SlideShare a Scribd company logo
1 of 4
Download to read offline
CURRICULAM VITAE 2016
Site no-21,3rd
Floor,
Ramakka Layout,
Mahadevapura
Bangalore -560048
Mobile: +91-9663211609
E.mail: josejvarun@gmail.com
JOSE VARUN J
Objective: To pursue a challenging career to deliver my knowledge to the best of my ability to the
concerned organization.
Educational Qualification:
Academic Project: Hydro Electric Power project renovated and erected (60MW)
Skills, Roles & Responsibilities:
 Professionally managing integrated system consisting of people, place, process & technology.
 Responsible for leading the Operations & maintenance staff in smooth operation of all
electromechanical area like HT& LT Side, DG Sets, HVAC System, STP, and WTP Plants.
 Generating & reporting of periodic facility reports such as daily MIS report / Management monthly
report / Break down report / Energy consumption report / critical incident reports to the senior
management.
 Preparation of preventive maintenance schedule for all the electrical equipment’s, systems & carrying
out the preventive maintenance work as per schedule.
Course Institution
Board/
University
Marks %
Year of
Completion
MBA Annamalai University
Annamalai
university
65% 2010
B.E
( EEE)
St. Xavier’s catholic
college of Engineering
Anna
University 65% 2005
Work Experience:
Presently working as an Assistant Facility Manager in Virginia Mall
through Pioneer Property Zone Pvt Ltd from 18th
January 2016 to till date.
Responsibilities:
 Looking the Operation & Maintenance and complete safety of Mechanical & electrical Equipment’s.
 Monitoring the operation and maintenance of
 Diesel Generators & Transformer
 UPS System and Air cooled chiller & CSU’s.
 Sewage Treatment Plant
 Water Treatment Plant
 Preparation of Manager Information Service Report (MIS), daily report, duty roaster, Materials
Intend, Mall daily power consumption report and vendor co –ordination.
 Planning, Preparing & conducting Planned Preventive Maintenance and keep the equipment’s zero
down time.
 Preparing Monthly Expenditure analysis based on the income & Monthly report.
 Preparing Utility report on daily basis and controlling the cost based on the expenditure and
budget.
 Preparation of Daily & Monthly MIS reports and others as required by client.
 Signing off from the client the entire checklist.
 Training & motivation to the staffs.
 Coordinating with the project people & preparing the snag points of the project in all the electro
mechanic equipment’s
 Preparation of 52 week PPM calendar & implementation.
 Taking over from projects transition & taking over or checklist.
 Implementing the checklist & log books for the Engineering & Maintenance.
 Preparing of the Standard Operating Procedure for the Engineering & maintenance.
Organization : Absotherm Facility Management Pvt Ltd (3 YEARS)
Time Period : 16th
January 2013 to 16th
July 2014 and 17th
July 2014 to 10th
January 2016
Designation : Shift Engineer and Assistant Facility Manager
(Phoenix Market city – 13 Lakhs sqft)
Location : Bangalore, Karnataka
Team Size: 45 (Shift Engineer’s – 4, Facility Executive – 1, MEP technician’s – 40).
Responsibilities:
 Look the Operation & Maintenance and complete safety of Mechanical & electrical Equipment’s.
 Monitoring the operation and maintenance of
 Diesel Generators 2000KVA & Transformer 2000 KVA
 UPS System 20 KVA & 40KVA and inverter 20 KVA, water cooled chiller 800 TR & Cooling
tower, AHU’s, CSU.
 Sewage Treatment Plant
 Water Treatment Plant
 Prepared Manager Information Service Report (MIS), daily report, duty roaster, Materials Intend,
Mall daily power consumption report and vendor co –ordination.
 Planned, Prepared & conducted Planned Preventive Maintenance and keep the equipment’s zero
down time.
 Prepared Monthly Expenditure analysis based on the income & Monthly report.
 Prepared Utility report on daily basis and controlling the cost based on the expenditure and
budget.
 Signed off from the client the entire checklist.
 Trained & motivation to the staffs.
 Coordinated with the project people & preparing the snag points of the project in all the electro
mechanic equipment’s
 Prepared the 52 week PPM calendar & implementation.
 Implemented the checklist & log books for the Engineering & Maintenance.
 Prepared of the Standard Operating Procedure for the Engineering & maintenance.
Organization : S L S Electricals.
Time Period : 22nd
August 2011 to January 15th
2013 (1.4 years)
Designation : Sr. Electrical Engineer
Location : Bangalore, Karnataka
Organization: Real time Integrated Infra tech Pvt Ltd
Time Period : 3rd
November 2010 to 19th
August 2011 (10 Months)
Designation : Electrical Engineer (Industrial Project – JSW, Bellary).
Location : Bangalore, Karnataka.
Responsibilities
 Performed the wiring of lighting circuit & Power circuit in hotels & malls as per consultant design.
 Tested & commissioned the AHU Starter Panels with Bypass and VFD.
 Erected the Metering panel, VCB, Transformer, LT Kiosk & LT Panels.
 Planned and Coordinated the Team members & Electrical vendors.
 Prepared the site materials checklist, weekend site report, attendance for site engineers.
 Prepared the bills as per the site measurement
Organization: Sabarigiri Hydro Electric Power Plant.
Time Period : October 2005 to October 2010. (5 years)
Designation : Electrical Engineer.
Location : Pathanamthitta, Kerala
Responsibilities
 Erected and Tested of 6 x 60 MW Power Projects
 Erected, Tested & Commissioned of 6x60 MW Generators, Excitation panels, Control &
Protection Panels in Hydro Electric Power Plant.
 Erected of Panels, End Termination of HV, LV cables as per the drawing Layout.
 Tested the insulation resistance of all HV, LV cables, Motors using Megger.
PERSONAL PROFILE
Father’s name : Mr. M. Jesudhas
Date of Birth : 23rd
June 1983
Gender : Male
Nationality : Indian
Passport no : F9962745
Languages known: Kannada, English, Tamil & Malayalam
Phone : +91-9663211609
Declaration:
I hereby declare that all the above information furnished by me is true to the best of my
Knowledge. I assure you that if given a chance I will do my work to the fullest satisfaction of my superiors.
Yours faithfully,
J. Jose Varun

More Related Content

What's hot (20)

Resume
ResumeResume
Resume
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Babban_Pandey-3
Babban_Pandey-3Babban_Pandey-3
Babban_Pandey-3
 
newRESUME
newRESUMEnewRESUME
newRESUME
 
Santhu CV Resume.
Santhu CV Resume.Santhu CV Resume.
Santhu CV Resume.
 
Yadav Manojkumar Indrapalbhai
Yadav  Manojkumar  IndrapalbhaiYadav  Manojkumar  Indrapalbhai
Yadav Manojkumar Indrapalbhai
 
Resume
ResumeResume
Resume
 
Rizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_CvRizwan Javed Mech_Engr_Cv
Rizwan Javed Mech_Engr_Cv
 
gopi chandra sahu, Resume
gopi  chandra sahu,  Resumegopi  chandra sahu,  Resume
gopi chandra sahu, Resume
 
cv of Shohid
cv of Shohidcv of Shohid
cv of Shohid
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
Elvis joy cv- mechanical engineer, primavera p6 hvac
Elvis joy  cv- mechanical engineer, primavera p6 hvacElvis joy  cv- mechanical engineer, primavera p6 hvac
Elvis joy cv- mechanical engineer, primavera p6 hvac
 
manju_cv_ updated
manju_cv_ updatedmanju_cv_ updated
manju_cv_ updated
 
SUFIYAN HVAC CV
SUFIYAN HVAC CVSUFIYAN HVAC CV
SUFIYAN HVAC CV
 
RAJESH ROUSHAN .
RAJESH ROUSHAN .RAJESH ROUSHAN .
RAJESH ROUSHAN .
 
RAJESH ROUSHAN
RAJESH ROUSHANRAJESH ROUSHAN
RAJESH ROUSHAN
 
Resume rupesh
Resume rupeshResume rupesh
Resume rupesh
 
Resume - Joshi Nivas
Resume - Joshi NivasResume - Joshi Nivas
Resume - Joshi Nivas
 
HVAC Engineer resume
HVAC Engineer resumeHVAC Engineer resume
HVAC Engineer resume
 
SuryaMohan_Resume_2016
SuryaMohan_Resume_2016SuryaMohan_Resume_2016
SuryaMohan_Resume_2016
 

Similar to jose varun-Technical - Assistant Facility Manager- resume

Similar to jose varun-Technical - Assistant Facility Manager- resume (20)

Resume new
Resume newResume new
Resume new
 
Resume 15 hvac
Resume 15 hvacResume 15 hvac
Resume 15 hvac
 
Ankit Resume - 1
Ankit Resume - 1Ankit Resume - 1
Ankit Resume - 1
 
Resume
Resume Resume
Resume
 
Kaustubh Pimputkar RESUME
Kaustubh Pimputkar  RESUMEKaustubh Pimputkar  RESUME
Kaustubh Pimputkar RESUME
 
Kaustubh Pimputkar RESUME
Kaustubh Pimputkar  RESUMEKaustubh Pimputkar  RESUME
Kaustubh Pimputkar RESUME
 
Resume chetan
Resume chetanResume chetan
Resume chetan
 
GOURAV_CHOUHAN_CV 120515.
GOURAV_CHOUHAN_CV 120515.GOURAV_CHOUHAN_CV 120515.
GOURAV_CHOUHAN_CV 120515.
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.
 
Resume.
Resume.Resume.
Resume.
 
SHAFFEE CV
SHAFFEE CVSHAFFEE CV
SHAFFEE CV
 
Resume 25.09.15
Resume 25.09.15Resume 25.09.15
Resume 25.09.15
 
CV OF droni
CV OF droniCV OF droni
CV OF droni
 
CV DRONI
CV DRONICV DRONI
CV DRONI
 
Cv (5) converted
Cv (5) convertedCv (5) converted
Cv (5) converted
 
Suresh V Resume
Suresh V ResumeSuresh V Resume
Suresh V Resume
 
sreeram cv 2016
sreeram cv 2016sreeram cv 2016
sreeram cv 2016
 
Loganathan Resume
Loganathan ResumeLoganathan Resume
Loganathan Resume
 
Resume_Latif Khan
Resume_Latif KhanResume_Latif Khan
Resume_Latif Khan
 
BSR 1-1
BSR 1-1BSR 1-1
BSR 1-1
 

jose varun-Technical - Assistant Facility Manager- resume

  • 1. CURRICULAM VITAE 2016 Site no-21,3rd Floor, Ramakka Layout, Mahadevapura Bangalore -560048 Mobile: +91-9663211609 E.mail: josejvarun@gmail.com JOSE VARUN J Objective: To pursue a challenging career to deliver my knowledge to the best of my ability to the concerned organization. Educational Qualification: Academic Project: Hydro Electric Power project renovated and erected (60MW) Skills, Roles & Responsibilities:  Professionally managing integrated system consisting of people, place, process & technology.  Responsible for leading the Operations & maintenance staff in smooth operation of all electromechanical area like HT& LT Side, DG Sets, HVAC System, STP, and WTP Plants.  Generating & reporting of periodic facility reports such as daily MIS report / Management monthly report / Break down report / Energy consumption report / critical incident reports to the senior management.  Preparation of preventive maintenance schedule for all the electrical equipment’s, systems & carrying out the preventive maintenance work as per schedule. Course Institution Board/ University Marks % Year of Completion MBA Annamalai University Annamalai university 65% 2010 B.E ( EEE) St. Xavier’s catholic college of Engineering Anna University 65% 2005
  • 2. Work Experience: Presently working as an Assistant Facility Manager in Virginia Mall through Pioneer Property Zone Pvt Ltd from 18th January 2016 to till date. Responsibilities:  Looking the Operation & Maintenance and complete safety of Mechanical & electrical Equipment’s.  Monitoring the operation and maintenance of  Diesel Generators & Transformer  UPS System and Air cooled chiller & CSU’s.  Sewage Treatment Plant  Water Treatment Plant  Preparation of Manager Information Service Report (MIS), daily report, duty roaster, Materials Intend, Mall daily power consumption report and vendor co –ordination.  Planning, Preparing & conducting Planned Preventive Maintenance and keep the equipment’s zero down time.  Preparing Monthly Expenditure analysis based on the income & Monthly report.  Preparing Utility report on daily basis and controlling the cost based on the expenditure and budget.  Preparation of Daily & Monthly MIS reports and others as required by client.  Signing off from the client the entire checklist.  Training & motivation to the staffs.  Coordinating with the project people & preparing the snag points of the project in all the electro mechanic equipment’s  Preparation of 52 week PPM calendar & implementation.  Taking over from projects transition & taking over or checklist.  Implementing the checklist & log books for the Engineering & Maintenance.  Preparing of the Standard Operating Procedure for the Engineering & maintenance. Organization : Absotherm Facility Management Pvt Ltd (3 YEARS) Time Period : 16th January 2013 to 16th July 2014 and 17th July 2014 to 10th January 2016 Designation : Shift Engineer and Assistant Facility Manager (Phoenix Market city – 13 Lakhs sqft) Location : Bangalore, Karnataka Team Size: 45 (Shift Engineer’s – 4, Facility Executive – 1, MEP technician’s – 40).
  • 3. Responsibilities:  Look the Operation & Maintenance and complete safety of Mechanical & electrical Equipment’s.  Monitoring the operation and maintenance of  Diesel Generators 2000KVA & Transformer 2000 KVA  UPS System 20 KVA & 40KVA and inverter 20 KVA, water cooled chiller 800 TR & Cooling tower, AHU’s, CSU.  Sewage Treatment Plant  Water Treatment Plant  Prepared Manager Information Service Report (MIS), daily report, duty roaster, Materials Intend, Mall daily power consumption report and vendor co –ordination.  Planned, Prepared & conducted Planned Preventive Maintenance and keep the equipment’s zero down time.  Prepared Monthly Expenditure analysis based on the income & Monthly report.  Prepared Utility report on daily basis and controlling the cost based on the expenditure and budget.  Signed off from the client the entire checklist.  Trained & motivation to the staffs.  Coordinated with the project people & preparing the snag points of the project in all the electro mechanic equipment’s  Prepared the 52 week PPM calendar & implementation.  Implemented the checklist & log books for the Engineering & Maintenance.  Prepared of the Standard Operating Procedure for the Engineering & maintenance. Organization : S L S Electricals. Time Period : 22nd August 2011 to January 15th 2013 (1.4 years) Designation : Sr. Electrical Engineer Location : Bangalore, Karnataka Organization: Real time Integrated Infra tech Pvt Ltd Time Period : 3rd November 2010 to 19th August 2011 (10 Months) Designation : Electrical Engineer (Industrial Project – JSW, Bellary). Location : Bangalore, Karnataka. Responsibilities  Performed the wiring of lighting circuit & Power circuit in hotels & malls as per consultant design.  Tested & commissioned the AHU Starter Panels with Bypass and VFD.  Erected the Metering panel, VCB, Transformer, LT Kiosk & LT Panels.  Planned and Coordinated the Team members & Electrical vendors.  Prepared the site materials checklist, weekend site report, attendance for site engineers.  Prepared the bills as per the site measurement
  • 4. Organization: Sabarigiri Hydro Electric Power Plant. Time Period : October 2005 to October 2010. (5 years) Designation : Electrical Engineer. Location : Pathanamthitta, Kerala Responsibilities  Erected and Tested of 6 x 60 MW Power Projects  Erected, Tested & Commissioned of 6x60 MW Generators, Excitation panels, Control & Protection Panels in Hydro Electric Power Plant.  Erected of Panels, End Termination of HV, LV cables as per the drawing Layout.  Tested the insulation resistance of all HV, LV cables, Motors using Megger. PERSONAL PROFILE Father’s name : Mr. M. Jesudhas Date of Birth : 23rd June 1983 Gender : Male Nationality : Indian Passport no : F9962745 Languages known: Kannada, English, Tamil & Malayalam Phone : +91-9663211609 Declaration: I hereby declare that all the above information furnished by me is true to the best of my Knowledge. I assure you that if given a chance I will do my work to the fullest satisfaction of my superiors. Yours faithfully, J. Jose Varun