SlideShare a Scribd company logo
1 of 3
Page 1 of 3
YADAV MANOJKUMAR INDRAPALBHAI
Mailing address: 188,Laxminarayan Soc.
A.K. Road,
Surat-395008
Cell No. : +91-8866368175 / 7016884055
Email id : manojyadav7878@gmail.com
 OBJECTIVE :
To be associated with an organization that will give me the chance to utilize my skills towards the
progress of an organization.
 WORK EXPERIENCE :
1. Company Name: TUV India Pvt Ltd (from July-2015 to at present)
Working as Project Coordinator cum Inspection Engineer
 in current company, Self is associated with arranging inspections for Mechanical & Electrical items
at various vendor places for various clients described as followed;
i.e. Pressure Vessel, Heat Exchanger, Air Cooler, Agitator, Skid mounted unit, Refractory, Pumps,
Pipe, Plate, Pipefittings, Fasteners, Forging, Flange, Gate valve, Globe valve , Check valve, Control
Valve, Structural steel beam, Structural steel plate, Tube, Butterfly valve, Generator, Transformer,
UPS system, LT Motor, HT Motor, Lighting Transformer, Switch Boards, control panel,
communication system, bus duct, battery charger, AC-DC Drive, Fire alarms, Flow meters, Water
treatment plant, concerting.
 Providing Service for Inspection of General, NACE & IBR Items.
 Manage contacts with clients, understand requests for activities worldwide. Working in close
partnership with the Executive Manager , I learned how to identify business opportunities and to
provide innovative and strategic initiatives. Lead the whole office with another project coordinator
& Inspectors working on daily basis. Taking care for documentation work.
 PROJECT WORKS in Current Company:
Working as Third Party Inspection Coordinator, Coordinated Various Projects successfully for
Industrial Services as follows:
1. Arranging Domestic as well as Overseas Inspections for various Projects.
2. Co-ordinated “VADINAR REFINARY” Shut-Down Project for M/s. ESSAR Oil Limited.
3. Co –ordinated Major Projects listed below for M/s. Larsen and Toubro Limited (L&T Power).
 2 x 660 MW, STAGE-II, UNIT 5 & 6, CHHABRA SUPER CRITICAL TPS
 Sikalbaha 225 MW CCPP
 BHERAMARA COMBINE CYCLE POWER PLANT (360 MW) DEVELOPMENT
 2 x 700 MWe PHWR - RAPP - Unit 7 and 8 (BOTI Package) [NPCIL approved
Inspection]
Page 2 of 3
4. Also Coordinating for Inspection Services for Various Clients. (M/s. GNFC, Deccan Fine
Chemicals, Hindalco-Unit of Birla Copper, SIEMENS, LINDE, RRVUNL, ANWESHA Engineering
& Projects, L&T Hydrocarbon Engineering, L&T Power, L&T Hravy Engineering, GEA, Essar
Heavy Engineering, PI Industries, ISGEC, RIL, ONGC, GCMMF etc.) For Various Projects in
various disciplines (Equipment, Piping, Fittings , Static, Packages, Rotary, Instrumentation)
 Following Major Projects are being executed for inspection currently for M/s. L&T Hydrocarbon ;
1) INDMAX-FCC Unit & LPG Treatment Facility at IOCL, Bongaigaon Refinary
2) Full conversion Hydrocracker Unit (FCHU)& Crude Distillation Unit-Vacuum Distillation
Unit (CDU-VDU) for HPCL, Vizag
3) Various Projects for M/s. L&T Hydrocarbon, Hazira for their client M/s. RIL, M/s. Technip &
M/s. ONGC.
 Associated with Business Development in current company & assisting for same. Also working
towards new approach of data analysis & documentation, which becomes useful to work towards
new orders/projects/clients, and also to evaluate company performance, which is useful to
identify & decide new strategies to be complied to enhance company performance.
 Acquainted with Tendering. (Online Tendering, Tender documentation, Documents Preparation
{Technical bid as well as Price bid} , Bid submission) , prepared and draft all the documents
requested.
 Support , manage and active cooperate in writing and overhauling contracts with clients and
vendors.
 Also serving for Quotation Preparation (for Indigenous as well as for overseas), Invoicing
Annexure Preparation, and Entry of Invoicing in SAP. Maintaining Registers for Inquiry, Various
Inspection Calls and Also managing Inspection calls & Inspection Reports as well as Inspection
Release Notes through various inspections monitoring system/software. Inspection Coordination,
Inspection calls Scheduling, Review of Reports, Documentation of Inspection Reports & Backup
Reports,
2. Company Name: Essar Steel India Ltd, Hazira
Worked as Inspection Supervisor in Refractory Section.
 Familiar with Ladle-Tundish Management/Operations, dimension checking of Refractory layer
in Tundish, assembly of Refractory parts, motorization of activities till tundish reaches for
pouring of Molten Metal in same.
3. Company Name: Vishal Engineering, Surat
Worked as Supervisor.
 Taking care of machining operations, manufacturing of textile machine Parts, CNC Operations,
Production & Quality checking, also familiar with Textile Machine Applications.
 ACHIEVEMENT :
NDT level-II certification - SNT-TC-1A by ASNT (American society for non-destructive testing)
level III Professions, from Trinity NDT Engineers, Bangalore.
Page 3 of 3
 EDUCATIONAL QUALIFICATION :
Examination Institution & Board Year of passing
SPI /
PERCENTAGES
NDT (Level-II)
TRINITY NDT
ENGINEERS,
BANGLORE
(ASNT)
Feb-2015
UT - 80.8
MT - 83.3
PT - 88.3
RT - 81.8
8th Sem
SHREE SWAMI
ATMANAND
SARASWATI
INSTITUTE OF
TECHNOLOGY,
GTU
BE (MECHANICAL)
May-2014 8.59
7th Sem Dec-2013 8.71
6th Sem May-2013 7.72
5th Sem Jan-2013 7.28
4th Sem May-2012 6.75
3rd Sem Dec-2011 6.94
2nd Sem June-2011 7.10
1st Sem Jan-2011 6.10
B. E. Aggregate – CPI (Cumulative Performance Index ) :- 7.41
CGPA(Cumulative Grade Point Average) :- 8.08
H.S.C.
P. P. SAVANI
VIDHYABHAVAN
2010 77.20%
S.S.C.
P. P. SAVANI
VIDHYABHAVAN
2008 86.15%
 COMPUTER SKILLS :
 MS-Office (Proficiency in Excell, Word, Outlook, Powerpoint)
 Monitoring inspection calls through Vision (TUV India software for Inspection calls & Reports
Monitoring), VCMS of M/s. L&T Power , ICMS of M/s. L&T Hydrocarbon & Quest.
 EXTRA CURRICULAR :
 Part-time worked as CNC Operator in Ishan Engineering, Surat.
 Participated in Robowar Event &b Various cultural events organized at SSASIT, Surat.
 Project work in college on “Experimental Investigation on performance of Diesel Engine
working on Diesel & Neem oil Blends”
 ORGANISATIONAL SKILLS AND COMPETENCES
Strong team spirit and ability to build and maintain Techno-commercial relationships with people, to
communicate, negotiate ,persuade and manage complains at all levels. I have also a strong ability to
work independently and to work under stress on multiple tasks. Years of experience in Client Service
jobs , dealing with high volumes of information made me a well-organized person ,with a practical
minded approach, who always see through resolutions.
Disciplined, Patient and persistent approach towards dealing with any situation.
 PERSONAL INFORMATION :
Date of birth : 28th October 1992
Languages known : Hindi, English, Gujarati

More Related Content

What's hot

Updated resume 06
Updated resume 06Updated resume 06
Updated resume 06shyam sahu
 
Resume - Electrical Engineer
Resume - Electrical EngineerResume - Electrical Engineer
Resume - Electrical EngineerNarender Singh
 
Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Sachin Pyasi
 
CV-SOMA-DECEMBER-2016
CV-SOMA-DECEMBER-2016CV-SOMA-DECEMBER-2016
CV-SOMA-DECEMBER-2016Kotesh Rao
 
jose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resumejose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resumejose varun
 
Rizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_CvRizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_CvRizwan Javed
 
Nitin_Patil_Resume
Nitin_Patil_ResumeNitin_Patil_Resume
Nitin_Patil_ResumeNitin Patil
 
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERjongguanzon
 
Company Profile - Div Project 2016
Company Profile - Div Project 2016Company Profile - Div Project 2016
Company Profile - Div Project 2016Riswanto DA
 
Fasil ck resume
Fasil ck resumeFasil ck resume
Fasil ck resumeFasil CK
 

What's hot (20)

Updated resume 06
Updated resume 06Updated resume 06
Updated resume 06
 
Resume - Electrical Engineer
Resume - Electrical EngineerResume - Electrical Engineer
Resume - Electrical Engineer
 
Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)
 
L Narayan's Resume
L Narayan's ResumeL Narayan's Resume
L Narayan's Resume
 
CSAR Brochure
CSAR BrochureCSAR Brochure
CSAR Brochure
 
Resume
ResumeResume
Resume
 
CV-SOMA-DECEMBER-2016
CV-SOMA-DECEMBER-2016CV-SOMA-DECEMBER-2016
CV-SOMA-DECEMBER-2016
 
jose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resumejose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resume
 
Rizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_CvRizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_Cv
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
 
RAJESH ROUSHAN
RAJESH ROUSHANRAJESH ROUSHAN
RAJESH ROUSHAN
 
Resume_kalika
Resume_kalikaResume_kalika
Resume_kalika
 
kamde_resume
kamde_resumekamde_resume
kamde_resume
 
Nitin_Patil_Resume
Nitin_Patil_ResumeNitin_Patil_Resume
Nitin_Patil_Resume
 
shoaib CV
shoaib CVshoaib CV
shoaib CV
 
DW RESUME II
DW RESUME IIDW RESUME II
DW RESUME II
 
afzal c.v
afzal c.vafzal c.v
afzal c.v
 
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEER
 
Company Profile - Div Project 2016
Company Profile - Div Project 2016Company Profile - Div Project 2016
Company Profile - Div Project 2016
 
Fasil ck resume
Fasil ck resumeFasil ck resume
Fasil ck resume
 

Similar to Yadav Manojkumar Indrapalbhai

Project Coordinator cum Inspection Engineer (B.E. Mechanical + NDT Level-II)
Project Coordinator cum Inspection Engineer (B.E. Mechanical + NDT Level-II)Project Coordinator cum Inspection Engineer (B.E. Mechanical + NDT Level-II)
Project Coordinator cum Inspection Engineer (B.E. Mechanical + NDT Level-II)Miyadav
 
Resume-Manoj Yadav B.E. mechanical (Project Coordinator)
Resume-Manoj Yadav  B.E. mechanical (Project Coordinator)Resume-Manoj Yadav  B.E. mechanical (Project Coordinator)
Resume-Manoj Yadav B.E. mechanical (Project Coordinator)Miyadav
 
Avtar_singh CV 2016
Avtar_singh  CV 2016Avtar_singh  CV 2016
Avtar_singh CV 2016Avtar Singh
 
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer ResumeSuresh Selvaraju
 
Anil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh
 
Anil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh
 
Anil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh
 
venu QAQC Resume
venu QAQC Resumevenu QAQC Resume
venu QAQC ResumeVenu Prasad
 
Elvis joy cv- mechanical engineer, primavera p6 hvac
Elvis joy  cv- mechanical engineer, primavera p6 hvacElvis joy  cv- mechanical engineer, primavera p6 hvac
Elvis joy cv- mechanical engineer, primavera p6 hvacElvis Joy
 
syed Raza _CV
syed Raza _CVsyed Raza _CV
syed Raza _CVSyed Raza
 
Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar
 

Similar to Yadav Manojkumar Indrapalbhai (20)

Project Coordinator cum Inspection Engineer (B.E. Mechanical + NDT Level-II)
Project Coordinator cum Inspection Engineer (B.E. Mechanical + NDT Level-II)Project Coordinator cum Inspection Engineer (B.E. Mechanical + NDT Level-II)
Project Coordinator cum Inspection Engineer (B.E. Mechanical + NDT Level-II)
 
Resume-Manoj Yadav B.E. mechanical (Project Coordinator)
Resume-Manoj Yadav  B.E. mechanical (Project Coordinator)Resume-Manoj Yadav  B.E. mechanical (Project Coordinator)
Resume-Manoj Yadav B.E. mechanical (Project Coordinator)
 
Avtar_singh CV 2016
Avtar_singh  CV 2016Avtar_singh  CV 2016
Avtar_singh CV 2016
 
MOHAMMAD Updated CV
MOHAMMAD Updated CV MOHAMMAD Updated CV
MOHAMMAD Updated CV
 
Kumaravel kpi
Kumaravel kpiKumaravel kpi
Kumaravel kpi
 
KUMARAVEL KPI
KUMARAVEL KPIKUMARAVEL KPI
KUMARAVEL KPI
 
Malikjan Resume New
Malikjan Resume NewMalikjan Resume New
Malikjan Resume New
 
Ujjwal Resume
Ujjwal ResumeUjjwal Resume
Ujjwal Resume
 
Instrumentation Engineer Resume
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer Resume
 
Anil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_Mech
 
Anil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_Mech
 
Anil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_Mech
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
Hedayatullah CV
Hedayatullah CVHedayatullah CV
Hedayatullah CV
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 
venu QAQC Resume
venu QAQC Resumevenu QAQC Resume
venu QAQC Resume
 
Elvis joy cv- mechanical engineer, primavera p6 hvac
Elvis joy  cv- mechanical engineer, primavera p6 hvacElvis joy  cv- mechanical engineer, primavera p6 hvac
Elvis joy cv- mechanical engineer, primavera p6 hvac
 
syed Raza _CV
syed Raza _CVsyed Raza _CV
syed Raza _CV
 
Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar (Resume)
Praveen Kumar (Resume)
 

Recently uploaded

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 

Recently uploaded (20)

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 

Yadav Manojkumar Indrapalbhai

  • 1. Page 1 of 3 YADAV MANOJKUMAR INDRAPALBHAI Mailing address: 188,Laxminarayan Soc. A.K. Road, Surat-395008 Cell No. : +91-8866368175 / 7016884055 Email id : manojyadav7878@gmail.com  OBJECTIVE : To be associated with an organization that will give me the chance to utilize my skills towards the progress of an organization.  WORK EXPERIENCE : 1. Company Name: TUV India Pvt Ltd (from July-2015 to at present) Working as Project Coordinator cum Inspection Engineer  in current company, Self is associated with arranging inspections for Mechanical & Electrical items at various vendor places for various clients described as followed; i.e. Pressure Vessel, Heat Exchanger, Air Cooler, Agitator, Skid mounted unit, Refractory, Pumps, Pipe, Plate, Pipefittings, Fasteners, Forging, Flange, Gate valve, Globe valve , Check valve, Control Valve, Structural steel beam, Structural steel plate, Tube, Butterfly valve, Generator, Transformer, UPS system, LT Motor, HT Motor, Lighting Transformer, Switch Boards, control panel, communication system, bus duct, battery charger, AC-DC Drive, Fire alarms, Flow meters, Water treatment plant, concerting.  Providing Service for Inspection of General, NACE & IBR Items.  Manage contacts with clients, understand requests for activities worldwide. Working in close partnership with the Executive Manager , I learned how to identify business opportunities and to provide innovative and strategic initiatives. Lead the whole office with another project coordinator & Inspectors working on daily basis. Taking care for documentation work.  PROJECT WORKS in Current Company: Working as Third Party Inspection Coordinator, Coordinated Various Projects successfully for Industrial Services as follows: 1. Arranging Domestic as well as Overseas Inspections for various Projects. 2. Co-ordinated “VADINAR REFINARY” Shut-Down Project for M/s. ESSAR Oil Limited. 3. Co –ordinated Major Projects listed below for M/s. Larsen and Toubro Limited (L&T Power).  2 x 660 MW, STAGE-II, UNIT 5 & 6, CHHABRA SUPER CRITICAL TPS  Sikalbaha 225 MW CCPP  BHERAMARA COMBINE CYCLE POWER PLANT (360 MW) DEVELOPMENT  2 x 700 MWe PHWR - RAPP - Unit 7 and 8 (BOTI Package) [NPCIL approved Inspection]
  • 2. Page 2 of 3 4. Also Coordinating for Inspection Services for Various Clients. (M/s. GNFC, Deccan Fine Chemicals, Hindalco-Unit of Birla Copper, SIEMENS, LINDE, RRVUNL, ANWESHA Engineering & Projects, L&T Hydrocarbon Engineering, L&T Power, L&T Hravy Engineering, GEA, Essar Heavy Engineering, PI Industries, ISGEC, RIL, ONGC, GCMMF etc.) For Various Projects in various disciplines (Equipment, Piping, Fittings , Static, Packages, Rotary, Instrumentation)  Following Major Projects are being executed for inspection currently for M/s. L&T Hydrocarbon ; 1) INDMAX-FCC Unit & LPG Treatment Facility at IOCL, Bongaigaon Refinary 2) Full conversion Hydrocracker Unit (FCHU)& Crude Distillation Unit-Vacuum Distillation Unit (CDU-VDU) for HPCL, Vizag 3) Various Projects for M/s. L&T Hydrocarbon, Hazira for their client M/s. RIL, M/s. Technip & M/s. ONGC.  Associated with Business Development in current company & assisting for same. Also working towards new approach of data analysis & documentation, which becomes useful to work towards new orders/projects/clients, and also to evaluate company performance, which is useful to identify & decide new strategies to be complied to enhance company performance.  Acquainted with Tendering. (Online Tendering, Tender documentation, Documents Preparation {Technical bid as well as Price bid} , Bid submission) , prepared and draft all the documents requested.  Support , manage and active cooperate in writing and overhauling contracts with clients and vendors.  Also serving for Quotation Preparation (for Indigenous as well as for overseas), Invoicing Annexure Preparation, and Entry of Invoicing in SAP. Maintaining Registers for Inquiry, Various Inspection Calls and Also managing Inspection calls & Inspection Reports as well as Inspection Release Notes through various inspections monitoring system/software. Inspection Coordination, Inspection calls Scheduling, Review of Reports, Documentation of Inspection Reports & Backup Reports, 2. Company Name: Essar Steel India Ltd, Hazira Worked as Inspection Supervisor in Refractory Section.  Familiar with Ladle-Tundish Management/Operations, dimension checking of Refractory layer in Tundish, assembly of Refractory parts, motorization of activities till tundish reaches for pouring of Molten Metal in same. 3. Company Name: Vishal Engineering, Surat Worked as Supervisor.  Taking care of machining operations, manufacturing of textile machine Parts, CNC Operations, Production & Quality checking, also familiar with Textile Machine Applications.  ACHIEVEMENT : NDT level-II certification - SNT-TC-1A by ASNT (American society for non-destructive testing) level III Professions, from Trinity NDT Engineers, Bangalore.
  • 3. Page 3 of 3  EDUCATIONAL QUALIFICATION : Examination Institution & Board Year of passing SPI / PERCENTAGES NDT (Level-II) TRINITY NDT ENGINEERS, BANGLORE (ASNT) Feb-2015 UT - 80.8 MT - 83.3 PT - 88.3 RT - 81.8 8th Sem SHREE SWAMI ATMANAND SARASWATI INSTITUTE OF TECHNOLOGY, GTU BE (MECHANICAL) May-2014 8.59 7th Sem Dec-2013 8.71 6th Sem May-2013 7.72 5th Sem Jan-2013 7.28 4th Sem May-2012 6.75 3rd Sem Dec-2011 6.94 2nd Sem June-2011 7.10 1st Sem Jan-2011 6.10 B. E. Aggregate – CPI (Cumulative Performance Index ) :- 7.41 CGPA(Cumulative Grade Point Average) :- 8.08 H.S.C. P. P. SAVANI VIDHYABHAVAN 2010 77.20% S.S.C. P. P. SAVANI VIDHYABHAVAN 2008 86.15%  COMPUTER SKILLS :  MS-Office (Proficiency in Excell, Word, Outlook, Powerpoint)  Monitoring inspection calls through Vision (TUV India software for Inspection calls & Reports Monitoring), VCMS of M/s. L&T Power , ICMS of M/s. L&T Hydrocarbon & Quest.  EXTRA CURRICULAR :  Part-time worked as CNC Operator in Ishan Engineering, Surat.  Participated in Robowar Event &b Various cultural events organized at SSASIT, Surat.  Project work in college on “Experimental Investigation on performance of Diesel Engine working on Diesel & Neem oil Blends”  ORGANISATIONAL SKILLS AND COMPETENCES Strong team spirit and ability to build and maintain Techno-commercial relationships with people, to communicate, negotiate ,persuade and manage complains at all levels. I have also a strong ability to work independently and to work under stress on multiple tasks. Years of experience in Client Service jobs , dealing with high volumes of information made me a well-organized person ,with a practical minded approach, who always see through resolutions. Disciplined, Patient and persistent approach towards dealing with any situation.  PERSONAL INFORMATION : Date of birth : 28th October 1992 Languages known : Hindi, English, Gujarati