The document discusses integrating business process management (BPM) with workforce management. It describes how analytics data from a BPM system about work patterns and resource utilization can be used to simulate and optimize scheduling. The simulation and scheduling tools work in a loop, with the scheduler generating resource schedules that are simulated and used to refine workload demand estimates. This integrated approach is best for structured, repeatable processes and large resource pools, and can potentially reduce staff costs by 10-20%. A case study shows how these tools identified over $1 million in benefits for a wholesale lockbox operation.