantity of sand = 5 x quantity of cement
= 5 x 1.2033 = 6.0165 cu. m
3. Tiling :
Total area of tiling = 134.3089 sq. m
Thickness of lime mortar bed = 0.01 m
Volume of lime mortar bed = area of tiling x thickness
= 134.3089 x 0.01 = 1.34309 cu.m
Volume of dry lime mortar = 1.5 x volume of lime mortar bed
= 1.5 x 1.34309 = 2.0146 cu. m
Ratio of lime mortar = 1:2
Total quantity of lime = quantity of lime mortar / 3
= 2.0146 / 3 = 0.67153 cu. m
Total quantity of sand = quantity of lime x 2
= 0.67153 x 2 = 1.3431 cu. m
1 cement bag fills the joints in an area of 25 sq. m tiling.
Total no. of white cement bags = area of tiling / 25
= 134.3089 / 25 = 6 bags
Area of floor tiling = 84.8051 sq. m
Size of floor tiles = 0.6 x 0.6 = 0.36 sq. m
No. of floor tiles required = floor tiling area / tile size
= 84.8051 / 0.36 = 236
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29, 42
COSTING SHEET - 1 (Sample)
SIGN LOGO
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENI
GNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
Ichigo 308/12/16
Quantity of materials contd.
Area of kitchen dado = 11.7038 sq. m Size of kitchen dado tiles = 0.3 x 0.3 = 0.09 sq. m
No. of dado tiles required = area of dado / tile size = 11.7038 / 0.09 = 131
Area of washroom tiling = 37.8 sq. m Size of washroom tiles = 0.25 x 0.25 = 0.0625 sq. m
No. of washroom tiles required = tiling area / tile size = 37.8 / 0.0625 = 605
4. R.C.C. work :
Quantity of R.C.C. work = 914.7055 cu. m Ratio of cement mortar = 1:2:4
Quantity of cement = 0.22 cu. m / cu. m volume of R.C.C. = 0.22 x 914.7055 = 201.2352 cu. m
Quantity of cement in a cement bag = 0.035 cu. m
Total no. of cement bags = 201.2352 / 0.035 = 5750
Total quantity of sand = 2 x quantity of cement = 2 x 201.2352 = 402.4704 cu. m
Total quantity of aggregates = 4 x quantity of cement = 4 x 201.2352 = 804.9408 cu. m
Quantity of steel = 1% of volume of R.C.C. = 0.01 x 914.7055 = 9.147055 cu. m
1 cu. m of steel = 78.5 quintals
Quantity of steel = 78.5 x 9.147055 = 718.0438 quintals
Infrastructure costing :
a. Primary pipes - DI Pipe k7 type, 250 mm : Rs. 2543 / meter
b. Secondary pipes - PN8 (8kg / sq. cm), 150 mm : Rs. 907 / meter
c. Tertiary pipes - PN8, 50 mm : Rs. 907 / meter
TOTAL COST = Rs. 15,00,000
d. Cost of ESR + GSR + Water treatment plant + Electricity = Rs. 4,00,00,000
e. Cost of Storm water treatment plant = Rs. 25,00,000
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29, 42
COSTING SHEET - 2
SIGN LOGO
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENI
GNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
Ichigo 318/12/16
G.S.R.
PHASE INDEX
Colour Phase
0
1
2
3
4
HIG
HMIG
HMIG
HMIG
HMIG
HIG
MIG
MIG
JAPANESE
GARDEN
School
Town hall
LIG
and
EW
S
UrbanAgriculture
E.S.R.
S.T.P.
HIG
HIG
MIG
School
Religious Centre
Community Hall
Dispensary
Market
Dispensary
Commercial
Urban
Agriculture
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
Site Location Scale: 1:90000
KEY MAP
PHASE PLAN:
NEIGHBOURHOOD PLANNING : PHASE PLAN
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29, 42
COSTING SHEET - 4
SIGN LOGO
C
O
L
L
E
G
E
OF
P O O N A
I
R
E
ENI
GNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
Ichigo
Phasing : Compound increase of cost in gradual phase.
Description of investment :
Phase 0 investment : Rs. 1,79,92,70,990
Phase I : Recovery of investment
Interest of investment for 2 years 3 months : Rs. 42,50,77,771 + investment
But still the loan is : Rs. 1,11,70,48,761 + 14 crore of interest of loan taken in phase I.
(2 years interest)
Phase II : Total profit gained is : Rs. 4,71,70,15,200
But on deducing the remaining loan and interest, net profit is : Rs. 2,21,66,97,775 in phase II.
Phase III: Amount available : Rs. 2,21,66,97,775
Loan taken for construction : Rs. 17,15,26,065
Interest paid : Rs. 5,40,30,710
Net profit at the end of phase III : Rs. 8,24,54,34,920
Considerations of Inflation and Profit :
1. Inflation is considered 8% and its cost is
hence added accordingly to each development.
2. As the surrounding development largely
impacts the cost of a particular place, there is
a regular increase in the cost of a building.
3. Each phase of development experiences an
increase in the cost.
4. Profit is also increased at a continuous but
gradual rate in all the phases of development.
338/12/16
COLLEGE OF ENGINEERING, PUNE
S. Y. B. TECH. PLANNING
DATE SCALE SHEET. NO.SUB. NO.
MIS NO: 111514003, 04, 06, 08, 29,42
SIGN LOGONORTH
N
C
OL
L
E
G
E
OF
P O O N A
I
R
E
ENIGNE
NG
S
TR
E
N
G
T H
T R U T H
E
C
N
AR
UDNE
NEIGHBOURHOOD PLANNING : MODEL
Ichigo
SCALE: 1:1330
KEY MAP
LOCATION OF HIG HOUSING
8/12/16 34
MODEL OF HIG SECTOR
LAKE VIEW APARTMENTS
ICHIGO TOWNSHIP
PHASE 3

More Related Content

What's hot

Urban conservation
Urban conservationUrban conservation
Urban conservationsada006
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentShruthi Kshirasagar
 
Gandhinagar town planning and master plan study
Gandhinagar town planning and master plan studyGandhinagar town planning and master plan study
Gandhinagar town planning and master plan studyAnoushka Tyagi
 
National Urban Housing and Habitat Policy-2007
National  Urban Housing and Habitat Policy-2007National  Urban Housing and Habitat Policy-2007
National Urban Housing and Habitat Policy-2007JIT KUMAR GUPTA
 
CLARENCE STEIN
CLARENCE STEINCLARENCE STEIN
CLARENCE STEINYamini K
 
GARDEN CITY(garden city concept)
GARDEN CITY(garden city concept)GARDEN CITY(garden city concept)
GARDEN CITY(garden city concept)ARCHITECTURE SCHOOL
 
Structural plan for bangalore
Structural plan for bangaloreStructural plan for bangalore
Structural plan for bangalorevidhya monisha
 
Le corbusiers planning concepts
Le corbusiers planning conceptsLe corbusiers planning concepts
Le corbusiers planning conceptsctlachu
 
Elements of city plan 3 unit
Elements of city plan 3 unitElements of city plan 3 unit
Elements of city plan 3 unitSumanta Das
 
Determinants or Urban Form urban morphology
Determinants or Urban Form urban morphologyDeterminants or Urban Form urban morphology
Determinants or Urban Form urban morphologySomesh Siddharth
 

What's hot (20)

Housing gr
Housing grHousing gr
Housing gr
 
Urban conservation
Urban conservationUrban conservation
Urban conservation
 
Garden city
Garden city Garden city
Garden city
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented Development
 
Neighborhood
NeighborhoodNeighborhood
Neighborhood
 
Udpfistandards
UdpfistandardsUdpfistandards
Udpfistandards
 
Gandhinagar town planning and master plan study
Gandhinagar town planning and master plan studyGandhinagar town planning and master plan study
Gandhinagar town planning and master plan study
 
National Urban Housing and Habitat Policy-2007
National  Urban Housing and Habitat Policy-2007National  Urban Housing and Habitat Policy-2007
National Urban Housing and Habitat Policy-2007
 
CLARENCE STEIN
CLARENCE STEINCLARENCE STEIN
CLARENCE STEIN
 
GARDEN CITY(garden city concept)
GARDEN CITY(garden city concept)GARDEN CITY(garden city concept)
GARDEN CITY(garden city concept)
 
Structural plan for bangalore
Structural plan for bangaloreStructural plan for bangalore
Structural plan for bangalore
 
Neighborhood concepts
Neighborhood conceptsNeighborhood concepts
Neighborhood concepts
 
Ud ppt
Ud pptUd ppt
Ud ppt
 
Radburn City
Radburn CityRadburn City
Radburn City
 
Image of city
Image of cityImage of city
Image of city
 
Le corbusiers planning concepts
Le corbusiers planning conceptsLe corbusiers planning concepts
Le corbusiers planning concepts
 
Elements of city plan 3 unit
Elements of city plan 3 unitElements of city plan 3 unit
Elements of city plan 3 unit
 
Neighborhood planning
Neighborhood planningNeighborhood planning
Neighborhood planning
 
Determinants or Urban Form urban morphology
Determinants or Urban Form urban morphologyDeterminants or Urban Form urban morphology
Determinants or Urban Form urban morphology
 
Radburn
RadburnRadburn
Radburn
 

Similar to Neighbourhood planning

IRJET- Water-Logging and Ground Water Recharge
IRJET- Water-Logging and Ground Water RechargeIRJET- Water-Logging and Ground Water Recharge
IRJET- Water-Logging and Ground Water RechargeIRJET Journal
 
NESTLE ABAJI EIA PRESENTATION
NESTLE  ABAJI  EIA  PRESENTATIONNESTLE  ABAJI  EIA  PRESENTATION
NESTLE ABAJI EIA PRESENTATIONAdewunmi Okumodi
 
EVALUATION OF ENVIRONMENTAL IMPACT ASSESSMENT ON INDUSTRIAL PROJECTS: A MODEL...
EVALUATION OF ENVIRONMENTAL IMPACT ASSESSMENT ON INDUSTRIAL PROJECTS: A MODEL...EVALUATION OF ENVIRONMENTAL IMPACT ASSESSMENT ON INDUSTRIAL PROJECTS: A MODEL...
EVALUATION OF ENVIRONMENTAL IMPACT ASSESSMENT ON INDUSTRIAL PROJECTS: A MODEL...IAEME Publication
 
Design Presentation of Unity Mall at Bhubaneswar
Design Presentation of Unity Mall at BhubaneswarDesign Presentation of Unity Mall at Bhubaneswar
Design Presentation of Unity Mall at Bhubaneswaralwayslogo
 
Co working office spaces
Co working office spacesCo working office spaces
Co working office spacesSiddiq Salim
 
Opportunities for Energy Conservation in Residential Buildings of Bhopal: A C...
Opportunities for Energy Conservation in Residential Buildings of Bhopal: A C...Opportunities for Energy Conservation in Residential Buildings of Bhopal: A C...
Opportunities for Energy Conservation in Residential Buildings of Bhopal: A C...Pratish Rawat
 
LAND-USE/ LAND-COVER CLASSIFICATION USING GIS AND REMOTE SENSING- PUNE CITY
LAND-USE/ LAND-COVER CLASSIFICATION USING GIS AND REMOTE SENSING- PUNE CITYLAND-USE/ LAND-COVER CLASSIFICATION USING GIS AND REMOTE SENSING- PUNE CITY
LAND-USE/ LAND-COVER CLASSIFICATION USING GIS AND REMOTE SENSING- PUNE CITYNeha Bansal
 
Signature Global City 37D-2 Sector 37D Gurgaon
Signature Global City 37D-2 Sector 37D GurgaonSignature Global City 37D-2 Sector 37D Gurgaon
Signature Global City 37D-2 Sector 37D GurgaonOrion Realtors
 
Architectural Portfolio - Madarati
Architectural Portfolio - MadaratiArchitectural Portfolio - Madarati
Architectural Portfolio - MadaratiAbdulhamid Madarati
 
SUSTANAILBE HOSTEL DESIGN
SUSTANAILBE HOSTEL DESIGN SUSTANAILBE HOSTEL DESIGN
SUSTANAILBE HOSTEL DESIGN omyAJain
 
ASPEK GEOLOGI DAERAH CALON IBUKOTA NEGARA UNMUL 29 APRIL 2021.pptx
ASPEK GEOLOGI DAERAH CALON IBUKOTA NEGARA UNMUL 29 APRIL 2021.pptxASPEK GEOLOGI DAERAH CALON IBUKOTA NEGARA UNMUL 29 APRIL 2021.pptx
ASPEK GEOLOGI DAERAH CALON IBUKOTA NEGARA UNMUL 29 APRIL 2021.pptxMukhtar Lutfie
 
Estimation of surface runoff in nallur amanikere
Estimation of surface runoff in nallur amanikereEstimation of surface runoff in nallur amanikere
Estimation of surface runoff in nallur amanikereeSAT Publishing House
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodeSAT Journals
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodeSAT Journals
 
IRJET- Identification of Groundwater Potential Zones at AMPRS, Odakkali using...
IRJET- Identification of Groundwater Potential Zones at AMPRS, Odakkali using...IRJET- Identification of Groundwater Potential Zones at AMPRS, Odakkali using...
IRJET- Identification of Groundwater Potential Zones at AMPRS, Odakkali using...IRJET Journal
 

Similar to Neighbourhood planning (20)

IRJET- Water-Logging and Ground Water Recharge
IRJET- Water-Logging and Ground Water RechargeIRJET- Water-Logging and Ground Water Recharge
IRJET- Water-Logging and Ground Water Recharge
 
NESTLE ABAJI EIA PRESENTATION
NESTLE  ABAJI  EIA  PRESENTATIONNESTLE  ABAJI  EIA  PRESENTATION
NESTLE ABAJI EIA PRESENTATION
 
EVALUATION OF ENVIRONMENTAL IMPACT ASSESSMENT ON INDUSTRIAL PROJECTS: A MODEL...
EVALUATION OF ENVIRONMENTAL IMPACT ASSESSMENT ON INDUSTRIAL PROJECTS: A MODEL...EVALUATION OF ENVIRONMENTAL IMPACT ASSESSMENT ON INDUSTRIAL PROJECTS: A MODEL...
EVALUATION OF ENVIRONMENTAL IMPACT ASSESSMENT ON INDUSTRIAL PROJECTS: A MODEL...
 
Design Presentation of Unity Mall at Bhubaneswar
Design Presentation of Unity Mall at BhubaneswarDesign Presentation of Unity Mall at Bhubaneswar
Design Presentation of Unity Mall at Bhubaneswar
 
famsey
famseyfamsey
famsey
 
Co working office spaces
Co working office spacesCo working office spaces
Co working office spaces
 
[IJET-V1I4P4] Authors :Pradeep S P, Vinay A
[IJET-V1I4P4] Authors :Pradeep S P, Vinay A[IJET-V1I4P4] Authors :Pradeep S P, Vinay A
[IJET-V1I4P4] Authors :Pradeep S P, Vinay A
 
Opportunities for Energy Conservation in Residential Buildings of Bhopal: A C...
Opportunities for Energy Conservation in Residential Buildings of Bhopal: A C...Opportunities for Energy Conservation in Residential Buildings of Bhopal: A C...
Opportunities for Energy Conservation in Residential Buildings of Bhopal: A C...
 
LAND-USE/ LAND-COVER CLASSIFICATION USING GIS AND REMOTE SENSING- PUNE CITY
LAND-USE/ LAND-COVER CLASSIFICATION USING GIS AND REMOTE SENSING- PUNE CITYLAND-USE/ LAND-COVER CLASSIFICATION USING GIS AND REMOTE SENSING- PUNE CITY
LAND-USE/ LAND-COVER CLASSIFICATION USING GIS AND REMOTE SENSING- PUNE CITY
 
Signature Global City 37D-2 Sector 37D Gurgaon
Signature Global City 37D-2 Sector 37D GurgaonSignature Global City 37D-2 Sector 37D Gurgaon
Signature Global City 37D-2 Sector 37D Gurgaon
 
Architectural Portfolio - Madarati
Architectural Portfolio - MadaratiArchitectural Portfolio - Madarati
Architectural Portfolio - Madarati
 
SUSTANAILBE HOSTEL DESIGN
SUSTANAILBE HOSTEL DESIGN SUSTANAILBE HOSTEL DESIGN
SUSTANAILBE HOSTEL DESIGN
 
Final presentation
Final presentationFinal presentation
Final presentation
 
ASPEK GEOLOGI DAERAH CALON IBUKOTA NEGARA UNMUL 29 APRIL 2021.pptx
ASPEK GEOLOGI DAERAH CALON IBUKOTA NEGARA UNMUL 29 APRIL 2021.pptxASPEK GEOLOGI DAERAH CALON IBUKOTA NEGARA UNMUL 29 APRIL 2021.pptx
ASPEK GEOLOGI DAERAH CALON IBUKOTA NEGARA UNMUL 29 APRIL 2021.pptx
 
Incubation hub
Incubation hubIncubation hub
Incubation hub
 
Estimation of surface runoff in nallur amanikere
Estimation of surface runoff in nallur amanikereEstimation of surface runoff in nallur amanikere
Estimation of surface runoff in nallur amanikere
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn method
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn method
 
Assignment 2
Assignment 2Assignment 2
Assignment 2
 
IRJET- Identification of Groundwater Potential Zones at AMPRS, Odakkali using...
IRJET- Identification of Groundwater Potential Zones at AMPRS, Odakkali using...IRJET- Identification of Groundwater Potential Zones at AMPRS, Odakkali using...
IRJET- Identification of Groundwater Potential Zones at AMPRS, Odakkali using...
 

Recently uploaded

ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 

Recently uploaded (20)

ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 

Neighbourhood planning

  • 1. Ichigo COLLEGE OF ENGINEERING PUNEC O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE NEIGHBOURHOOD PLANNING STUDIO PLANNING AND DESIGNING LAB III 111514003 AISHWARYA ASHOKAN 111514004 VAISHNAVI ALHAT 111514006 KALYANI BHADANE 111514029 SHIVANAND NALGIRE 1115140042 ISHRAT SAYYAD111514008 SOHEL FAKIR PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
  • 2. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29, 42 SIGN LOGONORTH N C O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE GROUND SCENARIO : Influx of IT has boosted up the residential demand in Pune especially areas surrounding Hinjewadi, Wakad, Pashan. Hinjewadi & Tathavade vicinity (around lavale) is developing as Educational hub. Reputed campuses like Symbiosis International University, Flame University, Bharati Vidyapeeth Group of Institutes are located in the vicinity. Nestled in the hills on one side, Lavale is an upcoming attraction to IT professionals and stakeholders. PULL FACTORS OF THE TOWNSHIP : Scenic beauty of hills along with peaceful surrounding nature. Hinjewadi Rajiv Gandhi IT park at just 8 km. At 10 km from Kothrud and 8 km from Pashan. Balewadi Stadium at just 7 km distance. Oxford Golf Resort at 2 km. Flame University Campus at walkable distance. Symbiosis International University at just 2 km. 3 km away from Bharati Vidyapeeth Group of Institutes. Proximity to Mumbai - Pune Expressway. 33 IT companies in 8 km radius. SITE Vidya Valley School International School of Business Symbiosis International University Lavale Universal Solutions Pvt. Ltd. Niasa College Suryadatta College of Management ABM Institute VIT's PVP School of Architecture Bharati Vidyapeeth Group of Institutes Symbiosis Institutes of Technology Nande Chande Bavdhan Gaon Sunarwadi Mumbai-PuneExpressway AH47(AsianHighway) ToMumbai(100km) Hinjewadi-PirangutRoad High Energy Research Lab Manas Lake And Resort Bhare Mulkhed Hinjewadi Lake Balewadi Stadium Pashan Kothrud Oxford Golf Resort Balewadi Stadium Mula River Bharati Vidyapeeth Hinjewadi Rajiv Gandhi IT Park Manas Lake Natural Hills & Forest Area Mumbai - Pune Expressway Infotech Park Flame University REGIONAL CONTEXT Megapolis Township TCS SCALE: 1:40400 NEIGHBOURHOOD PLANNING : REGIONAL CONTEXT 8/12/16 1:40400 1 Lake Mercedes Benz Institute Hinjewadi Hospital Mulshi Road LavaleRoad Ichigo SOURCE: SITE VISIT & GOOGLE EARTH Site Location KEY MAP SCALE: 1:90000
  • 3. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE South - West Monsoon Winds Summer sun path Winter wind path Climate AnalysisContour Map Of Proposed Site Contour Map Range : 600 m - 655 m NEIGHBOURHOOD PLANNING : PROPOSED SITE 2 > Location of the site : Bavdhan, on the boundary of Mulshi Taluka > Area of the site : 195.77 acres > Latitude : 18.5415 > Longitude : 73.7305 > Climate Zone : Tropical (Moderate) > Wind information : Southwest monsoon winds throughout the year > Average Rainfall : 2841 mm > Temperature information : Average annual temperature : 24.3 deg.C Highest average temperature : 28.1 deg.C Lowest average temperature : 21.3 deg.C Site Details 0 3500 7000 10500 14000 17500 GRAPHICAL SCALE : SCALE 1 : 10000 SOURCES : - The District Environment Atlas (DEA) of Pune District - www.mpcb.gov.in SCALE 1 : 3500 Site Boundary Contour lines LEGEND Building Orientation - > North & south facing vertical walls receive least amount of radiation. > East, southwest & northwest walls will receive same amount of radiation & the west walls will receive the most. > Windows facing east would admit the sun in the morning. Roofs & Walls - > East and especially west walls should be massive whereas north & south walls should be of light weight construction. > To limit heat during strong sunshine hours & store heat during cool period, high thermal capacity structures shall be used. eg: 200 mm concrete slab. Air Flow & Openings - > Solar heat gain is governing the orientation of windows. > Deciduous trees should be planted in this tropical zone since wilting of leaves takes place during winter & hence maximum sunlight can be received. > In summer, deciduous trees shall help to block the incident solar radiations & hence should be planted near the living room. Orientation of buildings on a sloping land - > For prevailing hot winds, trees would act as a buffer. > Openings of the buildings would be so placed so as to absorb cooler winds. > Good views shall be obtained by placing longer sides of the walls towards the water body side. > Vegetation shall be done in order to block the unwanted hot winds on the upland area. > Double roofs shall be provided to minimize the intensity of trapped solar radiations on the roof. Ichigo 8/12/16 Site Location KEY MAP SCALE: 1:90000
  • 4. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE 650 645 605 610 615 620 625 630 635 640 645 655 650 650 645 605 610 615 620 625 630 635 640 645 Scale 1 : 10000 Scale 1 : 10000 A B Y Z SECTION AB SECTION YZ Proposed Site Soil Map : Scale 1 : 10000 Pune District Soil Map ( Not to scale ) > The area is with steep slopes, highly erosion prone with shallow soils. > The soil is acidic in nature. > It has low electrical conductivity, organic carbon and phosphorous content. > It has a very high potash content. > It has sufficient amount of copper, manganese and zinc but is deficient in iron. > The soil thickness ranges from 1 to 7.5 cm. > For such a type of soil, to impart strength to the building, deep foundation is required. > Pile foundation : Among various types of deep foundations, pile foundation is suitable for this site as the load bearing capacity of the soil is very low. Source : Pune DEA Report 2008 Class VII : Extremely shallow soil Scale 1 : 6800 Non-developable Land Very Flat 8/12/16 3 Steep 8 % Flat FIG. NO. 1 : Slope Analysis Pie Chart TABLE NO. 1 VERTICAL SECTION HORIZONTAL SECTION Horizontal distance Horizontaldistance Very Steep Slope Analysis of the Site : Developable Land 5 - 10 % Slope 10 - 25 % Slope 92 % NEIGHBOURHOOD PLANNING : SITE ANALYSIS > 25 % Slope 2 - 5 % Slope 8 % 29 % 27 % 36 % Feasible for Building Construction (63 %) Feasible for Open Spaces & Services (29 %) Ichigo Site Location KEY MAP SCALE: 1:90000
  • 5. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29, 42 SIGN LOGO C O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE 8/12/16 4 NEIGHBOURHOOD PLANNING : TOWNSHIP THEME ORGANIC FARMING And the overall feasible Solution is ... Urban agriculture is an industry located within ( intra-urban ) or on the fringe ( peri-urban ) of a town, a city or a metropolis, that grows and raises, processes and distributes a diversity of agricultural products from both plants and animals, using human, land and water resources, products and services found in and around that urban area. Ensures safe & healthy world for future generation Boosts immune system Prevents immature aging Tastes better than non - organic food Reduces risk of heart diseases Promotes animal welfare Prevents cancer Reduces presence of pesticides Vermi - compost Animal Husbandry Manure Crop Rotation Biofertilizers Biological Management Green-leaf Manure Organic Farming The climate and the soil typology on the site, favours growth of following crops using organic farming methods : 1. Vegetables like tomato, brinjal, cabbage, cauliflower, onion, peas, leafy vegetables, etc. 2. Fruits like Japanese strawberry ( Ichigo ), grapes, etc. 3. Floriculture EVOLUTION OF THEME ... Aim : To develop a healthy township in terms of physical and mental health of the residents, and the natural environment . Important Health Statistics of Pune : 0 10 20 30 40 50 60 70 80 90 100 Heart Problem s Hyperlipidem iaHypertension Obesity Diabetes 54 21 7778 38 Fig. No. 1 : Major prevalent diseases PercentofPopulation Some of the major factors responsible for these health issues are : - Stressful city life - Polluted environment - Improper lifestyle habits - Consumption of conventional farm products Thus, the township should be based on such a theme that would solve the above problems. Source : State Bureau of Health Intelligence and Vital Statistics, Pune Fig. no. 3 : Organic Farming Fig. no. 4 : Benefits of Organic FarmingFig. no. 2 : Benefits of Urban Agriculture URBAN AGRICULTURE Site Location KEY MAP Ichigo SCALE: 1:90000
  • 6. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29, 42 SIGN LOGONORTH N C O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE 8/12/16 NEIGHBOURHOOD PLANNING : CONCEPT PLAN HIGH INCOME GROUP : Reasons for the allotted position of HIG : Lakeview Proximity to the entrance, hence enhanced accessibility. View of the hills and the horticulture. Proximity to the golf course. Proximity to the garden. Tucked away from the crowd that might be present in the commercial zone. OPEN SPACES (GARDEN) : Reasons for the allotted position of garden: Centrally placed so that it is accessible to all. Closest to the HIG and HMIG so that it provides a calming ambience to their residences. PUBLIC - SEMI PUBLIC SERVICES : Reasons for the allotted position of PSP : Placed so that it is accessible to all income groups. LOW INCOME GROUP : Reasons for the allotted position of LIG: Proximity to potential workplace (urban agricultural land). Affordable land prices. Proximity to Lavale village (workplace, educational institution). MIDDLE INCOME GROUP : Reasons for allotted position of MIG : Reasonably close to the entrance. Proximity to the garden. Proximity to the PSP services provided. HIG HIG MIG MIG LIG PSP PSP SERVICES CO M M ERCIAL LAKE HORTICULTURE FARM LAND OPEN SPACE CONCEPT PLAN URBAN AGRICULTURAL LAND: Reasons for the allotted position of urban agricultural land: Land is undevelopable or developable at very high cost due to very steep slopes. Provides a natural boundary on one side of the township. C:UsersLenovoDesktopUntitled.jpg C:UsersLenovoDesktopimages.png C:UsersLenovoDesktop5024010.jpg C:UsersLenovoDesktopdownload.png C:UsersLenovoDesktopimages (1).png ENTRANCE 1:38800 5 View of lake View of Horticulture 650 645 CONTOUR MAP SCALE 1 : 38800 Summer sun path Winter wind path N South - west Monsoon Winds SCALE; 1:1330 Symbiosis University Flame University Oxford Golf Resort Ichigo O pen Land Site Location KEY MAP SCALE: 1:90000
  • 7. : > Should have sufficiently a wide means (not less than 18 m wide). > Should be one continuous unbroken and uninterrupted & in any case should not be less than 40 Ha (100 acres) at one place. The area will be notified as 'special township' by government in Urban Development Department according to section 20 read with section 18 of the MRTP Act 1966. ENVIRONMENT : > Should not involve topographical changes, changes in alignment, etc. > It should have parks / gardens / playgrounds, etc. SPECIAL CONCESSIONS : (a) N. A. Permission - Non - agriculture permission will be automatic. (b) Stamp duty rates should be 50% of prevailing rates of Mumbai Stamp Act. (c) Any special government land falling under township area is granted on terms & conditions. (d) The condition that only the agriculturist is eligible to buy the agriculture land is not applicable. (e) Concessions for Star Category Hotels, Hospitals & Multiplexes / Property Tax shall be provided. COLLEGE OF ENGINEERING, PUNE E S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29, 42 C O L L E G E OF P O O N A I R E ENIGN NG N R U HU SIGN S T G R T E H T T E A N E C LOGO R D NEIGHBOURHOOD PLANNING : REGULATIONS N INFRASTRUCTURE FACILITIES : Water supply - > To develop source for drinking water other than groundwater and to meet daily requirement of minimum 140 litres per capita per day. > Storage capacity of it should be at least 1.5 times of actual required quantity. Drainage and Garbage disposal - > Suitable and environment friendly arrangements for disposal and treatment of sewage and solid waste. Power - > To draw power from existing supply system or arrangement of captive power generation. 6 GENERAL NORMS FOR DIFFERENT LAND USES : (a) Residential - > Out of the total floor area, at least 60% may be used for residential development. > 10% of it shall be used for residential tenements having built up area up to 40 sq.m. (b) Commercial - > Should be properly distributed in hierarchical manner like convenience shopping, community centre, etc. (c) Parks, Gardens & Play Grounds - > 20% of the total area is for Parks/ Gardens/ Playgrounds. > Should be distributed in all residential clusters and kept open to general public. (d) Transport and Communication - > Roads should be developed as per standard and road widths as: (i) Classified Roads as prescribed. (ii) Main road/ Ring road- 18 to 24 m. wide. (iii) Internal road- as per prevailing bye-laws & of minimum width 9 m. F. S. I & FLOATING F. S. I : > Total built - up area / F.S.I of the special township in Residential Zone will be 1.00. > F. S. I for Agriculture / No Development Zone shall be 0.5. > The F. S. I of any uncovered plot can be used anywhere in the township as floating F. S. I. 8/12/16 Source : MR & TP Act 1996 SPECIAL TOWNSHIP SCHEME FOR PUNE REGION AS PER MRTP ACT 1996 Ichigo
  • 8. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C O L L E G E OF P O O N A I R E E NIGNE NG S T R E N G T H T R U T H E C N ARUDNE KEY MAP NEIGHBOURHOOD PLANNING: CALCULATIONS Ichigo Total site area : 195.77acres = 792, 253.082 sq.m. SITE BOUNDARY SCALE: 1:1330 SITE DETAILS: Total site area : 195.77 acres = 792, 253.082 sq.m. Total built up area : 176.13 acres = 712, 772.822 sq.m. Population : 22,382 Transportation Residential Agricultural Open spaces BUILT-UP AREA (%) Public Semi-public Commercial Services LAND USE 50 20 6 10 77 2 GROUND COVERAGE (%) GROUND COVERAGE (SQ.M.) 548, 835 BUILT-UP AREA (SQ.M.) 0 0 0 Higher Middle Income Group (HMIG) 20Higher Income Group (HIG) 109,767 Middle Income Group (MIG) Low Income Group (LIG) Economically Weaker Section (EWS) 32,930 30 40 6 4 BUILT-UP AREA (%) BUILT-UP AREA (SQ.M.) 50% 5% 20% 164,650 219,534 10% 21,954 9.4% 2% 3.6% Residential Agricultural Open spaces Transportation Public Semi-public Commercial Services GROUND COVERAGE (%) GROUND COVERAGE (SQ.M.) TABLE NO. 1 : LAND USE DISTRIBUTION FIG. NO. 1 : LAND USE DISTRIBUTION LEGEND APARTMENTS: Therefore, total built up area for apartments : 109,767 - 7500 = 102,267 sq.m. Built up area excluding 20% area for common spaces : 102,267 - 20,453 = 81,814 sq.m. Built up area of one flat : 120 sq.m. No. of flats : 81,814 / 120 = 682 flats Ground coverage for HIG flats (excluding bungalows) : 40% (Ground Coverage for HIG) = 40% of 71,725 sq.m. = 28,690 sq.m. Permissible no. of floors : Total built up area for flats / Ground coverage = 102,267 / 28,690 = 4 floors Each floor has 4 flats Therefore, no. of floors required : 682 / 4 = 170.5 Each building has 4 floors Hence, no. of buildings : 170.5 / 4 = 43 buildings 396,126 20 30 40 6 4 79,225 118,837 158,450 23,768 15,845 TABLE NO. 2 : DISTRIBUTION OF BUILT UP AREA HIGHER MIDDLE INCOME GROUP (HMIG): Total built up area : 164,650 sq.m. Ground coverage : 118,837 sq.m. Population belonging to HMIG : No. of dwelling units x 4.5 = (1318) x 4.5 = 5931 Built up area excluding 20% area for common spaces : 164,650 - 32,930 = 131,720 sq.m. Built up area of one flat : 100 sq.m. No. of flats : 131,720 / 100 = 1318 flats Ground coverage for HMIG flats : 40% (Ground Coverage for HMIG) = 40% of 118,837 sq.m. = 47,535 sq.m. Permissible no. of floors : Total built up area for flats / Ground coverage = 164,650 / 47,535 = 4 floors Each floor has 4 flats Therefore, no. of floors required : 1318 / 4 = 329.5 Each building has 4 floors Hence, no. of buildings : 329.5 / 4 = 82 buildings HIGHER INCOME GROUP (HIG): Total built up area : 109,767 sq.m. Ground coverage : 79,225 sq.m. Population belonging to HIG : No. of dwelling units x 4.5 = (30+682) x 4.5 =3204 BUNGALOWS: No. of bungalows : 30 Built up area of one bungalow : 250 sq.m. Total built up area of all bungalows : 250 x 30 = 7500 sq.m. INCOME GROUPS Higher Income Group (HIG) : FLAT Higher Middle Income Group (HMIG) Middle Income Group (MIG) Low Income Group (LIG) Economically Weaker Section (EWS) 120 100 85 60 40 AREA OF DWELLING UNIT (SQ.M.) TABLE NO. 3 : SIZE OF DWELLING UNITS INCOME GROUPS Higher Income Group (HIG) : BUNGALOW 250 158,450 39,613 79,225 15,845 74,400 20,500 9.4 2.6 15 5 3 0 0 0 106,916 35,639 21,383 RESIDENTIAL : SCALE: 1:90000 8/12/16 Site location 7
  • 9. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C OL L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE NEIGHBOURHOOD PLANNING: CALCULATIONS Ichigo Total site area : 195.77acres = 792, 253.082 sq.m. SITE BOUNDARY SCALE: 1:1330 MIDDLE INCOME GROUP (MIG): Total built up area : 219,534 sq.m. Ground coverage : 158,450 sq.m. Population belonging to MIG : No. of dwelling units x 4.5 = (2066) x 4.5 = 9297 Built up area excluding 20% area for common spaces : 219,543 - 43,907 = 175,627 sq.m. Built up area of one flat : 85 sq.m. No. of flats : 175,627 / 85 = 2066 flats Ground coverage for MIG flats : 40% (Ground Coverage for MIG) = 40% of 158,450 sq.m. = 63,380 sq.m. Permissible no. of floors : Total built up area for flats / Ground coverage = 219,534 / 63,380 = 4 floors Each floor has 4 flats Therefore, no. of floors required : 2066 / 4 = 516.5 Each building has 4 floors Hence, no. of buildings : 516.5 / 4 = 129 buildings LOWER INCOME GROUP (LIG): Total built up area : 32,930 sq.m. Ground coverage : 23,768 sq.m. Population belonging to LIG : No. of dwelling units x 4.5 = (439) x 4.5 = 1975 Built up area excluding 20% area for common spaces : 32,930 - 6586 = 26,344 sq.m. Built up area of one flat : 60 sq.m. No. of flats : 26,344 / 60 = 439 flats Ground coverage for LIG flats : 40% (Ground Coverage for LIG) = 40% of 23,768 sq.m. = 9507 sq.m. Permissible no. of floors : Total built up area for flats / Ground coverage = 32,930 / 9507 = 4 floors Each floor has 6 flats Therefore, no. of floors required : 439 / 6 = 73.16 Each building has 4 floors Hence, no. of buildings : 73.16 / 4 = 18 buildings ECONOMICALLY WEAKER SECTIONS (EWS): Total built up area : 21,954 sq.m. Ground coverage : 15,845 sq.m. Population belonging to EWS : No. of dwelling units x 4.5 = (439) x 4.5 = 1975 Built up area excluding 20% area for common spaces : 21,954 - 4391 = 17,563 sq.m. Built up area of one flat : 40 sq.m. No. of flats : 17,563 / 40 = 439 flats Ground coverage for EWG flats : 40% (Ground Coverage for EWS) = 40% of 15,845 sq.m. = 6338 sq.m. Permissible no. of floors : Total built up area for flats / Ground coverage = 21,954 / 6338 = 4 floors Each floor has 6 flats Therefore, no. of floors required : 439 / 6 = 73.16 Each building has 4 floors Hence, no. of buildings : 73.16 / 4 = 18 buildings PUBLIC AND SEMI-PUBLIC (PSP) : Multipurpose Community Hall Amenities Count Total Area Required (Sq.m.)Area Required (Sq.m.) Primary Schools Senior Secondary Schools Dispensary Community Room Religious Center 4 2 2 4 4 4000 18,000 900 2000 750 1600 16,000 36,000 1800 4000 3000 6400 74,400 COMMERCIAL : Amenities Count Total Area Required (Sq.m.)Area Required (Sq.m.) Convenience Shopping Centres Local Area Shopping Centres Banks 5 2 5 2000 5000 100 10,000 10,000 500 20,500 Pre-primary Schools / Nursery 800 9 7200 2 TABLE NO. 4 : AMENITIES PROVIDED IN PSP TABLE NO. 5 : AMENITIES PROVIDED IN COMMERCIAL KEY MAP SCALE: 1:90000 Site location 8/12/16 8
  • 10. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE 8/12/16 Site Location Key Map Not to Scale NEIGHBOURHOOD PLANNING : MASTER PLAN Ichigo JAPANESE GARDEN COMMERCIAL VEGETABLE MARKET TOWN HALL PRIMARY SCHOOL DISPENSARY TRAINING CENTRE LOCALSHOPPINGCENTRE URBAN AGRICULTURE LAND U.A. UTILITY LAND SPO RTS FIELD VEGETABLE MARKET SCHOOL PRIMARY SCHOOL COMMUNITY HALL RELIGIOUS CENTRE DISPENSARY COMMERCIAL E.S.R. G.S.R. STORM W ATER TREATM ENT PLANT CONVENIENT SHOPPING CENTRE 1:2500 SCALE :1:2500 RESIDENTIAL OPEN SPACE COMMERCIAL PSP SERVICES AGRICULTURAL LAND LEGEND TRANSPORTATION 50% 5% 20% 10% 9.4% 2% 3.6% FIG. NO. 1 : LAND USE DISTRIBUTION Transportation Residential Agricultural Open spaces Public Semi-public Commercial Services 396,126 158,450 39,613 79,225 15,845 74,400 20,500 LAND USE AREA (SQ M) TABLE NO. 1 : LAND USE DISTRIBUTION MASTER PLAN TOTAL SITE AREA : 792, 253.082 sq.m. 18 M W IDE ROAD TOWARDS LAVLE NANDED ROAD ENTRANCE 12M W IDE ROAD 9 M W IDE ROAD 12 M W IDE RO AD 12 M W IDE RO AD 18 M WIDE ROAD 9 M WIDE ROAD 9
  • 11. Sr no. Legend Dimensions 1) W1 1.6 m x 0.23 m 2) W2 0.7 m x 1.2 m 3) W3 0.8 m x 1.2 m 4) D1 1.2 m x 2 m 5) D2 1.0 m x 2 m 6) D3 0.8 x 2 m 7) D4 0.7 x 2 m 8) D5 2.1 x 2 m COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE W = Window , D = Door ROW HOUSE PLAN : STAIRCASE DESIGN CALCULATIONS : Height of step (Riser) : 0.15 m Width of step (Tread) : 0.25 m No. of stairs in staircase : 20 Floor height : 3 m Table No. 1 : Ichigo KEY MAP KITCHEN (3.3 X 4 m) DINING ROOM (3.3 X 4.8 m) BEDROOM (4.5 X 3.65 m) LIVING ROOM (5.3 X 4 m) W.C (1.2 X 2.15 m) FAMILY ROOM (3.3 X 4.8 m) CHILDREN'S BEDROOM (3.2 X 4.1 m) DRY BALCONY (1.25 X 2 m) WASHROOM (1.25 X 2 m) MASTER BEDROOM (4.9 X 4.5 m) W.C (1.2 X 2.15 m) PUJA ROOM (4 X 2.2 m) GYM (4 X 2.2 m) WASHROOM (1.2 X 2 m) WASHROOM (2.15 X 1.2 m) BALCONY (5.2 X 3.8 m) BALCONY (4.4 X 3.1 m) UP DOWN ENTRANCE GROUND FLOOR PLAN FIRST FLOOR PLAN D1 D2 W1 W2 D3 D3 W1 W3 W1 W1 W2 D1 D4 D4 W2 W2 D4 D4 W1 W3 D2 D3 D5 W1 W1 W2 D4 D3 W1 Scale = 1: 40 8/12/16 1: 40 NEIGHBOURHOOD PLANNING : ROW HOUSE PLAN Location of row houses Scale 1 : 1330 UP DOWN DOWN 11
  • 12. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C OL L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE NEIGHBOURHOOD PLANNING : UNIT DESIGN Ichigo DIMENSIONSSCHEDULE OF ITEMSSR.NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 LIVING ROOM 4.6 x 4.0 BALCONY 3.9 x 1.1 KITCHEN DINING AREA 3.1 x 2.4 2.7 x 2.2 DRY BALCONY BEDROOM 1 1.5 x 1.3 4.4 x 4.0 BEDROOM 2 4.2 x 3.5 WASHROOM 2 BEDROOM 3 WASHROOM 3 PLUMBING DUCT 1 1.9 x 1.8 4.2 x 3.5 1.8 x 1.5 3.9 x 0.8 PLUMBING DUCT 2 3.8 x 0.8 GARBAGE DUCT 2.4 x 0.5 LIFT CAR 2.0 x 1.5 STAIRCASE WINDOW 1 3.8 x 3.1 3.1 x 2.0 WINDOW 2 WINDOW 3 WINDOW 4 1.8 x 1.2 0.7 x 0.6 1.2 x 0.8 DOOR 1 2.0 x 1.1 2.0 x 0.9 DOOR 2 DOOR 3 2.0 x 1.3 LEGEND WASHROOM 1 1.9 x 1.8 GD LC SC W1 W2 W3 W4 D1 D2 D3 PD 1 PD 2 W2 W3 W3 W2 W2 W3 W4 W1 D2 D2 D2 D2 D2 D3 D1 D3 LIVING ROOM(DINING) 5.7 x 4.0 3.5 X 3.5 4.0 X 3.0 3.3 X 2.8 4.0 X 3.0 2.3 X 1.6 1.5 X 1.2 1.5 X 1.4 2.7 X 1.5 3.8 X 0.6 4.3 X 0.6 2.0 X 2.0 4.2 X 3.0 3.3 X 1.0 1.7 X 0.5 2.0 X 1.0 2.0 X 0.7 2.2 X 2.0 1.5 X 1.2 0.7 X 0.7 DIMENSIONSSCHEDULE OF ITEMSSR.NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 KITCHEN BEDROOM 1 BEDROOM 2 WASHROOM 2 BEDROOM 3 LIFT CAR STAIRCASE WINDOW 1 WINDOW 2 DOOR 1 DOOR 2 DOOR 3 LEGEND WASHROOM 1 LC SC W1 W2 D1 D2 D3 PD FOYER BALCONY 1 BALCONY 2 BALCONY 3 PLUMBING DUCT PRESSURIZATION DUCTPRD FLOOR PLAN OF 3BHK Scale: 1:110 Area: 120 sq.m. Floor to floor height: 3.6 m. No. of floors : 4 LIVING ROOM 4.6 x 4.0 FLOOR PLAN OF 2.5 BHK DWELLING UNIT SCALE: 1:130 FLOOR PLAN OF 2.5BHK Scale: 1:190 Area: 100 sq.m. Floor to floor height: 3.6 m. No. of floors : 4 D1 D2 FLOOR PLAN OF 3 BHK DWELLING UNIT SCALE: 1:80 BEDROOM 2 4.2 x 3.5 DINING AREA 2.7 x 2.2 BALCONY 2.7 x 1.5 BEDROOM 1 4.4 x 4.0 KITCHEN 3.1 x 2.4 W1 BALCONY 3.9 x 1.1 W1 W1 D1 W1 D2 W2 D1 D3 BED- ROOM 2 4.0 x 3.0 W2 LIVING ROOM (DINING) 5.7 x 4.0 BED- ROOM 3 3.3 x 2.8 KITCHEN 3.5 x 3.5 BED- ROOM 1 4.0 x 3.0 BALCONY 3.8 x 0.6 BALCONY 4.3 x 0.6 BEDROOM 3 4.2 x 3.5 D1 D1 3 BHK UNIT DESIGN 2.5 BHK UNIT DESIGN SCALE: 1:1330 KEY MAP LOCATION OF HIG HOUSING LOCATION OF HMIG HOUSING TABLE NO. 1 TABLE NO. 2 D1 8/12/16 12
  • 13. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE 2 BHK FLOOR DESIGN: SCALE 1 : 100 Living room (L) Master Bedroom (M) Bedroom (B) Kitchen (K) Washroom (WR) 1) 2) 3) 4) 5) Sr. No. Rooms Dimensions Sr no. Legend Dimensions 1) W1 1.5 m x 1.2 m 2) W2 0.6 m x 1.2 m 3) D1 1 m x 2 m 4) D2 0.8 m x 2 m 5) D3 2 m x 2 m 6) B1 1 m x 3 m 7) PD 2.8 m x 2.5 m 3.7 x 4.2 m 1.5 x 2 m 5.2 x 4 m 4.2 x 4 m 4.6 x 4.2 m 8) B2 2.5 m x 1 m TABLE NO. 3 TABLE NO. 4 STAIRCASE DESIGN CALCULATIONS: Height of step (Riser) : 0.15 m Width of step (Tread) : 0.25 m No. of stairs in staircase : 20 Floor height : 3 m Passage SCALE 1 : 40 SCALE 1 : 100 Ichigo KEY MAP Legend NEIGHBOURHOOD PLANNING : UNIT DESIGN Living room (3.7 x 4.2) Kitchen (5.2 x 4) Bedroom (4.2 x 4) MasterBedroom (4.6x4.2) Balcony (3 x 1) Dry Balcony (2.5 x 1) Balcony (3 x 1) 8/12/16 13 Site Location Scale 1 : 1330
  • 14. D2 B1 1 BHK FLOOR DESIGN: Living room (L) Bedroom (B) Kitchen (K) Washroom (WR) 1) 2) 3) 4) Sr. No. Rooms Dimensions 3.6 x 5.3 m 2.3 x 1.2 m 3.4 x 5.2 m 4.8 x 3.1 m W1 D1 D2 W2 1) 2) 3) 4) Sr. No. Legends Dimensions 1.2 x 1.2 m 0.6 x 1.2 m 0.8 x 2 m 1 x 2 m 5) 6) B1 B2 1 x 2.5 m 4.5 x 1 m W1 W1 D1 D1 D2 W2 Living room (3.6 x 5.3) (WR) TABLE NO. 1 TABLE NO. 2 7) PD (Plumbing Duct) 2.2 x 1.4 m PD COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE STAIRCASE DESIGN CALCULATIONS: Height of step (Riser) : 0.15 m Width of step (Tread) : 0.25 m No. of stairs in staircase : 20 Floor height : 3 m Passage SCALE 1 : 115 SCALE 1 : 115 SCALE 1 : 35 Ichigo UNIT FLOOR PLAN: B2 W1 Legend NEIGHBOURHOOD PLANNING : UNIT DESIGN Kitchen (3.4 x 5.2) Bedroom (4.8x3.1) Balcony (4.5x1) 8/12/16 14 KEY MAP Site Location Scale 1 : 1330
  • 15. B Sr no. Legends Rooms Dimensions 1) Living room (L) 3.4 x 4.7 m 2) Kitchen (K) 4.0 x 4.7 m 3) Washroom (WR) 1.2 x 2.0 m W2 D1 D1 B2 B1PD 1 D1 D1 PD 2 W1 W1 W1 W1 D1 D1 W2 D2 D2 W2 D2 D2 W1 W1 D1 D1 B4 Sr no. Legend Dimensions 1) W1 0.6 m x 1.2 m 2) W2 1.2 m x 1.2 m 3) D1 0.6 m x 2 m 4) D2 0.8 m x 2 m 5) D3 0.9 m x 2 m 6) B 0.9 x 3.5 m 7) PD 0.8 x 2.5 m W2 W2 D1 D1 B2 B1 PD 1 D1 D1 PD 2 W1 W1 W1 W1 D1 D1 W2 D2 D2 W2 D2 D2 W1 W1 D1 D1 B4 W2 WR WR WRWR WR WR WRWR D2 PD W1 WR COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE W2 W2 W2 W2 W2 W2 W2 W2 D2 B D1 D1 D2 D2 D3 D3 D1 D1 D2 D1 D1 D2 B B B B PD PD PD W1 W1 W1 W1 W1 W1 K WR WR WR WR W - Window , D - Door , B - Balcony , PD - Plumbing Duct 1 RK FLOOR DESIGN: STAIRCASE DESIGN CALCULATIONS: Height of step (Riser) : 0.15 m Width of step (Tread) : 0.25 m No. of stairs in staircase : 20 Floor height : 3 m Passage TABLE NO. 1 TABLE NO. 2 SCALE 1:80 SCALE 1 : 95 SCALE 1 : 25 Ichigo UNIT FLOOR PLAN: Living room (3.4 x 4.7) Kitchen (4 x 4.7) Balcony (3.5 x 0.9) 8/12/16 15 KEY MAP Site Location Scale 1 : 1330 NEIGHBOURHOOD PLANNING : UNIT DESIGN
  • 16. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29, 42 SIGN LOGO C O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE NEIGHBOURHOOD PLANNING : ROW HOUSE KEY MAP Ichigo SITE PLAN OF A ROW HOUSE LANDSCAPE PLAN OF A ROW HOUSE 1.5 0.23 2 2 2.5 30.5 1.15 4.73 12.5 20 Down Down Up Up Entrance CURRY LEAVES CUCUMBER CORIANDER CABBAGE GREEN CHILLIES TOMATO 1 2 Side View of the Swing Stilt Parking Elevation Size of Plot : 12.5 m x 20 m PAVERS LAWN 8/12/16 16 SCALE 1 : 50 Entrance Location of row houses Scale 1 : 1330
  • 17. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C OL L E G E OF P O O N A I R E ENIGNE NG S T R E N G T H T R U T H E C N AR UDNE NEIGHBOURHOOD PLANNING : SITE PLAN OF HIG Ichigo PARKING CALCULATIONS FOR PART A No. of flats per building : 16 Parking demand per building : 32 Parking demand for part A : 96 Adding 10% for visitors' parking, total parking demand : 106 Size of a parking bay : 5.0 m x 2.5 m No. of bays in stilts of one building : 23 Total no. of parking bays : 69 Hence, no. of bays in surface parking : 106-69 = 37 PARKING CALCULATIONS FOR PART B No. of flats per building : 16 Parking demand per building : 32 Parking demand for part B : 32 x 9 = 288 Adding 10% for visitors' parking, total parking demand : 317 Size of a parking bay : 5.0 m x 2.5 m No. of bays in stilts of one building : 23 Hence, no. of bays in surface parking : 317 - (23 x 9) = 110 Surface parking cannot accommodate 110 bays. Therefore, basement parking is provided. Area of basement parking : 12,264 sq.m. No. of parking bays in the basement : 12, 264 / 35 = 350 19.3861 14.2721 14.5050 7.0201 7.1011 17.0697 14.8333 16.0361 15.2077 7.0211 6.2468 7.3915 7.7647 7.6117 9.6075 22.2826 8.4128 1.015 1.1074 7.8402 12.0647 12.8518 9.1311 11.6441 8.3066 9 m. wide road 12 m . wide road 6 m. wide road PLAN AND ELEVATION OF STILT PARKING ELEVATION OF BASEMENT PARKING SITE PLAN OF HIGHER INCOME GROUP HOUSING SCALE: 1:500 ALL DIMENSIONS ARE IN METRES SCALE: 1:310 SCALE: 1:200 3.6 M 3.6 M SCALE: 1:1330 KEY MAP LOCATION OF HIG HOUSING SOURCE: IRC STANDARDS FOR PARKING 8/12/16 17 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
  • 18. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE NEIGHBOURHOOD PLANNING: LANDSCAPE PLAN (HIG) Ichigo LANDSCAPE PLAN FOR HIGHER INCOME GROUP HOUSING LANDSCAPE PLAN FOR HIGHER INCOME GROUP HOUSING SCALE: 1:1330 KEY MAP LOCATION OF HIG HOUSING ELEVATION OF SWING-SLIDE SET DOG PARK ELEVATION OF SUNBATHING CHAIR SKATING PARK 9 M. WIDE ROAD 6 M. WIDE ROAD 12 M .W ID E R O AD CYCLING TRACK ENTRANCE TO BASEMENT ELEVATION OF PERGOLA & SEATING AREA CLUB HOUSE GREEN HOUSE ELEVATION OF FOUNTAIN 8/12/16 18 SCALE: 1:420 INDEX Gulmohar tree Neem tree Arjun tree Coconut tree Green ash tree Periwinkle shrub Rose shrub PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
  • 19. E COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C O U L L E G C OF P O O N A I R E ENIGNE NG S TR E N G T H T R T H E N AR UDNE A6 A1 A A3 A5 B4 B1 B6 A4 B3 B2 B5 C2 C1 C3 SCALE 1:350 PARKING CALCULATIONS : 1. Requirements of one dwelling unit or flat : 1 car and 1 two-wheeler 2. Total dwelling in units in study sector : 32 x 15 = 480 dwelling units 3. Total parking requirement (In terms of no. of cars ) : 480 x 1 + 480 x 0.5 = 720 4. Providing 10% for visitors parking = 720 x 10 100=72 5. Total car parking requirement = 800 Parking Management : Stilt parking : a.15 cars in one building footprint b. Total cars in Stilt parking : 225 Underground Parking: c. Remaining cars 800 - 225 = 575 cars d. Area required for 575 cars in underground parking = 575 x 35 = 20125 sq.m e. Setback for underground parking area = 3 m f. Area availabale after setback for parking = 23100sq.m g. Ramp Design : 1:10 gradient ( 3m floor height ) Runway required : 30 m 0 1700 3400 8500 Scale: Scale: 5100 6800 Elevation AB Ichigo BUILDING SETBACK Building Type Setback A3-A4 and B1-B2 8.75 M A4-A5 and B5-B6 7 M C1-C2-C3 9 M Not to the Scale B D Scale: 1:400 C 18 m W ide road 12m W ideroad 12m W ideroad ENTRY Elevation CD EXIT FROM BASEMENT PARKING 30 M Scale: 1:100 Section of Ramp: (EF) RAMP RAMP DOW N UP E F Basement Level (Underground Parking) Ground Level NEIGHBOURHOOD PLANNING : SITE PLAN (HMIG) Towards Japanese garden 10m 6m SITE PLAN FOR HIGHER MIDDLE INCOME GROUP Ground Level Basement Level (Underground Parking) Basement parking area SCALE: 1:1330 KEY MAP LOCATION OF HMIG HOUSING Setback boundary of parking area 8/12/16 19
  • 20. RAMP PLANTING DETAILS SR. NO. NAME BOTANICAL NAME HEIGHT CANOPY SPACING NATURE 1 Ashoka Polyalthia longifolia 9 - 10 m 0.8 - 0.9 m 0.7m Evergreen 2 Rose Rosa 0.5 - 1 m 0.5 - 1 m Continuos Ornamental 3 Arjun Temilania arjuna 25- 30 m 2 - 3 m Patches Ornamental 4 Periwinkle Contarantus 1 - 2 m 0.5 - 1 m Continuos Ornamental COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 N C O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE LEGEND Ashoka Rose Arjuna Periwinkle Gulmohor MATERIALS 1 Paver Blocks 2 Brick stone welches 3 Wooden Garden Benches Ichigo RAMP R1.8 5 1.0 0 1.4 5 1.4 5 1.0 0 1.0 0 1.4 5 0.7 0 1.4 5 1.0 0 R4 .08 ENTRY EXIT ENTRY Structural Design of Fountain: Structural Design of Interior Garden: Garden Area: 650 sq.m. Central Fountain: 15 sq.m. Each Large Quadrant Area: 130 sq.m. Each Smaller Quadrant Area: 30 sq.m. Central pathway Width: 2 m Secondary pathway width: 1 m Structural Design of Playground: Playground Playground Area: 1500 sq.m. 0 3000 6000 15000 Scale: Scale: 9000 12000 SCALE: 1:350 There are fountains of three hierarchy, 90sq.m, 50sq.m and 15 sq.m. LANDSCAPE PLAN FOR HIGHER MIDDLE INCOME GROUP 18 m W ide road 12 m W ide Road Towards Main gate of township 12 m W ide Road Tow ards japanese garden NEIGHBOURHOOD PLANNING : LANDSCAPE FOR HMIG SCALE: 1:1330 KEY MAP LOCATION OF HMIG HOUSING 8/12/16 20 SCALE: 1:200 ELEVATION OF FOUNTAIN
  • 21. ENTRANCE EN TR AN CE EN TR AN CE EN TR AN CE ENTRANCE EN TR AN CE EN TR AN CE EN TR AN CE EN TR AN CE VEGETATION Vegetation COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C O L L E G E OF P O O N A I R E ENI GNE NG S TR E N G T H T R U T H E C N AR UDNE 1 3.0 5.5 6 3.8 24 0.8 4 6.2 5.5 65 28 16 5.9 5 11 8 12 15.6 7.5 7.7 6.7 2.3 4.4 4 6 7.4 12.96 32 5.8 ENTRANCE GARDEN Children play area Sitting park 8 7.73 6 6 5.54 6.1 5.4 2.7 PARKING CALCULATION Consider 1 car for 1 dwelling unit of MIG. 4 flats on 1 floor and 4 floors in 1 building. Total no. of buildings = 10 Therefore, total no. of dwelling units = 160. No. of cars = 160. 10% visitors parking for residential = 10 100*160 = 16 cars. Total no. of cars = 160 + 16 = 176 cars. Therefore, 176 cars is the parking demand for the site. For stilt parking, the parking bay is 2.5 x 5. 18 bays on the ground floor of 1 building. Thus, total no. of bays = 18 x 10 = 180. By norms, parking calculation according to built up area . Built up area = 13600 m2. ECS = 100 M2 and FSI = 1. the total parking demand = 13600* 1 100 = 136. 10 % visitors parking = 10 100 * 136 = 13.6. the total parking demand is 136 + 14 = 150 cars. 4 m wide road 12 m wide road 6 m wide road 3 Baby pool Swimming pool Security room ELEVATION OF STILT PARKING SITE PLAN FOR MIG Ichigo NEIGHBOURHOOD PLANNING : SITE PLAN SCALE : 1 : 500 ALL DIMENSIONS ARE IN METERS Site Location KEY MAP EN TR AN CE Scale 1 : 90000 Source : IRC Standards for Parking Area Entrance PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
  • 22. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29, 42 SIGN LOGO C O L L E G E OF P O O N A I R E ENI GNE NG S TR E N G T H T R U T H E C N AR UDNE NEIGHBOURHOOD PLANNING : MIG LANDSCAPE PLAN KEY MAP Ichigo INDEX Gulmohar tree Neem tree Periwinkle Coconut tree Palm tree 3 m Security room Garden Children play area Sitting park 4 m wide road 12 m wide road 6 m wide road Baby pool Swimming pool Fountain 13,44 17,28 Elevation of Dino climber Elevation of sitting place Elevation of slider Elevation of swing Top view of swing LANDSCAPE PLAN : MIDDLE INCOME GROUP Ornamental tree Ashoka tree Ornamental tree Bushes Sitting place 1 m buffer 3 m buffer E. ED D. C. B. A. A B C B. Entrance SCALE : 1 : 500 Scale : 1 :1330 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
  • 23.
  • 24. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29, 42 SIGN LOGO C O L L E G E OF P O O N A I R E ENI GNE NG S TR E N G T H T R U T H E C N AR UDNE 8/12/16 NEIGHBOURHOOD PLANNING : LIG LANDSCAPING KEY MAP Ichigo INDEX Gulmohar tree Shrubs Rose Palm tree Neem tree Pavers 135,41 134,78 16,44 76,26 Plan of a large swing Side elevation of a large swing Front elevation of a large swing Side elevation of a short swing 104,63 117,76 Front elevation of a swing 70,67 C. Entrance LANDSCAPE PLAN : LOW INCOME GROUP HOUSING A B C B. A. Seating spaces 65 Scale = 1: 270 1:270 Scale = 1: 1330 24
  • 25.
  • 26. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29, 42 SIGN LOGO C O L L E G E OF P O O N A I R E E NIGNE NG S TR E N G T H T R U T H E C N ARUDNE 8/12/16 NEIGHBOURHOOD PLANNING :JAPANESE GARDEN Ichigo PLANTS USED IN PARKING SYMBOL NAME OF PLANT GREEN ASH TREE ZELKOVA PLANTS USED IN ORNAMENTAL TREE FOREST SYMBOL NAME OF PLANT RING CUPED OAK MOCHINOKI PLANTS USED IN SAHIO-JI GARDEN SYMBOL NAME OF PLANT UBAMEGASHI PINE PLANTS USED AS BUFFER SYMBOL NAME OF PLANT CYPTOMERA DEODAR CEDAR SOURCE: ACCORDING TO NHB REPORT THESE TREES GROW ON SITE. CLIMATE AND SOIL REPORT FROM FAO 18 M W IDE ROAD 12 M W ID E R O AD 18 M W IDE ROAD 12 M W IDE RO AD The area of garden = 10 acres. Total cost of garden = 6 crore. Total water requirement = minimum 3000 lit. per day ( as per water audit of Chandigarh Japanese garden Sector 31). Maintenance cost = 1.2 crore per year. Maintenance cost is gained from the entry fees and the members of garden committee which are residents of the township.View pointStone Lantern Rock Garden Entrance gate Bridge on lake Ornamental tree garden Meditation areaHill as natural element Sahiho - Ji garden Parking area Security room Flower garden Bonsai and showcase garden Elements of Traditional Japanese Garden 1. Water. 2. Rocks and sand. 3. Garden bridges. 4. Stone lanterns and water basins. 5. Garden fences, gates, and devices. 6. Trees and flowers. 7. Fish. Location of Garden Entrance JAPANESE GARDEN Scale: 1:1330 1:660
  • 27. 645 GARDEN JAPANESE GARDEN COMMERCIAL VEGETABLE MARKET SCHOOL PRIMARY SCHOOL DISPENSARY TOWN HALL TRAINING CENTRE LOCALSHOPPINGCENTRE URBAN AGRICULTURE LAND SPO RTS FIELD VEGETABLE MARKET SCHOOL PRIMARY SCHOOL COMMUNITY HALL DISPENSARY COMMERCIAL SERVICES 640 640 645 645 650 645650 645 645 655 650 640 645 645 650 COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE Ichigo URBAN AGRICULTURE LANDSCAPE ... NEIGHBOURHOOD PLANNING : URBAN AGRICULTURE HORTICULTURE LANDSCAPE KEY MAP 1 KEY MAP 2 SCALE 1:1330 SCALE 1:1330 LEGEND ANIMAL SHED Neem tree Grape Vineyard 8/12/16 27 Vermicompost Strawberry Marigold Scale = 1 : 500 Scale = 1 : 650 VERMICOMPOST AND ANIMAL SHED Seating Space Grape Vineyard Strawberry garden Grape Vineyard Marigold garden Bilke Area Strawberry garden PLAN OF GAZEBO Fountain Seatings Strawberry pathway 9 M 9 M Store Room (SR) (SR) (SR) (SR) N
  • 28. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C O L L E G E OF P O O N A I R E ENI GNE NG S TR E N G T H T R U T H E C N AR UDNE Uses Per Capita Requirement Residential 135 lit. Public spaces 45 lit. Fire demand 20 lit Loss demand 25 lit. 80% of water supply = sewer produced = 4050000 lit. Total sewerage produced in township in a day = 405000 lit. Total sewerage produced in township in a month = 121500000 lit. Total sewerage produced in township in a year = 1458000000 lit. 500 mm from mainline running along. 250 mm from main line to collector road. 150 mm from collector to local road. NEIGHBOURHOOD PLANNING: INFRASTRUCTURE KEY MAP Ichigo SEWERAGE SYSTEM CALCULATIONS Water tank Services E.S.R. G.S.R. WATER SUPPLY CALCULATIONS Water requirement of a person per day = 225 lit. Water requirement of a person for a year = 82125 lit. Water requirement of township = 82125 x 222500 = 1847812500 lit. According to Special Township Scheme, water reservoir should be 1.5 times of requirement . Water reservoir capacity = 2771718750 lit. 1 lit. = 0.0001 m3. Water reservoir capacity = 2771718.750 m3. According to URDPFI, water treatment plant of 2771718.750 m3 capacity requires 0.8 hectare. Sewerage System based on hierarchy of sewer lines. ESR CALCULATIONS Population = 22500 per capacity water demand = 225 lpcd. per day water requirement = 22500 x 225 lpcd = 5062500 litre is the water requirement of the day. The ESR should have 100% capacity of 1 day demand. Capacity of ESR = 5062500 lit. = 5062.5000 cu.m. The depth of ESR is 7m. Required areavof reservoir is 5062.500/7 = 723.2 sq.m.. The ESR is of circular shape. Interval radius of ESR = (723.2/3.142)^1 2 = 15.17. Therefore. the diameter of ESR is 30 m . Township requires 2 such ESR. 1 M0.6 M SECTION OF 12 M ROAD WATER SUPPLY LINE SEWER LINE PIPE CONTAINING ELECTRIC WIRES Bharegaon Substation Water supply line Sewer line Electric supply line Storm water supply line 12 m wide road Water System based on hierarchy of sewer lines. From Mulshi Dam 500 mm dia sewer line 250 mm dia sewer line 100 mm dia sewer line Mig sector WATER, SEWER AND ELECTRIC WATER SYSTEM Scale 1 : 90000 Site Location Source : Maharashtra Water Supply and Sewerage Board Water source located at a distance of 17 kms from the site PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
  • 29. S R COLLEGE OF ENGINEERING, PUNE G S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 N SIGN LOGONORTH N C O L L E G E OF P O O N A I R E ENI GNE NG T E N T H T R U T H E C N AR UDE Ichigo KEY MAP LEGENDS Site Boundary Drainage Line Contour Lines Rainwater Harvesting Plant A Detailing Sector (A) TOTAL AREA: 112159.5 sq.m. Diameter of drainage line = ( nQ/As^1 2 )^3 2 A SECTOR "A" : DRAINAGE LINE DESIGNED NETWORK: DRAINAGE SYSTEM CALCULATIONS TYPE FLOOR AREA NO. OF BUILDINGS HIG 250 and 43 30 and 129 res. HMIG 429.0800 82 MIG 370.5400 129 LIG 536.72 and 423.24 10 and 8 res. EWS 410.5000 18 RAINWATER HARVESTING CALCULATIONS : TOTAL RAINWATER COLLECTION: By using rational formula for calculation: Q = CiA where, Q = Run off, C = Run off coefficient i = Intensity of Rainfall A = Area Taking C value as 0.8 for the road. Hence total rainwater = 08 x 2.841 x 112149.5 = 254916.100 cubic.m. SCALE: 1:4000 (mm) SCALE: 1:2100 (mm) RAINWATER HARVESTING PLANT DETAILS: AREA REQUIRED FOR PLANT: (URDPFI) DRAINAGE SYSTEM (ROAD HIERARCHY BASED) Road Width Drainage Line Drainage Line Hierarchy 18m Both Side 500 mm 12m Both Side 250 mm 6m or insite One side 150 mm According to URDPFI guideline area of rainwater harvesting plant for 0.25 million of "Q" is = 0.1 Ha. (1000 sq.m) DRAINAGE LINE SCALE: 1:120 (mm) where. s =slope gradient, A=Area, Q=Capacity, n=Manning's coefficient Site Location Scale: 1:90000 Very Flat Steep Flat Very Steep 5 - 10 % Slope 10 - 25 % Slope > 25 % Slope 2 - 5 % Slope (250 mm diameter) 12 m Demand and supp;y analysis: Daily 60000 litres of water is required for landscaping purpose of various gardens etc. and our harvested water satisfies need for landscaping for more than 2 years. And hence remaining water in a year we use for other purposes like Urban agriculture. . Source: URDPFI guidelines Source:Council Of Architecture
  • 30. Quantity of Materials 1. Brickwork : Quantity of brickwork = 29.6093 cu. m No. of bricks are 500/cu. m Total no. of bricks = 29.6093 x 500 = 14805 Quantity of mortar = 30% of brickwork = 0.3 x 29.6093 = 8.8828 cu. m Ratio of cement mortar = 1:6 Quantity of cement = 8.8828 / 7 = 1.269 cu. m Quantity of cement in a cement bag = 0.035 cu. m Total no. of cement bags = 1.269 / 0.035 = 37 Total quantity of sand = 6 x quantity of cement = 6 x 1.269 = 7.614 cu. m 2. Plastering : Quantity of plastering = 360.9886 sq. m Dry cement mortar for 1 sq. m plastering = 0.02 cu. m Total dry mortar required = 0.02 x quantity of plastering = 0.02 x 360.9886 = 7.22 cu. m Ratio of cement mortar = 1:5 Quantity of cement = 7.22 / 6 = 1.2033 cu. m Quantity of cement in a cement bag = 0.035 cu. m Total no. of cement bags = 1.2033 / 0.035 = 35 Total quantity of sand = 5 x quantity of cement = 5 x 1.2033 = 6.0165 cu. m 3. Tiling : Total area of tiling = 134.3089 sq. m Thickness of lime mortar bed = 0.01 m Volume of lime mortar bed = area of tiling x thickness = 134.3089 x 0.01 = 1.34309 cu.m Volume of dry lime mortar = 1.5 x volume of lime mortar bed = 1.5 x 1.34309 = 2.0146 cu. m Ratio of lime mortar = 1:2 Total quantity of lime = quantity of lime mortar / 3 = 2.0146 / 3 = 0.67153 cu. m Total quantity of sand = quantity of lime x 2 = 0.67153 x 2 = 1.3431 cu. m 1 cement bag fills the joints in an area of 25 sq. m tiling. Total no. of white cement bags = area of tiling / 25 = 134.3089 / 25 = 6 bags Area of floor tiling = 84.8051 sq. m Size of floor tiles = 0.6 x 0.6 = 0.36 sq. m No. of floor tiles required = floor tiling area / tile size = 84.8051 / 0.36 = 236 COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29, 42 COSTING SHEET - 1 (Sample) SIGN LOGO C O L L E G E OF P O O N A I R E ENI GNE NG S TR E N G T H T R U T H E C N AR UDNE Ichigo 308/12/16
  • 31. Quantity of materials contd. Area of kitchen dado = 11.7038 sq. m Size of kitchen dado tiles = 0.3 x 0.3 = 0.09 sq. m No. of dado tiles required = area of dado / tile size = 11.7038 / 0.09 = 131 Area of washroom tiling = 37.8 sq. m Size of washroom tiles = 0.25 x 0.25 = 0.0625 sq. m No. of washroom tiles required = tiling area / tile size = 37.8 / 0.0625 = 605 4. R.C.C. work : Quantity of R.C.C. work = 914.7055 cu. m Ratio of cement mortar = 1:2:4 Quantity of cement = 0.22 cu. m / cu. m volume of R.C.C. = 0.22 x 914.7055 = 201.2352 cu. m Quantity of cement in a cement bag = 0.035 cu. m Total no. of cement bags = 201.2352 / 0.035 = 5750 Total quantity of sand = 2 x quantity of cement = 2 x 201.2352 = 402.4704 cu. m Total quantity of aggregates = 4 x quantity of cement = 4 x 201.2352 = 804.9408 cu. m Quantity of steel = 1% of volume of R.C.C. = 0.01 x 914.7055 = 9.147055 cu. m 1 cu. m of steel = 78.5 quintals Quantity of steel = 78.5 x 9.147055 = 718.0438 quintals Infrastructure costing : a. Primary pipes - DI Pipe k7 type, 250 mm : Rs. 2543 / meter b. Secondary pipes - PN8 (8kg / sq. cm), 150 mm : Rs. 907 / meter c. Tertiary pipes - PN8, 50 mm : Rs. 907 / meter TOTAL COST = Rs. 15,00,000 d. Cost of ESR + GSR + Water treatment plant + Electricity = Rs. 4,00,00,000 e. Cost of Storm water treatment plant = Rs. 25,00,000 COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29, 42 COSTING SHEET - 2 SIGN LOGO C O L L E G E OF P O O N A I R E ENI GNE NG S TR E N G T H T R U T H E C N AR UDNE Ichigo 318/12/16
  • 32. G.S.R. PHASE INDEX Colour Phase 0 1 2 3 4 HIG HMIG HMIG HMIG HMIG HIG MIG MIG JAPANESE GARDEN School Town hall LIG and EW S UrbanAgriculture E.S.R. S.T.P. HIG HIG MIG School Religious Centre Community Hall Dispensary Market Dispensary Commercial Urban Agriculture COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C O L L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE Site Location Scale: 1:90000 KEY MAP PHASE PLAN: NEIGHBOURHOOD PLANNING : PHASE PLAN
  • 33. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29, 42 COSTING SHEET - 4 SIGN LOGO C O L L E G E OF P O O N A I R E ENI GNE NG S TR E N G T H T R U T H E C N AR UDNE Ichigo Phasing : Compound increase of cost in gradual phase. Description of investment : Phase 0 investment : Rs. 1,79,92,70,990 Phase I : Recovery of investment Interest of investment for 2 years 3 months : Rs. 42,50,77,771 + investment But still the loan is : Rs. 1,11,70,48,761 + 14 crore of interest of loan taken in phase I. (2 years interest) Phase II : Total profit gained is : Rs. 4,71,70,15,200 But on deducing the remaining loan and interest, net profit is : Rs. 2,21,66,97,775 in phase II. Phase III: Amount available : Rs. 2,21,66,97,775 Loan taken for construction : Rs. 17,15,26,065 Interest paid : Rs. 5,40,30,710 Net profit at the end of phase III : Rs. 8,24,54,34,920 Considerations of Inflation and Profit : 1. Inflation is considered 8% and its cost is hence added accordingly to each development. 2. As the surrounding development largely impacts the cost of a particular place, there is a regular increase in the cost of a building. 3. Each phase of development experiences an increase in the cost. 4. Profit is also increased at a continuous but gradual rate in all the phases of development. 338/12/16
  • 34. COLLEGE OF ENGINEERING, PUNE S. Y. B. TECH. PLANNING DATE SCALE SHEET. NO.SUB. NO. MIS NO: 111514003, 04, 06, 08, 29,42 SIGN LOGONORTH N C OL L E G E OF P O O N A I R E ENIGNE NG S TR E N G T H T R U T H E C N AR UDNE NEIGHBOURHOOD PLANNING : MODEL Ichigo SCALE: 1:1330 KEY MAP LOCATION OF HIG HOUSING 8/12/16 34 MODEL OF HIG SECTOR LAKE VIEW APARTMENTS ICHIGO TOWNSHIP PHASE 3