The kaizen project redesigned the final assembly cell for Applied Technologies to decrease travel distance and reduce floor space usage. The team analyzed customer demand and takt times to design a custom cell layout that accommodated all product assemblies. Individual work stations were customized and the cell was rearranged to reduce the assembly area by 40% and product travel distance by 63%, meeting targets of 400 square feet and 60 feet respectively.
Topsoil removal and excavation began at the camp platform and construction office area as widening of access road RD-5 started between Gndevaz and the Amulsar site. Early earthworks included slope cutting, material removal, and rerouting a powerline near the planned hazardous waste facility as the project site continued preparations for gold production.
Rachel Howard interned at NGPL during the summer of 2015. She worked on several projects including cost estimates for pipeline modifications to make sections piggable. She also created recoating cost estimates and analyzed budget versus actual costs for previous projects. Rachel assisted other project managers with scope documents, meeting minutes, and procurement reports. Additionally, she toured NGPL facilities and gained field experience monitoring a flow reversal and compressor station modifications.
This project proposal aims to survey exploration holes at Makomo Resources' main pit to calculate stripping ratios for mining block cut 7. The objectives are to establish control points, set up a baseline, traverse the area, survey exploration holes, and calculate volumes and stripping ratios. This will help determine the overburden and coal to be mined, providing an updated mining plan as required by regulations. The methodology will include office and field reconnaissance, establishing a baseline, triangulation, spotting exploration holes, and calculating volumes and stripping ratios. The expected results are cross-sectional plans, a surface plan, volume calculations, and stripping ratios.
A Two-Lift concrete Paving (2LCP) workshop was organized as a part of the Texas Department of Transportation (TxDOT) project 0-6749: Feasibility Study of Two-Lift Concrete Paving (2LCP). This workshop was conducted at the J. J. Pickle Research Campus (PRC), The University of Texas at Austin, Austin, TX on May 23rd, 2013. Dr. Jiong Hu, Texas State University, Research Supervisor, and Dr. David Fowler, The University of Texas at Austin, Co-Research Supervisor, co-chaired the workshop. The workshop offered the option of attending in person or remotely through webinar. Fifty-one attendees were present remotely or in person; 28 in person and 23 persons remotely.
BGC Contracting was awarded a $450 million contract to perform civil and earthworks for the Roy Hill Port landside development in Port Hedland, Western Australia from August 2013 to June 2015. The scope of work included clearing, grubbing, topsoil removal, ground improvement, construction of 5km of rail and road embankments, stockyard facilities, and site infrastructure over soft ground and tidal areas. Major tasks were to move 5.5 million cubic meters of earth, pour 45,000 cubic meters of concrete, install 6,000 meters of cast-in-situ piles, and mobilize a workforce of 500 people and heavy earthmoving equipment.
The document discusses tools developed to help local governments quantify and reduce greenhouse gas emissions from cement and asphalt used in construction projects. These tools include a materials reporting form and greenhouse gas calculator to inventory emissions on a project level. The calculator can also be used to evaluate alternatives to determine how different strategies, like using supplementary cementitious materials or warm mix asphalt, could impact emissions and costs. Hypothetical case studies are presented to demonstrate how the tools work in evaluating alternatives for arterial roadway construction, a CSO basin, and a local park renovation project.
The kaizen project redesigned the final assembly cell for Applied Technologies to decrease travel distance and reduce floor space usage. The team analyzed customer demand and takt times to design a custom cell layout that accommodated all product assemblies. Individual work stations were customized and the cell was rearranged to reduce the assembly area by 40% and product travel distance by 63%, meeting targets of 400 square feet and 60 feet respectively.
Topsoil removal and excavation began at the camp platform and construction office area as widening of access road RD-5 started between Gndevaz and the Amulsar site. Early earthworks included slope cutting, material removal, and rerouting a powerline near the planned hazardous waste facility as the project site continued preparations for gold production.
Rachel Howard interned at NGPL during the summer of 2015. She worked on several projects including cost estimates for pipeline modifications to make sections piggable. She also created recoating cost estimates and analyzed budget versus actual costs for previous projects. Rachel assisted other project managers with scope documents, meeting minutes, and procurement reports. Additionally, she toured NGPL facilities and gained field experience monitoring a flow reversal and compressor station modifications.
This project proposal aims to survey exploration holes at Makomo Resources' main pit to calculate stripping ratios for mining block cut 7. The objectives are to establish control points, set up a baseline, traverse the area, survey exploration holes, and calculate volumes and stripping ratios. This will help determine the overburden and coal to be mined, providing an updated mining plan as required by regulations. The methodology will include office and field reconnaissance, establishing a baseline, triangulation, spotting exploration holes, and calculating volumes and stripping ratios. The expected results are cross-sectional plans, a surface plan, volume calculations, and stripping ratios.
A Two-Lift concrete Paving (2LCP) workshop was organized as a part of the Texas Department of Transportation (TxDOT) project 0-6749: Feasibility Study of Two-Lift Concrete Paving (2LCP). This workshop was conducted at the J. J. Pickle Research Campus (PRC), The University of Texas at Austin, Austin, TX on May 23rd, 2013. Dr. Jiong Hu, Texas State University, Research Supervisor, and Dr. David Fowler, The University of Texas at Austin, Co-Research Supervisor, co-chaired the workshop. The workshop offered the option of attending in person or remotely through webinar. Fifty-one attendees were present remotely or in person; 28 in person and 23 persons remotely.
BGC Contracting was awarded a $450 million contract to perform civil and earthworks for the Roy Hill Port landside development in Port Hedland, Western Australia from August 2013 to June 2015. The scope of work included clearing, grubbing, topsoil removal, ground improvement, construction of 5km of rail and road embankments, stockyard facilities, and site infrastructure over soft ground and tidal areas. Major tasks were to move 5.5 million cubic meters of earth, pour 45,000 cubic meters of concrete, install 6,000 meters of cast-in-situ piles, and mobilize a workforce of 500 people and heavy earthmoving equipment.
The document discusses tools developed to help local governments quantify and reduce greenhouse gas emissions from cement and asphalt used in construction projects. These tools include a materials reporting form and greenhouse gas calculator to inventory emissions on a project level. The calculator can also be used to evaluate alternatives to determine how different strategies, like using supplementary cementitious materials or warm mix asphalt, could impact emissions and costs. Hypothetical case studies are presented to demonstrate how the tools work in evaluating alternatives for arterial roadway construction, a CSO basin, and a local park renovation project.
The document provides an overview of the Geo Analytics Canada demonstration platform. It describes how the platform addresses the challenge of analyzing large satellite datasets using traditional desktop tools by bringing algorithms to scalable cloud data and computing resources. Key features highlighted include on-demand compute and storage, tools for querying, discovering and analyzing satellite data, pre-processing pipelines, and personal analytic environments for interactive exploration and scaling of analyses. The platform aims to enable big data analytics of satellite datasets through open-source technologies and partnerships between IT and Earth observation experts.
Shruti Pimpalkar is a design engineer with over 10 years of experience in automotive part design and development. She has expertise in CAD design using UG NX and experience from concept development through launch. Currently working at TechMahindra, her responsibilities include designing and packaging interior components for Navistar commercial vehicles. She has extensive experience leading projects involving instrument panels, driver environments, and other interior and exterior automotive parts.
The SLAM group decided to update their system management infrastructure from Puppet 2 to Red Hat Satellite 6 to better manage their growing number of systems. They described their implementation of Satellite 6 to provide centralized lifecycle management of their 454 systems across 27 organizations. While a new product, Satellite 6 provides improved workflows, system attributes, and future-proofing compared to their previous tools. Future plans include integrating more automation and reporting features.
This document provides an overview of Neboneed Farhadi's experience portfolio, including:
- A Bachelor's degree in Aerospace Engineering and over 1.5 years of industry experience.
- Coursework and projects in areas like aircraft design, CAD, CFD, and robotics.
- Recent engineering work experience at Bloom Energy in remote monitoring and technical support.
- Additional non-engineering internship experience in hydrology data analysis.
This document discusses challenges and potential solutions for preserving 125 databases for access in the year 2080. It describes the Landesarchiv Baden-Württemberg archive and its oldest database from 1961 containing punched cards. The challenge presented is how to preserve the 125 databases from diverse origins for future use after 2080 while incurring no costs until then and keeping the contents private. Potential solutions discussed include exporting data to CSV or XML formats, taking disk/Docker images, or using a web crawler. The document analyzes the costs of each solution over time and invites others to join the discussion and workshop.
This was my 'last lecture' as the Sakai Executive Director at the 2007 Amsterdam conference where I just looked forward and postulated things that I thought should be done without taking any responsibility for actually doing them.
At the California Asphalt Pavement Association (CalAPA) Spring Asphalt Pavement Conference & Equipment Expo held on March 23-24, 2023 in Ontario, Calif., a presentation titled, "Caltrans Pavement Program – Incorporating Innovative and Proven Strategies for Sustainability and Efficiency" was delivered by
Cathrina Barros, P.E., Chief Office of Asphalt Pavements, Caltrans. Learn the latest from Caltrans on how Caltrans will update and publish future Standard books. Also, what changes should industry and agencies anticipate that will significantly change how pavements are constructed and accepted.
Steel Shelving Rack Case Study by Dragon SourcingJohn William
Here is a case study by Dragon Sourcing on Steel Shelving Rack from the Industrial Products sector for the year 2018 covering Hungary, Poland, Slovakia, Czech Rep, Bulgaria, Slovenia, Romania, Serbia, Croatia and India. For details contact: www.dragonsourcing.com
Status and Prospects for the Advanced Packaging Industry in China - 2016 Repo...Yole Developpement
This report analyzes the advanced packaging industry in China. It finds that the advanced packaging market in China is expected to grow at a CAGR of 16% to reach $4.6 billion by 2020, driven by long-term growth in the China IC industry and aggressive M&As. Total wafer bumping capacity in China is forecasted to reach 8 million 12-inch wafers per year by 2020, with Cu pillar bumping capacity growing at a CAGR of 19.7% as key Chinese OSATs ramp up 12-inch Cu pillar production. The report also examines the equipment infrastructure, materials market, and role of the Chinese government and investment funds in supporting the development of the local advanced packaging supply
"Benchmarking of distributed linked data streaming systems" as presented in the Stream Reasoning Workshop 2018, January 16-17, 2018, held by Department of Informatics DDIS (University of Zurich) in Zurich, Suisse
This work was supported by grants from the EU H2020 Framework Programme provided for the project HOBBIT (GA no. 688227).
Digitization of the audio, video and film collections. Patrick Monette, Media...FIAT/IFTA
This document discusses Radio-Canada's plans to digitize its audio, video, and film collections. It provides an overview of the objectives, collections volumes, and lessons learned from pilot projects. Key points include:
- Radio-Canada has one of the largest TV and radio collections in the world, totaling over 500,000 programs and 30,000 hours of production footage.
- Digitization will facilitate reuse of content, preserve collections, and reduce storage needs as formats become obsolete.
- Pilot projects to digitize videocassettes, CDs, and films in Montreal provided experience in developing workflows and addressing challenges like missing metadata.
- Future plans include expanding digitization to other regions over several years,
Archith Sanker P V has over 4 years of experience in wastewater modeling, design, and project planning and execution. He has extensive experience using hydraulic modeling software like InfoWorks CS and ICM to model wastewater networks. Some of his projects include wastewater network modeling and development impact assessments for Anglian Water in the UK. He also has experience verifying and building wastewater models for various clients in the UK and India. Archith holds a B.Tech in Civil Engineering and is proficient in several wastewater and GIS modeling software.
This document provides details on the construction methodology and schedule for the extension phase 1 of the Indus Hospital. It outlines the site establishment plan, project management structure, construction quality control plan, and work methodology for substructure works, building package A and building package B. The substructure works are scheduled from November 2015 to July 2016, followed by construction of 10 floors for building package A from May 2016 to September 2017. Building package B involves construction of 8 floors from June 2016 to May 2017. Equipment, staffing and material procurement plans are also included.
The document provides details on several engineering projects that the author has worked on, including hydropower projects in the Philippines and Laos, university buildings, commercial buildings, condominiums, and ministry offices. For each project, brief details are given on the project location and type, the client, the author's role as a structural engineer, and their responsibilities such as structural design calculations, construction drawings, and coordinating project teams. Engineering drawings and 3D models are included for some projects.
The Process of Shipping Hardware ProductsOmer Kilic
The document discusses the process of shipping hardware products. It outlines the typical stages of hardware development including specification, proof of concept, engineering prototype, and product. It then provides a case study of developing an RFID attendance monitor and walks through the stages of ideation, design, engineering, and validation. Key aspects of the hardware development process discussed include component selection, PCB design for manufacturability, working with contract electronics manufacturers, and regulatory compliance.
Mandar Date is seeking a middle level position in design engineering or project management in the oil & gas, pharmaceutical, FMCG, or power sector. He has nearly 10 years of experience in piping design engineering, drawings, team management, and implementing piping designs according to client requirements and piping standards. Currently he works as an Assistant Manager at Larsen & Toubro where he is responsible for piping design projects in Indonesia and the USA. Previously he has worked on power plant, chemical plant, and oil & gas projects in India, China, and Norway.
Large Scale Additive Manufacturing and Construction KTN
On July 10th Innovate UK and the KTN held a business innovation day to showcase 30 of the Innovate UK projects that are currently active in the area of Additive Manufacturing. The presentations and pitches made on the day are now available to download. Topic 5 focuses on large scale additive manufacturing and construction.
Roca Groups presentation on BIMobject LIVe 2014BIMobject
The document discusses Roca Group's BIM project from 2013-2014. It began as a pilot project to create BIM objects for 50 of Roca's products in Revit and ArchiCAD formats. The objectives were to learn how to properly create BIM components, control ownership and distribution, and determine a strategy for future large-scale production. The pilot was completed over 8 weeks and involved defining standards, creating early prototypes, testing, and documentation. Lessons learned included the need to specify BIM component requirements, define a strategy for ongoing component management, and estimate costs and time required for mass production.
The document discusses various aspects of manufacturing plant design including plant layouts, scheduling, and inventory management. It provides details on different types of plant layouts such as functional, product, and cellular layouts. It also covers topics like single machine scheduling, parallel machine scheduling, critical path analysis, economic order quantity, and master production scheduling. Plant location selection and material requirement planning are analyzed through examples and formulas. The document is an in-depth reference on manufacturing design and production planning concepts.
Null Bangalore | Pentesters Approach to AWS IAMDivyanshu
#Abstract:
- Learn more about the real-world methods for auditing AWS IAM (Identity and Access Management) as a pentester. So let us proceed with a brief discussion of IAM as well as some typical misconfigurations and their potential exploits in order to reinforce the understanding of IAM security best practices.
- Gain actionable insights into AWS IAM policies and roles, using hands on approach.
#Prerequisites:
- Basic understanding of AWS services and architecture
- Familiarity with cloud security concepts
- Experience using the AWS Management Console or AWS CLI.
- For hands on lab create account on [killercoda.com](https://killercoda.com/cloudsecurity-scenario/)
# Scenario Covered:
- Basics of IAM in AWS
- Implementing IAM Policies with Least Privilege to Manage S3 Bucket
- Objective: Create an S3 bucket with least privilege IAM policy and validate access.
- Steps:
- Create S3 bucket.
- Attach least privilege policy to IAM user.
- Validate access.
- Exploiting IAM PassRole Misconfiguration
-Allows a user to pass a specific IAM role to an AWS service (ec2), typically used for service access delegation. Then exploit PassRole Misconfiguration granting unauthorized access to sensitive resources.
- Objective: Demonstrate how a PassRole misconfiguration can grant unauthorized access.
- Steps:
- Allow user to pass IAM role to EC2.
- Exploit misconfiguration for unauthorized access.
- Access sensitive resources.
- Exploiting IAM AssumeRole Misconfiguration with Overly Permissive Role
- An overly permissive IAM role configuration can lead to privilege escalation by creating a role with administrative privileges and allow a user to assume this role.
- Objective: Show how overly permissive IAM roles can lead to privilege escalation.
- Steps:
- Create role with administrative privileges.
- Allow user to assume the role.
- Perform administrative actions.
- Differentiation between PassRole vs AssumeRole
Try at [killercoda.com](https://killercoda.com/cloudsecurity-scenario/)
More Related Content
Similar to X-Ray Spares Project: GE Healthcare Summer 2020
The document provides an overview of the Geo Analytics Canada demonstration platform. It describes how the platform addresses the challenge of analyzing large satellite datasets using traditional desktop tools by bringing algorithms to scalable cloud data and computing resources. Key features highlighted include on-demand compute and storage, tools for querying, discovering and analyzing satellite data, pre-processing pipelines, and personal analytic environments for interactive exploration and scaling of analyses. The platform aims to enable big data analytics of satellite datasets through open-source technologies and partnerships between IT and Earth observation experts.
Shruti Pimpalkar is a design engineer with over 10 years of experience in automotive part design and development. She has expertise in CAD design using UG NX and experience from concept development through launch. Currently working at TechMahindra, her responsibilities include designing and packaging interior components for Navistar commercial vehicles. She has extensive experience leading projects involving instrument panels, driver environments, and other interior and exterior automotive parts.
The SLAM group decided to update their system management infrastructure from Puppet 2 to Red Hat Satellite 6 to better manage their growing number of systems. They described their implementation of Satellite 6 to provide centralized lifecycle management of their 454 systems across 27 organizations. While a new product, Satellite 6 provides improved workflows, system attributes, and future-proofing compared to their previous tools. Future plans include integrating more automation and reporting features.
This document provides an overview of Neboneed Farhadi's experience portfolio, including:
- A Bachelor's degree in Aerospace Engineering and over 1.5 years of industry experience.
- Coursework and projects in areas like aircraft design, CAD, CFD, and robotics.
- Recent engineering work experience at Bloom Energy in remote monitoring and technical support.
- Additional non-engineering internship experience in hydrology data analysis.
This document discusses challenges and potential solutions for preserving 125 databases for access in the year 2080. It describes the Landesarchiv Baden-Württemberg archive and its oldest database from 1961 containing punched cards. The challenge presented is how to preserve the 125 databases from diverse origins for future use after 2080 while incurring no costs until then and keeping the contents private. Potential solutions discussed include exporting data to CSV or XML formats, taking disk/Docker images, or using a web crawler. The document analyzes the costs of each solution over time and invites others to join the discussion and workshop.
This was my 'last lecture' as the Sakai Executive Director at the 2007 Amsterdam conference where I just looked forward and postulated things that I thought should be done without taking any responsibility for actually doing them.
At the California Asphalt Pavement Association (CalAPA) Spring Asphalt Pavement Conference & Equipment Expo held on March 23-24, 2023 in Ontario, Calif., a presentation titled, "Caltrans Pavement Program – Incorporating Innovative and Proven Strategies for Sustainability and Efficiency" was delivered by
Cathrina Barros, P.E., Chief Office of Asphalt Pavements, Caltrans. Learn the latest from Caltrans on how Caltrans will update and publish future Standard books. Also, what changes should industry and agencies anticipate that will significantly change how pavements are constructed and accepted.
Steel Shelving Rack Case Study by Dragon SourcingJohn William
Here is a case study by Dragon Sourcing on Steel Shelving Rack from the Industrial Products sector for the year 2018 covering Hungary, Poland, Slovakia, Czech Rep, Bulgaria, Slovenia, Romania, Serbia, Croatia and India. For details contact: www.dragonsourcing.com
Status and Prospects for the Advanced Packaging Industry in China - 2016 Repo...Yole Developpement
This report analyzes the advanced packaging industry in China. It finds that the advanced packaging market in China is expected to grow at a CAGR of 16% to reach $4.6 billion by 2020, driven by long-term growth in the China IC industry and aggressive M&As. Total wafer bumping capacity in China is forecasted to reach 8 million 12-inch wafers per year by 2020, with Cu pillar bumping capacity growing at a CAGR of 19.7% as key Chinese OSATs ramp up 12-inch Cu pillar production. The report also examines the equipment infrastructure, materials market, and role of the Chinese government and investment funds in supporting the development of the local advanced packaging supply
"Benchmarking of distributed linked data streaming systems" as presented in the Stream Reasoning Workshop 2018, January 16-17, 2018, held by Department of Informatics DDIS (University of Zurich) in Zurich, Suisse
This work was supported by grants from the EU H2020 Framework Programme provided for the project HOBBIT (GA no. 688227).
Digitization of the audio, video and film collections. Patrick Monette, Media...FIAT/IFTA
This document discusses Radio-Canada's plans to digitize its audio, video, and film collections. It provides an overview of the objectives, collections volumes, and lessons learned from pilot projects. Key points include:
- Radio-Canada has one of the largest TV and radio collections in the world, totaling over 500,000 programs and 30,000 hours of production footage.
- Digitization will facilitate reuse of content, preserve collections, and reduce storage needs as formats become obsolete.
- Pilot projects to digitize videocassettes, CDs, and films in Montreal provided experience in developing workflows and addressing challenges like missing metadata.
- Future plans include expanding digitization to other regions over several years,
Archith Sanker P V has over 4 years of experience in wastewater modeling, design, and project planning and execution. He has extensive experience using hydraulic modeling software like InfoWorks CS and ICM to model wastewater networks. Some of his projects include wastewater network modeling and development impact assessments for Anglian Water in the UK. He also has experience verifying and building wastewater models for various clients in the UK and India. Archith holds a B.Tech in Civil Engineering and is proficient in several wastewater and GIS modeling software.
This document provides details on the construction methodology and schedule for the extension phase 1 of the Indus Hospital. It outlines the site establishment plan, project management structure, construction quality control plan, and work methodology for substructure works, building package A and building package B. The substructure works are scheduled from November 2015 to July 2016, followed by construction of 10 floors for building package A from May 2016 to September 2017. Building package B involves construction of 8 floors from June 2016 to May 2017. Equipment, staffing and material procurement plans are also included.
The document provides details on several engineering projects that the author has worked on, including hydropower projects in the Philippines and Laos, university buildings, commercial buildings, condominiums, and ministry offices. For each project, brief details are given on the project location and type, the client, the author's role as a structural engineer, and their responsibilities such as structural design calculations, construction drawings, and coordinating project teams. Engineering drawings and 3D models are included for some projects.
The Process of Shipping Hardware ProductsOmer Kilic
The document discusses the process of shipping hardware products. It outlines the typical stages of hardware development including specification, proof of concept, engineering prototype, and product. It then provides a case study of developing an RFID attendance monitor and walks through the stages of ideation, design, engineering, and validation. Key aspects of the hardware development process discussed include component selection, PCB design for manufacturability, working with contract electronics manufacturers, and regulatory compliance.
Mandar Date is seeking a middle level position in design engineering or project management in the oil & gas, pharmaceutical, FMCG, or power sector. He has nearly 10 years of experience in piping design engineering, drawings, team management, and implementing piping designs according to client requirements and piping standards. Currently he works as an Assistant Manager at Larsen & Toubro where he is responsible for piping design projects in Indonesia and the USA. Previously he has worked on power plant, chemical plant, and oil & gas projects in India, China, and Norway.
Large Scale Additive Manufacturing and Construction KTN
On July 10th Innovate UK and the KTN held a business innovation day to showcase 30 of the Innovate UK projects that are currently active in the area of Additive Manufacturing. The presentations and pitches made on the day are now available to download. Topic 5 focuses on large scale additive manufacturing and construction.
Roca Groups presentation on BIMobject LIVe 2014BIMobject
The document discusses Roca Group's BIM project from 2013-2014. It began as a pilot project to create BIM objects for 50 of Roca's products in Revit and ArchiCAD formats. The objectives were to learn how to properly create BIM components, control ownership and distribution, and determine a strategy for future large-scale production. The pilot was completed over 8 weeks and involved defining standards, creating early prototypes, testing, and documentation. Lessons learned included the need to specify BIM component requirements, define a strategy for ongoing component management, and estimate costs and time required for mass production.
The document discusses various aspects of manufacturing plant design including plant layouts, scheduling, and inventory management. It provides details on different types of plant layouts such as functional, product, and cellular layouts. It also covers topics like single machine scheduling, parallel machine scheduling, critical path analysis, economic order quantity, and master production scheduling. Plant location selection and material requirement planning are analyzed through examples and formulas. The document is an in-depth reference on manufacturing design and production planning concepts.
Similar to X-Ray Spares Project: GE Healthcare Summer 2020 (20)
Null Bangalore | Pentesters Approach to AWS IAMDivyanshu
#Abstract:
- Learn more about the real-world methods for auditing AWS IAM (Identity and Access Management) as a pentester. So let us proceed with a brief discussion of IAM as well as some typical misconfigurations and their potential exploits in order to reinforce the understanding of IAM security best practices.
- Gain actionable insights into AWS IAM policies and roles, using hands on approach.
#Prerequisites:
- Basic understanding of AWS services and architecture
- Familiarity with cloud security concepts
- Experience using the AWS Management Console or AWS CLI.
- For hands on lab create account on [killercoda.com](https://killercoda.com/cloudsecurity-scenario/)
# Scenario Covered:
- Basics of IAM in AWS
- Implementing IAM Policies with Least Privilege to Manage S3 Bucket
- Objective: Create an S3 bucket with least privilege IAM policy and validate access.
- Steps:
- Create S3 bucket.
- Attach least privilege policy to IAM user.
- Validate access.
- Exploiting IAM PassRole Misconfiguration
-Allows a user to pass a specific IAM role to an AWS service (ec2), typically used for service access delegation. Then exploit PassRole Misconfiguration granting unauthorized access to sensitive resources.
- Objective: Demonstrate how a PassRole misconfiguration can grant unauthorized access.
- Steps:
- Allow user to pass IAM role to EC2.
- Exploit misconfiguration for unauthorized access.
- Access sensitive resources.
- Exploiting IAM AssumeRole Misconfiguration with Overly Permissive Role
- An overly permissive IAM role configuration can lead to privilege escalation by creating a role with administrative privileges and allow a user to assume this role.
- Objective: Show how overly permissive IAM roles can lead to privilege escalation.
- Steps:
- Create role with administrative privileges.
- Allow user to assume the role.
- Perform administrative actions.
- Differentiation between PassRole vs AssumeRole
Try at [killercoda.com](https://killercoda.com/cloudsecurity-scenario/)
AI for Legal Research with applications, toolsmahaffeycheryld
AI applications in legal research include rapid document analysis, case law review, and statute interpretation. AI-powered tools can sift through vast legal databases to find relevant precedents and citations, enhancing research accuracy and speed. They assist in legal writing by drafting and proofreading documents. Predictive analytics help foresee case outcomes based on historical data, aiding in strategic decision-making. AI also automates routine tasks like contract review and due diligence, freeing up lawyers to focus on complex legal issues. These applications make legal research more efficient, cost-effective, and accessible.
Build the Next Generation of Apps with the Einstein 1 Platform.
Rejoignez Philippe Ozil pour une session de workshops qui vous guidera à travers les détails de la plateforme Einstein 1, l'importance des données pour la création d'applications d'intelligence artificielle et les différents outils et technologies que Salesforce propose pour vous apporter tous les bénéfices de l'IA.
Introduction- e - waste – definition - sources of e-waste– hazardous substances in e-waste - effects of e-waste on environment and human health- need for e-waste management– e-waste handling rules - waste minimization techniques for managing e-waste – recycling of e-waste - disposal treatment methods of e- waste – mechanism of extraction of precious metal from leaching solution-global Scenario of E-waste – E-waste in India- case studies.
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...IJECEIAES
Climate change's impact on the planet forced the United Nations and governments to promote green energies and electric transportation. The deployments of photovoltaic (PV) and electric vehicle (EV) systems gained stronger momentum due to their numerous advantages over fossil fuel types. The advantages go beyond sustainability to reach financial support and stability. The work in this paper introduces the hybrid system between PV and EV to support industrial and commercial plants. This paper covers the theoretical framework of the proposed hybrid system including the required equation to complete the cost analysis when PV and EV are present. In addition, the proposed design diagram which sets the priorities and requirements of the system is presented. The proposed approach allows setup to advance their power stability, especially during power outages. The presented information supports researchers and plant owners to complete the necessary analysis while promoting the deployment of clean energy. The result of a case study that represents a dairy milk farmer supports the theoretical works and highlights its advanced benefits to existing plants. The short return on investment of the proposed approach supports the paper's novelty approach for the sustainable electrical system. In addition, the proposed system allows for an isolated power setup without the need for a transmission line which enhances the safety of the electrical network
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...shadow0702a
This document serves as a comprehensive step-by-step guide on how to effectively use PyCharm for remote debugging of the Windows Subsystem for Linux (WSL) on a local Windows machine. It meticulously outlines several critical steps in the process, starting with the crucial task of enabling permissions, followed by the installation and configuration of WSL.
The guide then proceeds to explain how to set up the SSH service within the WSL environment, an integral part of the process. Alongside this, it also provides detailed instructions on how to modify the inbound rules of the Windows firewall to facilitate the process, ensuring that there are no connectivity issues that could potentially hinder the debugging process.
The document further emphasizes on the importance of checking the connection between the Windows and WSL environments, providing instructions on how to ensure that the connection is optimal and ready for remote debugging.
It also offers an in-depth guide on how to configure the WSL interpreter and files within the PyCharm environment. This is essential for ensuring that the debugging process is set up correctly and that the program can be run effectively within the WSL terminal.
Additionally, the document provides guidance on how to set up breakpoints for debugging, a fundamental aspect of the debugging process which allows the developer to stop the execution of their code at certain points and inspect their program at those stages.
Finally, the document concludes by providing a link to a reference blog. This blog offers additional information and guidance on configuring the remote Python interpreter in PyCharm, providing the reader with a well-rounded understanding of the process.
Embedded machine learning-based road conditions and driving behavior monitoringIJECEIAES
Car accident rates have increased in recent years, resulting in losses in human lives, properties, and other financial costs. An embedded machine learning-based system is developed to address this critical issue. The system can monitor road conditions, detect driving patterns, and identify aggressive driving behaviors. The system is based on neural networks trained on a comprehensive dataset of driving events, driving styles, and road conditions. The system effectively detects potential risks and helps mitigate the frequency and impact of accidents. The primary goal is to ensure the safety of drivers and vehicles. Collecting data involved gathering information on three key road events: normal street and normal drive, speed bumps, circular yellow speed bumps, and three aggressive driving actions: sudden start, sudden stop, and sudden entry. The gathered data is processed and analyzed using a machine learning system designed for limited power and memory devices. The developed system resulted in 91.9% accuracy, 93.6% precision, and 92% recall. The achieved inference time on an Arduino Nano 33 BLE Sense with a 32-bit CPU running at 64 MHz is 34 ms and requires 2.6 kB peak RAM and 139.9 kB program flash memory, making it suitable for resource-constrained embedded systems.
Discover the latest insights on Data Driven Maintenance with our comprehensive webinar presentation. Learn about traditional maintenance challenges, the right approach to utilizing data, and the benefits of adopting a Data Driven Maintenance strategy. Explore real-world examples, industry best practices, and innovative solutions like FMECA and the D3M model. This presentation, led by expert Jules Oudmans, is essential for asset owners looking to optimize their maintenance processes and leverage digital technologies for improved efficiency and performance. Download now to stay ahead in the evolving maintenance landscape.
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...IJECEIAES
Medical image analysis has witnessed significant advancements with deep learning techniques. In the domain of brain tumor segmentation, the ability to
precisely delineate tumor boundaries from magnetic resonance imaging (MRI)
scans holds profound implications for diagnosis. This study presents an ensemble convolutional neural network (CNN) with transfer learning, integrating
the state-of-the-art Deeplabv3+ architecture with the ResNet18 backbone. The
model is rigorously trained and evaluated, exhibiting remarkable performance
metrics, including an impressive global accuracy of 99.286%, a high-class accuracy of 82.191%, a mean intersection over union (IoU) of 79.900%, a weighted
IoU of 98.620%, and a Boundary F1 (BF) score of 83.303%. Notably, a detailed comparative analysis with existing methods showcases the superiority of
our proposed model. These findings underscore the model’s competence in precise brain tumor localization, underscoring its potential to revolutionize medical
image analysis and enhance healthcare outcomes. This research paves the way
for future exploration and optimization of advanced CNN models in medical
imaging, emphasizing addressing false positives and resource efficiency.
1. Placeholder confidentialitydisclosure. Edit or delete from layout master if not needed.
Use this second line if additional confidentialitydisclosure information is required.
X-Ray Spares Project
Presented by Mike Rathke
2. Project: X-Ray Spares
• Problem Statement:
• Current X-Ray spare part aisle (P) has mixed inventory of spare, obsolete and
forward production material. There is currently no process for the replenishment of
spare parts for the mobile or fixed line.
21 October 2020
3. Project: X-Ray Spares
• Project Scope and Goals:
• Consolidate and separate forward production and spare parts.
• Free up an entire bay of roller racking for Mobile 2.0 launch.
• Implement FIFO, standard quantities and standard location for all material.
• Work with sourcing to create BPAs and replenishment strategy for 50% of the parts.
3
1 October 2020
4. Project: X-Ray Spares
• Project Team and Collaborators:
• Materials Team
• Stock Room IDL Team
• Product Quality Engineers
• Production Operators
• Sourcing Team
41 October 2020
5.
6. Project: X-Ray Spares
• Project Status and Accomplishments:
• ≈$10,000 of unused spares to IDN and scrap.
• 13 Part numbers removed or scrapped. 13 Parts moved to spare skid in high bays.
• 144 sq. ft of roller rack space freed up.
• Labels created on both side of the aisle for roller rack parts.
• Majority of roller rack parts set up with BPAs (~55 created).
• All mobile parts set up with Min-Max Kanban Replenishment Strategy (~32 created).
6
1 October 2020
7. Project: X-Ray Spares
• Project Opportunities and Future:
• The entire bay of P.10 (minus the high bays) left to be filled with Mobile 2.0
production parts and material.
• Potential to set up Fixed Rad parts on Min-Max Kanban replenishment strategy.
• Introduction to KanbanBox; a potential purchasing tool for WSO.
• Treat similar projects as 5S projects in the future.
71 October 2020
15. Nothing
60%
Move to High Bays (Spare Skid)
14%
Move to Gray Racks
7%
Scrap/Remove
10%
Order More
5%
Move to DifferentLocator
4%
Actions Taken for Spare Parts
Nothing Move to High Bays (Spare Skid) Move to Gray Racks Scrap/Remove Order More Move to Different Locator