Workflow Assessment Process
Helps establish, with
proposed investment,
the Payback & ROI
                                 Assess Strategic Goals
                                 Operational Costs associated
                                    with Flow (Paper)
                                        Labor, Supplies, Storage
                                 Operational Flow (People)
 Evaluate the AS—IS
                                        Application & Manual Processes
Process in Comparison
   to Best Practices             IT Infrastructure (Survey)
                                        Network, Copier, Servers, & Clients




Collection of Data
         –   Current Personnel Costs
         –   Projected Personnel Costs
         –   Existing Operating Costs
         –   Organization Procedures & Tasks
         –   Projected Operating Expense Reduction/Elimination
         –   Financial Data
         –   Investment Information

Analysis of the Current Systems
         •   Implementation Issues
         •   Operational Issues
         •   Integration Issues
         •   Support Issues
         •   Security Issues
Phase 1. Initiating
•   Define what the Assessment should accomplish
•   Define the overall project goal
•   Define expectations of customers, management & other stakeholders
•   Define project scope
•   Select members for the project team


                                  Phase 2. Planning
•   Refine the project scope to include a balance among results, time and resources
•   List tasks and activities that lead to achieving project goals
•   Sequence activities in the most efficient manner
•   Develop a workable schedule and budget for assigning resources
•   Get plan approved by appropriate stakeholders


                                   Phase 3. Design
•   Define what tools will match up with the requirements and what each should do
•   Define the capture tools
•   Define viewing and/or editing tools
•   Define the storage requirements and records policy
•   Define interface requirements and collaboration tools
•   Define output and/or retrieval tools
•   Select members for the implementation team


                             Phase 4. Implementation
•   Refine the project design to include any relevant updates and technology improvements
•   List tasks and activities that are needed to properly deploy the solution
•   Sequence installation and training activities in the most efficient manner
•   Develop a workable schedule for the launch of the new process
•   Utilize project milestones to deploy and evaluate the project


                                  Phase 5. Optimize
•   Refine the project design to include any relevant updates and technology improvements
•   List tasks and activities that are needed to properly enhance the process
•   Enable end-users with tools that help them understand the plan for optimization
•   Develop a workable schedule for the launch of the optimized process

More Related Content

What's hot

Scenario - The Project Management Environment
Scenario - The Project Management EnvironmentScenario - The Project Management Environment
Scenario - The Project Management Environment
DavidMcLachlan1
 
Time management
Time managementTime management
Time management
Mostafa Elgamala
 
American Electric Power Ercot kickoff
American Electric Power Ercot kickoffAmerican Electric Power Ercot kickoff
American Electric Power Ercot kickoff
John Napier
 
Proposal to revise documentation
Proposal to revise documentationProposal to revise documentation
Proposal to revise documentation
rgroup99
 
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
iFour Institute - Sustainable Learning
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost management
Imran Jamil
 
All about project management
All about project managementAll about project management
All about project management
Tudor Bejan
 
Steps in project control process
Steps in project control processSteps in project control process
Steps in project control process
Uday Doyal
 
Managing Sys
Managing SysManaging Sys
Managing Sys
check81
 
BPM Implementation (downloadable)
BPM Implementation (downloadable)BPM Implementation (downloadable)
BPM Implementation (downloadable)
Mark Carlson
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Control
guy_davis
 
Snowden_Daniele_14_v13
Snowden_Daniele_14_v13Snowden_Daniele_14_v13
Snowden_Daniele_14_v13
Daniele Snowden
 
7.3 Determine Budget
7.3 Determine Budget7.3 Determine Budget
7.3 Determine Budget
DavidMcLachlan1
 
Monitoring of project implementation
Monitoring of project implementationMonitoring of project implementation
Monitoring of project implementation
Dejened
 
Operations Excellence
Operations ExcellenceOperations Excellence
Operations Excellence
David McDonald
 
Project Monitoring and Controlling Processes
Project Monitoring and Controlling ProcessesProject Monitoring and Controlling Processes
Project Monitoring and Controlling Processes
Nishant Munjal
 
Honeywell Experience
Honeywell ExperienceHoneywell Experience
Honeywell Experience
Clarence Bell
 
Develop Project Management Plan Data Flow Diagram
Develop Project Management Plan Data Flow DiagramDevelop Project Management Plan Data Flow Diagram
Develop Project Management Plan Data Flow Diagram
riosabel
 
Resource Scheduling
Resource SchedulingResource Scheduling
Resource Scheduling
Nicola2903
 
Environmental geologist kpi
Environmental geologist kpiEnvironmental geologist kpi
Environmental geologist kpi
dvayfuges
 

What's hot (20)

Scenario - The Project Management Environment
Scenario - The Project Management EnvironmentScenario - The Project Management Environment
Scenario - The Project Management Environment
 
Time management
Time managementTime management
Time management
 
American Electric Power Ercot kickoff
American Electric Power Ercot kickoffAmerican Electric Power Ercot kickoff
American Electric Power Ercot kickoff
 
Proposal to revise documentation
Proposal to revise documentationProposal to revise documentation
Proposal to revise documentation
 
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost management
 
All about project management
All about project managementAll about project management
All about project management
 
Steps in project control process
Steps in project control processSteps in project control process
Steps in project control process
 
Managing Sys
Managing SysManaging Sys
Managing Sys
 
BPM Implementation (downloadable)
BPM Implementation (downloadable)BPM Implementation (downloadable)
BPM Implementation (downloadable)
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Control
 
Snowden_Daniele_14_v13
Snowden_Daniele_14_v13Snowden_Daniele_14_v13
Snowden_Daniele_14_v13
 
7.3 Determine Budget
7.3 Determine Budget7.3 Determine Budget
7.3 Determine Budget
 
Monitoring of project implementation
Monitoring of project implementationMonitoring of project implementation
Monitoring of project implementation
 
Operations Excellence
Operations ExcellenceOperations Excellence
Operations Excellence
 
Project Monitoring and Controlling Processes
Project Monitoring and Controlling ProcessesProject Monitoring and Controlling Processes
Project Monitoring and Controlling Processes
 
Honeywell Experience
Honeywell ExperienceHoneywell Experience
Honeywell Experience
 
Develop Project Management Plan Data Flow Diagram
Develop Project Management Plan Data Flow DiagramDevelop Project Management Plan Data Flow Diagram
Develop Project Management Plan Data Flow Diagram
 
Resource Scheduling
Resource SchedulingResource Scheduling
Resource Scheduling
 
Environmental geologist kpi
Environmental geologist kpiEnvironmental geologist kpi
Environmental geologist kpi
 

Viewers also liked

Rojas violence Children Peru_9sep2016_2
Rojas violence Children Peru_9sep2016_2Rojas violence Children Peru_9sep2016_2
Rojas violence Children Peru_9sep2016_2
Young Lives Oxford
 
Cueto trajectories CIES 2016
Cueto trajectories CIES 2016Cueto trajectories CIES 2016
Cueto trajectories CIES 2016
Young Lives Oxford
 
Pells violence 9_sept2016
Pells violence 9_sept2016Pells violence 9_sept2016
Pells violence 9_sept2016
Young Lives Oxford
 
Method to Provide Mobile Signal when the Network Provider Has Failed
Method to Provide Mobile Signal when the Network Provider Has FailedMethod to Provide Mobile Signal when the Network Provider Has Failed
Method to Provide Mobile Signal when the Network Provider Has Failed
Association of Scientists, Developers and Faculties
 
Resume*
Resume*Resume*
IPCC trifold 3 21 14
IPCC trifold 3 21 14IPCC trifold 3 21 14
IPCC trifold 3 21 14
Nikki Schaubel
 
VNPT và Luật Viễn thông
VNPT và Luật Viễn thông VNPT và Luật Viễn thông
VNPT và Luật Viễn thông
Tien Hoang
 
Banks_Capstone_Report
Banks_Capstone_ReportBanks_Capstone_Report
Banks_Capstone_Report
Aaron Banks
 
BeadStyle magazine spread
BeadStyle magazine spreadBeadStyle magazine spread
BeadStyle magazine spread
Carole Ross
 
Web and Social Computing - Presentation Week8
Web and Social Computing - Presentation Week8Web and Social Computing - Presentation Week8
Web and Social Computing - Presentation Week8
Matthew Courtney
 
Palmprint Recognition using Multimodal Biometrics and Generation of One Time ...
Palmprint Recognition using Multimodal Biometrics and Generation of One Time ...Palmprint Recognition using Multimodal Biometrics and Generation of One Time ...
Palmprint Recognition using Multimodal Biometrics and Generation of One Time ...
Association of Scientists, Developers and Faculties
 
Krutikova plenary ag slides ifs slides_final
Krutikova plenary ag slides ifs slides_finalKrutikova plenary ag slides ifs slides_final
Krutikova plenary ag slides ifs slides_final
Young Lives Oxford
 
Broadband Internet in Vietnam
Broadband Internet in VietnamBroadband Internet in Vietnam
Broadband Internet in Vietnam
Aleksander Nguyen Le Anh
 
Eritema multiforme
Eritema multiformeEritema multiforme
Eritema multiforme
Monica Saenz
 

Viewers also liked (15)

VH1 Sales Slick
VH1 Sales SlickVH1 Sales Slick
VH1 Sales Slick
 
Rojas violence Children Peru_9sep2016_2
Rojas violence Children Peru_9sep2016_2Rojas violence Children Peru_9sep2016_2
Rojas violence Children Peru_9sep2016_2
 
Cueto trajectories CIES 2016
Cueto trajectories CIES 2016Cueto trajectories CIES 2016
Cueto trajectories CIES 2016
 
Pells violence 9_sept2016
Pells violence 9_sept2016Pells violence 9_sept2016
Pells violence 9_sept2016
 
Method to Provide Mobile Signal when the Network Provider Has Failed
Method to Provide Mobile Signal when the Network Provider Has FailedMethod to Provide Mobile Signal when the Network Provider Has Failed
Method to Provide Mobile Signal when the Network Provider Has Failed
 
Resume*
Resume*Resume*
Resume*
 
IPCC trifold 3 21 14
IPCC trifold 3 21 14IPCC trifold 3 21 14
IPCC trifold 3 21 14
 
VNPT và Luật Viễn thông
VNPT và Luật Viễn thông VNPT và Luật Viễn thông
VNPT và Luật Viễn thông
 
Banks_Capstone_Report
Banks_Capstone_ReportBanks_Capstone_Report
Banks_Capstone_Report
 
BeadStyle magazine spread
BeadStyle magazine spreadBeadStyle magazine spread
BeadStyle magazine spread
 
Web and Social Computing - Presentation Week8
Web and Social Computing - Presentation Week8Web and Social Computing - Presentation Week8
Web and Social Computing - Presentation Week8
 
Palmprint Recognition using Multimodal Biometrics and Generation of One Time ...
Palmprint Recognition using Multimodal Biometrics and Generation of One Time ...Palmprint Recognition using Multimodal Biometrics and Generation of One Time ...
Palmprint Recognition using Multimodal Biometrics and Generation of One Time ...
 
Krutikova plenary ag slides ifs slides_final
Krutikova plenary ag slides ifs slides_finalKrutikova plenary ag slides ifs slides_final
Krutikova plenary ag slides ifs slides_final
 
Broadband Internet in Vietnam
Broadband Internet in VietnamBroadband Internet in Vietnam
Broadband Internet in Vietnam
 
Eritema multiforme
Eritema multiformeEritema multiforme
Eritema multiforme
 

Similar to Workflow Improvement

103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
ssuser835d1a
 
Effective scoping and execution of business process efforts in major system i...
Effective scoping and execution of business process efforts in major system i...Effective scoping and execution of business process efforts in major system i...
Effective scoping and execution of business process efforts in major system i...
Richard Gordon
 
9.2 Estimate Activity Resources
9.2 Estimate Activity Resources9.2 Estimate Activity Resources
9.2 Estimate Activity Resources
DavidMcLachlan1
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule Development
Chris Carson
 
Training on ASAP Methodology_11.10.2020.ppt
Training on ASAP Methodology_11.10.2020.pptTraining on ASAP Methodology_11.10.2020.ppt
Training on ASAP Methodology_11.10.2020.ppt
AshwaniKumar207236
 
The project plan
The project planThe project plan
The project plan
VatsalaPG
 
7.2 Estimate Cost
7.2 Estimate Cost7.2 Estimate Cost
7.2 Estimate Cost
DavidMcLachlan1
 
Best practice for_agile_ds_projects
Best practice for_agile_ds_projectsBest practice for_agile_ds_projects
Best practice for_agile_ds_projects
Khalid Kahloot
 
6396901
63969016396901
6396901
addisu kahsay
 
Project Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaProject Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | Edureka
Edureka!
 
Training on ASAP Methodology.ppt
Training on ASAP Methodology.pptTraining on ASAP Methodology.ppt
Training on ASAP Methodology.ppt
AshwaniKumar207236
 
07 project cost management
07 project cost management07 project cost management
07 project cost management
Omer Alsayed PhD,MBA, PMP®
 
Successfully Implementing an Aggregate Spend Solution
Successfully Implementing an Aggregate Spend SolutionSuccessfully Implementing an Aggregate Spend Solution
Successfully Implementing an Aggregate Spend Solution
Huron Consulting Group
 
Mam she
Mam sheMam she
Mam she
Janecatalla
 
Offshore R&D Project Management
Offshore R&D Project ManagementOffshore R&D Project Management
Offshore R&D Project Management
N P Singh
 
PMP-Cost Management area
PMP-Cost Management areaPMP-Cost Management area
PMP-Cost Management area
Zaur Ahmadov, PMP
 
Using Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process ImprovementUsing Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process Improvement
Quantitative Software Management, Inc.
 
04 project integration management
04 project integration management04 project integration management
04 project integration management
Omer Alsayed PhD,MBA, PMP®
 
IT Processes & Systems
IT Processes & SystemsIT Processes & Systems
IT Processes & Systems
Anand Subramaniam
 
Managing Technology in Your Organization or is it Managing You?
Managing Technology in Your Organizationor is it Managing You?Managing Technology in Your Organizationor is it Managing You?
Managing Technology in Your Organization or is it Managing You?
Minnesota Historical Society
 

Similar to Workflow Improvement (20)

103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
103240-The-New-Way-of-Thinking-Our-Implementation-experience-with-Oracle-HCM-...
 
Effective scoping and execution of business process efforts in major system i...
Effective scoping and execution of business process efforts in major system i...Effective scoping and execution of business process efforts in major system i...
Effective scoping and execution of business process efforts in major system i...
 
9.2 Estimate Activity Resources
9.2 Estimate Activity Resources9.2 Estimate Activity Resources
9.2 Estimate Activity Resources
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule Development
 
Training on ASAP Methodology_11.10.2020.ppt
Training on ASAP Methodology_11.10.2020.pptTraining on ASAP Methodology_11.10.2020.ppt
Training on ASAP Methodology_11.10.2020.ppt
 
The project plan
The project planThe project plan
The project plan
 
7.2 Estimate Cost
7.2 Estimate Cost7.2 Estimate Cost
7.2 Estimate Cost
 
Best practice for_agile_ds_projects
Best practice for_agile_ds_projectsBest practice for_agile_ds_projects
Best practice for_agile_ds_projects
 
6396901
63969016396901
6396901
 
Project Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaProject Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | Edureka
 
Training on ASAP Methodology.ppt
Training on ASAP Methodology.pptTraining on ASAP Methodology.ppt
Training on ASAP Methodology.ppt
 
07 project cost management
07 project cost management07 project cost management
07 project cost management
 
Successfully Implementing an Aggregate Spend Solution
Successfully Implementing an Aggregate Spend SolutionSuccessfully Implementing an Aggregate Spend Solution
Successfully Implementing an Aggregate Spend Solution
 
Mam she
Mam sheMam she
Mam she
 
Offshore R&D Project Management
Offshore R&D Project ManagementOffshore R&D Project Management
Offshore R&D Project Management
 
PMP-Cost Management area
PMP-Cost Management areaPMP-Cost Management area
PMP-Cost Management area
 
Using Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process ImprovementUsing Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process Improvement
 
04 project integration management
04 project integration management04 project integration management
04 project integration management
 
IT Processes & Systems
IT Processes & SystemsIT Processes & Systems
IT Processes & Systems
 
Managing Technology in Your Organization or is it Managing You?
Managing Technology in Your Organizationor is it Managing You?Managing Technology in Your Organizationor is it Managing You?
Managing Technology in Your Organization or is it Managing You?
 

Workflow Improvement

  • 1. Workflow Assessment Process Helps establish, with proposed investment, the Payback & ROI Assess Strategic Goals Operational Costs associated with Flow (Paper) Labor, Supplies, Storage Operational Flow (People) Evaluate the AS—IS Application & Manual Processes Process in Comparison to Best Practices IT Infrastructure (Survey) Network, Copier, Servers, & Clients Collection of Data – Current Personnel Costs – Projected Personnel Costs – Existing Operating Costs – Organization Procedures & Tasks – Projected Operating Expense Reduction/Elimination – Financial Data – Investment Information Analysis of the Current Systems • Implementation Issues • Operational Issues • Integration Issues • Support Issues • Security Issues
  • 2. Phase 1. Initiating • Define what the Assessment should accomplish • Define the overall project goal • Define expectations of customers, management & other stakeholders • Define project scope • Select members for the project team Phase 2. Planning • Refine the project scope to include a balance among results, time and resources • List tasks and activities that lead to achieving project goals • Sequence activities in the most efficient manner • Develop a workable schedule and budget for assigning resources • Get plan approved by appropriate stakeholders Phase 3. Design • Define what tools will match up with the requirements and what each should do • Define the capture tools • Define viewing and/or editing tools • Define the storage requirements and records policy • Define interface requirements and collaboration tools • Define output and/or retrieval tools • Select members for the implementation team Phase 4. Implementation • Refine the project design to include any relevant updates and technology improvements • List tasks and activities that are needed to properly deploy the solution • Sequence installation and training activities in the most efficient manner • Develop a workable schedule for the launch of the new process • Utilize project milestones to deploy and evaluate the project Phase 5. Optimize • Refine the project design to include any relevant updates and technology improvements • List tasks and activities that are needed to properly enhance the process • Enable end-users with tools that help them understand the plan for optimization • Develop a workable schedule for the launch of the optimized process