V 2.0
Project Scope Statement
Project Name
Speakeasy Hotel Network Installation
Project Number
P05258-5
Project Manager
Timothy P Ross
Prioritization
1A
Owner(s)
Trifecta Corp. ( Owners - David Eaker, Troy Gray, and Coura
Badiane )
Statement of Work—Project Description and
Project Product
The purpose of the project is to coordinate and successfully
install the network infrastructure in the Speakeasy Hotel in
order to ensure a smooth operational grand opening that will
provide administrative and guest network services including;
phone, video, internet, security, guest tracking, and POS
system. Trifecta inc. is renovating a new acquisition in
preparation of a scheduled grand opening. This project will
help Speakeasy to better serve their client base, make their stay
comfortable and enjoyable and better enable the staff to manage
the day to day activities of the hotel. The scope of this network
installation includes the planning, design, deployment,
configuration, testing, and transition of the network system.
This network will meet or exceed organizational requirements
established in the project charter. The scope of this project also
includes the completion of all documentation, manuals, and
training aides to be used in conjunction with the various
systems. Project completion will occur when the network and
documentation package has been successfully executed.
We intend to execute this project by completing the following:
1. Maintain focus on the implementation of the approved LAN
Vendor solution and ongoing support services, including but not
limited to;
2. Project Management, serving as a local single point of
contact for the Owner/Operator ( Trifecta inc. )
3. Implementing the approved LSP solution including the
installation of all equipment, configuration, integration, and
testing.
4. Obtain all onboarding documents from network vendors
specifying network requirements for IPTV system, Security
system, Phone system, Business Center, Guest Services System,
and Point of Sale System.
5. Perform a site survey to determine strategic location of
equipment deployment for maximum coverage and reliability.
6. Utilize the LAN Vendor as to test and ensure all vendor
equipment communicates effectively on the network observing
high network security standards and routing protocols.
7. Obtain a contract for 3 – 5 years for ongoing customer
support utilizing Helpdesk Services, a Remote Call Center, a
Remote Network Operations Center ( NOC ), and arranging
onsite support as necessary to maintain network integrity.
8. Obtain all network drawings, applicable licenses & permits,
equipment specifications, port mapping/ identification
information, training documentation, and warranty
documentation to ensure Speakeasy staff is able to effectively
identify and support equipment at the hotel.
Project Deliverables
There are 4 tangible services being provided from this network
installation project. Each service is being installed by a separate
vendor. Each vendor will provide a project lead or small
projects manager to coordinate their installation phase provide
daily updates to the Project Manager ( Timothy Ross ) for this
install. Upon the successful completion of this phase the
Speakeasy Hotel will have a fully functional communications,
video, and LAN network meeting the needs for the hotel
administrative staff and hotel guests including IPTV, Phones,
computers, POS, guest tracking services, security system,
billing system, printing services, and internet access.Vendor 1 -
Network LAN Vendor will provide proactive network
monitoring services ( Public IP Required ) – equipment will
include all necessary routers/switches/servers/wireless
equipment/mounting racks, televisions, set top boxes for Guest
TV system, and all applicable LAN design documentation, Bill
of Material, Wireless Site Surveys, and training documentation.
Vendor 2 - The Customer
Solution
s vendor will provide all administrative office equipment
including printers/computers/monitors/software and applicable
equipment for guest billing and tracking services including
equipment associated with food and beverage ordering as well
as equipment necessary to set up a Guest Business service
center that will be connected and monitored by Vendor 1
network Vendor – equipment will include 3 computers, printer,
and remote printing services. Vendor 3 – Will provide all
associated security equipment including camera’s, servers,
monitors, documentation, and applicable software and recording
equipment to maximize guest security and safety. Vendor 4 –
Will provide all equipment and software associated with
establishing communication via guest phones and administration
offices and meet all criteria associated with meeting hotel life
safety requirements – equipment will include
PBX/Servers/phones and all associated software with remote
monitoring capability ( Public IP Required )
Project Objectives
Cost
The total amount of funds budgeted for the network installation
is $500,000. This does not include the monthly expenses the
Speakeasy hotel will incur for the proactive network monitoring
service or funds required to maintain monthly internet service
with the ISP. This value is a budget estimate of the equipment
materials and labor. A contingency factor of 5% was used on
equipment and material in anticipation of potential price
increases or required network changes.
Objectives & Schedule:
1. To complete all tasks associated with the project and
Milestones are met to effectively open the Speakeasy Hotel as
scheduled as we work to expand our market presence in
preparation of the upcoming vacation season.
2. Low voltage Contractor will - Test, certify, and terminate as
necessary all network cabling to maximize network integrity
and infrastructure. Contractor shall be responsible for providing
all necessary patch cables for guestrooms, conference space and
equipment rooms. Vendor will be responsible for patching the
switch ports to the patch panel.
3. Vendor 1 will Install all network associated equipment to
establish essential communications and services to ensure hotel
staff, hotel equipment, and vendor equipment are fully
operational to maximize the health, comfort, and safety of hotel
guests.
4. Vendor 2 - will install, configure, establish network
communications, test, train hotel staff, and aide in the Grand
opening to ensure all critical hotel operational systems are on
line and processing per operational guidelines.
5. Vendor 3 will install, configure, establish network
communications, test, train hotel security and engineering staff
on equipment deployment, basic troubleshooting, and system
operations in accordance with the security system being
deployed to help ensure safety of hotel guests and staff.
6. Vendor 4 will install, configure, establish network
communications, test, and train hotel engineering staff on basic
system operation and deployment to effectively establish phone
communications throughout the hotel.
7. Vendor 1 will provide all necessary warranty documentation,
network diagrams, equipment specifications, and configurations
as well as provide 3 years of “Proactive Network Monitoring”
of network equipment.
8. Owners – Will approve the network design and network
specifications provided by Vendor 1in a timely fashion to allow
all equipment to be ordered in time to meet all milestones.
9. Owners – Will pay a 30% deposit to all vendors per the
contract guidelines in order for vendors to order required
equipment and to begin work.
10. 3rd Party onboarding docs will be provided 16 weeks prior
Grand Opening.
11. ISP WAN Router installation will be ordered and installed 4
weeks prior to grand opening.
12. VLAN and Network IP Scheme will be provided 6 weeks
prior toGrand Opening.
13. List of ALL software applications requiring ISP interface
will be provided 3 weeks prior to Grand Opening.
14. Port counts, equipment locations, and site survey will be
finalized 12 weeks prior to Grand Opening.
15. Hotel Equipment deployment will be completed 3 weeks
prior to Grand Opening.
16. Guest services including wireless network equipment be
completed 3 weeks prior to Grand Opening.
17. Go Live testing will occur 1 week prior to Grand Opening.
Hotel will be open for business for non-paying guests.
18. Billing and guest tracking interface and software will be
operational 1 week prior to Go Live date.
19. Wireless and network testing will begin 1 week prior to Go
Live date utilizing and documenting accordingly test results in
accordance to the established test criteria..
20. Associate operations and training will begin 1 week prior to
Go Live date.
21. System acceptance testing will begin 2 days prior to Grand
Opening.
Project Assumptions
This statement of work is based on the following key
assumptions. Any assumptions found to be invalid could have
an effect on price or schedule and will be handled in accordance
with the “Communication & Project Change Procedure”. The
budget allows for slight variances in order to meet project
deadlines. Project budget is expected to be high initially and
market projections indicate a sustained return on investment
after Grand Opening.
1. Vendors will provide services described in this Scope of
Work Statement during Vendor’s normal business hours, 9:00 to
6:00 Monday thru Friday.
2. Vendors will not be responsible for any project delays.
3. LAN Vendor will provide a Service Level Agreement
addressing any service interruptions caused by equipment
failure.
4. ISP will provide a Service Level Agreement addressing any
service interruptions caused by the Internet Vendor line or
service outage.
5. The implementation of this project is based on the equipment
list provided by each vendor associated with their system of
responsibility and products associated with such equipment.
Project Constraints· It may be difficult to free up the required
internal staff without 24 hour notice.· The timeline must be met
to meet “Go Live” dates for Grand Opening.· ISP services must
be ordered with sufficient time to allow ISP provisioning.· No
new temporary hires are allowed with the exception of the PM.
Exclusions
· There will not be Internet access to the new system during this
implementation project.
· RFID ( Radio Frequency Identification Device ) will not be a
part of the network installation or utilized on the network.
· No used equipment will be authorized for this installation
without prior consent and justification. If PM determines used
equipment can or should be utilized said equipment must be
refurbished and warrantied
Acceptance Criteria
Vendors will provide a property site completion list
documenting that all of the required installation and migration
tasks as listed in this SOW have been successfully completed,
and will also complete the Acceptance Checklist.to be
completed during the Test Phase. Vendors shall have fulfilled
their obligations under the SOW when any of the following first
occurs:
· Vendor accomplishes the Vendor tasks described under "
Vendor Responsibilities"
· The Operator/Owner notifies Vendor, in writing, that further
services are not required.
Technical Requirements
Upon completion of this project and the network installation
this hotel will be fully operational capable of supporting and
servicing hotel guests. This property consists of 527 guest
rooms, 12 meeting spaces, 1 ball room, a restaurant, a bar, pool,
and exercise area. The Speakeasy hotel is centrally located near
a variety of local attractions and a major sports venue that will
help attract clients.
APPROVALSType NameSignatureDate
Project Manager Approval:
Customer/Sponsor Approval:

More Related Content

Similar to V 2.0Project Scope StatementProject NameSpeakeasy Ho.docx

Authentic Assessment Project (AAP) Jan 2017Background Informat.docx
Authentic Assessment Project (AAP) Jan 2017Background Informat.docxAuthentic Assessment Project (AAP) Jan 2017Background Informat.docx
Authentic Assessment Project (AAP) Jan 2017Background Informat.docx
rock73
 
RichardLaca-Resume-Associate Engineer-Telecom
RichardLaca-Resume-Associate Engineer-TelecomRichardLaca-Resume-Associate Engineer-Telecom
RichardLaca-Resume-Associate Engineer-TelecomRichard Laca
 
Background Information for World-Wide Trading CompanyWorld-Wide .docx
Background Information for World-Wide Trading CompanyWorld-Wide .docxBackground Information for World-Wide Trading CompanyWorld-Wide .docx
Background Information for World-Wide Trading CompanyWorld-Wide .docx
ikirkton
 
Thomas Hooton Resume
Thomas Hooton ResumeThomas Hooton Resume
Thomas Hooton Resume
Thomas Hooton
 
WWTC Office Layout Diagram.htmlBackground Information for Wo.docx
WWTC Office Layout Diagram.htmlBackground Information for Wo.docxWWTC Office Layout Diagram.htmlBackground Information for Wo.docx
WWTC Office Layout Diagram.htmlBackground Information for Wo.docx
ericbrooks84875
 
1 CITY OF DuPONT REQUEST FOR PROPOSALS .docx
1 CITY OF DuPONT   REQUEST FOR PROPOSALS   .docx1 CITY OF DuPONT   REQUEST FOR PROPOSALS   .docx
1 CITY OF DuPONT REQUEST FOR PROPOSALS .docx
karisariddell
 
Arpit resume new
Arpit resume newArpit resume new
Arpit resume new
Arpit pouranik
 
plan for penetration test
plan for penetration testplan for penetration test
plan for penetration test
hetvi naik
 
John Dallas 2015
John Dallas 2015John Dallas 2015
John Dallas 2015John Dallas
 
Proposal to Manage the Upgrade of the IT Infrastructure for PPESA
Proposal to Manage the Upgrade of the IT Infrastructure for PPESAProposal to Manage the Upgrade of the IT Infrastructure for PPESA
Proposal to Manage the Upgrade of the IT Infrastructure for PPESAFederico Schiavio
 
Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Dabban
 
System%20security%20Engineer%20#1 (2)
System%20security%20Engineer%20#1 (2)System%20security%20Engineer%20#1 (2)
System%20security%20Engineer%20#1 (2)Mike Sanders
 
Thomas Hooton Resume
Thomas Hooton ResumeThomas Hooton Resume
Thomas Hooton ResumeThomas Hooton
 

Similar to V 2.0Project Scope StatementProject NameSpeakeasy Ho.docx (20)

Authentic Assessment Project (AAP) Jan 2017Background Informat.docx
Authentic Assessment Project (AAP) Jan 2017Background Informat.docxAuthentic Assessment Project (AAP) Jan 2017Background Informat.docx
Authentic Assessment Project (AAP) Jan 2017Background Informat.docx
 
Project Plan
Project PlanProject Plan
Project Plan
 
RichardLaca-Resume-Associate Engineer-Telecom
RichardLaca-Resume-Associate Engineer-TelecomRichardLaca-Resume-Associate Engineer-Telecom
RichardLaca-Resume-Associate Engineer-Telecom
 
Background Information for World-Wide Trading CompanyWorld-Wide .docx
Background Information for World-Wide Trading CompanyWorld-Wide .docxBackground Information for World-Wide Trading CompanyWorld-Wide .docx
Background Information for World-Wide Trading CompanyWorld-Wide .docx
 
Thomas Hooton Resume
Thomas Hooton ResumeThomas Hooton Resume
Thomas Hooton Resume
 
WWTC Office Layout Diagram.htmlBackground Information for Wo.docx
WWTC Office Layout Diagram.htmlBackground Information for Wo.docxWWTC Office Layout Diagram.htmlBackground Information for Wo.docx
WWTC Office Layout Diagram.htmlBackground Information for Wo.docx
 
1 CITY OF DuPONT REQUEST FOR PROPOSALS .docx
1 CITY OF DuPONT   REQUEST FOR PROPOSALS   .docx1 CITY OF DuPONT   REQUEST FOR PROPOSALS   .docx
1 CITY OF DuPONT REQUEST FOR PROPOSALS .docx
 
Arpit resume new
Arpit resume newArpit resume new
Arpit resume new
 
plan for penetration test
plan for penetration testplan for penetration test
plan for penetration test
 
idrees resume
idrees resumeidrees resume
idrees resume
 
ASG
ASGASG
ASG
 
John Dallas 2015
John Dallas 2015John Dallas 2015
John Dallas 2015
 
CV_PM_Mohammed Fazal Imran
CV_PM_Mohammed Fazal ImranCV_PM_Mohammed Fazal Imran
CV_PM_Mohammed Fazal Imran
 
Daniel Cottam C.V
Daniel Cottam C.VDaniel Cottam C.V
Daniel Cottam C.V
 
Proposal to Manage the Upgrade of the IT Infrastructure for PPESA
Proposal to Manage the Upgrade of the IT Infrastructure for PPESAProposal to Manage the Upgrade of the IT Infrastructure for PPESA
Proposal to Manage the Upgrade of the IT Infrastructure for PPESA
 
Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Kamal Dabban CV
Adnan Kamal Dabban CV
 
Abraham Resume updated
Abraham Resume updatedAbraham Resume updated
Abraham Resume updated
 
Project Scope Statement
Project Scope StatementProject Scope Statement
Project Scope Statement
 
System%20security%20Engineer%20#1 (2)
System%20security%20Engineer%20#1 (2)System%20security%20Engineer%20#1 (2)
System%20security%20Engineer%20#1 (2)
 
Thomas Hooton Resume
Thomas Hooton ResumeThomas Hooton Resume
Thomas Hooton Resume
 

More from dickonsondorris

Copyright © eContent Management Pty Ltd. Health Sociology Revi.docx
Copyright © eContent Management Pty Ltd. Health Sociology Revi.docxCopyright © eContent Management Pty Ltd. Health Sociology Revi.docx
Copyright © eContent Management Pty Ltd. Health Sociology Revi.docx
dickonsondorris
 
Copyright © Pearson Education 2010 Digital Tools in Toda.docx
Copyright © Pearson Education 2010 Digital Tools in Toda.docxCopyright © Pearson Education 2010 Digital Tools in Toda.docx
Copyright © Pearson Education 2010 Digital Tools in Toda.docx
dickonsondorris
 
Copyright © Jen-Wen Lin 2018 1 STA457 Time series .docx
Copyright © Jen-Wen Lin 2018   1 STA457 Time series .docxCopyright © Jen-Wen Lin 2018   1 STA457 Time series .docx
Copyright © Jen-Wen Lin 2018 1 STA457 Time series .docx
dickonsondorris
 
Copyright © John Wiley & Sons, Inc. All rights reserved..docx
Copyright © John Wiley & Sons, Inc. All rights reserved..docxCopyright © John Wiley & Sons, Inc. All rights reserved..docx
Copyright © John Wiley & Sons, Inc. All rights reserved..docx
dickonsondorris
 
Copyright © by The McGraw-Hill Companies, Inc. The Aztec Accou.docx
Copyright © by The McGraw-Hill Companies, Inc. The Aztec Accou.docxCopyright © by The McGraw-Hill Companies, Inc. The Aztec Accou.docx
Copyright © by The McGraw-Hill Companies, Inc. The Aztec Accou.docx
dickonsondorris
 
Copyright © Cengage Learning. All rights reserved. CHAPTE.docx
Copyright © Cengage Learning.  All rights reserved. CHAPTE.docxCopyright © Cengage Learning.  All rights reserved. CHAPTE.docx
Copyright © Cengage Learning. All rights reserved. CHAPTE.docx
dickonsondorris
 
Copyright © by Holt, Rinehart and Winston. All rights reserved.docx
Copyright © by Holt, Rinehart and Winston. All rights reserved.docxCopyright © by Holt, Rinehart and Winston. All rights reserved.docx
Copyright © by Holt, Rinehart and Winston. All rights reserved.docx
dickonsondorris
 
Copyright © 2020 by Jones & Bartlett Learning, LLC, an Ascend .docx
Copyright © 2020 by Jones & Bartlett Learning, LLC, an Ascend .docxCopyright © 2020 by Jones & Bartlett Learning, LLC, an Ascend .docx
Copyright © 2020 by Jones & Bartlett Learning, LLC, an Ascend .docx
dickonsondorris
 
Copyright © 2019, American Institute of Certified Public Accou.docx
Copyright © 2019, American Institute of Certified Public Accou.docxCopyright © 2019, American Institute of Certified Public Accou.docx
Copyright © 2019, American Institute of Certified Public Accou.docx
dickonsondorris
 
Copyright © 2018 Pearson Education, Inc. All Rights ReservedChild .docx
Copyright © 2018 Pearson Education, Inc. All Rights ReservedChild .docxCopyright © 2018 Pearson Education, Inc. All Rights ReservedChild .docx
Copyright © 2018 Pearson Education, Inc. All Rights ReservedChild .docx
dickonsondorris
 
Copyright © 2018 Pearson Education, Inc. C H A P T E R 6.docx
Copyright © 2018 Pearson Education, Inc. C H A P T E R  6.docxCopyright © 2018 Pearson Education, Inc. C H A P T E R  6.docx
Copyright © 2018 Pearson Education, Inc. C H A P T E R 6.docx
dickonsondorris
 
Copyright © 2018 Capella University. Copy and distribution o.docx
Copyright © 2018 Capella University. Copy and distribution o.docxCopyright © 2018 Capella University. Copy and distribution o.docx
Copyright © 2018 Capella University. Copy and distribution o.docx
dickonsondorris
 
Copyright © 2018 Pearson Education, Inc.C H A P T E R 3.docx
Copyright © 2018 Pearson Education, Inc.C H A P T E R  3.docxCopyright © 2018 Pearson Education, Inc.C H A P T E R  3.docx
Copyright © 2018 Pearson Education, Inc.C H A P T E R 3.docx
dickonsondorris
 
Copyright © 2018 by Steven Levitsky and Daniel.docx
Copyright © 2018 by Steven Levitsky and Daniel.docxCopyright © 2018 by Steven Levitsky and Daniel.docx
Copyright © 2018 by Steven Levitsky and Daniel.docx
dickonsondorris
 
Copyright © 2017, 2014, 2011 Pearson Education, Inc. All Right.docx
Copyright © 2017, 2014, 2011 Pearson Education, Inc. All Right.docxCopyright © 2017, 2014, 2011 Pearson Education, Inc. All Right.docx
Copyright © 2017, 2014, 2011 Pearson Education, Inc. All Right.docx
dickonsondorris
 
Copyright © 2017 Wolters Kluwer Health Lippincott Williams.docx
Copyright © 2017 Wolters Kluwer Health  Lippincott Williams.docxCopyright © 2017 Wolters Kluwer Health  Lippincott Williams.docx
Copyright © 2017 Wolters Kluwer Health Lippincott Williams.docx
dickonsondorris
 
Copyright © 2016, 2013, 2010 Pearson Education, Inc. All Right.docx
Copyright © 2016, 2013, 2010 Pearson Education, Inc. All Right.docxCopyright © 2016, 2013, 2010 Pearson Education, Inc. All Right.docx
Copyright © 2016, 2013, 2010 Pearson Education, Inc. All Right.docx
dickonsondorris
 
Copyright © 2017 by University of Phoenix. All rights rese.docx
Copyright © 2017 by University of Phoenix. All rights rese.docxCopyright © 2017 by University of Phoenix. All rights rese.docx
Copyright © 2017 by University of Phoenix. All rights rese.docx
dickonsondorris
 
Copyright © 2016 John Wiley & Sons, Inc.Copyright © 20.docx
Copyright © 2016 John Wiley & Sons, Inc.Copyright © 20.docxCopyright © 2016 John Wiley & Sons, Inc.Copyright © 20.docx
Copyright © 2016 John Wiley & Sons, Inc.Copyright © 20.docx
dickonsondorris
 
Copyright © 2016 Pearson Education, Inc. .docx
Copyright © 2016 Pearson Education, Inc.                    .docxCopyright © 2016 Pearson Education, Inc.                    .docx
Copyright © 2016 Pearson Education, Inc. .docx
dickonsondorris
 

More from dickonsondorris (20)

Copyright © eContent Management Pty Ltd. Health Sociology Revi.docx
Copyright © eContent Management Pty Ltd. Health Sociology Revi.docxCopyright © eContent Management Pty Ltd. Health Sociology Revi.docx
Copyright © eContent Management Pty Ltd. Health Sociology Revi.docx
 
Copyright © Pearson Education 2010 Digital Tools in Toda.docx
Copyright © Pearson Education 2010 Digital Tools in Toda.docxCopyright © Pearson Education 2010 Digital Tools in Toda.docx
Copyright © Pearson Education 2010 Digital Tools in Toda.docx
 
Copyright © Jen-Wen Lin 2018 1 STA457 Time series .docx
Copyright © Jen-Wen Lin 2018   1 STA457 Time series .docxCopyright © Jen-Wen Lin 2018   1 STA457 Time series .docx
Copyright © Jen-Wen Lin 2018 1 STA457 Time series .docx
 
Copyright © John Wiley & Sons, Inc. All rights reserved..docx
Copyright © John Wiley & Sons, Inc. All rights reserved..docxCopyright © John Wiley & Sons, Inc. All rights reserved..docx
Copyright © John Wiley & Sons, Inc. All rights reserved..docx
 
Copyright © by The McGraw-Hill Companies, Inc. The Aztec Accou.docx
Copyright © by The McGraw-Hill Companies, Inc. The Aztec Accou.docxCopyright © by The McGraw-Hill Companies, Inc. The Aztec Accou.docx
Copyright © by The McGraw-Hill Companies, Inc. The Aztec Accou.docx
 
Copyright © Cengage Learning. All rights reserved. CHAPTE.docx
Copyright © Cengage Learning.  All rights reserved. CHAPTE.docxCopyright © Cengage Learning.  All rights reserved. CHAPTE.docx
Copyright © Cengage Learning. All rights reserved. CHAPTE.docx
 
Copyright © by Holt, Rinehart and Winston. All rights reserved.docx
Copyright © by Holt, Rinehart and Winston. All rights reserved.docxCopyright © by Holt, Rinehart and Winston. All rights reserved.docx
Copyright © by Holt, Rinehart and Winston. All rights reserved.docx
 
Copyright © 2020 by Jones & Bartlett Learning, LLC, an Ascend .docx
Copyright © 2020 by Jones & Bartlett Learning, LLC, an Ascend .docxCopyright © 2020 by Jones & Bartlett Learning, LLC, an Ascend .docx
Copyright © 2020 by Jones & Bartlett Learning, LLC, an Ascend .docx
 
Copyright © 2019, American Institute of Certified Public Accou.docx
Copyright © 2019, American Institute of Certified Public Accou.docxCopyright © 2019, American Institute of Certified Public Accou.docx
Copyright © 2019, American Institute of Certified Public Accou.docx
 
Copyright © 2018 Pearson Education, Inc. All Rights ReservedChild .docx
Copyright © 2018 Pearson Education, Inc. All Rights ReservedChild .docxCopyright © 2018 Pearson Education, Inc. All Rights ReservedChild .docx
Copyright © 2018 Pearson Education, Inc. All Rights ReservedChild .docx
 
Copyright © 2018 Pearson Education, Inc. C H A P T E R 6.docx
Copyright © 2018 Pearson Education, Inc. C H A P T E R  6.docxCopyright © 2018 Pearson Education, Inc. C H A P T E R  6.docx
Copyright © 2018 Pearson Education, Inc. C H A P T E R 6.docx
 
Copyright © 2018 Capella University. Copy and distribution o.docx
Copyright © 2018 Capella University. Copy and distribution o.docxCopyright © 2018 Capella University. Copy and distribution o.docx
Copyright © 2018 Capella University. Copy and distribution o.docx
 
Copyright © 2018 Pearson Education, Inc.C H A P T E R 3.docx
Copyright © 2018 Pearson Education, Inc.C H A P T E R  3.docxCopyright © 2018 Pearson Education, Inc.C H A P T E R  3.docx
Copyright © 2018 Pearson Education, Inc.C H A P T E R 3.docx
 
Copyright © 2018 by Steven Levitsky and Daniel.docx
Copyright © 2018 by Steven Levitsky and Daniel.docxCopyright © 2018 by Steven Levitsky and Daniel.docx
Copyright © 2018 by Steven Levitsky and Daniel.docx
 
Copyright © 2017, 2014, 2011 Pearson Education, Inc. All Right.docx
Copyright © 2017, 2014, 2011 Pearson Education, Inc. All Right.docxCopyright © 2017, 2014, 2011 Pearson Education, Inc. All Right.docx
Copyright © 2017, 2014, 2011 Pearson Education, Inc. All Right.docx
 
Copyright © 2017 Wolters Kluwer Health Lippincott Williams.docx
Copyright © 2017 Wolters Kluwer Health  Lippincott Williams.docxCopyright © 2017 Wolters Kluwer Health  Lippincott Williams.docx
Copyright © 2017 Wolters Kluwer Health Lippincott Williams.docx
 
Copyright © 2016, 2013, 2010 Pearson Education, Inc. All Right.docx
Copyright © 2016, 2013, 2010 Pearson Education, Inc. All Right.docxCopyright © 2016, 2013, 2010 Pearson Education, Inc. All Right.docx
Copyright © 2016, 2013, 2010 Pearson Education, Inc. All Right.docx
 
Copyright © 2017 by University of Phoenix. All rights rese.docx
Copyright © 2017 by University of Phoenix. All rights rese.docxCopyright © 2017 by University of Phoenix. All rights rese.docx
Copyright © 2017 by University of Phoenix. All rights rese.docx
 
Copyright © 2016 John Wiley & Sons, Inc.Copyright © 20.docx
Copyright © 2016 John Wiley & Sons, Inc.Copyright © 20.docxCopyright © 2016 John Wiley & Sons, Inc.Copyright © 20.docx
Copyright © 2016 John Wiley & Sons, Inc.Copyright © 20.docx
 
Copyright © 2016 Pearson Education, Inc. .docx
Copyright © 2016 Pearson Education, Inc.                    .docxCopyright © 2016 Pearson Education, Inc.                    .docx
Copyright © 2016 Pearson Education, Inc. .docx
 

Recently uploaded

Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
EduSkills OECD
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
Fundacja Rozwoju Społeczeństwa Przedsiębiorczego
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
Col Mukteshwar Prasad
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
PedroFerreira53928
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
Steve Thomason
 
Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
GeoBlogs
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 

Recently uploaded (20)

Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......Ethnobotany and Ethnopharmacology ......
Ethnobotany and Ethnopharmacology ......
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 

V 2.0Project Scope StatementProject NameSpeakeasy Ho.docx

  • 1. V 2.0 Project Scope Statement Project Name Speakeasy Hotel Network Installation Project Number P05258-5 Project Manager Timothy P Ross Prioritization 1A Owner(s) Trifecta Corp. ( Owners - David Eaker, Troy Gray, and Coura Badiane ) Statement of Work—Project Description and Project Product The purpose of the project is to coordinate and successfully install the network infrastructure in the Speakeasy Hotel in order to ensure a smooth operational grand opening that will provide administrative and guest network services including; phone, video, internet, security, guest tracking, and POS system. Trifecta inc. is renovating a new acquisition in preparation of a scheduled grand opening. This project will help Speakeasy to better serve their client base, make their stay comfortable and enjoyable and better enable the staff to manage the day to day activities of the hotel. The scope of this network installation includes the planning, design, deployment, configuration, testing, and transition of the network system.
  • 2. This network will meet or exceed organizational requirements established in the project charter. The scope of this project also includes the completion of all documentation, manuals, and training aides to be used in conjunction with the various systems. Project completion will occur when the network and documentation package has been successfully executed. We intend to execute this project by completing the following: 1. Maintain focus on the implementation of the approved LAN Vendor solution and ongoing support services, including but not limited to; 2. Project Management, serving as a local single point of contact for the Owner/Operator ( Trifecta inc. ) 3. Implementing the approved LSP solution including the installation of all equipment, configuration, integration, and testing. 4. Obtain all onboarding documents from network vendors specifying network requirements for IPTV system, Security system, Phone system, Business Center, Guest Services System, and Point of Sale System. 5. Perform a site survey to determine strategic location of equipment deployment for maximum coverage and reliability. 6. Utilize the LAN Vendor as to test and ensure all vendor equipment communicates effectively on the network observing high network security standards and routing protocols. 7. Obtain a contract for 3 – 5 years for ongoing customer support utilizing Helpdesk Services, a Remote Call Center, a Remote Network Operations Center ( NOC ), and arranging onsite support as necessary to maintain network integrity. 8. Obtain all network drawings, applicable licenses & permits, equipment specifications, port mapping/ identification information, training documentation, and warranty documentation to ensure Speakeasy staff is able to effectively identify and support equipment at the hotel.
  • 3. Project Deliverables There are 4 tangible services being provided from this network installation project. Each service is being installed by a separate vendor. Each vendor will provide a project lead or small projects manager to coordinate their installation phase provide daily updates to the Project Manager ( Timothy Ross ) for this install. Upon the successful completion of this phase the Speakeasy Hotel will have a fully functional communications, video, and LAN network meeting the needs for the hotel administrative staff and hotel guests including IPTV, Phones, computers, POS, guest tracking services, security system, billing system, printing services, and internet access.Vendor 1 - Network LAN Vendor will provide proactive network monitoring services ( Public IP Required ) – equipment will include all necessary routers/switches/servers/wireless equipment/mounting racks, televisions, set top boxes for Guest TV system, and all applicable LAN design documentation, Bill of Material, Wireless Site Surveys, and training documentation. Vendor 2 - The Customer Solution s vendor will provide all administrative office equipment including printers/computers/monitors/software and applicable equipment for guest billing and tracking services including equipment associated with food and beverage ordering as well as equipment necessary to set up a Guest Business service center that will be connected and monitored by Vendor 1 network Vendor – equipment will include 3 computers, printer, and remote printing services. Vendor 3 – Will provide all
  • 4. associated security equipment including camera’s, servers, monitors, documentation, and applicable software and recording equipment to maximize guest security and safety. Vendor 4 – Will provide all equipment and software associated with establishing communication via guest phones and administration offices and meet all criteria associated with meeting hotel life safety requirements – equipment will include PBX/Servers/phones and all associated software with remote monitoring capability ( Public IP Required ) Project Objectives Cost The total amount of funds budgeted for the network installation is $500,000. This does not include the monthly expenses the Speakeasy hotel will incur for the proactive network monitoring service or funds required to maintain monthly internet service with the ISP. This value is a budget estimate of the equipment materials and labor. A contingency factor of 5% was used on equipment and material in anticipation of potential price increases or required network changes. Objectives & Schedule: 1. To complete all tasks associated with the project and Milestones are met to effectively open the Speakeasy Hotel as scheduled as we work to expand our market presence in preparation of the upcoming vacation season.
  • 5. 2. Low voltage Contractor will - Test, certify, and terminate as necessary all network cabling to maximize network integrity and infrastructure. Contractor shall be responsible for providing all necessary patch cables for guestrooms, conference space and equipment rooms. Vendor will be responsible for patching the switch ports to the patch panel. 3. Vendor 1 will Install all network associated equipment to establish essential communications and services to ensure hotel staff, hotel equipment, and vendor equipment are fully operational to maximize the health, comfort, and safety of hotel guests. 4. Vendor 2 - will install, configure, establish network communications, test, train hotel staff, and aide in the Grand opening to ensure all critical hotel operational systems are on line and processing per operational guidelines. 5. Vendor 3 will install, configure, establish network communications, test, train hotel security and engineering staff on equipment deployment, basic troubleshooting, and system operations in accordance with the security system being deployed to help ensure safety of hotel guests and staff. 6. Vendor 4 will install, configure, establish network communications, test, and train hotel engineering staff on basic system operation and deployment to effectively establish phone communications throughout the hotel.
  • 6. 7. Vendor 1 will provide all necessary warranty documentation, network diagrams, equipment specifications, and configurations as well as provide 3 years of “Proactive Network Monitoring” of network equipment. 8. Owners – Will approve the network design and network specifications provided by Vendor 1in a timely fashion to allow all equipment to be ordered in time to meet all milestones. 9. Owners – Will pay a 30% deposit to all vendors per the contract guidelines in order for vendors to order required equipment and to begin work. 10. 3rd Party onboarding docs will be provided 16 weeks prior Grand Opening. 11. ISP WAN Router installation will be ordered and installed 4 weeks prior to grand opening. 12. VLAN and Network IP Scheme will be provided 6 weeks prior toGrand Opening. 13. List of ALL software applications requiring ISP interface will be provided 3 weeks prior to Grand Opening. 14. Port counts, equipment locations, and site survey will be finalized 12 weeks prior to Grand Opening. 15. Hotel Equipment deployment will be completed 3 weeks prior to Grand Opening. 16. Guest services including wireless network equipment be completed 3 weeks prior to Grand Opening. 17. Go Live testing will occur 1 week prior to Grand Opening.
  • 7. Hotel will be open for business for non-paying guests. 18. Billing and guest tracking interface and software will be operational 1 week prior to Go Live date. 19. Wireless and network testing will begin 1 week prior to Go Live date utilizing and documenting accordingly test results in accordance to the established test criteria.. 20. Associate operations and training will begin 1 week prior to Go Live date. 21. System acceptance testing will begin 2 days prior to Grand Opening. Project Assumptions This statement of work is based on the following key assumptions. Any assumptions found to be invalid could have an effect on price or schedule and will be handled in accordance with the “Communication & Project Change Procedure”. The budget allows for slight variances in order to meet project deadlines. Project budget is expected to be high initially and market projections indicate a sustained return on investment after Grand Opening. 1. Vendors will provide services described in this Scope of Work Statement during Vendor’s normal business hours, 9:00 to 6:00 Monday thru Friday. 2. Vendors will not be responsible for any project delays. 3. LAN Vendor will provide a Service Level Agreement
  • 8. addressing any service interruptions caused by equipment failure. 4. ISP will provide a Service Level Agreement addressing any service interruptions caused by the Internet Vendor line or service outage. 5. The implementation of this project is based on the equipment list provided by each vendor associated with their system of responsibility and products associated with such equipment. Project Constraints· It may be difficult to free up the required internal staff without 24 hour notice.· The timeline must be met to meet “Go Live” dates for Grand Opening.· ISP services must be ordered with sufficient time to allow ISP provisioning.· No new temporary hires are allowed with the exception of the PM. Exclusions · There will not be Internet access to the new system during this implementation project. · RFID ( Radio Frequency Identification Device ) will not be a part of the network installation or utilized on the network. · No used equipment will be authorized for this installation without prior consent and justification. If PM determines used equipment can or should be utilized said equipment must be refurbished and warrantied Acceptance Criteria Vendors will provide a property site completion list
  • 9. documenting that all of the required installation and migration tasks as listed in this SOW have been successfully completed, and will also complete the Acceptance Checklist.to be completed during the Test Phase. Vendors shall have fulfilled their obligations under the SOW when any of the following first occurs: · Vendor accomplishes the Vendor tasks described under " Vendor Responsibilities" · The Operator/Owner notifies Vendor, in writing, that further services are not required. Technical Requirements Upon completion of this project and the network installation this hotel will be fully operational capable of supporting and servicing hotel guests. This property consists of 527 guest rooms, 12 meeting spaces, 1 ball room, a restaurant, a bar, pool, and exercise area. The Speakeasy hotel is centrally located near a variety of local attractions and a major sports venue that will help attract clients. APPROVALSType NameSignatureDate Project Manager Approval: