SlideShare a Scribd company logo
1 of 4
CURRICULUM VITAE
SyedAfzal Alam
Email: alam.827@rediffmail.com/ amberfaridi1006@gmail.com
Mob. 94063287/ 69330118
Kuwait.
Total work experience: 12 Years (India and Kuwait)
Date of Birth: 10/05/1973
Nationality: Indian.
Present Address: Abbasiya, Kuwait.
Career objective:
To obtain a position where in my knowledge, experience and skills can be
utilized optimum for the growth of organization and progress of myself.
Educational Qualification: Bachelor of Technology in
Agriculture Engineering Degree
Elective subject: Irrigation Engineering (Soil Water Conservation)
Project Done: Marketable yield, irrigation production
Efficiency and economic return of
Cauliflower as influenced by different
Irrigation methods and schedules.
Employement Record:
I.
Company: KGL Agriculture services Co.
Position: Irrigation Engineer (PAAF approved)
Project Name: Garden District 4 (GD-4) Contract no. PAAF/7-2009-2010
Duration: March 2013 Till February 2014
Responsibilities:
 Design and drawing of drip and sprinkler system.
 Design schedule and execute the renovatin works related to the irrigatin
system right from pump houses to emitting device including all the
irrigatin network and Automatic control system.
 Prepare detailed schedules other various maintenance and operation
activities and implementation to the total satisfaction to the client.
 Achieve economy of the precious resources such as irrigation water,
power and man power utilize their resources for the optimum result.
II.
Company: KGL Agriculture services Co.
Position: Irrigation Engineer (PAAF approved)
Project Name: Shuhada Forestry Project Kuwait, Contract No. PAAF/ HA/
MM/13/2006/2007
Duraiton: October 2009 to March 2013
Responsibilities:
 Design of automatic Irrigation & Landscape Project and implementation
Erection, Commissioning, and testing of automatic irrigation network
system.
 As per the Water requirement for the Plants, installation of automatic
irrigation Controller and preparing water budget for summer and winter
seasons to irrigate the Plants through the automatic controller.
 Monitoring every day working status of the transfer pumps R-11, R-1R 22
to get proper and continuous TSE water supply to the related Irrigation
pumping station reserviors. Keeping proper maintenance to the TSE
modulating valve of each reservior and direct co-ordination to the
Mechanical Engineers.
 Prepare detailed schedules other various maintenance and operation
activities and implementation to the total satisfaction to the client.
 The pumping stations in project –A, Project B-1, Project B-2 keeping
direct coordination with R-R25 control room working status of irrigation
pumps run through telemetry and Scada system checking flow pressure in
upper stream and downstream, regarding any type of problem and
coordination with Mechanical engineer to find out the problema nd
rectificaiton timely.
III.
Company: KGL Agriculture services Co.
Position: Irrigation Engineer (PAAF approved)
Project Name: Motorways Project Kuwait, Contract no. PAAF/CT-16-05/06
Duraiton: October 2007 to September 2009
Responsibilities:
 Design and drawing of drip and sprinkler system. Design schedule and
execute the renovation works related to the irrigation system right from
the pump houses to the Emmitting device including all the irrigation
network and Automatic Control System.
 Design and drawing of drip and sprinkler system. Design schedule and
execute the renovation works related to the Irrigation system right from
the pump houses to Emitting device including all the irrigation network
and Automatic Control System.
 Prepare detailed schedules other various maintenance and operation
activities and implementation to the total satisfaction to the client.
 Achieve economy of the precious resources such as irrigation water,
power and man power utilize their resources for the optimum result.
 Detailed procedures for the operation and maintenance various equipment
and appurtenances as per the Manufacturer Recommendation and
implement them.
 Submit detailed report on the present status of equipment, suggest repairs
and cost estimates and schedule of these repairs.
 Overseas quality control of the equipment used by caring our Test at
critical points routinely.
 Co-ordinating activities of the irrigation, mechanical works, Telemetry
system, in order to have interruption free operation of the system and
trouble shooting.
IV.
Company: House of Development & Agriculture Cont. Co.
Position: Irrigation Engineer (PAAF approved)
Project Name: Motorways Project Kuwait, Contract no. PAAF/CT-4-02/03
Duraiton: Since 25th May 2004 to October 2007
Responsibilities:
 Design and drawing of drip and sprinkler system.
 Excavation and installation of drip and sprinkler irrigation System.
 Trouble shooting the drip and sprinkler system.
 Execute the outstanding variation and day worki instruction.
 Prepare requisition Irrigation materials tools and equipments.
 Prepared the dialy and monthly reports strictly implement the safety
measures in the irrigation and Landscapeworks.
V. (India)
Company: Ajay Industrial Corporation – Irrigation Division (India)
Position: Irrigation Engineer
Duraiton: From 2002 to October 2004
Responsibilities:
 Design and drawing of drip and sprinkler system.
 Design of Automatic Irrigation and Landscape project and
implementation, Erection, Commissioning and testing of
Automatic Irrigation network system. As per the water
requirement for the plants, installation Automatic controller and
preparing water budget for summer and Winter seasons to irrigate
through the automatic controlled execution, planing of works, and
controlling of manpower and completion of work as per work
schedule, prepared materials.
 Quantity list as per approved construction drawings, making
monthly payment certificates and preparing all checklist related to
Executed site work for final inspection and getting approval from
the ministry conduction correspondence with concerned
authorities regarding the site problem.
 Installation of mainlines, laterals, preparing material take off,
installation and maintenance of Irrigation pipes, maintenance
Solenoid valve, (R.C.V), Air release valves and etc.

More Related Content

What's hot

JEFFIN K JOSE CV
JEFFIN K JOSE CVJEFFIN K JOSE CV
JEFFIN K JOSE CVJeff Jose
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H
 
RESUME - Abhay Paranjape
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay ParanjapeAbhay Paranjape
 
Venkata Chandra Sekhar Sure
Venkata Chandra Sekhar SureVenkata Chandra Sekhar Sure
Venkata Chandra Sekhar Surechandu52
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineerKaran Vinayak
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015SANJAY SHARAN
 
Imran Resume HVAC Engineer
Imran Resume HVAC EngineerImran Resume HVAC Engineer
Imran Resume HVAC Engineerimran ahmed
 

What's hot (20)

Shabd saran sahu
Shabd saran sahuShabd saran sahu
Shabd saran sahu
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
resume-01
resume-01resume-01
resume-01
 
JEFFIN K JOSE CV
JEFFIN K JOSE CVJEFFIN K JOSE CV
JEFFIN K JOSE CV
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
Vijayendra CV
Vijayendra CVVijayendra CV
Vijayendra CV
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 
RESUME - Abhay Paranjape
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay Paranjape
 
renjith piping engineer
renjith piping engineerrenjith piping engineer
renjith piping engineer
 
Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)
 
Mechanical Engineer
Mechanical EngineerMechanical Engineer
Mechanical Engineer
 
Resume_VPrabu
Resume_VPrabuResume_VPrabu
Resume_VPrabu
 
Venkata Chandra Sekhar Sure
Venkata Chandra Sekhar SureVenkata Chandra Sekhar Sure
Venkata Chandra Sekhar Sure
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineer
 
CV_HVAC_ENGINEER
CV_HVAC_ENGINEERCV_HVAC_ENGINEER
CV_HVAC_ENGINEER
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
 
Imran Resume HVAC Engineer
Imran Resume HVAC EngineerImran Resume HVAC Engineer
Imran Resume HVAC Engineer
 
HVAC Engineer
HVAC EngineerHVAC Engineer
HVAC Engineer
 

Viewers also liked (20)

LEAN SUPPLY CHAIN
LEAN SUPPLY CHAINLEAN SUPPLY CHAIN
LEAN SUPPLY CHAIN
 
Ayuntamiento Ermua - 2015/12/11 Feria Bizhirik Erakusketa
Ayuntamiento Ermua - 2015/12/11 Feria Bizhirik ErakusketaAyuntamiento Ermua - 2015/12/11 Feria Bizhirik Erakusketa
Ayuntamiento Ermua - 2015/12/11 Feria Bizhirik Erakusketa
 
gazettenet_HMBnetwork
gazettenet_HMBnetworkgazettenet_HMBnetwork
gazettenet_HMBnetwork
 
MANUAL PARCHES CAPTURAS
MANUAL PARCHES CAPTURASMANUAL PARCHES CAPTURAS
MANUAL PARCHES CAPTURAS
 
holiness.in.marriage
holiness.in.marriageholiness.in.marriage
holiness.in.marriage
 
Μη Ευκλείδιες Γεωμετρίες
Μη Ευκλείδιες ΓεωμετρίεςΜη Ευκλείδιες Γεωμετρίες
Μη Ευκλείδιες Γεωμετρίες
 
Wedding Looks for Women
Wedding Looks for WomenWedding Looks for Women
Wedding Looks for Women
 
Coaching Profile
Coaching ProfileCoaching Profile
Coaching Profile
 
Thesis preview
Thesis previewThesis preview
Thesis preview
 
Corporate Kirtan L
Corporate Kirtan LCorporate Kirtan L
Corporate Kirtan L
 
Bons mots d'artistes
Bons mots d'artistesBons mots d'artistes
Bons mots d'artistes
 
Powerpoint Libreta.jpn
Powerpoint Libreta.jpnPowerpoint Libreta.jpn
Powerpoint Libreta.jpn
 
earley.sample.nopb
earley.sample.nopbearley.sample.nopb
earley.sample.nopb
 
ejemplo ANA Y SARA
ejemplo ANA Y SARAejemplo ANA Y SARA
ejemplo ANA Y SARA
 
Client Sites
Client SitesClient Sites
Client Sites
 
Authenticity of ahadith
Authenticity of ahadithAuthenticity of ahadith
Authenticity of ahadith
 
Brian_sResume1
Brian_sResume1Brian_sResume1
Brian_sResume1
 
Lathmar holi
Lathmar holiLathmar holi
Lathmar holi
 
CHUG_presentation_Hope
CHUG_presentation_HopeCHUG_presentation_Hope
CHUG_presentation_Hope
 
AJP67631460835000
AJP67631460835000AJP67631460835000
AJP67631460835000
 

Similar to afzal c.v

CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!Sayed Mosawi
 
CV Shray Jain
CV Shray Jain CV Shray Jain
CV Shray Jain Shray Jain
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerageKhalid Pervez
 
Alaa el kady c.v 2015
Alaa el kady  c.v 2015Alaa el kady  c.v 2015
Alaa el kady c.v 2015Alaa ElKady
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq Ahmad
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Ibrahim
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)Ahmed Youssef
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 

Similar to afzal c.v (20)

CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
CV Shray Jain
CV Shray Jain CV Shray Jain
CV Shray Jain
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Alaa el kady c.v 2015
Alaa el kady  c.v 2015Alaa el kady  c.v 2015
Alaa el kady c.v 2015
 
MOHAMMAD Updated CV
MOHAMMAD Updated CV MOHAMMAD Updated CV
MOHAMMAD Updated CV
 
SUNDAR CV.
SUNDAR CV.SUNDAR CV.
SUNDAR CV.
 
Aftab CV.
Aftab CV.Aftab CV.
Aftab CV.
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialist
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
Aathikesavan CV
Aathikesavan CVAathikesavan CV
Aathikesavan CV
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 

afzal c.v

  • 1. CURRICULUM VITAE SyedAfzal Alam Email: alam.827@rediffmail.com/ amberfaridi1006@gmail.com Mob. 94063287/ 69330118 Kuwait. Total work experience: 12 Years (India and Kuwait) Date of Birth: 10/05/1973 Nationality: Indian. Present Address: Abbasiya, Kuwait. Career objective: To obtain a position where in my knowledge, experience and skills can be utilized optimum for the growth of organization and progress of myself. Educational Qualification: Bachelor of Technology in Agriculture Engineering Degree Elective subject: Irrigation Engineering (Soil Water Conservation) Project Done: Marketable yield, irrigation production Efficiency and economic return of Cauliflower as influenced by different Irrigation methods and schedules. Employement Record: I. Company: KGL Agriculture services Co. Position: Irrigation Engineer (PAAF approved) Project Name: Garden District 4 (GD-4) Contract no. PAAF/7-2009-2010 Duration: March 2013 Till February 2014
  • 2. Responsibilities:  Design and drawing of drip and sprinkler system.  Design schedule and execute the renovatin works related to the irrigatin system right from pump houses to emitting device including all the irrigatin network and Automatic control system.  Prepare detailed schedules other various maintenance and operation activities and implementation to the total satisfaction to the client.  Achieve economy of the precious resources such as irrigation water, power and man power utilize their resources for the optimum result. II. Company: KGL Agriculture services Co. Position: Irrigation Engineer (PAAF approved) Project Name: Shuhada Forestry Project Kuwait, Contract No. PAAF/ HA/ MM/13/2006/2007 Duraiton: October 2009 to March 2013 Responsibilities:  Design of automatic Irrigation & Landscape Project and implementation Erection, Commissioning, and testing of automatic irrigation network system.  As per the Water requirement for the Plants, installation of automatic irrigation Controller and preparing water budget for summer and winter seasons to irrigate the Plants through the automatic controller.  Monitoring every day working status of the transfer pumps R-11, R-1R 22 to get proper and continuous TSE water supply to the related Irrigation pumping station reserviors. Keeping proper maintenance to the TSE modulating valve of each reservior and direct co-ordination to the Mechanical Engineers.  Prepare detailed schedules other various maintenance and operation activities and implementation to the total satisfaction to the client.  The pumping stations in project –A, Project B-1, Project B-2 keeping direct coordination with R-R25 control room working status of irrigation pumps run through telemetry and Scada system checking flow pressure in upper stream and downstream, regarding any type of problem and
  • 3. coordination with Mechanical engineer to find out the problema nd rectificaiton timely. III. Company: KGL Agriculture services Co. Position: Irrigation Engineer (PAAF approved) Project Name: Motorways Project Kuwait, Contract no. PAAF/CT-16-05/06 Duraiton: October 2007 to September 2009 Responsibilities:  Design and drawing of drip and sprinkler system. Design schedule and execute the renovation works related to the irrigation system right from the pump houses to the Emmitting device including all the irrigation network and Automatic Control System.  Design and drawing of drip and sprinkler system. Design schedule and execute the renovation works related to the Irrigation system right from the pump houses to Emitting device including all the irrigation network and Automatic Control System.  Prepare detailed schedules other various maintenance and operation activities and implementation to the total satisfaction to the client.  Achieve economy of the precious resources such as irrigation water, power and man power utilize their resources for the optimum result.  Detailed procedures for the operation and maintenance various equipment and appurtenances as per the Manufacturer Recommendation and implement them.  Submit detailed report on the present status of equipment, suggest repairs and cost estimates and schedule of these repairs.  Overseas quality control of the equipment used by caring our Test at critical points routinely.  Co-ordinating activities of the irrigation, mechanical works, Telemetry system, in order to have interruption free operation of the system and trouble shooting. IV. Company: House of Development & Agriculture Cont. Co. Position: Irrigation Engineer (PAAF approved)
  • 4. Project Name: Motorways Project Kuwait, Contract no. PAAF/CT-4-02/03 Duraiton: Since 25th May 2004 to October 2007 Responsibilities:  Design and drawing of drip and sprinkler system.  Excavation and installation of drip and sprinkler irrigation System.  Trouble shooting the drip and sprinkler system.  Execute the outstanding variation and day worki instruction.  Prepare requisition Irrigation materials tools and equipments.  Prepared the dialy and monthly reports strictly implement the safety measures in the irrigation and Landscapeworks. V. (India) Company: Ajay Industrial Corporation – Irrigation Division (India) Position: Irrigation Engineer Duraiton: From 2002 to October 2004 Responsibilities:  Design and drawing of drip and sprinkler system.  Design of Automatic Irrigation and Landscape project and implementation, Erection, Commissioning and testing of Automatic Irrigation network system. As per the water requirement for the plants, installation Automatic controller and preparing water budget for summer and Winter seasons to irrigate through the automatic controlled execution, planing of works, and controlling of manpower and completion of work as per work schedule, prepared materials.  Quantity list as per approved construction drawings, making monthly payment certificates and preparing all checklist related to Executed site work for final inspection and getting approval from the ministry conduction correspondence with concerned authorities regarding the site problem.  Installation of mainlines, laterals, preparing material take off, installation and maintenance of Irrigation pipes, maintenance Solenoid valve, (R.C.V), Air release valves and etc.