1 of 6
A S H O K   U P A D H Y A Y  
ashokupadhyay100@yahoo.com, +60138305978 
PROFILE 
An accomplished and trained Professional with 20 Years of extensive experience in Project 
Management  comprising  Planning,  Coordination,  Execution  of  Onshore  &  Offshore 
Pipelines,  Terminals,  Platforms  and  Process  Plant  projects  through  Engineering, 
Procurement,  Construction  and  Commissioning  phases  with  various  renowned  Owners, 
EPC Consultants & Contracting organizations. 
Innovative  leadership  qualities,  persuasive  interpersonal  skills  &  ability  to  work  with 
multinationals. 
CORE COMPETENCIES 
 
 Executed  projects  with  various  international  clients  and  consultants  like  Petronas, 
Total, PGN, JFE, BP, ONGC, Huricane, Halliburton, BOTAS, EIL, GAIL, Reliance and 
familiar with their requirement standards and specifications on pipelines. 
 Executed  projects  in  difficult  geological  conditions:  marshy  swamps  in  Indonesia, 
rainforest  and  steep  slopes  in  Malaysia,  deserts  in  Kazakhstan,  undulated  rocky 
mountains in Turkey, tidal zones and busiest city like Mumbai in India. 
 Executed  projects  in  extreme  climatic  conditions:  monsoons  with  heavy  rainfall  in 
Malaysia & Indonesia, extreme cold weather with snow in Kazakhstan. 
 Worked in multicultural environment with various nationalities like Japanese, British, 
Koreans, Indonesians, Kazakhs, Russians, Turks, and Malaysians. 
 Coordinates and facilitates smooth interaction between intercompany departments as 
appropriate,  including  Engineering,  Procurement,  Construction,  Commissioning, 
Project Control, Finance and HR. 
 Executed  projects  with  at  most  safety  &  highest  quality  standards  and  received 
various safety awards from client. 
 Areas of Expertise include: 
Project Management  Field Engineering      Project Execution   
Site Safety                         Cost Control                 Resource Management 
Risk Assessment              Team Building             Claim & Contracts Management 
 
    
2 of 6
SUMMARY OF RESPONSIBILITIES 
PROJECTS MANGER 
   Direct and manage project responsibilities and activities from beginning to end, i.e. ‐ 
from initiation to client handover. 
 Uncover initial requirements, risks & constraints. 
 Develop  detailed  and  complete  project  execution  plans,  budget,  schedule,  and  all 
other necessary project communications and reporting documents. 
 Evaluate and select local subcontractors/suppliers 
 Assign roles & responsibilities of the project team. 
 Execute the work according to the plan and control the time & cost overruns. 
 Perform quality & safety audits.  
 Evaluate the performance and give recognition/rewards.  
 Monitor the project performance and determine if variance warrants corrective action. 
 To  act  as  communication  channel  for  project  information  exchange  between 
Contractor  and  other  disciplines  and  forwarding  feedback  to  project  functional 
groups till the completion of the contract. 
 Obtain the final acceptance from client and complete financial closure. 
PROJECT COORDINATOR 
   Coordination  with  discipline  engineers  and  sub‐contractors  relating  to  engineering, 
procurement  &  construction  progress  monitoring,  hold‐ups,  delay  analysis, 
identification of areas of concern and constraints to ensure smooth inter‐disciplinary 
operations. 
 Liaise  with  the  client  project  management,  company  management  and  vendors 
associated with the project on regular and ongoing basis. 
CONSTRUCTION MANGER / SECTION IN‐CHARGE  
   Overall  execution  planning  at  micro  level,  monitoring  and  controlling  of  all 
construction activities to ensure fulfillment of contract commitment. 
 Ensure timely mobilization of resources to site. 
 Ensure that the job is executed as per approved ITP/Procedures  
 Control Client & Contractor supplied materials.  
Assure  that  all  company,  client,  and  regulatory  EHS  policies  and  procedures  are 
followed  in  all  aspects  and  details  and  that  any  incidents  are  reported  as  soon  as 
possible to client and company management. 
 Ensure  quality  checks  are  carried  out  as  per  Project  Quality  Plan,  identify  quality 
problems and implement corrective action. 
 Periodic progress evaluations with look‐ahead schedules. 
 Work Front determination and analysis for various disciplines. 
 Work productivity evaluations through production reports. 
3 of 6
ENGINEER 
   With the responsibility of Pipeline Construction Engineer Involved in various pipeline 
activities  from  survey,  bending,  welding,  lowering,  backfilling,  hydro  testing 
including pre commissioning & commissioning activities.
 With the responsibility of Civil & Structural Engineer Involved in execution of various 
RCC works, fabrication & erection of steel structure. 
PROJECT DETAILS – PROJECT MANAGER 
 
MAR 2008 – Till Date          PUNJ LLYOD OIL & GAS (M) SDN BHD           Malaysia 
Position : Resident Construction Manager to Project Manager (SSGP)  
                 (Deputy General Manager to General Manager) 
Project   : EPCC for Sabah Sarawak Gas Pipeline (SSGP) 
Client     : Petronas Carigali Sdn Bhd (PCSB) 
Value     :  Eq. USD 830 Million 
Scope     :  
 36”  x  512  Km  Gas  Pipeline  with  Block  Valve  Stations  (22  Nos.)  and  Intermediate 
Scraper Stations (3 Nos.).  
 The terrain was extremely harsh with dense forests around 100 Km where no access 
road near to ROW, rocky and mountainous terrain with steep slopes interspersed all 
over with altitude up to 3,300ft (Around 50 locations with 70  steep slopes). 
 At  some  locations  where  it  was  almost  difficult  to  shift  the  pipes  through  roads, 
helicopters were deployed for airlift and stringing the pipes in ROW (1635 Nos.) 
 2,868  open  cut  crossings  including  8  major perennial rivers,  305  smaller  perennial 
rivers and 27 major roads, 24 HDD crossings and 17 Thrust Boring crossings. 
 Around  55  Km  length  of  pipeline  was  laid  in  swamp  stretches  where  around  48 
kilometer  lengths  of  pipeline  were  provided  with  screw  anchors  as  an  anti‐
buoyancy protection.  
 1.7 Million Cubic Meter of rock was removed during grading and trenching. 
 Natives inhabit a large portion of the pipeline route and handled with utmost care 
and sincerity. There are 9 different tribes along the route. 
 Metering Stations (2 Nos.) with Gas Chromatograph Analyzer and Filter Separators 
(Each 500 MMSCFD X 2 Trains) 
 Compressor Station (Each 256 MMSCFD GTCP Packages X 4 Nos) 
 Combined  Station  Works  –  Civil,  Mechanical,  Electrical,  Instrumentation  works 
such as SCADA, Telecommunication, Gas Management System, Fire Detection and 
Extinguishing System, Integrated CCTV. 
 Administrative  offices,  Gas  Control  Center/Operation  office,  Workshop  and 
Warehouse for the project. 
 
4 of 6
PROJECT DETAILS – PROJECT COORDINATOR 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
JUN 2007 – FEB 2008              PUNJ LLOYD  LTD                           Malaysia  
Position : Project Coordinator  
Project   :  EPCC for Heera Field Re‐development Offshore Project, Mumbai 
Client    :  ONGC, India 
PMC      :  CEIL, India 
Scope      : 
 Fabrication of jacket and top side at Kenchana yard in Malaysia 
 
NOV 2005 ‐ DEC 2005           PT PUNJ LLOYD INDONESIA       Indonesia   
Position : Project Coordinator 
Project   : EPC for Tambora Field Development Phase 2 / EPSC 2, Kalimantan 
Client    :  Total E&P, Indonesia 
Scope      : 
 24” Pipe Line between 03 Nos. new GTS stations 
 8”Flow line to connect 06 Nos. Remote wellhead Platform to GTS stations by HDD 
and aerial methods Crude Distillation Unit (CDU)  
PROJECT DETAILS – CONSTRUCTION MANAGER / SECTION IN CHARGE 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DEC 2005 – MAY 2007         PT PUNJ LLOYD INDONESIA       Indonesia  
Position : Resident Construction Manager 
Project   : EPC for South Sumatera West Java Onshore Gas Pipeline – Phase 2 
Client    : PT Perusahaan Gas Negara, Indonesia. 
Project Value : U$ 52.0 Million (Approx.) Including VO’s 
Scope      : 
 Design,  Detail  Engineering,  Procurement,  Installation,  Testing,  Pre‐
Commissioning & Commissioning Assistance of 32” x 272 Km pipeline. 
 Sectional Valves Stations (9 Nos.), Future Connections (5 Nos.), Civil, Mechanical, 
Piping, Instrumentation & Insulation Works  
 Including 11 Nos of HDD and 5 Km of Swamp Section  
 
Position : Resident Construction Manager 
Project  : Construction of South Sumatera West Java Onshore Gas Pipeline – Phase 1 
Client    : PT Perusahaan Gas Negara, Indonesia. 
Main Contractor : JFE Engineering Corporation, Japan. 
Project Value : U$ 47.3 Million (Approx.) 
 
5 of 6
JAN 2005 – OCT 2005               PUNJ LLOYD  LTD                     India 
Position : Section In‐Charge 
Project   : Mora Sachin Palsana Pipeline (MSPPL)
Client    : Gujarat Gas Company 
PMC      : GLI 
Scope      : Installation & Pre‐Commissioning of 16” x 10 Km pipeline. 
 
JUL 2004 DEC 2008                    PUNJ LLOYD  LTD                     India 
Position : Section In‐Charge  
Projects  : Offshore Crude Handling Project 
Client     : Gujarat Adani Port Limited 
PMC       : Intec Asia Pacific 
Contractor   : M/S Valentine Maritime (Mauritius) Ltd 
Scope      :  48” OD Concrete Coated Pipeline, length 1.50 km. in tidal zone. 
 
APR 2004 – JUL 2004                 PUNJ LLOYD  LTD                     Turkey 
Position : Section In‐Charge 
Projects  : Baku – Tibilisi – Ceyhan Crude Oil Pipeline Project Lot – C 
Client     : British Petroleum 
PMC       : BOTAS, Turkey 
Scope      : 332 Km (34” Dia – 124.8 Kms and 42” Dia – 207.8 Kms) pipeline. 
 
AUG 2003 – MAR 2004             PUNJ LLOYD  LTD                     India 
Position : Section In‐Charge 
Projects  : Dahej –Vijaipur Pipeline Project, India 
Client     : M/S Gas Authority of (India) Limited 
PMC       : M/S Engineers India Limited.  
Scope      : 42” OD 506 km length of pipe line passing through many rivers, dense forest 
and undulated rocky terrain and completed in record time of 6 ½ months. 
 
JUL 2002 – JUL 2003                 PUNJ LLOYD  LTD                      Kazakhstan 
Position : Coordinator for three spreads 
Projects  : KAM Pipeline Project, Kazakhstan 
Client     : Huricane Hydrocarbons Limited (Canada). 
PMC       : Haliburton (UK).  
Scope      :  16”  OD,  179  km  length,  Crude  Oil  Pipeline  laid  in  extreme  cold  weather 
condition i.e. heavy snow fall and in –30 degree temperature in desert land. 
6 of 6
PROJECT DETAILS – AS AN ENGINEER IN PUNJ LLOYD LTD. 
  Period  Project Name  Client 
(Consultant) 
Scope 
JAN 2001 – JUN 2002 Mangalore Bangalore 
Pipeline Project, India
Petronet MHB 
Limited (EIL)
24” OD X 375 km length, 
Petroleum Pipeline.
NOV 1999– DEC 2000    Tunu Oil and Gas 
development field, 
Indonesia.
Total Finamena 
(Petrosea)
36” OD, 20 km length 
Concrete Coated Offshore 
Pipeline. 
SEP 1998 – OCT 1999     Reliance Onshore 
Pipeline, India 
Reliance 
Petroleum 
Limited. (Saipem) 
1” to 48” OD 17 nos. 
different dia. Pipeline in 
three tier pipe racks. 
JAN 1997 – AUG 1998    Mumbai ‐ Manmad 
Pipeline Project, India 
Bharat Petroleum 
Corporation 
Limited. (EIL) 
18”  OD  and  260  km  length 
pipeline  in  congested  city 
terrain of Mumbai 
JUN 1996 – DEC 1996    HBJ Expansion 
Pipeline Project, India 
Gas Authority of 
India Limited. 
(EIL) 
36” OD, 335 km length 
Jagdishpur Expansion 
Pipeline (Vijaipur to Dadri). 
FEB 1996 – JUN 1996      Ravva Oil and Gas 
Field Project, India 
Command 
Petroleum. 
(Hyundai) 
Expansion  of  Ravva  Oil  and 
Gas Field Plant Project  
 
 
SEP 1994 – JAN 1996                     RSB Projects Ltd                     India 
Position     : Engineer 
Project       : Expansion project, Phase‐3 
Client         : Oil and Natural Gas Corporation 
Contractor :  Dalliem Engineering Co. Ltd. (Korea). 
Scope         :  Condensate Fractionation unit. 
EDUCATION 
 B‐Tech in Civil Engineering from University of Rajasthan, India.                                         
 Diploma in Civil Engineering from IERT, Allahabad, India. 
COMPUTER PROFICIENCY 
 MS Office (Word, Excel) 
 Oracle Application (Procurement – PR/PO Approval)      
PERSONAL INFORMATION 
 Marital status          : Married 
 Nationality              : Indian 
 Date of Birth            : January 01, 1973 
 Languages             : Hindi, English, Russian, Indonesian, Malay and Turkish 
 Permanent Address: Lane No. IV, Om Nagar Colony, Pahariya, Varanasi, U.P., India.  
 

Ashok Upadhyay Resume

  • 1.
    1 of 6 AS H O K   U P A D H Y A Y   ashokupadhyay100@yahoo.com, +60138305978  PROFILE  An accomplished and trained Professional with 20 Years of extensive experience in Project  Management  comprising  Planning,  Coordination,  Execution  of  Onshore  &  Offshore  Pipelines,  Terminals,  Platforms  and  Process  Plant  projects  through  Engineering,  Procurement,  Construction  and  Commissioning  phases  with  various  renowned  Owners,  EPC Consultants & Contracting organizations.  Innovative  leadership  qualities,  persuasive  interpersonal  skills  &  ability  to  work  with  multinationals.  CORE COMPETENCIES     Executed  projects  with  various  international  clients  and  consultants  like  Petronas,  Total, PGN, JFE, BP, ONGC, Huricane, Halliburton, BOTAS, EIL, GAIL, Reliance and  familiar with their requirement standards and specifications on pipelines.   Executed  projects  in  difficult  geological  conditions:  marshy  swamps  in  Indonesia,  rainforest  and  steep  slopes  in  Malaysia,  deserts  in  Kazakhstan,  undulated  rocky  mountains in Turkey, tidal zones and busiest city like Mumbai in India.   Executed  projects  in  extreme  climatic  conditions:  monsoons  with  heavy  rainfall  in  Malaysia & Indonesia, extreme cold weather with snow in Kazakhstan.   Worked in multicultural environment with various nationalities like Japanese, British,  Koreans, Indonesians, Kazakhs, Russians, Turks, and Malaysians.   Coordinates and facilitates smooth interaction between intercompany departments as  appropriate,  including  Engineering,  Procurement,  Construction,  Commissioning,  Project Control, Finance and HR.   Executed  projects  with  at  most  safety  &  highest  quality  standards  and  received  various safety awards from client.   Areas of Expertise include:  Project Management  Field Engineering      Project Execution    Site Safety                         Cost Control                 Resource Management  Risk Assessment              Team Building             Claim & Contracts Management        
  • 2.
    2 of 6 SUMMARY OF RESPONSIBILITIES  PROJECTS MANGER    Direct and manage project responsibilities and activities from beginning to end, i.e. ‐  from initiation to client handover.   Uncover initial requirements, risks & constraints.   Develop  detailed  and  complete  project  execution  plans,  budget,  schedule,  and  all  other necessary project communications and reporting documents.   Evaluate and select local subcontractors/suppliers   Assign roles & responsibilities of the project team.   Execute the work according to the plan and control the time & cost overruns.   Perform quality & safety audits.    Evaluate the performance and give recognition/rewards.    Monitor the project performance and determine if variance warrants corrective action.   To  act  as  communication  channel  for  project  information  exchange  between  Contractor  and  other  disciplines  and  forwarding  feedback  to  project  functional  groups till the completion of the contract.   Obtain the final acceptance from client and complete financial closure.  PROJECT COORDINATOR     Coordination  with  discipline  engineers  and  sub‐contractors  relating  to  engineering,  procurement  &  construction  progress  monitoring,  hold‐ups,  delay  analysis,  identification of areas of concern and constraints to ensure smooth inter‐disciplinary  operations.   Liaise  with  the  client  project  management,  company  management  and  vendors  associated with the project on regular and ongoing basis.  CONSTRUCTION MANGER / SECTION IN‐CHARGE      Overall  execution  planning  at  micro  level,  monitoring  and  controlling  of  all  construction activities to ensure fulfillment of contract commitment.   Ensure timely mobilization of resources to site.   Ensure that the job is executed as per approved ITP/Procedures    Control Client & Contractor supplied materials.   Assure  that  all  company,  client,  and  regulatory  EHS  policies  and  procedures  are  followed  in  all  aspects  and  details  and  that  any  incidents  are  reported  as  soon  as  possible to client and company management.   Ensure  quality  checks  are  carried  out  as  per  Project  Quality  Plan,  identify  quality  problems and implement corrective action.   Periodic progress evaluations with look‐ahead schedules.   Work Front determination and analysis for various disciplines.   Work productivity evaluations through production reports. 
  • 3.
    3 of 6 ENGINEER    With the responsibility of Pipeline Construction Engineer Involved in various pipeline  activities  from  survey,  bending,  welding,  lowering,  backfilling,  hydro  testing  including pre commissioning & commissioning activities.  With the responsibility of Civil & Structural Engineer Involved in execution of various  RCC works, fabrication & erection of steel structure.  PROJECT DETAILS – PROJECT MANAGER    MAR 2008 – Till Date          PUNJ LLYOD OIL & GAS (M) SDN BHD           Malaysia  Position : Resident Construction Manager to Project Manager (SSGP)                    (Deputy General Manager to General Manager)  Project   : EPCC for Sabah Sarawak Gas Pipeline (SSGP)  Client     : Petronas Carigali Sdn Bhd (PCSB)  Value     :  Eq. USD 830 Million  Scope     :    36”  x  512  Km  Gas  Pipeline  with  Block  Valve  Stations  (22  Nos.)  and  Intermediate  Scraper Stations (3 Nos.).    The terrain was extremely harsh with dense forests around 100 Km where no access  road near to ROW, rocky and mountainous terrain with steep slopes interspersed all  over with altitude up to 3,300ft (Around 50 locations with 70  steep slopes).   At  some  locations  where  it  was  almost  difficult  to  shift  the  pipes  through  roads,  helicopters were deployed for airlift and stringing the pipes in ROW (1635 Nos.)   2,868  open  cut  crossings  including  8  major perennial rivers,  305  smaller  perennial  rivers and 27 major roads, 24 HDD crossings and 17 Thrust Boring crossings.   Around  55  Km  length  of  pipeline  was  laid  in  swamp  stretches  where  around  48  kilometer  lengths  of  pipeline  were  provided  with  screw  anchors  as  an  anti‐ buoyancy protection.    1.7 Million Cubic Meter of rock was removed during grading and trenching.   Natives inhabit a large portion of the pipeline route and handled with utmost care  and sincerity. There are 9 different tribes along the route.   Metering Stations (2 Nos.) with Gas Chromatograph Analyzer and Filter Separators  (Each 500 MMSCFD X 2 Trains)   Compressor Station (Each 256 MMSCFD GTCP Packages X 4 Nos)   Combined  Station  Works  –  Civil,  Mechanical,  Electrical,  Instrumentation  works  such as SCADA, Telecommunication, Gas Management System, Fire Detection and  Extinguishing System, Integrated CCTV.   Administrative  offices,  Gas  Control  Center/Operation  office,  Workshop  and  Warehouse for the project.   
  • 4.
    4 of 6 PROJECT DETAILS – PROJECT COORDINATOR                                  JUN 2007 – FEB 2008              PUNJ LLOYD  LTD                           Malaysia   Position : Project Coordinator   Project   :  EPCC for Heera Field Re‐development Offshore Project, Mumbai  Client    :  ONGC, India  PMC      :  CEIL, India  Scope      :  Fabrication of jacket and top side at Kenchana yard in Malaysia    NOV 2005 ‐ DEC 2005           PT PUNJ LLOYD INDONESIA       Indonesia    Position : Project Coordinator  Project   : EPC for Tambora Field Development Phase 2 / EPSC 2, Kalimantan  Client    :  Total E&P, Indonesia  Scope      :   24” Pipe Line between 03 Nos. new GTS stations   8”Flow line to connect 06 Nos. Remote wellhead Platform to GTS stations by HDD  and aerial methods Crude Distillation Unit (CDU)   PROJECT DETAILS – CONSTRUCTION MANAGER / SECTION IN CHARGE                                    DEC 2005 – MAY 2007         PT PUNJ LLOYD INDONESIA       Indonesia   Position : Resident Construction Manager  Project   : EPC for South Sumatera West Java Onshore Gas Pipeline – Phase 2  Client    : PT Perusahaan Gas Negara, Indonesia.  Project Value : U$ 52.0 Million (Approx.) Including VO’s  Scope      :   Design,  Detail  Engineering,  Procurement,  Installation,  Testing,  Pre‐ Commissioning & Commissioning Assistance of 32” x 272 Km pipeline.   Sectional Valves Stations (9 Nos.), Future Connections (5 Nos.), Civil, Mechanical,  Piping, Instrumentation & Insulation Works    Including 11 Nos of HDD and 5 Km of Swamp Section     Position : Resident Construction Manager  Project  : Construction of South Sumatera West Java Onshore Gas Pipeline – Phase 1  Client    : PT Perusahaan Gas Negara, Indonesia.  Main Contractor : JFE Engineering Corporation, Japan.  Project Value : U$ 47.3 Million (Approx.)   
  • 5.
    5 of 6 JAN 2005 – OCT 2005               PUNJ LLOYD  LTD                     India  Position : Section In‐Charge  Project   : Mora Sachin Palsana Pipeline (MSPPL) Client    : Gujarat Gas Company  PMC      : GLI  Scope      : Installation & Pre‐Commissioning of 16” x 10 Km pipeline.    JUL 2004 DEC 2008                   PUNJ LLOYD  LTD                     India  Position : Section In‐Charge   Projects  : Offshore Crude Handling Project  Client     : Gujarat Adani Port Limited  PMC       : Intec Asia Pacific  Contractor   : M/S Valentine Maritime (Mauritius) Ltd  Scope      :  48” OD Concrete Coated Pipeline, length 1.50 km. in tidal zone.    APR 2004 – JUL 2004                 PUNJ LLOYD  LTD                     Turkey  Position : Section In‐Charge  Projects  : Baku – Tibilisi – Ceyhan Crude Oil Pipeline Project Lot – C  Client     : British Petroleum  PMC       : BOTAS, Turkey  Scope      : 332 Km (34” Dia – 124.8 Kms and 42” Dia – 207.8 Kms) pipeline.    AUG 2003 – MAR 2004             PUNJ LLOYD  LTD                     India  Position : Section In‐Charge  Projects  : Dahej –Vijaipur Pipeline Project, India  Client     : M/S Gas Authority of (India) Limited  PMC       : M/S Engineers India Limited.   Scope      : 42” OD 506 km length of pipe line passing through many rivers, dense forest  and undulated rocky terrain and completed in record time of 6 ½ months.    JUL 2002 – JUL 2003                 PUNJ LLOYD  LTD                      Kazakhstan  Position : Coordinator for three spreads  Projects  : KAM Pipeline Project, Kazakhstan  Client     : Huricane Hydrocarbons Limited (Canada).  PMC       : Haliburton (UK).   Scope      :  16”  OD,  179  km  length,  Crude  Oil  Pipeline  laid  in  extreme  cold  weather  condition i.e. heavy snow fall and in –30 degree temperature in desert land. 
  • 6.
    6 of 6 PROJECT DETAILS – AS AN ENGINEER IN PUNJ LLOYD LTD.   Period  Project Name  Client  (Consultant)  Scope  JAN 2001 – JUN 2002 Mangalore Bangalore  Pipeline Project, India Petronet MHB  Limited (EIL) 24” OD X 375 km length,  Petroleum Pipeline. NOV 1999– DEC 2000    Tunu Oil and Gas  development field,  Indonesia. Total Finamena  (Petrosea) 36” OD, 20 km length  Concrete Coated Offshore  Pipeline.  SEP 1998 – OCT 1999     Reliance Onshore  Pipeline, India  Reliance  Petroleum  Limited. (Saipem)  1” to 48” OD 17 nos.  different dia. Pipeline in  three tier pipe racks.  JAN 1997 – AUG 1998    Mumbai ‐ Manmad  Pipeline Project, India  Bharat Petroleum  Corporation  Limited. (EIL)  18”  OD  and  260  km  length  pipeline  in  congested  city  terrain of Mumbai  JUN 1996 – DEC 1996    HBJ Expansion  Pipeline Project, India  Gas Authority of  India Limited.  (EIL)  36” OD, 335 km length  Jagdishpur Expansion  Pipeline (Vijaipur to Dadri).  FEB 1996 – JUN 1996      Ravva Oil and Gas  Field Project, India  Command  Petroleum.  (Hyundai)  Expansion  of  Ravva  Oil  and  Gas Field Plant Project       SEP 1994 – JAN 1996                     RSB Projects Ltd                     India  Position     : Engineer  Project       : Expansion project, Phase‐3  Client         : Oil and Natural Gas Corporation  Contractor :  Dalliem Engineering Co. Ltd. (Korea).  Scope         :  Condensate Fractionation unit.  EDUCATION   B‐Tech in Civil Engineering from University of Rajasthan, India.                                           Diploma in Civil Engineering from IERT, Allahabad, India.  COMPUTER PROFICIENCY   MS Office (Word, Excel)   Oracle Application (Procurement – PR/PO Approval)       PERSONAL INFORMATION   Marital status          : Married   Nationality              : Indian   Date of Birth            : January 01, 1973   Languages             : Hindi, English, Russian, Indonesian, Malay and Turkish   Permanent Address: Lane No. IV, Om Nagar Colony, Pahariya, Varanasi, U.P., India.