SlideShare a Scribd company logo
Page 1 of 5
DINESH CHANDULAL PARDESHI
Home Address: Work Address:
B-102 Parijat Apartment. Hamad International Airport (FMM)
Survey No. 11A/1, Ephinstone Road, P. O Box: 82710
Bopodi, Pune ,Maharashtra India. Doha - Qatar
Phone: +91 7385607944 Phone(Qat): +974 74740518
Email: jayshridin@yahoo.co.in; jayshridin@gmail.com
Skype id : eng.dineshpardeshi
PROJECT ENGINEERING AND MANAGEMENT
▪ Security, Communication, CCTV, Intrusion Detector, Access Control, Fire Alarm, Public Address ▪
Many significant project management achievements. Broad ranging experience of 12+ covers
the optimization of team potentials, liaising with internal and external works as well as
operational management from both practical and administrative standpoints in the Security,
Communication, CCTV, Intrusion Detector, Access Control, Public Address, and Fire Alarm.
AREAS OF EXPERTISE
Project Management Total Quality Team Leadership
Trouble shooting – problem solving Contract Negotiations Strategic Planning
Staff & Team Development Project Execution Technical Design
PROFESSIONAL EXPERIENCE AND SIGNIFICANT ACHIEVEMENTS
Electronics Engineer Qatar-Doha August 2013– Present
Hamad International Airport-(FMM ),
Project: Electronics & Telecom System Up-gradation for International Airport – Qatar Airways.
Nature of Work :
Responsible for administrative & supervisory work assisting the Facility Manager in
Construction & Maintenance of Operations at Hamad International Airport. Work involves
responsibility for supervision of technical and maintenance employees as well as assisting in
the development and implementation of plans & policies. Such as Security, Communication,
CCTV, Intrusion Detector, Access Control System, Public Address, Fire Alarm, Flight Information
Display System, Electronic Visual Information Display & Visual Docking Guidance System
Duties& Responsibilities :
 Attending the project meetings with the client and providing the weekly progress.
 Assignment of work with variety of work schedules including compulsory work periods in
special, emergency, and/or disaster situations with a team of 45 employees.
 Directs and manages airside as well as landside operations, maintenance, firefighting,
security, ground transportation and terminal services.
Page 2 of 5
 Assigns, coordinates, and reviews airport operations, maintenance, firefighting and
custodial projects. Implements airport rules and ensures employees and tenants comply
with federal, state and county rules & regulations.
 Assists in coordinating construction activities through consultation with engineers,
contractors, federal agencies and tenants.
 Performs inspection of airport facilities to determine maintenance requirement and schedule
maintenance projects.
 Prepare a detailed project plan to ensure completion of project as scheduled and thereafter
a costing to complete the project within budget, with good quality and to client’s
satisfaction.
 Attended various technical meeting with contractor, consultant & client.
 Prepare technical documents, design and drawings to ensure an element of continuity and
understanding of project is achieved.
 Coordinate with Purchase department for procurement of materials and material control.
 Coordinate with Design Engineer, Systems Engineer to ensure that system functions are in-
line with submitted/approved design.
 Coordinate with consultants, clients and subcontractors to arrange meetings and meet the
project targets in all manners.
Superintendent Kingdom of Saudi Arabia Aug 2011 – Oct 2012
Saudi Bin laden Group (BTAT) MOI Centre Security Building @ Riyadh, Jeddah & Al-Qassim.
Nature of Work : Design, Supply, Installation & Commissioning of Structured cabling
System(FTTH Design), CCTV System, Intercom System, Access Control System, Fire Alarm
System Public address System and Building Management Systems, Nurse call system :
Worked which is involved in their various construction projects in Saudi Arabia for (Installation of first
fix, second fix, third fix & testing and commissioning) for various systems and models such as :
CCTV IP: WV-SP302, & Analog Cameras WV-NW964P, WV-GXE500P from PANASONIC .
Public Address Systems VX-2000, Paging Horn speakers SC-610M, Ceiling speaker PC-1867FC
from TOA JAPAN,
Fire alarm systems from SIMPLEX (4100 U Fire control panels, Smoke detectors (4098-9714),
Isolators(4098-9714, 4098-9793), heat detectors, smoke duct detectors-(4098-9756) Manual pull
stations (4098-9001), Project Beam Detector with Remote Test Station & Strobe Light
Access Control Systems from SIEMENS GERMANY such as ACX-4000, output point modules
KDA24, input point modules KDM16, card readers AR6181MS , single and double magnetic door locks
such as GEM 10002, GEM 10004, Emergency break glass CP-22, Push button to exit PBT-020,
Magnetic door contacts (MK300- 11,MK200-2),Lock L & Z Bracket (Single Door & Double Door )
Intercom systems from TOA JAPAN such as N-8000EX IP exchange unit, IP substation interface
unit N-8000 RS, IP Audio interface unit N-8000AF, Master station unit MS-900, Indoor substation
unit RS-160, and Outdoor substation unit RS-170.
Building Management systems from Siemens Germany such as BMS controllers, BMS sensors and
devices, BMS valves and actuators.
Cisco Switches for LAN and WAN networking. IPTV systems with IPTV set top box IME 20S from
PANASONIC JAPAN.
Nurses c a l l system TELECOR USA. Microprocessor Controller & Master Controller Nurse Station Unit.
Structured cabling system from COMMOSCOPE AND SYSTIMAX. Besides this the second fix
cabling used for low current systems is from BELDEN USA.
Page 3 of 5
Project: Ministry of Interior ( Central Security Building – Jail ) , Al-Qassim , Riyadh , Jeddah
 Managing activities right from the conceptualization stage to the execution; involving
finalization of technical specifications, scheduling, progress monitoring, site
management and manpower planning.
 Project comprises of CCTV System, PA system, Structured Cabling System, IPTV System,
Fire Alarm System BMS and Access Control Systems in 32 Building compounds.
 All Low Current System in 32 Buildings are centralized in a single Data Center and
Operation Control Room (for Operation and Maintenance Purpose) through Centralized
Network Architecture (CAN).
 Establishing project review, monitoring and status reporting procedures to accurately
report progress of the project to the Project Head.
 Monitoring the activity at sites and review of project schedule, ensuring cost control
within budget, planning for cash flow requirements, etc.
 Maintaining proper coordination between the Project Management Team (PMT),
Supervisor, Engineer, Sub-contractors and other parties involved in the project to ensure
proper progress of the project.
 Monitoring project completion check list; ensuring that supply of material, installation,
labeling and commissioning activities are completed and accepted to allow release of
payment to contractors.
 Analyzing & producing the technical requirements as well as recommending design
modifications based on the client requirements.
 Evaluating designs; coordinating with Architects / Consultants and Sub Contractors for
changes as required.
 Coordinate with Purchase department for procurement of materials and material control.
 Coordinate with consultants, clients and subcontractors to arrange meetings and meet
the project targets in all manners.
Project Lead (Engg Services) Pune (Rural & Urban Project) May 2007–June 2011
NETWORK SOLUTIONS An IBM Co
Job responsibilities:
 The job involves implementation and execution of all the above mentioned systems on
site according to the approved shop drawings from the core design team indigenously.
 Supervises the activities and ensures the proper implementation of the related Low
Current systems policies and procedures.
 Ensure proper installation of the Low current Systems and devices.
 Responsible for all the technical decisions and directions regarding the work on the site
and Solving all technical work issues in coordination with the consultant and the core
design teams.
 Preparation and submission of RFI ( Request for inspection) & MIR (Material inspection
report) to the consultant according to the submittals and presentation of the material
technically to the consultant & Project manager for taking approval for the material to
be used on site.
 Preparation and submission of overall progress reports and daily progress reports to the
project manager. Preparation and submission of material status reports to the site
manager and project manager.
Page 4 of 5
 Preparation of daily work tasks for the team leaders on the site according to the project
plan and its follow up.
 Overall technical supervision of the work done on the site on daily basis.
 Technical trainings and briefs to the Jr engineers and team leaders working on the site
and Keeping them technically updated and informed regarding the work.
Senior Technical Officer (BSNL DID FRANCHISEE) April 2005 – May 2007
Metro Telecom
 Prepare a detailed project plan to ensure completion of project as scheduled and
thereafter a costing to complete the project within budget, with good quality and to
client’s satisfaction.
 Collate and produce monthly forecast for cost and billing; Cost control, payment follow-
ups; estimation, costing & approval for Variations.
 Prepare technical documents, design and drawings to ensure an element of continuity
and understanding of project is achieved.
 Coordinate with Purchase department for procurement of materials and material control.
 Co-ordinate with Site Engineers and Site Supervisors to ensure completion of installation
on time and as per project requirements.
 Coordinate with Design Engineer and Commissioning Engineer to ensure that system
functions are in-line with submitted/approved design.
 Coordinate with consultants, clients and subcontractors to arrange meetings and meet
the project targets in all manners.
Customer Support Engineer Pune April 2004-March 2005
Sark Enterprises.
Client: Uttara Foods,
Project: WiMAX Project
 Take over from existing tower lead and bring the already delayed program on track
 Lead the tower and be an interface to other towers for dependent services and
infrastructure
 Ensure the quality of delivery complies to the quality specifications and plans
 Issue escalations, problem solving and conflict resolution
 Delivering client requirements, client communication and providing status updates
Maintenance Engineer Pune Oct 2003-March 2004
Euro veg Business Hotel
 Successfully implemented all the projects within strict quality norms
 On site leadership and execution expertise
 Planning & troubleshooting capability
 Resources Development Document maintenance and control
 Published and maintained Engineering documentation (Drawings, Work Instructions etc.)
 Working as a Trainee Project Engineer engaged in Design, coordinating with Installation &
Commissioning of Various Systems for.
Page 5 of 5
PROFESSIONAL DEVELOPMENT
2013 Post Graduate Diploma in Business Management (Marketing) Pune University
2003 Bachelor of Engineering (Electronics & Telecommunications) Pune University
1995 Higher Secondary Certificate(HSC) Maharashtra State Board
1992 State Secondary Certificate (SSC) Maharashtra State Board
TRAINING & CERTIFICATIONS
 Life Corporate Member of the Institution of Engineers (India) M-1547652
 Entertech Qatar Basic Fire Fighting Security No 51102147662.
 Entertech Qatar Basic First Aid & CPR Security No 50802137653.
 Honeywell – Building Management System (Tridium Web Supervisor & Jace Controller)
 Honeywell – (FS90) Fire Alarm System & Enterprise Buildings Integrator
 Commscope Systimax SCS Design & Engineering : SP3321Certified Cabling Specialist.
 R&Mfreenet Installation Manager (Copper & Fiber ). Certificate No : 116255
 LANscape@Network of Preferred Installers (NPI) of Corning Cable Systems Fiber Optic
 Fluke Academy of Certified Training in Doha, Qatar.
 Tyco Amp Certification - Campus & LAN Cabling.
 Facility Maintenance Management Certified in Managing Health Safety Environment
 Winners Workshop Course.
 IBM Certificate with Excellence in Flying Honor
Project Handled at GULF COUNTRIES
KINGDOM OF SAUDI ARABIA (MOI ) , QATAR (DOHA-QATAR HAMAD INTERNATIONAL AIRPORT)
Project Handled at Outstation at Gujarat State Wide Area Network(GSWAN)
District : Banasakatha & Sabarkantha total 23 Talukas Mamlatdar Office WAN networking work
at the site location in the rural areas
Project Handled at Pune
Manufacturing Industries
Tata Motors : - HVAC, Climate Control, ERC, Styling Studio, Hall 11-15, Advance Engine
Development Centre, Outdoor Testing, Substation G3, Photoshop, SPMM, Hall 28 HR Office,
BOSCH CHASSIS SYSTEMS INDIA LTD (Nanekarwadi -Chakan)
Atlas Copco :- CMT, RHS, Engineering, MD Cabin, Marketing, Flow team, Geccia, New Factory,
Old Factory, CPCC.(Dapodi) Toyota Kirloskar Motor Ltd (Talegaon MIDC)
ITES & Software
Mastek : - Phase 1, Phase2, & Phase3.( Kalyaninagar),TechMahindra-Etisalat (Commerzone)
Symantec :- Baner Block No2 (Ground Floor To Fourth Floor) , EON : CPOD A-WING(Kharadi)
Telecom & BPO
Vodafone: - Hirabaug-Town Hall, Kalyaninagar, Kolhapur (DabhlokarCorner)
Bharati Airtel (Data Centre) Kharadi , WNS :-3 rd Floor & 4 th Floor (Magarpatta)
Five Star Hotels
Hotel Marriott: -Basement level to Fifth Level (Hingewadi)
Hotel Hyatt : Upper Basement to 9th floor ( Guest & Apartment) (Weikfeld)
SHOPPERS STOP INORBIT MALL (Vimannagar)
PERSONAL DETAILS
Marital Status: Married
Nationality: Indian
Passport: H9010989 (Valid upto 2020).
Driving License: KSA , Qatar & Airport Driving License
References and detailed project list available on request.

More Related Content

What's hot

Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryPMI Chennai Chapter
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar Sheikh
 
JOHN FAMELIGOS-CV-12 2016a
JOHN FAMELIGOS-CV-12 2016aJOHN FAMELIGOS-CV-12 2016a
JOHN FAMELIGOS-CV-12 2016aFameligos John
 
Why EPC
Why EPCWhy EPC
Why EPC
vivektmax
 
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
p6academy
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CVmuhammad abdullah
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qcvipin joy
 
COE
COECOE
Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoEpc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promo
ignitetribes
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
ignitetribes
 
Benjamin Santos Resume V1
Benjamin Santos Resume V1Benjamin Santos Resume V1
Benjamin Santos Resume V1Benjie Santos
 

What's hot (20)

Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC Industry
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-Construction
 
Epc presentation robert foxpresentation
Epc presentation robert foxpresentationEpc presentation robert foxpresentation
Epc presentation robert foxpresentation
 
Srinivaskumar_cv_16
Srinivaskumar_cv_16Srinivaskumar_cv_16
Srinivaskumar_cv_16
 
Bernard_Onyiwe Resume 2017_Modified
Bernard_Onyiwe Resume 2017_ModifiedBernard_Onyiwe Resume 2017_Modified
Bernard_Onyiwe Resume 2017_Modified
 
JOHN FAMELIGOS-CV-12 2016a
JOHN FAMELIGOS-CV-12 2016aJOHN FAMELIGOS-CV-12 2016a
JOHN FAMELIGOS-CV-12 2016a
 
Gary Blakeley CV
Gary Blakeley CVGary Blakeley CV
Gary Blakeley CV
 
Why EPC
Why EPCWhy EPC
Why EPC
 
Sunshine Andres
Sunshine AndresSunshine Andres
Sunshine Andres
 
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...30 60 90 percent ifc engineering   what is the project progress - Oracle Prim...
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
 
CV
CVCV
CV
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qc
 
CV
CVCV
CV
 
COE
COECOE
COE
 
Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoEpc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promo
 
cv 2016
cv 2016cv 2016
cv 2016
 
Detailed engineering-design-phase
Detailed engineering-design-phaseDetailed engineering-design-phase
Detailed engineering-design-phase
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
 
Benjamin Santos Resume V1
Benjamin Santos Resume V1Benjamin Santos Resume V1
Benjamin Santos Resume V1
 

Similar to DCP_RESUME

Neelakandan resume cctv
Neelakandan resume  cctvNeelakandan resume  cctv
Neelakandan resume cctv
Neelakandan J
 
Muhammad Yasir(updatedCV)
Muhammad Yasir(updatedCV)Muhammad Yasir(updatedCV)
Muhammad Yasir(updatedCV)rana yasir
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Mostafa Sayed
 
Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama,PMP
 
Construction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docxConstruction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docx
melvinjrobinson2199
 
Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Dabban
 
M.athar malik
M.athar malikM.athar malik
M.athar malik
Mohammed Athar Malik
 
ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project EngineerFahim Mohamed
 
BI CV 6 June 2016 [448161]
BI CV 6 June 2016 [448161]BI CV 6 June 2016 [448161]
BI CV 6 June 2016 [448161]Bassem Kamel
 
Kaustubh updated resume 2020- 16th sept. (2)
Kaustubh updated resume   2020- 16th sept. (2)Kaustubh updated resume   2020- 16th sept. (2)
Kaustubh updated resume 2020- 16th sept. (2)
KAUSTUBH KOTHIWAN PMP®️,ITILV3
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERAbd~el Hakim mohamed izran
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
Fahim Mohamed
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
Fahim Mohamed
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015Ismail Shaikh
 
Bala electl engineer-cv
Bala electl engineer-cvBala electl engineer-cv
Bala electl engineer-cv
Balamurugan chandramohan
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNouman Jamil
 
Resume Keith DiMarco
Resume Keith DiMarcoResume Keith DiMarco
Resume Keith DiMarcoKeith DiMarco
 

Similar to DCP_RESUME (20)

Neelakandan resume cctv
Neelakandan resume  cctvNeelakandan resume  cctv
Neelakandan resume cctv
 
Muhammad Yasir(updatedCV)
Muhammad Yasir(updatedCV)Muhammad Yasir(updatedCV)
Muhammad Yasir(updatedCV)
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016
 
Construction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docxConstruction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docx
 
Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Kamal Dabban CV
Adnan Kamal Dabban CV
 
M.athar malik
M.athar malikM.athar malik
M.athar malik
 
ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project Engineer
 
BI CV 6 June 2016 [448161]
BI CV 6 June 2016 [448161]BI CV 6 June 2016 [448161]
BI CV 6 June 2016 [448161]
 
Kaustubh updated resume 2020- 16th sept. (2)
Kaustubh updated resume   2020- 16th sept. (2)Kaustubh updated resume   2020- 16th sept. (2)
Kaustubh updated resume 2020- 16th sept. (2)
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
Bala electl engineer-cv
Bala electl engineer-cvBala electl engineer-cv
Bala electl engineer-cv
 
Joel's Resume II
Joel's Resume IIJoel's Resume II
Joel's Resume II
 
mohamed sobhi cv
mohamed sobhi cvmohamed sobhi cv
mohamed sobhi cv
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
 
Kaustubh updated resume 2021- 20th march
Kaustubh updated resume   2021- 20th marchKaustubh updated resume   2021- 20th march
Kaustubh updated resume 2021- 20th march
 
Resume Keith DiMarco
Resume Keith DiMarcoResume Keith DiMarco
Resume Keith DiMarco
 

DCP_RESUME

  • 1. Page 1 of 5 DINESH CHANDULAL PARDESHI Home Address: Work Address: B-102 Parijat Apartment. Hamad International Airport (FMM) Survey No. 11A/1, Ephinstone Road, P. O Box: 82710 Bopodi, Pune ,Maharashtra India. Doha - Qatar Phone: +91 7385607944 Phone(Qat): +974 74740518 Email: jayshridin@yahoo.co.in; jayshridin@gmail.com Skype id : eng.dineshpardeshi PROJECT ENGINEERING AND MANAGEMENT ▪ Security, Communication, CCTV, Intrusion Detector, Access Control, Fire Alarm, Public Address ▪ Many significant project management achievements. Broad ranging experience of 12+ covers the optimization of team potentials, liaising with internal and external works as well as operational management from both practical and administrative standpoints in the Security, Communication, CCTV, Intrusion Detector, Access Control, Public Address, and Fire Alarm. AREAS OF EXPERTISE Project Management Total Quality Team Leadership Trouble shooting – problem solving Contract Negotiations Strategic Planning Staff & Team Development Project Execution Technical Design PROFESSIONAL EXPERIENCE AND SIGNIFICANT ACHIEVEMENTS Electronics Engineer Qatar-Doha August 2013– Present Hamad International Airport-(FMM ), Project: Electronics & Telecom System Up-gradation for International Airport – Qatar Airways. Nature of Work : Responsible for administrative & supervisory work assisting the Facility Manager in Construction & Maintenance of Operations at Hamad International Airport. Work involves responsibility for supervision of technical and maintenance employees as well as assisting in the development and implementation of plans & policies. Such as Security, Communication, CCTV, Intrusion Detector, Access Control System, Public Address, Fire Alarm, Flight Information Display System, Electronic Visual Information Display & Visual Docking Guidance System Duties& Responsibilities :  Attending the project meetings with the client and providing the weekly progress.  Assignment of work with variety of work schedules including compulsory work periods in special, emergency, and/or disaster situations with a team of 45 employees.  Directs and manages airside as well as landside operations, maintenance, firefighting, security, ground transportation and terminal services.
  • 2. Page 2 of 5  Assigns, coordinates, and reviews airport operations, maintenance, firefighting and custodial projects. Implements airport rules and ensures employees and tenants comply with federal, state and county rules & regulations.  Assists in coordinating construction activities through consultation with engineers, contractors, federal agencies and tenants.  Performs inspection of airport facilities to determine maintenance requirement and schedule maintenance projects.  Prepare a detailed project plan to ensure completion of project as scheduled and thereafter a costing to complete the project within budget, with good quality and to client’s satisfaction.  Attended various technical meeting with contractor, consultant & client.  Prepare technical documents, design and drawings to ensure an element of continuity and understanding of project is achieved.  Coordinate with Purchase department for procurement of materials and material control.  Coordinate with Design Engineer, Systems Engineer to ensure that system functions are in- line with submitted/approved design.  Coordinate with consultants, clients and subcontractors to arrange meetings and meet the project targets in all manners. Superintendent Kingdom of Saudi Arabia Aug 2011 – Oct 2012 Saudi Bin laden Group (BTAT) MOI Centre Security Building @ Riyadh, Jeddah & Al-Qassim. Nature of Work : Design, Supply, Installation & Commissioning of Structured cabling System(FTTH Design), CCTV System, Intercom System, Access Control System, Fire Alarm System Public address System and Building Management Systems, Nurse call system : Worked which is involved in their various construction projects in Saudi Arabia for (Installation of first fix, second fix, third fix & testing and commissioning) for various systems and models such as : CCTV IP: WV-SP302, & Analog Cameras WV-NW964P, WV-GXE500P from PANASONIC . Public Address Systems VX-2000, Paging Horn speakers SC-610M, Ceiling speaker PC-1867FC from TOA JAPAN, Fire alarm systems from SIMPLEX (4100 U Fire control panels, Smoke detectors (4098-9714), Isolators(4098-9714, 4098-9793), heat detectors, smoke duct detectors-(4098-9756) Manual pull stations (4098-9001), Project Beam Detector with Remote Test Station & Strobe Light Access Control Systems from SIEMENS GERMANY such as ACX-4000, output point modules KDA24, input point modules KDM16, card readers AR6181MS , single and double magnetic door locks such as GEM 10002, GEM 10004, Emergency break glass CP-22, Push button to exit PBT-020, Magnetic door contacts (MK300- 11,MK200-2),Lock L & Z Bracket (Single Door & Double Door ) Intercom systems from TOA JAPAN such as N-8000EX IP exchange unit, IP substation interface unit N-8000 RS, IP Audio interface unit N-8000AF, Master station unit MS-900, Indoor substation unit RS-160, and Outdoor substation unit RS-170. Building Management systems from Siemens Germany such as BMS controllers, BMS sensors and devices, BMS valves and actuators. Cisco Switches for LAN and WAN networking. IPTV systems with IPTV set top box IME 20S from PANASONIC JAPAN. Nurses c a l l system TELECOR USA. Microprocessor Controller & Master Controller Nurse Station Unit. Structured cabling system from COMMOSCOPE AND SYSTIMAX. Besides this the second fix cabling used for low current systems is from BELDEN USA.
  • 3. Page 3 of 5 Project: Ministry of Interior ( Central Security Building – Jail ) , Al-Qassim , Riyadh , Jeddah  Managing activities right from the conceptualization stage to the execution; involving finalization of technical specifications, scheduling, progress monitoring, site management and manpower planning.  Project comprises of CCTV System, PA system, Structured Cabling System, IPTV System, Fire Alarm System BMS and Access Control Systems in 32 Building compounds.  All Low Current System in 32 Buildings are centralized in a single Data Center and Operation Control Room (for Operation and Maintenance Purpose) through Centralized Network Architecture (CAN).  Establishing project review, monitoring and status reporting procedures to accurately report progress of the project to the Project Head.  Monitoring the activity at sites and review of project schedule, ensuring cost control within budget, planning for cash flow requirements, etc.  Maintaining proper coordination between the Project Management Team (PMT), Supervisor, Engineer, Sub-contractors and other parties involved in the project to ensure proper progress of the project.  Monitoring project completion check list; ensuring that supply of material, installation, labeling and commissioning activities are completed and accepted to allow release of payment to contractors.  Analyzing & producing the technical requirements as well as recommending design modifications based on the client requirements.  Evaluating designs; coordinating with Architects / Consultants and Sub Contractors for changes as required.  Coordinate with Purchase department for procurement of materials and material control.  Coordinate with consultants, clients and subcontractors to arrange meetings and meet the project targets in all manners. Project Lead (Engg Services) Pune (Rural & Urban Project) May 2007–June 2011 NETWORK SOLUTIONS An IBM Co Job responsibilities:  The job involves implementation and execution of all the above mentioned systems on site according to the approved shop drawings from the core design team indigenously.  Supervises the activities and ensures the proper implementation of the related Low Current systems policies and procedures.  Ensure proper installation of the Low current Systems and devices.  Responsible for all the technical decisions and directions regarding the work on the site and Solving all technical work issues in coordination with the consultant and the core design teams.  Preparation and submission of RFI ( Request for inspection) & MIR (Material inspection report) to the consultant according to the submittals and presentation of the material technically to the consultant & Project manager for taking approval for the material to be used on site.  Preparation and submission of overall progress reports and daily progress reports to the project manager. Preparation and submission of material status reports to the site manager and project manager.
  • 4. Page 4 of 5  Preparation of daily work tasks for the team leaders on the site according to the project plan and its follow up.  Overall technical supervision of the work done on the site on daily basis.  Technical trainings and briefs to the Jr engineers and team leaders working on the site and Keeping them technically updated and informed regarding the work. Senior Technical Officer (BSNL DID FRANCHISEE) April 2005 – May 2007 Metro Telecom  Prepare a detailed project plan to ensure completion of project as scheduled and thereafter a costing to complete the project within budget, with good quality and to client’s satisfaction.  Collate and produce monthly forecast for cost and billing; Cost control, payment follow- ups; estimation, costing & approval for Variations.  Prepare technical documents, design and drawings to ensure an element of continuity and understanding of project is achieved.  Coordinate with Purchase department for procurement of materials and material control.  Co-ordinate with Site Engineers and Site Supervisors to ensure completion of installation on time and as per project requirements.  Coordinate with Design Engineer and Commissioning Engineer to ensure that system functions are in-line with submitted/approved design.  Coordinate with consultants, clients and subcontractors to arrange meetings and meet the project targets in all manners. Customer Support Engineer Pune April 2004-March 2005 Sark Enterprises. Client: Uttara Foods, Project: WiMAX Project  Take over from existing tower lead and bring the already delayed program on track  Lead the tower and be an interface to other towers for dependent services and infrastructure  Ensure the quality of delivery complies to the quality specifications and plans  Issue escalations, problem solving and conflict resolution  Delivering client requirements, client communication and providing status updates Maintenance Engineer Pune Oct 2003-March 2004 Euro veg Business Hotel  Successfully implemented all the projects within strict quality norms  On site leadership and execution expertise  Planning & troubleshooting capability  Resources Development Document maintenance and control  Published and maintained Engineering documentation (Drawings, Work Instructions etc.)  Working as a Trainee Project Engineer engaged in Design, coordinating with Installation & Commissioning of Various Systems for.
  • 5. Page 5 of 5 PROFESSIONAL DEVELOPMENT 2013 Post Graduate Diploma in Business Management (Marketing) Pune University 2003 Bachelor of Engineering (Electronics & Telecommunications) Pune University 1995 Higher Secondary Certificate(HSC) Maharashtra State Board 1992 State Secondary Certificate (SSC) Maharashtra State Board TRAINING & CERTIFICATIONS  Life Corporate Member of the Institution of Engineers (India) M-1547652  Entertech Qatar Basic Fire Fighting Security No 51102147662.  Entertech Qatar Basic First Aid & CPR Security No 50802137653.  Honeywell – Building Management System (Tridium Web Supervisor & Jace Controller)  Honeywell – (FS90) Fire Alarm System & Enterprise Buildings Integrator  Commscope Systimax SCS Design & Engineering : SP3321Certified Cabling Specialist.  R&Mfreenet Installation Manager (Copper & Fiber ). Certificate No : 116255  LANscape@Network of Preferred Installers (NPI) of Corning Cable Systems Fiber Optic  Fluke Academy of Certified Training in Doha, Qatar.  Tyco Amp Certification - Campus & LAN Cabling.  Facility Maintenance Management Certified in Managing Health Safety Environment  Winners Workshop Course.  IBM Certificate with Excellence in Flying Honor Project Handled at GULF COUNTRIES KINGDOM OF SAUDI ARABIA (MOI ) , QATAR (DOHA-QATAR HAMAD INTERNATIONAL AIRPORT) Project Handled at Outstation at Gujarat State Wide Area Network(GSWAN) District : Banasakatha & Sabarkantha total 23 Talukas Mamlatdar Office WAN networking work at the site location in the rural areas Project Handled at Pune Manufacturing Industries Tata Motors : - HVAC, Climate Control, ERC, Styling Studio, Hall 11-15, Advance Engine Development Centre, Outdoor Testing, Substation G3, Photoshop, SPMM, Hall 28 HR Office, BOSCH CHASSIS SYSTEMS INDIA LTD (Nanekarwadi -Chakan) Atlas Copco :- CMT, RHS, Engineering, MD Cabin, Marketing, Flow team, Geccia, New Factory, Old Factory, CPCC.(Dapodi) Toyota Kirloskar Motor Ltd (Talegaon MIDC) ITES & Software Mastek : - Phase 1, Phase2, & Phase3.( Kalyaninagar),TechMahindra-Etisalat (Commerzone) Symantec :- Baner Block No2 (Ground Floor To Fourth Floor) , EON : CPOD A-WING(Kharadi) Telecom & BPO Vodafone: - Hirabaug-Town Hall, Kalyaninagar, Kolhapur (DabhlokarCorner) Bharati Airtel (Data Centre) Kharadi , WNS :-3 rd Floor & 4 th Floor (Magarpatta) Five Star Hotels Hotel Marriott: -Basement level to Fifth Level (Hingewadi) Hotel Hyatt : Upper Basement to 9th floor ( Guest & Apartment) (Weikfeld) SHOPPERS STOP INORBIT MALL (Vimannagar) PERSONAL DETAILS Marital Status: Married Nationality: Indian Passport: H9010989 (Valid upto 2020). Driving License: KSA , Qatar & Airport Driving License References and detailed project list available on request.