Workshop 14
Pipe Whip Analysis
Introduction
This workshop involves the simulation of a pipe-on-pipe impact resulting from the
rupture of a high-pressure line in a power plant. It is assumed that a sudden release of
fluid could cause one segment of the pipe to rotate about its support and strike a
neighboring pipe. The goal of the analysis is to determine strain and stress conditions in
both pipes and their deformed shapes. The simulation will be performed using
ABAQUS/Explicit.
This workshop is based on ABAQUS Benchmark Problem 1.3.9.
Geometry and model
Both pipes have a mean diameter of 6.5 in with a .432 in wall thickness and a span of
50 in between supports. The fixed pipe is assumed to be fully restrained at both ends,
while the impacting pipe is allowed to rotate about a fixed pivot located at one of its ends,
with the other end free. We exploit the symmetry of the structure and the loading and thus
model only the geometry on one side of the central symmetry plane, as shown in Figure
W14–1. The pipe geometry is modeled as a shell feature.
Figure W14–1. Pipe model assembly
1. Start a new session of ABAQUS/CAE from the workshops/pipeWhip
directory.
2. Switch to the Part module.
3. From the main menu bar, select PartCreate.
impacting pipe
fixed pipe
axis of rotation
4. In the Create Part dialog box:
A. Name the part pipe-fixed.
B. The pipe will be modeled using shell elements; thus, choose Shell as the base
feature shape, Extrusion as the base feature type, and set the Approximate
size to 20.
C. Review the other defaults and click Continue.
Since the pipe is modeled using a shell feature, the pipe radius must be equal to the mean
pipe radius.
5. Use the Create Isolated Point tool to create points at the coordinates (0.0,
3.25) and (0.0, -3.25).
6. Sketch a circle of radius 3.25 in. as shown in Figure W14–2.
Figure W14–2. Geometry sketch for the fixed pipe
7. Dimension the circle using the radial dimension tool from the toolbox shown as
Figure W14–3.
Figure W14–3. Dimensioning tools
8. Click mouse button 2 to continue; in the Edit Base Extrusion dialog box, enter
25.0 in. as the value of the extrusion depth. (Mouse button 2 is the middle mouse
button on a 3-button mouse; on a 2-button mouse, press both mouse buttons
simultaneously.)
9. From the main menu bar, select PartCopy and copy the part named pipe-
fixed to a new part named pipe-impacting.
W14.2
radial dimension tool
Click on the black
triangle to extend the
toolbox option
10. Switch to the part pipe-impacting by selecting it from the Part pull-down
list in the context bar.
11. From the main menu bar, select FeatureEdit.
12. In the prompt area, click Feature List.
13. In the Feature List dialog box, select Shell-extrude-1 and click OK.
14. In the Edit Feature dialog box select Edit Section Sketch.
15. Delete the circle and sketch a semi-circle with the same radius as shown in
Figure W14–4.
Figure W14–4. Geometry sketch for the impacting pipe
16. Modify the depth of extrusion to be 50.0.
17. In the Edit Feature dialog box, click OK to generate the modified part.
Materials and section
Both pipes are made of steel. A von Mises elastic, perfectly plastic material model is
used, with a yield stress of 45E3 psi.
1. Switch to the Property module.
18. From the main menu bar, select MaterialCreate. Create a material named
Steel with the following properties:
Modulus of elasticity: 30E6 psi
Poisson's ratio: 0.3
Yield Stress: 45.0E3 psi
Density: 7.324E-4 lb-sec2
/in4
19. From the main menu bar, select SectionCreate and create a homogeneous
Shell section named PipeSection with a shell thickness of 0.432 in.
20. Use the analysis default section Poisson ratio of 0.5.
W14.3
21. Select Gauss quadrature for shell section integration with three integration points
through the thickness.
22. From the main menu bar, select AssignSection and assign the shell section to
both parts.
Model assembly
You will now create an instance of each pipe and position them relative to one another.
1. Switch to the Assembly module.
23. From the main menu bar, select InstanceCreate. In the Create Instance
dialog box, select both parts and toggle on Auto-offset from other instances.
24. Modify the position of the impacting part as follows:
A. From the main menu bar, select InstanceTranslate. Select the impacting
pipe as the instance to be translated, and define the translation vector using the
start and end points indicated in Figure W14–5.
Figure W14–5. Translation used to position the impacting pipe
D. From the main menu bar, select InstanceRotate and rotate the impacting
pipe 90 degrees about the axis defined by the two points shown in
Figure W14–6.
W14.4
Start point of translation vector
(center point on bottom edge of
impacting pipe)
End point of translation
vector
Figure W14–6. Rotation used to position the impacting pipe
Since ABAQUS/Explicit considers the shell thickness in its contact calculations and does
not permit any initial overclosures, the initial position of the pipes must account for the
shell thickness.
25. Modify the vertical position of the impacting pipe as follows:
· From the main menu bar, select InstanceTranslate. Translate the impacting pipe
a distance of 0.432 in. in the vertical direction. This will eliminate any initial
overclosure between the pipes.
The fixed pivot at the end of the impacting pipe will be modeled using a rigid body
constraint. This constraint will tie the nodes at one end of the impacting pipe with a
reference node that will act as the pivot point.
26. From the main menu bar, select ToolsReference Point and create a reference
point at the location shown in Figure W14–7:
Figure W14–7. Final assembly and reference point
W14.5
end point of rotation axis
start point of rotation axis
Analysis step and output requests
Because of the high-speed nature of the event, the simulation is performed using a single
explicit dynamics step.
1. Switch to the Step module.
27. From the main menu bar, select StepCreate to create a Dynamic, Explicit
step with a time period of 0.015 seconds. Accept all defaults for the time
incrementation and other parameters.
28. From the main menu bar, select OutputField Output RequestsEdit
F-Output-1 and review the preselected field output requests. Change the
frequency at which the output is written to 12 equally spaced intervals.
29. Create a geometry set consisting of the reference point. This set will be used to
restrict output of the reaction force history to this region. From the main menu bar,
select ToolsSetCreate. In the Create Set dialog box, name the set RefPt
and click Continue. Select the Ref Pt in the viewport, and click Done.
30. From the main menu bar, select OutputHistory Output Requests
Create and request stored history output to the ODB at 100 equally spaced time
intervals during the analysis containing the following information:
· Reaction forces at the constrained end of the fixed pipe. Use the set RefPt to restrict
the output.
Interactions
You will now define a contact interaction between the two pipes and constrain the pivot
end of the impacting pipe to behave like a rigid body. To facilitate the definition of the
contact interaction and rigid body constraint, the pipes will first be partitioned into
different regions. The partitions will also serve another purpose: they will permit selective
mesh refinement in the regions where contact is expected to take place.
Partitions
The impacting pipe will be divided into three regions of lengths 15, 20, and 15 in.,
respectively. The fixed pipe will be divided into two regions of lengths 18 and 7 in. each.
Partitioning the impacting pipe
1. Switch to the Interaction module.
31. From the main menu bar, select ToolsDatumPlane3 points. Create a
datum plane by selecting the 3 points shown in Figure W14–8.
W14.6
Figure W14–8. Points used to define datum plane
32. From the main menu bar, select ToolsPartitionFaceSketch.
33. Select the curved face on the impacting pipe as the face to be partitioned and the
datum plane as the plane on which the partitions will be sketched.
34. Specify the projection distance as Through All and accept the default projection
direction as shown in Figure W14–9.
35. Select the circular edge highlighted in Figure W14–9 when prompted for an edge
that will appear vertical and to the right of the sketch.
Figure W14–9. Sketch projection direction
W14.7
projection
direction
36. Sketch two vertical lines for the partitions as shown in Figure W14–10.
37. Create the partition.
Figure W14–10. Face partition sketch
Partitioning the fixed pipe
1. From the main menu bar, select ToolsPartitionFaceShortest path
between 2 points to partition the fixed pipe using the 2 points highlighted in
Figure W14–11. This partition will later be used for assigning edge seeds.
W14.8
Figure W14–11. Face partition using shortest path between 2 points
38. From the main menu bar, select ToolsDatumPlaneOffset from plane.
39. Select the datum plane created earlier as the plane from which to offset.
40. In the prompt area, click Enter Value to choose the method by which to specify
the offset distance. If necessary, flip the direction of the arrow indicating the offset
direction so that it points in the direction shown in Figure W14–12.
41. Specify an offset distance of 7.0 in.
Figure W14–12. Projection direction for fixed pipe partition
W14.9
Select these
two points
offset direction
base datum plane
new datum plane
42. From the main menu bar, select ToolsPartitionFaceUse datum
plane.
43. Select the surface of the fixed pipe as the face to be partitioned and the datum
plane created above as the plane with which to create the partition, as shown in
Figure W14–13.
44. Create the partition.
Figure W14–13. Partition of the fixed pipe
Contact interaction
1. From the main menu bar, select InteractionPropertyCreate.
45. In the Create Interaction Property dialog box, select Contact as the
interaction type and click Continue.
46. In the Edit Contact Property dialog box, select MechanicalTangential
Behavior and choose the Penalty friction formulation. Enter a friction
coefficient of 0.2, and click OK to close the dialog box.
47. From the main menu bar, select InteractionCreate.
48. In the Create Interaction dialog box, choose step-1 as the step in which the
interaction will be created and select the Surface-to-surface contact
(Explicit) type.
For the impacting pipe, the outer surface of its center region will be used for contact; for
the fixed pipe, the outer surface of its shorter region will be used for contact.
49. Define contact between these surfaces as shown in Figure W14–14.
W14.10
Partition the fixed
pipe with this
datum plane
Figure W14–14. Surfaces involved in contact
Rigid body constraint
1. From the main menu bar, select ConstraintCreate.
50. In the Create Constraint dialog box, select Rigid body as the constraint type
and click Continue.
51. In the Edit Constraint dialog box, select the region type Tie (nodes) and click
Edit in the right side of the dialog box.
52. Select the edge shown in Figure W14–15 as the tie region for the rigid body.
53. Similarly, select the point in the viewport identified by the label Ref Pt as the
rigid body reference point.
Figure W14–15. Rigid body constraint
master surface slave surface
W14.11
tie region
Boundary conditions
The edges located on the symmetry plane must be given appropriate symmetry boundary
conditions. One end of the impacting pipe and both ends of the fixed pipe are fully
restrained.
1. Switch to the Load module.
54. From the main menu bar, select BCCreate.
55. In the Create Boundary Condition dialog box, select Symmetry/
Antisymmetry/Encastre as the boundary condition type and click Continue
to create the boundary conditions shown in Figure W14–16.
· Symmetry boundary conditions: Select the edges shown in Figure W14–16; and in the
Edit Boundary Condition dialog box, choose the ZSYMM (U3=UR1=UR2=0)
boundary condition.
· Fully constrained boundary conditions: Select the edge shown in
Figure W14–16; and in the Edit Boundary Condition dialog box, choose the
ENCASTRE (U1=U2=U3=UR1=UR2=UR3=0) boundary condition.
· Pinned Boundary condition: Select the Ref Pt; and in the Edit Boundary
Condition dialog box, choose the PINNED (U1=U2=U3=0) boundary condition.
Figure W14–16. Boundary conditions
Initial conditions
The impacting pipe is given an initial angular velocity of 75 radians/sec about its
supported (pinned) end.
symmetry: ZSYMM BC
(all edges on this plane)
fully constrained end:
ENCASTRE BC
W14.12
PINNED BC
1. Use ToolsQueryPoint to determine the coordinates of two end points on
the axis of rotation at the pivot end of impacting pipe as shown in
Figure W14–17.
Figure W14–17. Points on axis of rotation
The coordinates will be printed out to the CLI as shown in Figure W14–18.
Figure W14–18. Point coordinates
56. From the main menu bar, select FieldCreate.
57. In the Create Field dialog box, set the step to Initial and accept the default
category and type selections. Click Continue to proceed.
58. Select the impacting pipe as the region to which the initial velocity will be
assigned, and click Done.
59. In the Edit Field dialog box, change the field definition to Rotational only.
Enter a value of 75 for the Angular velocity. Use the coordinates of the first
point indicated in Figure W14–17 to define the first axis point and the coordinates
of the second point indicated in Figure W14–17 to define the second axis point.
Mesh
W14.13
second point
first point
The pipes will be meshed with S4R shell elements. A finer mesh density will be used in
the regions of the pipes where impact will is expected to occur.
1. Switch to the Mesh module.
60. From the main menu bar, select MeshElement Type and select the whole
model by clicking the left mouse button and dragging across the viewport.
Examine the various options available in the Element type dialog box, and
accept the default element type S4R.
61. From the main menu bar, select SeedEdge By Number and assign the
number of edge seeds to each edge shown in Figure W14–19.
Figure W14–19. Edge seeds
62. From the main menu bar, select MeshInstance and select both pipes as the
part instances to be meshed. The mesh is shown in Figure W14–20.
W14.14
9
28
9
16
12
9
7
12
Figure W14–20. Instance meshes
Analysis
1. Switch to the Job module.
63. From the main menu bar, select JobCreate and create a job named pipe-
whip.
64. Open the Job Manager, and click Submit to submit the job for analysis
65. Monitor the progress of the job by clicking Monitor in the Job Manager.
Visualization
1. Once the analysis completes successfully, click Results in the Job Manager to
switch to the Visualization module.
66. Plot the undeformed and the deformed model shapes. From the main menu bar,
select ToolsColor Code and specify different colors to the two pipe instances,
as shown in Figure W14–21.
W14.15
Figure W14–21. Deformed model shape
67. From the main menu bar, select AnimateTime History to animate the
deformation history.
68. Plot the contours for Mises stress and PEEQ on the deformed shape. The contour
plots are shown in Figure W14–22.
Figure W14–22. Contour plots
69. From the main menu bar, select ResultHistory Output to create time history
X–Y plots of the model’s kinetic energy (ALLKE), internal energy (ALLIE), and
dissipated energy (ALLPD).
70. In the History Output dialog box, click Plot to display the curves and click
Dismiss to close the dialog box. The energy plot is shown in Figure W14–23.
W14.16
MISES PEEQ
Figure W14–23. Energy histories
Near the end of the simulation, the impacting pipe is beginning to rebound, having
dissipated the majority of its kinetic energy by inelastic deformation in the crushed zone.
71. From the main menu bar, select ToolXY DataManager. In the XY Data
Manager, click Create. In the Create XY Data dialog box, choose ODB
history output and click Continue. Select the three reaction forces
components, and click Save As. Save the components using the default names.
Click Dismiss to close the dialog box.
72. Simultaneously plot the total reaction components (RF1, RF2, RF3) versus time
by selecting the three curves in the XY Data Manager and clicking Plot. The
curves appear in Figure W14–24.
W14.17
Figure W14–24. Reaction force histories
W14.18

More Related Content

What's hot

Workshop9 pump-mesh2005
Workshop9 pump-mesh2005Workshop9 pump-mesh2005
Workshop9 pump-mesh2005mmd110
 
Workshop5 pump-mat
Workshop5 pump-matWorkshop5 pump-mat
Workshop5 pump-matmmd110
 
Workshop4 creep-props
Workshop4 creep-propsWorkshop4 creep-props
Workshop4 creep-propsmmd110
 
Workshop8 creep-mesh
Workshop8 creep-meshWorkshop8 creep-mesh
Workshop8 creep-meshmmd110
 
Workshop15 rolling-plate
Workshop15 rolling-plateWorkshop15 rolling-plate
Workshop15 rolling-platemmd110
 
Workshop13 pump-analysis
Workshop13 pump-analysisWorkshop13 pump-analysis
Workshop13 pump-analysismmd110
 
Workshop6 pump-assy
Workshop6 pump-assyWorkshop6 pump-assy
Workshop6 pump-assymmd110
 
Workshop9 pump-mesh
Workshop9 pump-meshWorkshop9 pump-mesh
Workshop9 pump-meshmmd110
 
SAP2000 Piperack Tutorial 2010.pdf
SAP2000 Piperack Tutorial 2010.pdfSAP2000 Piperack Tutorial 2010.pdf
SAP2000 Piperack Tutorial 2010.pdfsdads1
 
Building model-sap2000-tutorial-guide
Building model-sap2000-tutorial-guideBuilding model-sap2000-tutorial-guide
Building model-sap2000-tutorial-guideVanz Einstein
 
Finite Element Simulation with Ansys Workbench 14
Finite Element Simulation with Ansys Workbench 14Finite Element Simulation with Ansys Workbench 14
Finite Element Simulation with Ansys Workbench 14Prem Prakash Pandey
 
02 release document_8.8
02 release document_8.802 release document_8.8
02 release document_8.8struds
 
Lecture 10: introduction to computer
Lecture 10: introduction to computerLecture 10: introduction to computer
Lecture 10: introduction to computerSultan Omar Shige
 
Workbench tutorial airfoil
Workbench tutorial airfoilWorkbench tutorial airfoil
Workbench tutorial airfoilApriansyah Azis
 
Tutorial for design of foundations using safe
Tutorial for design of foundations using safeTutorial for design of foundations using safe
Tutorial for design of foundations using safeAsaye Dilbo
 
315925614 cadence-tutorial
315925614 cadence-tutorial315925614 cadence-tutorial
315925614 cadence-tutorialkhaalidkk
 

What's hot (20)

Workshop9 pump-mesh2005
Workshop9 pump-mesh2005Workshop9 pump-mesh2005
Workshop9 pump-mesh2005
 
Workshop5 pump-mat
Workshop5 pump-matWorkshop5 pump-mat
Workshop5 pump-mat
 
Workshop4 creep-props
Workshop4 creep-propsWorkshop4 creep-props
Workshop4 creep-props
 
Workshop8 creep-mesh
Workshop8 creep-meshWorkshop8 creep-mesh
Workshop8 creep-mesh
 
Workshop15 rolling-plate
Workshop15 rolling-plateWorkshop15 rolling-plate
Workshop15 rolling-plate
 
Workshop13 pump-analysis
Workshop13 pump-analysisWorkshop13 pump-analysis
Workshop13 pump-analysis
 
Workshop6 pump-assy
Workshop6 pump-assyWorkshop6 pump-assy
Workshop6 pump-assy
 
Workshop9 pump-mesh
Workshop9 pump-meshWorkshop9 pump-mesh
Workshop9 pump-mesh
 
Axis vm stepbystep
Axis vm stepbystepAxis vm stepbystep
Axis vm stepbystep
 
SAP2000 Piperack Tutorial 2010.pdf
SAP2000 Piperack Tutorial 2010.pdfSAP2000 Piperack Tutorial 2010.pdf
SAP2000 Piperack Tutorial 2010.pdf
 
Building model-sap2000-tutorial-guide
Building model-sap2000-tutorial-guideBuilding model-sap2000-tutorial-guide
Building model-sap2000-tutorial-guide
 
Civil 3d workflow
Civil 3d workflowCivil 3d workflow
Civil 3d workflow
 
Finite Element Simulation with Ansys Workbench 14
Finite Element Simulation with Ansys Workbench 14Finite Element Simulation with Ansys Workbench 14
Finite Element Simulation with Ansys Workbench 14
 
Safe tutorial
Safe tutorialSafe tutorial
Safe tutorial
 
02 release document_8.8
02 release document_8.802 release document_8.8
02 release document_8.8
 
Lecture 10: introduction to computer
Lecture 10: introduction to computerLecture 10: introduction to computer
Lecture 10: introduction to computer
 
Workbench tutorial airfoil
Workbench tutorial airfoilWorkbench tutorial airfoil
Workbench tutorial airfoil
 
Tutorial for design of foundations using safe
Tutorial for design of foundations using safeTutorial for design of foundations using safe
Tutorial for design of foundations using safe
 
315925614 cadence-tutorial
315925614 cadence-tutorial315925614 cadence-tutorial
315925614 cadence-tutorial
 
Etabs tutorial
Etabs tutorialEtabs tutorial
Etabs tutorial
 

Viewers also liked

13 priznakov togo_chto_vy_uchitel
13 priznakov togo_chto_vy_uchitel13 priznakov togo_chto_vy_uchitel
13 priznakov togo_chto_vy_uchitelALEXANDRA_K1988
 
Energy Efficient Communications Solutions for Nomadic Nodes within a Wireless...
Energy Efficient Communications Solutions for Nomadic Nodes within a Wireless...Energy Efficient Communications Solutions for Nomadic Nodes within a Wireless...
Energy Efficient Communications Solutions for Nomadic Nodes within a Wireless...luca-bencini
 
TT| Case histories - Mobile APP
TT| Case histories - Mobile APPTT| Case histories - Mobile APP
TT| Case histories - Mobile APPluca-bencini
 
Web design principles knj
Web design principles knjWeb design principles knj
Web design principles knjhaldajo
 
A history of the early MacCarthys
A history of the early MacCarthysA history of the early MacCarthys
A history of the early MacCarthyspmaccotter
 
Jiajiach presentation
Jiajiach presentationJiajiach presentation
Jiajiach presentationJAMe0323
 
соединение вида и разреза.
соединение вида и разреза.соединение вида и разреза.
соединение вида и разреза.ALEXANDRA_K1988
 
TT Smart Stamp - Brochure
TT Smart Stamp - BrochureTT Smart Stamp - Brochure
TT Smart Stamp - Brochureluca-bencini
 
Continuous Experimentation in the B2B Domain: A Case Study
Continuous Experimentation in the B2B Domain: A Case StudyContinuous Experimentation in the B2B Domain: A Case Study
Continuous Experimentation in the B2B Domain: A Case StudyJürgen Münch
 
Abastecimiento de agua por gravedad para poblaciones rurales dispersas
Abastecimiento de agua por gravedad para poblaciones rurales dispersasAbastecimiento de agua por gravedad para poblaciones rurales dispersas
Abastecimiento de agua por gravedad para poblaciones rurales dispersasJorge Beni Flores Rodriguez
 

Viewers also liked (14)

abaqus lecture 2
abaqus lecture 2abaqus lecture 2
abaqus lecture 2
 
13 priznakov togo_chto_vy_uchitel
13 priznakov togo_chto_vy_uchitel13 priznakov togo_chto_vy_uchitel
13 priznakov togo_chto_vy_uchitel
 
hello
hellohello
hello
 
Energy Efficient Communications Solutions for Nomadic Nodes within a Wireless...
Energy Efficient Communications Solutions for Nomadic Nodes within a Wireless...Energy Efficient Communications Solutions for Nomadic Nodes within a Wireless...
Energy Efficient Communications Solutions for Nomadic Nodes within a Wireless...
 
TT| Case histories - Mobile APP
TT| Case histories - Mobile APPTT| Case histories - Mobile APP
TT| Case histories - Mobile APP
 
Web design principles knj
Web design principles knjWeb design principles knj
Web design principles knj
 
A history of the early MacCarthys
A history of the early MacCarthysA history of the early MacCarthys
A history of the early MacCarthys
 
Presentation2
Presentation2Presentation2
Presentation2
 
Jiajiach presentation
Jiajiach presentationJiajiach presentation
Jiajiach presentation
 
соединение вида и разреза.
соединение вида и разреза.соединение вида и разреза.
соединение вида и разреза.
 
Internet
Internet Internet
Internet
 
TT Smart Stamp - Brochure
TT Smart Stamp - BrochureTT Smart Stamp - Brochure
TT Smart Stamp - Brochure
 
Continuous Experimentation in the B2B Domain: A Case Study
Continuous Experimentation in the B2B Domain: A Case StudyContinuous Experimentation in the B2B Domain: A Case Study
Continuous Experimentation in the B2B Domain: A Case Study
 
Abastecimiento de agua por gravedad para poblaciones rurales dispersas
Abastecimiento de agua por gravedad para poblaciones rurales dispersasAbastecimiento de agua por gravedad para poblaciones rurales dispersas
Abastecimiento de agua por gravedad para poblaciones rurales dispersas
 

Similar to Workshop14 pipe-whip

ConSteel_14_User_Manual-101-150.pdf
ConSteel_14_User_Manual-101-150.pdfConSteel_14_User_Manual-101-150.pdf
ConSteel_14_User_Manual-101-150.pdfJuanUnafVargas
 
Deriner Arch Dam Geometry Solution with a software developed by Taner Cigdem
Deriner Arch Dam Geometry Solution with a software developed by Taner CigdemDeriner Arch Dam Geometry Solution with a software developed by Taner Cigdem
Deriner Arch Dam Geometry Solution with a software developed by Taner CigdemTaner Çiğdem
 
Engineering System Modelling and Simulation Lab
Engineering System Modelling and Simulation LabEngineering System Modelling and Simulation Lab
Engineering System Modelling and Simulation LabVishal Singh
 
Modeling seismic analysis_and_design_of_rc_building_10_story
Modeling seismic analysis_and_design_of_rc_building_10_storyModeling seismic analysis_and_design_of_rc_building_10_story
Modeling seismic analysis_and_design_of_rc_building_10_storyAliAlmayalee
 
Finite Element Analysis of Shaft of Centrifugal Pump
Finite Element Analysis of Shaft of Centrifugal PumpFinite Element Analysis of Shaft of Centrifugal Pump
Finite Element Analysis of Shaft of Centrifugal PumpIOSR Journals
 
Numerical analysis for two phase flow distribution headers in heat exchangers
Numerical analysis for two phase flow distribution headers in heat exchangersNumerical analysis for two phase flow distribution headers in heat exchangers
Numerical analysis for two phase flow distribution headers in heat exchangerseSAT Journals
 
Introductory tutorial etab2016
Introductory tutorial etab2016Introductory tutorial etab2016
Introductory tutorial etab2016TPHCM
 
Karakuri based dolly frames unstacking system
Karakuri based dolly frames unstacking systemKarakuri based dolly frames unstacking system
Karakuri based dolly frames unstacking systemAnshumanRaj8
 

Similar to Workshop14 pipe-whip (20)

Ig proe-wf-5.0
Ig proe-wf-5.0Ig proe-wf-5.0
Ig proe-wf-5.0
 
Ig proe-wf-5.0
Ig proe-wf-5.0Ig proe-wf-5.0
Ig proe-wf-5.0
 
Lesson02
Lesson02Lesson02
Lesson02
 
ConSteel_14_User_Manual-101-150.pdf
ConSteel_14_User_Manual-101-150.pdfConSteel_14_User_Manual-101-150.pdf
ConSteel_14_User_Manual-101-150.pdf
 
EMM- Mech Comparator.ppt
EMM- Mech Comparator.pptEMM- Mech Comparator.ppt
EMM- Mech Comparator.ppt
 
Motion_Sim_and_FEA
Motion_Sim_and_FEAMotion_Sim_and_FEA
Motion_Sim_and_FEA
 
Catia v5 NOTES
Catia v5  NOTESCatia v5  NOTES
Catia v5 NOTES
 
Deriner Arch Dam Geometry Solution with a software developed by Taner Cigdem
Deriner Arch Dam Geometry Solution with a software developed by Taner CigdemDeriner Arch Dam Geometry Solution with a software developed by Taner Cigdem
Deriner Arch Dam Geometry Solution with a software developed by Taner Cigdem
 
Tutorial ic design
Tutorial ic designTutorial ic design
Tutorial ic design
 
New manual
New manualNew manual
New manual
 
Engineering System Modelling and Simulation Lab
Engineering System Modelling and Simulation LabEngineering System Modelling and Simulation Lab
Engineering System Modelling and Simulation Lab
 
Prestress Scia Engineer
Prestress Scia EngineerPrestress Scia Engineer
Prestress Scia Engineer
 
Modeling seismic analysis_and_design_of_rc_building_10_story
Modeling seismic analysis_and_design_of_rc_building_10_storyModeling seismic analysis_and_design_of_rc_building_10_story
Modeling seismic analysis_and_design_of_rc_building_10_story
 
Finite Element Analysis of Shaft of Centrifugal Pump
Finite Element Analysis of Shaft of Centrifugal PumpFinite Element Analysis of Shaft of Centrifugal Pump
Finite Element Analysis of Shaft of Centrifugal Pump
 
Numerical analysis for two phase flow distribution headers in heat exchangers
Numerical analysis for two phase flow distribution headers in heat exchangersNumerical analysis for two phase flow distribution headers in heat exchangers
Numerical analysis for two phase flow distribution headers in heat exchangers
 
Introductory tutorial etab2016
Introductory tutorial etab2016Introductory tutorial etab2016
Introductory tutorial etab2016
 
C496
C496C496
C496
 
Simulik pdf
Simulik pdfSimulik pdf
Simulik pdf
 
Wce2013 pp1809 1814
Wce2013 pp1809 1814Wce2013 pp1809 1814
Wce2013 pp1809 1814
 
Karakuri based dolly frames unstacking system
Karakuri based dolly frames unstacking systemKarakuri based dolly frames unstacking system
Karakuri based dolly frames unstacking system
 

Recently uploaded

A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonJericReyAuditor
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxAnaBeatriceAblay2
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 

Recently uploaded (20)

A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lesson
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 

Workshop14 pipe-whip

  • 1. Workshop 14 Pipe Whip Analysis Introduction This workshop involves the simulation of a pipe-on-pipe impact resulting from the rupture of a high-pressure line in a power plant. It is assumed that a sudden release of fluid could cause one segment of the pipe to rotate about its support and strike a neighboring pipe. The goal of the analysis is to determine strain and stress conditions in both pipes and their deformed shapes. The simulation will be performed using ABAQUS/Explicit. This workshop is based on ABAQUS Benchmark Problem 1.3.9. Geometry and model Both pipes have a mean diameter of 6.5 in with a .432 in wall thickness and a span of 50 in between supports. The fixed pipe is assumed to be fully restrained at both ends, while the impacting pipe is allowed to rotate about a fixed pivot located at one of its ends, with the other end free. We exploit the symmetry of the structure and the loading and thus model only the geometry on one side of the central symmetry plane, as shown in Figure W14–1. The pipe geometry is modeled as a shell feature. Figure W14–1. Pipe model assembly 1. Start a new session of ABAQUS/CAE from the workshops/pipeWhip directory. 2. Switch to the Part module. 3. From the main menu bar, select PartCreate. impacting pipe fixed pipe axis of rotation
  • 2. 4. In the Create Part dialog box: A. Name the part pipe-fixed. B. The pipe will be modeled using shell elements; thus, choose Shell as the base feature shape, Extrusion as the base feature type, and set the Approximate size to 20. C. Review the other defaults and click Continue. Since the pipe is modeled using a shell feature, the pipe radius must be equal to the mean pipe radius. 5. Use the Create Isolated Point tool to create points at the coordinates (0.0, 3.25) and (0.0, -3.25). 6. Sketch a circle of radius 3.25 in. as shown in Figure W14–2. Figure W14–2. Geometry sketch for the fixed pipe 7. Dimension the circle using the radial dimension tool from the toolbox shown as Figure W14–3. Figure W14–3. Dimensioning tools 8. Click mouse button 2 to continue; in the Edit Base Extrusion dialog box, enter 25.0 in. as the value of the extrusion depth. (Mouse button 2 is the middle mouse button on a 3-button mouse; on a 2-button mouse, press both mouse buttons simultaneously.) 9. From the main menu bar, select PartCopy and copy the part named pipe- fixed to a new part named pipe-impacting. W14.2 radial dimension tool Click on the black triangle to extend the toolbox option
  • 3. 10. Switch to the part pipe-impacting by selecting it from the Part pull-down list in the context bar. 11. From the main menu bar, select FeatureEdit. 12. In the prompt area, click Feature List. 13. In the Feature List dialog box, select Shell-extrude-1 and click OK. 14. In the Edit Feature dialog box select Edit Section Sketch. 15. Delete the circle and sketch a semi-circle with the same radius as shown in Figure W14–4. Figure W14–4. Geometry sketch for the impacting pipe 16. Modify the depth of extrusion to be 50.0. 17. In the Edit Feature dialog box, click OK to generate the modified part. Materials and section Both pipes are made of steel. A von Mises elastic, perfectly plastic material model is used, with a yield stress of 45E3 psi. 1. Switch to the Property module. 18. From the main menu bar, select MaterialCreate. Create a material named Steel with the following properties: Modulus of elasticity: 30E6 psi Poisson's ratio: 0.3 Yield Stress: 45.0E3 psi Density: 7.324E-4 lb-sec2 /in4 19. From the main menu bar, select SectionCreate and create a homogeneous Shell section named PipeSection with a shell thickness of 0.432 in. 20. Use the analysis default section Poisson ratio of 0.5. W14.3
  • 4. 21. Select Gauss quadrature for shell section integration with three integration points through the thickness. 22. From the main menu bar, select AssignSection and assign the shell section to both parts. Model assembly You will now create an instance of each pipe and position them relative to one another. 1. Switch to the Assembly module. 23. From the main menu bar, select InstanceCreate. In the Create Instance dialog box, select both parts and toggle on Auto-offset from other instances. 24. Modify the position of the impacting part as follows: A. From the main menu bar, select InstanceTranslate. Select the impacting pipe as the instance to be translated, and define the translation vector using the start and end points indicated in Figure W14–5. Figure W14–5. Translation used to position the impacting pipe D. From the main menu bar, select InstanceRotate and rotate the impacting pipe 90 degrees about the axis defined by the two points shown in Figure W14–6. W14.4 Start point of translation vector (center point on bottom edge of impacting pipe) End point of translation vector
  • 5. Figure W14–6. Rotation used to position the impacting pipe Since ABAQUS/Explicit considers the shell thickness in its contact calculations and does not permit any initial overclosures, the initial position of the pipes must account for the shell thickness. 25. Modify the vertical position of the impacting pipe as follows: · From the main menu bar, select InstanceTranslate. Translate the impacting pipe a distance of 0.432 in. in the vertical direction. This will eliminate any initial overclosure between the pipes. The fixed pivot at the end of the impacting pipe will be modeled using a rigid body constraint. This constraint will tie the nodes at one end of the impacting pipe with a reference node that will act as the pivot point. 26. From the main menu bar, select ToolsReference Point and create a reference point at the location shown in Figure W14–7: Figure W14–7. Final assembly and reference point W14.5 end point of rotation axis start point of rotation axis
  • 6. Analysis step and output requests Because of the high-speed nature of the event, the simulation is performed using a single explicit dynamics step. 1. Switch to the Step module. 27. From the main menu bar, select StepCreate to create a Dynamic, Explicit step with a time period of 0.015 seconds. Accept all defaults for the time incrementation and other parameters. 28. From the main menu bar, select OutputField Output RequestsEdit F-Output-1 and review the preselected field output requests. Change the frequency at which the output is written to 12 equally spaced intervals. 29. Create a geometry set consisting of the reference point. This set will be used to restrict output of the reaction force history to this region. From the main menu bar, select ToolsSetCreate. In the Create Set dialog box, name the set RefPt and click Continue. Select the Ref Pt in the viewport, and click Done. 30. From the main menu bar, select OutputHistory Output Requests Create and request stored history output to the ODB at 100 equally spaced time intervals during the analysis containing the following information: · Reaction forces at the constrained end of the fixed pipe. Use the set RefPt to restrict the output. Interactions You will now define a contact interaction between the two pipes and constrain the pivot end of the impacting pipe to behave like a rigid body. To facilitate the definition of the contact interaction and rigid body constraint, the pipes will first be partitioned into different regions. The partitions will also serve another purpose: they will permit selective mesh refinement in the regions where contact is expected to take place. Partitions The impacting pipe will be divided into three regions of lengths 15, 20, and 15 in., respectively. The fixed pipe will be divided into two regions of lengths 18 and 7 in. each. Partitioning the impacting pipe 1. Switch to the Interaction module. 31. From the main menu bar, select ToolsDatumPlane3 points. Create a datum plane by selecting the 3 points shown in Figure W14–8. W14.6
  • 7. Figure W14–8. Points used to define datum plane 32. From the main menu bar, select ToolsPartitionFaceSketch. 33. Select the curved face on the impacting pipe as the face to be partitioned and the datum plane as the plane on which the partitions will be sketched. 34. Specify the projection distance as Through All and accept the default projection direction as shown in Figure W14–9. 35. Select the circular edge highlighted in Figure W14–9 when prompted for an edge that will appear vertical and to the right of the sketch. Figure W14–9. Sketch projection direction W14.7 projection direction
  • 8. 36. Sketch two vertical lines for the partitions as shown in Figure W14–10. 37. Create the partition. Figure W14–10. Face partition sketch Partitioning the fixed pipe 1. From the main menu bar, select ToolsPartitionFaceShortest path between 2 points to partition the fixed pipe using the 2 points highlighted in Figure W14–11. This partition will later be used for assigning edge seeds. W14.8
  • 9. Figure W14–11. Face partition using shortest path between 2 points 38. From the main menu bar, select ToolsDatumPlaneOffset from plane. 39. Select the datum plane created earlier as the plane from which to offset. 40. In the prompt area, click Enter Value to choose the method by which to specify the offset distance. If necessary, flip the direction of the arrow indicating the offset direction so that it points in the direction shown in Figure W14–12. 41. Specify an offset distance of 7.0 in. Figure W14–12. Projection direction for fixed pipe partition W14.9 Select these two points offset direction base datum plane new datum plane
  • 10. 42. From the main menu bar, select ToolsPartitionFaceUse datum plane. 43. Select the surface of the fixed pipe as the face to be partitioned and the datum plane created above as the plane with which to create the partition, as shown in Figure W14–13. 44. Create the partition. Figure W14–13. Partition of the fixed pipe Contact interaction 1. From the main menu bar, select InteractionPropertyCreate. 45. In the Create Interaction Property dialog box, select Contact as the interaction type and click Continue. 46. In the Edit Contact Property dialog box, select MechanicalTangential Behavior and choose the Penalty friction formulation. Enter a friction coefficient of 0.2, and click OK to close the dialog box. 47. From the main menu bar, select InteractionCreate. 48. In the Create Interaction dialog box, choose step-1 as the step in which the interaction will be created and select the Surface-to-surface contact (Explicit) type. For the impacting pipe, the outer surface of its center region will be used for contact; for the fixed pipe, the outer surface of its shorter region will be used for contact. 49. Define contact between these surfaces as shown in Figure W14–14. W14.10 Partition the fixed pipe with this datum plane
  • 11. Figure W14–14. Surfaces involved in contact Rigid body constraint 1. From the main menu bar, select ConstraintCreate. 50. In the Create Constraint dialog box, select Rigid body as the constraint type and click Continue. 51. In the Edit Constraint dialog box, select the region type Tie (nodes) and click Edit in the right side of the dialog box. 52. Select the edge shown in Figure W14–15 as the tie region for the rigid body. 53. Similarly, select the point in the viewport identified by the label Ref Pt as the rigid body reference point. Figure W14–15. Rigid body constraint master surface slave surface W14.11 tie region
  • 12. Boundary conditions The edges located on the symmetry plane must be given appropriate symmetry boundary conditions. One end of the impacting pipe and both ends of the fixed pipe are fully restrained. 1. Switch to the Load module. 54. From the main menu bar, select BCCreate. 55. In the Create Boundary Condition dialog box, select Symmetry/ Antisymmetry/Encastre as the boundary condition type and click Continue to create the boundary conditions shown in Figure W14–16. · Symmetry boundary conditions: Select the edges shown in Figure W14–16; and in the Edit Boundary Condition dialog box, choose the ZSYMM (U3=UR1=UR2=0) boundary condition. · Fully constrained boundary conditions: Select the edge shown in Figure W14–16; and in the Edit Boundary Condition dialog box, choose the ENCASTRE (U1=U2=U3=UR1=UR2=UR3=0) boundary condition. · Pinned Boundary condition: Select the Ref Pt; and in the Edit Boundary Condition dialog box, choose the PINNED (U1=U2=U3=0) boundary condition. Figure W14–16. Boundary conditions Initial conditions The impacting pipe is given an initial angular velocity of 75 radians/sec about its supported (pinned) end. symmetry: ZSYMM BC (all edges on this plane) fully constrained end: ENCASTRE BC W14.12 PINNED BC
  • 13. 1. Use ToolsQueryPoint to determine the coordinates of two end points on the axis of rotation at the pivot end of impacting pipe as shown in Figure W14–17. Figure W14–17. Points on axis of rotation The coordinates will be printed out to the CLI as shown in Figure W14–18. Figure W14–18. Point coordinates 56. From the main menu bar, select FieldCreate. 57. In the Create Field dialog box, set the step to Initial and accept the default category and type selections. Click Continue to proceed. 58. Select the impacting pipe as the region to which the initial velocity will be assigned, and click Done. 59. In the Edit Field dialog box, change the field definition to Rotational only. Enter a value of 75 for the Angular velocity. Use the coordinates of the first point indicated in Figure W14–17 to define the first axis point and the coordinates of the second point indicated in Figure W14–17 to define the second axis point. Mesh W14.13 second point first point
  • 14. The pipes will be meshed with S4R shell elements. A finer mesh density will be used in the regions of the pipes where impact will is expected to occur. 1. Switch to the Mesh module. 60. From the main menu bar, select MeshElement Type and select the whole model by clicking the left mouse button and dragging across the viewport. Examine the various options available in the Element type dialog box, and accept the default element type S4R. 61. From the main menu bar, select SeedEdge By Number and assign the number of edge seeds to each edge shown in Figure W14–19. Figure W14–19. Edge seeds 62. From the main menu bar, select MeshInstance and select both pipes as the part instances to be meshed. The mesh is shown in Figure W14–20. W14.14 9 28 9 16 12 9 7 12
  • 15. Figure W14–20. Instance meshes Analysis 1. Switch to the Job module. 63. From the main menu bar, select JobCreate and create a job named pipe- whip. 64. Open the Job Manager, and click Submit to submit the job for analysis 65. Monitor the progress of the job by clicking Monitor in the Job Manager. Visualization 1. Once the analysis completes successfully, click Results in the Job Manager to switch to the Visualization module. 66. Plot the undeformed and the deformed model shapes. From the main menu bar, select ToolsColor Code and specify different colors to the two pipe instances, as shown in Figure W14–21. W14.15
  • 16. Figure W14–21. Deformed model shape 67. From the main menu bar, select AnimateTime History to animate the deformation history. 68. Plot the contours for Mises stress and PEEQ on the deformed shape. The contour plots are shown in Figure W14–22. Figure W14–22. Contour plots 69. From the main menu bar, select ResultHistory Output to create time history X–Y plots of the model’s kinetic energy (ALLKE), internal energy (ALLIE), and dissipated energy (ALLPD). 70. In the History Output dialog box, click Plot to display the curves and click Dismiss to close the dialog box. The energy plot is shown in Figure W14–23. W14.16 MISES PEEQ
  • 17. Figure W14–23. Energy histories Near the end of the simulation, the impacting pipe is beginning to rebound, having dissipated the majority of its kinetic energy by inelastic deformation in the crushed zone. 71. From the main menu bar, select ToolXY DataManager. In the XY Data Manager, click Create. In the Create XY Data dialog box, choose ODB history output and click Continue. Select the three reaction forces components, and click Save As. Save the components using the default names. Click Dismiss to close the dialog box. 72. Simultaneously plot the total reaction components (RF1, RF2, RF3) versus time by selecting the three curves in the XY Data Manager and clicking Plot. The curves appear in Figure W14–24. W14.17
  • 18. Figure W14–24. Reaction force histories W14.18