Process: Final Assembly Cell Customer: Applied Technologies Area: Box Build
Kaizen Project: ATA Lean Cell Kaizen Tracking #: 13 Date:
Item # Statement of Purpose: Measures/Actions:
1 Decrease travel distance of chassis builds. a) Compiled TAKT times for every ATA product
b) Analyzed all ATA MPI's
2 Reduce square footage of ATA Box area c) Created cell designed based on a) & b)
d) Build custom Cell & re-arrange adjacent areas.
3 Set up Lean Cell capable of producing qty X assemblies per month. e) Create shadow boards, re-org materials, increase Aegis stations
The team analyzed customer requirements for next 6 months.
Each assembly time was broken down into logical pieces.
The work cell was designed to accommodate all assemblies.
Each work station was custom made by the team.
Metric 1 Metric 2 Results Notes
Baseline: 605sq' 123' Metric 1 = Area used
Target: 400sq' 60' Metric 2 = Product distance travelled
Actual: 364sq' 46'
Improv % 40% 63%
Before After
No tape to define cart
Tape damaged and in wrong area
Project Leader: Team Members: T I M W O O D S S
Ben Yorkey TY, Ricky, Dan J, Billy C, Phil A, Lan C, Sivilay, Angie C.
6/26/2014
PROCESS IMPROVEMENT
6Assy
RacRack
6 Assy6 Assy6 Assy
6Assy
6Assy
Rack
6Assy
Rac
6Assy
Rack
4 Assy
Ra
6 Assy6 Assy
FG5Pack-QC
5Assy
Rac
Rac
4Assy
4Assy
Rac
FM-028 Kaizen Rev 1

More Related Content

What's hot

dan hoelter resume
dan hoelter resumedan hoelter resume
dan hoelter resume
daniel hoelter
 
Altair slideshare nanofluidx summary 2017
Altair slideshare nanofluidx summary 2017Altair slideshare nanofluidx summary 2017
Altair slideshare nanofluidx summary 2017
Paul Kirkham
 
150616 Quickscan Fokker Services (Casper Sterkman)
150616 Quickscan Fokker Services (Casper Sterkman)150616 Quickscan Fokker Services (Casper Sterkman)
150616 Quickscan Fokker Services (Casper Sterkman)
SINTAS
 
ECS Showcase
ECS ShowcaseECS Showcase
ECS Showcase
Pablo Vazquez
 
Final Presentation (Jesse Columbus)
Final Presentation (Jesse Columbus)Final Presentation (Jesse Columbus)
Final Presentation (Jesse Columbus)
colum006
 
GSI Internship Portfolio
GSI Internship PortfolioGSI Internship Portfolio
GSI Internship Portfolio
Nicole Ripperda
 
Thesis_presentation1
Thesis_presentation1Thesis_presentation1
Thesis_presentation1
Bhushan Velis
 
DDI Dense Point Cloud Processing Presentation Oct 2009
DDI Dense Point Cloud Processing Presentation Oct 2009DDI Dense Point Cloud Processing Presentation Oct 2009
DDI Dense Point Cloud Processing Presentation Oct 2009
Direct Dimensions, Inc.
 
Malkin Panel: Blade Root Cause Analysis Processes and Inspection Methods
Malkin Panel: Blade Root Cause Analysis Processes and Inspection MethodsMalkin Panel: Blade Root Cause Analysis Processes and Inspection Methods
Malkin Panel: Blade Root Cause Analysis Processes and Inspection Methods
Sandia National Laboratories: Energy & Climate: Renewables
 
IRJET- Study of Real Time Kinematica Survey with Differential Global Position...
IRJET- Study of Real Time Kinematica Survey with Differential Global Position...IRJET- Study of Real Time Kinematica Survey with Differential Global Position...
IRJET- Study of Real Time Kinematica Survey with Differential Global Position...
IRJET Journal
 
End of Summer Intern Presentation-3
End of Summer Intern Presentation-3End of Summer Intern Presentation-3
End of Summer Intern Presentation-3
Rachel Howard
 
SaskPower CCS Project - presentation by Mike Monea, SaskPower, London, 17 Nov...
SaskPower CCS Project - presentation by Mike Monea, SaskPower, London, 17 Nov...SaskPower CCS Project - presentation by Mike Monea, SaskPower, London, 17 Nov...
SaskPower CCS Project - presentation by Mike Monea, SaskPower, London, 17 Nov...
UK Carbon Capture and Storage Research Centre
 
certificato commissioning
certificato commissioningcertificato commissioning
certificato commissioning
Andrea Pinna
 
NIST_SURF_2016_Presentation
NIST_SURF_2016_PresentationNIST_SURF_2016_Presentation
NIST_SURF_2016_Presentation
Kasner Margaret
 
Rocky Mtn Glut
Rocky Mtn GlutRocky Mtn Glut
Rocky Mtn Glut
Eric R. Peterson
 
3d laser scanning services
3d laser scanning services3d laser scanning services
3d laser scanning services
sixdindia0
 
COMIT March 2017 - Cost Effective Digitisation of Existing Assets
COMIT March 2017 - Cost Effective Digitisation of Existing AssetsCOMIT March 2017 - Cost Effective Digitisation of Existing Assets
COMIT March 2017 - Cost Effective Digitisation of Existing Assets
Comit Projects Ltd
 
Patrick Calder Experience Summary
Patrick Calder Experience SummaryPatrick Calder Experience Summary
Patrick Calder Experience Summary
Patrick Calder
 
Hvacs
HvacsHvacs
Hvacs
kiakaha
 
Walchandnagar Industries
Walchandnagar IndustriesWalchandnagar Industries
Walchandnagar Industries
ketan.pole
 

What's hot (20)

dan hoelter resume
dan hoelter resumedan hoelter resume
dan hoelter resume
 
Altair slideshare nanofluidx summary 2017
Altair slideshare nanofluidx summary 2017Altair slideshare nanofluidx summary 2017
Altair slideshare nanofluidx summary 2017
 
150616 Quickscan Fokker Services (Casper Sterkman)
150616 Quickscan Fokker Services (Casper Sterkman)150616 Quickscan Fokker Services (Casper Sterkman)
150616 Quickscan Fokker Services (Casper Sterkman)
 
ECS Showcase
ECS ShowcaseECS Showcase
ECS Showcase
 
Final Presentation (Jesse Columbus)
Final Presentation (Jesse Columbus)Final Presentation (Jesse Columbus)
Final Presentation (Jesse Columbus)
 
GSI Internship Portfolio
GSI Internship PortfolioGSI Internship Portfolio
GSI Internship Portfolio
 
Thesis_presentation1
Thesis_presentation1Thesis_presentation1
Thesis_presentation1
 
DDI Dense Point Cloud Processing Presentation Oct 2009
DDI Dense Point Cloud Processing Presentation Oct 2009DDI Dense Point Cloud Processing Presentation Oct 2009
DDI Dense Point Cloud Processing Presentation Oct 2009
 
Malkin Panel: Blade Root Cause Analysis Processes and Inspection Methods
Malkin Panel: Blade Root Cause Analysis Processes and Inspection MethodsMalkin Panel: Blade Root Cause Analysis Processes and Inspection Methods
Malkin Panel: Blade Root Cause Analysis Processes and Inspection Methods
 
IRJET- Study of Real Time Kinematica Survey with Differential Global Position...
IRJET- Study of Real Time Kinematica Survey with Differential Global Position...IRJET- Study of Real Time Kinematica Survey with Differential Global Position...
IRJET- Study of Real Time Kinematica Survey with Differential Global Position...
 
End of Summer Intern Presentation-3
End of Summer Intern Presentation-3End of Summer Intern Presentation-3
End of Summer Intern Presentation-3
 
SaskPower CCS Project - presentation by Mike Monea, SaskPower, London, 17 Nov...
SaskPower CCS Project - presentation by Mike Monea, SaskPower, London, 17 Nov...SaskPower CCS Project - presentation by Mike Monea, SaskPower, London, 17 Nov...
SaskPower CCS Project - presentation by Mike Monea, SaskPower, London, 17 Nov...
 
certificato commissioning
certificato commissioningcertificato commissioning
certificato commissioning
 
NIST_SURF_2016_Presentation
NIST_SURF_2016_PresentationNIST_SURF_2016_Presentation
NIST_SURF_2016_Presentation
 
Rocky Mtn Glut
Rocky Mtn GlutRocky Mtn Glut
Rocky Mtn Glut
 
3d laser scanning services
3d laser scanning services3d laser scanning services
3d laser scanning services
 
COMIT March 2017 - Cost Effective Digitisation of Existing Assets
COMIT March 2017 - Cost Effective Digitisation of Existing AssetsCOMIT March 2017 - Cost Effective Digitisation of Existing Assets
COMIT March 2017 - Cost Effective Digitisation of Existing Assets
 
Patrick Calder Experience Summary
Patrick Calder Experience SummaryPatrick Calder Experience Summary
Patrick Calder Experience Summary
 
Hvacs
HvacsHvacs
Hvacs
 
Walchandnagar Industries
Walchandnagar IndustriesWalchandnagar Industries
Walchandnagar Industries
 

Viewers also liked

El pacto de la flor y la oruga
El pacto de la flor y la orugaEl pacto de la flor y la oruga
El pacto de la flor y la oruga
Durero
 
Creative
CreativeCreative
Creative
Kavaler
 
Raymond Unwin: La pratica della progettazione urbana
Raymond Unwin: La pratica della progettazione urbanaRaymond Unwin: La pratica della progettazione urbana
Raymond Unwin: La pratica della progettazione urbana
pagliard
 
Masterplan di Tor Bella Monaca di Lèon Krier
Masterplan di Tor Bella Monaca di Lèon KrierMasterplan di Tor Bella Monaca di Lèon Krier
Masterplan di Tor Bella Monaca di Lèon Krierpagliard
 
Gujarati Pride
Gujarati PrideGujarati Pride
Factories Act 1948
Factories Act 1948Factories Act 1948
Factories Act 1948
HAQ: Centre for Child Rights
 
Mini MBA Program
Mini MBA Program Mini MBA Program
Mini MBA Program
Lina Shamia
 
Los golfos de España -Paula y Lucía
Los golfos  de España -Paula y LucíaLos golfos  de España -Paula y Lucía
Los golfos de España -Paula y Lucía
chikichulos
 
Personality
PersonalityPersonality
Personality
Kiran Rana
 
Contoh Daftar riwayat hidup Akhyadi
Contoh Daftar riwayat hidup AkhyadiContoh Daftar riwayat hidup Akhyadi
Contoh Daftar riwayat hidup Akhyadi
Aditiga Serang
 

Viewers also liked (10)

El pacto de la flor y la oruga
El pacto de la flor y la orugaEl pacto de la flor y la oruga
El pacto de la flor y la oruga
 
Creative
CreativeCreative
Creative
 
Raymond Unwin: La pratica della progettazione urbana
Raymond Unwin: La pratica della progettazione urbanaRaymond Unwin: La pratica della progettazione urbana
Raymond Unwin: La pratica della progettazione urbana
 
Masterplan di Tor Bella Monaca di Lèon Krier
Masterplan di Tor Bella Monaca di Lèon KrierMasterplan di Tor Bella Monaca di Lèon Krier
Masterplan di Tor Bella Monaca di Lèon Krier
 
Gujarati Pride
Gujarati PrideGujarati Pride
Gujarati Pride
 
Factories Act 1948
Factories Act 1948Factories Act 1948
Factories Act 1948
 
Mini MBA Program
Mini MBA Program Mini MBA Program
Mini MBA Program
 
Los golfos de España -Paula y Lucía
Los golfos  de España -Paula y LucíaLos golfos  de España -Paula y Lucía
Los golfos de España -Paula y Lucía
 
Personality
PersonalityPersonality
Personality
 
Contoh Daftar riwayat hidup Akhyadi
Contoh Daftar riwayat hidup AkhyadiContoh Daftar riwayat hidup Akhyadi
Contoh Daftar riwayat hidup Akhyadi
 

Similar to Copy of 6-14 ATA Box Cell Kaizen

Michael_Kogan_portfolio
Michael_Kogan_portfolioMichael_Kogan_portfolio
Michael_Kogan_portfolio
Michael Kogan
 
Michael_Kogan_portfolio
Michael_Kogan_portfolioMichael_Kogan_portfolio
Michael_Kogan_portfolio
Michael Kogan
 
Manas ranjan ray_resume
Manas ranjan ray_resumeManas ranjan ray_resume
Manas ranjan ray_resume
Manas Ray
 
Seminar in IPP Max-Planck. Only questions phase. 16-10-2015
Seminar in IPP Max-Planck. Only questions phase. 16-10-2015Seminar in IPP Max-Planck. Only questions phase. 16-10-2015
Seminar in IPP Max-Planck. Only questions phase. 16-10-2015
Vicent_Net
 
Design and analysis of sla printer
Design and analysis of sla printerDesign and analysis of sla printer
Design and analysis of sla printer
Satyajeet Udavant
 
Bikram Jeet (Achievements from 2006 - 2013)
Bikram Jeet (Achievements from 2006 - 2013)Bikram Jeet (Achievements from 2006 - 2013)
Bikram Jeet (Achievements from 2006 - 2013)
Bikram Jeet
 
6 MONTH INTERNSHIP AT
6 MONTH INTERNSHIP AT6 MONTH INTERNSHIP AT
6 MONTH INTERNSHIP AT
Aditya Thombare
 
Built In Self Testing(BIST) Architecture for Motin Estimation and Computing A...
Built In Self Testing(BIST) Architecture for Motin Estimation and Computing A...Built In Self Testing(BIST) Architecture for Motin Estimation and Computing A...
Built In Self Testing(BIST) Architecture for Motin Estimation and Computing A...
Shashidhar Reddy
 
Suresha_B_resume
Suresha_B_resumeSuresha_B_resume
Suresha_B_resume
suresha B
 
resumelrs_jan_2017
resumelrs_jan_2017resumelrs_jan_2017
resumelrs_jan_2017
Laird Snowden
 
Resume_new1_may
Resume_new1_mayResume_new1_may
Resume_new1_may
anuradha m masanan
 
Portfolio - William Main
Portfolio - William MainPortfolio - William Main
Portfolio - William Main
William Main
 
Emgineering Design Portfolio
Emgineering Design PortfolioEmgineering Design Portfolio
Emgineering Design Portfolio
Tsuyoshi Yokoyama
 
Proceedings
ProceedingsProceedings
Proceedings
butest
 
Design of RCC Beam By using C Programming
Design of RCC Beam By using C ProgrammingDesign of RCC Beam By using C Programming
Design of RCC Beam By using C Programming
IRJET Journal
 
Kiran P Kumarswamy_CV
Kiran P Kumarswamy_CVKiran P Kumarswamy_CV
Kiran P Kumarswamy_CV
Kiran Puranad
 
Process optimization of pressure die casting to eliminate defect using cae so...
Process optimization of pressure die casting to eliminate defect using cae so...Process optimization of pressure die casting to eliminate defect using cae so...
Process optimization of pressure die casting to eliminate defect using cae so...
eSAT Journals
 
Motorcycle Pallet Rack Project Report
Motorcycle Pallet Rack Project ReportMotorcycle Pallet Rack Project Report
Motorcycle Pallet Rack Project Report
Olusegun. B Adekoya
 
Engineering Portfolio
Engineering PortfolioEngineering Portfolio
Engineering Portfolio
FrankIattarelli
 
SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing.
SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing. SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing.
SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing.
SIMUL8 Corporation
 

Similar to Copy of 6-14 ATA Box Cell Kaizen (20)

Michael_Kogan_portfolio
Michael_Kogan_portfolioMichael_Kogan_portfolio
Michael_Kogan_portfolio
 
Michael_Kogan_portfolio
Michael_Kogan_portfolioMichael_Kogan_portfolio
Michael_Kogan_portfolio
 
Manas ranjan ray_resume
Manas ranjan ray_resumeManas ranjan ray_resume
Manas ranjan ray_resume
 
Seminar in IPP Max-Planck. Only questions phase. 16-10-2015
Seminar in IPP Max-Planck. Only questions phase. 16-10-2015Seminar in IPP Max-Planck. Only questions phase. 16-10-2015
Seminar in IPP Max-Planck. Only questions phase. 16-10-2015
 
Design and analysis of sla printer
Design and analysis of sla printerDesign and analysis of sla printer
Design and analysis of sla printer
 
Bikram Jeet (Achievements from 2006 - 2013)
Bikram Jeet (Achievements from 2006 - 2013)Bikram Jeet (Achievements from 2006 - 2013)
Bikram Jeet (Achievements from 2006 - 2013)
 
6 MONTH INTERNSHIP AT
6 MONTH INTERNSHIP AT6 MONTH INTERNSHIP AT
6 MONTH INTERNSHIP AT
 
Built In Self Testing(BIST) Architecture for Motin Estimation and Computing A...
Built In Self Testing(BIST) Architecture for Motin Estimation and Computing A...Built In Self Testing(BIST) Architecture for Motin Estimation and Computing A...
Built In Self Testing(BIST) Architecture for Motin Estimation and Computing A...
 
Suresha_B_resume
Suresha_B_resumeSuresha_B_resume
Suresha_B_resume
 
resumelrs_jan_2017
resumelrs_jan_2017resumelrs_jan_2017
resumelrs_jan_2017
 
Resume_new1_may
Resume_new1_mayResume_new1_may
Resume_new1_may
 
Portfolio - William Main
Portfolio - William MainPortfolio - William Main
Portfolio - William Main
 
Emgineering Design Portfolio
Emgineering Design PortfolioEmgineering Design Portfolio
Emgineering Design Portfolio
 
Proceedings
ProceedingsProceedings
Proceedings
 
Design of RCC Beam By using C Programming
Design of RCC Beam By using C ProgrammingDesign of RCC Beam By using C Programming
Design of RCC Beam By using C Programming
 
Kiran P Kumarswamy_CV
Kiran P Kumarswamy_CVKiran P Kumarswamy_CV
Kiran P Kumarswamy_CV
 
Process optimization of pressure die casting to eliminate defect using cae so...
Process optimization of pressure die casting to eliminate defect using cae so...Process optimization of pressure die casting to eliminate defect using cae so...
Process optimization of pressure die casting to eliminate defect using cae so...
 
Motorcycle Pallet Rack Project Report
Motorcycle Pallet Rack Project ReportMotorcycle Pallet Rack Project Report
Motorcycle Pallet Rack Project Report
 
Engineering Portfolio
Engineering PortfolioEngineering Portfolio
Engineering Portfolio
 
SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing.
SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing. SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing.
SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing.
 

Copy of 6-14 ATA Box Cell Kaizen

  • 1. Process: Final Assembly Cell Customer: Applied Technologies Area: Box Build Kaizen Project: ATA Lean Cell Kaizen Tracking #: 13 Date: Item # Statement of Purpose: Measures/Actions: 1 Decrease travel distance of chassis builds. a) Compiled TAKT times for every ATA product b) Analyzed all ATA MPI's 2 Reduce square footage of ATA Box area c) Created cell designed based on a) & b) d) Build custom Cell & re-arrange adjacent areas. 3 Set up Lean Cell capable of producing qty X assemblies per month. e) Create shadow boards, re-org materials, increase Aegis stations The team analyzed customer requirements for next 6 months. Each assembly time was broken down into logical pieces. The work cell was designed to accommodate all assemblies. Each work station was custom made by the team. Metric 1 Metric 2 Results Notes Baseline: 605sq' 123' Metric 1 = Area used Target: 400sq' 60' Metric 2 = Product distance travelled Actual: 364sq' 46' Improv % 40% 63% Before After No tape to define cart Tape damaged and in wrong area Project Leader: Team Members: T I M W O O D S S Ben Yorkey TY, Ricky, Dan J, Billy C, Phil A, Lan C, Sivilay, Angie C. 6/26/2014 PROCESS IMPROVEMENT 6Assy RacRack 6 Assy6 Assy6 Assy 6Assy 6Assy Rack 6Assy Rac 6Assy Rack 4 Assy Ra 6 Assy6 Assy FG5Pack-QC 5Assy Rac Rac 4Assy 4Assy Rac FM-028 Kaizen Rev 1