Project Appraisal Document (PAD)
Title: Installation of Home-Theater & Video Conferencing System in the Newly Constructed
Auditorium at Bahria University, Islamabad Campus.
The objective of the AV and HT systems installation & interior development activity is to make
available state-of-the –art facilities for Bahria University members for inter-university communication
at global level and recreational purposes at local level for the university academia, staff and students.
Bahria University Islamabad Campus intends to install a state-of-the–art Home theater (HT) system to
give a cinematic functionality to the venue and to provide the subject facility of video conferencing and
entertainment for its members. The size of the auditorium is 150’x80’. The structure includes the
audio-visual (AV) system, sitting arrangement through reclining chairs and the noise-cancelling wall
paneling as interior development activities. The University also intends to have a video conferencing
system for two-way communication with world’s leading universities. All the sub-activities will be
executed in a single contract, with multiple work packages.
The project will be funded by Government funds under the Federal PPRA Rules 2004.
The tasks include Interior Development Works for the reclining chairs, Interior Development Works for
noise-canceling wall paneling, Electrical works for the new HT system wiring, Electrical works for the
new VC system wiring, Installation of Home Theater (HT) Equipment, Installation of Video
Conferencing (VC) Equipment, Civil works for installation fixtures, Electrical works for Uninterrupted
power supply, Plumbing works/waste water flushing, Maintenance /repair of the facility, Patio Tiling
and Vehicle Parking. The Work Requirements for the this contract include the contractual service
which must be accomplished through single point of contact through contractor’s project manager who
will liaise with the University’s Project Director for precise measurements, tolerances, materials,
quality control requirements, and other Government requirements that control the processes of the
Contractor.
The Contractor shall install the hardware and software for both the systems for testing in the
Auditorium to determine digital capability of the systems with the ability to record at least five streams
of input simultaneously. The upgrade shall include a digital face camera that video records a
participant’s face, feed from an overhead camera, an audio input component, The Contractor’s
system shall have the ability to record voice notes over the combined recording after the fact, and
include some sort of logging recording along with these other five streams of data.
• The software described above shall allow real-time flagging of digital data feed so that later
coding can be done where the feed was flagged. This later coding will entail detailed behavior
coding.
• 50” LED high definition TV for VC with all cables included capable of picture-in-picture display
of screen and participant.
• Streamline the wiring feed between the control room and the center stage to eliminate wire
cluttering.
• Ensure all hardware and software communicates across systems and software.
The HT System will be installed as per technical specifications given in the Technical Specification
Section of the Standard Bidding Documents (SBDs).
Hardware and software shall be delivered free of defects and viruses and shall be installed and
demonstrated to work is accordance with the above requirements prior to acceptance. Program
Manager and Project Director will notify vendor in writing of acceptance.
NOTE: In this section, remote computer access refers to any number of services where the vendor is
able to view the screen of the lab computers remotely and walk the user through the trouble-shooting
process while looking at the same screen.
The maintenance contract is for the period of one fiscal year with one (1) option year to renew at the
end of the initial year. The contractor shall give an estimate for one year of maintenance service only.
The Contractor shall also Provide two site visits during the period of performance to 1) ensure that all
of the hardware and software in the Auditorium is functioning correctly, efficiently and in accordance
with the specifications and standards provided in each component’s manual and according to industry
standards and, 2) solve equipment or software problems as reported in writing by the program
manager. He shall maintain functional control of the two installed systems from the control room
during testing sessions as well as bi-directional audio video communication between the control room
and the connected station (s). He shall maintain functional transmission of participant video and audio
feed along with screen shot feed in real time to the observation screen. He shall respond to requests
for maintenance within 24 hours of request. He shall respond to basic questions about hardware and
software within 12 business hours of request. He shall provide trouble-shooting/remote assistance on
an unlimited basis during period of performance. The hardware required to achieve this remote control
from the control room shall include updated and streamlined hardware.
The University expects to accomplish under the contract the completion of the tasks at the same time
within the budgetary allocation for new systems installation and interior development, both within four
months under the Lump sum Fixed price contract.
Place of performance will be the North-East side of the University on Plot coordinates latitude 37’-09
and 14’-38 Longitude. The said coordinates will be indicated by the PD on the Coordinates map and
will be given to the Contractor after contract award.
A combination of hardware and software/firmware that performs a dedicated function serving a
Government requirement, including, but not limited to electronics equipment, networks, shelters,
ground support equipment, and support structures. These also include all University-furnished
property, as mentioned in the lists at the time of contract award.
Certain University office or laboratory space may be made available for performance of specific
Tasks. Contractor may be required to establish operations and support facilities and warehouses
within a University-provided facility that comply with Product or process certification and accreditation
requirements
The unique security requirements associated with contract performance:
• Special pass for identification requirements will be issued by the University management.
Project Director will sign the said passes.
• All contractor personnel will require special security clearance as the contract performance site
belongs to an Defence establishment;
• Special escort requirements arranged by the PD will be required for the Contractor’s
specialized technical staff to University’s server rooms, IT installations and electricity facilities.
Including generator room.
The signaling and ICT gadgets are required to be inspected by the University’s Security staff before
giving a green flag to the same for their entry into the premises. Such equipment whose frequency
may interfere with the frequency of the signaling equipment of the Defence establishments, will be
treated as Special materials and their transport, entry and handling will be treated differently as per
the SOPs issued by the PD in this regard. The Contractor may describe requirements for any other
special materials that are to be encountered in the performance of the service(s).
The Contractor must deliver its technical input on the schematic drawings of the new structure for civil,
plumbing and electrical works 7 days after the contract award.
The Contractor must deliver the work schedule in Primavera Project Planner not more than 7 days
after the submission of its technical input.
The deliverables shall include complete, functional system including hardware and software as
described above. The whole system should function to support the daily workflow of the functions,
maintenance both remotely and on-site twice per fiscal year, provision by contractor before
installation, of upgrade, detailed diagrams and descriptions of the work that will be done as well as
contact information for the person to be contacted for trouble-shooting for each component of the
system. After installation, he needs to provide detailed specs, diagrams, and manuals to document
the new equipment setup and functionality. Contractor shall give 2-3 hours training on the new
equipment and at least 4 hours training on the new integrated software system for up to 8 University
employees. He shall visit two site visits during contract performance.
In order to maintain the hassle-free traffic of vehicles and undisturbed flow of student entry into the
university premises, the Contractor’s personnel will be allowed to travel to the back gate of the
University through the passage which is otherwise exclusively reserved for the defence personnel for
reaching the Bahria and Air Force establishments. The Contractor may require to tell any other travel
requirements that are to be encountered in the performance of the service(s).
The Contractor may describe requirements for any other unique materials that are to be encountered
in the performance of the service(s) or considerations.
The period of performance is not more than four months from the date of award of contract.

More Related Content

What's hot

Resume wgb 18 jan 2016
Resume wgb 18 jan 2016Resume wgb 18 jan 2016
Resume wgb 18 jan 2016
Gerry Bicknaver
 
Ch 111 computer hardware technician
Ch 111 computer hardware technicianCh 111 computer hardware technician
Ch 111 computer hardware technicianToralf Risvik
 
RBI for Power Generation
RBI for Power GenerationRBI for Power Generation
RBI for Power GenerationNikhil Kumar
 
Adil Field Instrument without apprentice Cv
Adil Field Instrument  without apprentice CvAdil Field Instrument  without apprentice Cv
Adil Field Instrument without apprentice CvMuhammad Adil
 
updated munoz resume-noemunoz1
updated munoz resume-noemunoz1updated munoz resume-noemunoz1
updated munoz resume-noemunoz1Noe Munoz
 
Thomas Yates Resume
Thomas Yates ResumeThomas Yates Resume
Thomas Yates ResumeThomas Yates
 
Eng Raeed Senior Security System Engineer
Eng Raeed Senior Security System EngineerEng Raeed Senior Security System Engineer
Eng Raeed Senior Security System EngineerEngineering Rule
 
Pa pdf-output-specs-section-c9-biomedical-engineering-final-no
Pa pdf-output-specs-section-c9-biomedical-engineering-final-noPa pdf-output-specs-section-c9-biomedical-engineering-final-no
Pa pdf-output-specs-section-c9-biomedical-engineering-final-no
Ryan Tansa T Wardhana
 
Kazadi_Mosayi_cv_new2
Kazadi_Mosayi_cv_new2Kazadi_Mosayi_cv_new2
Kazadi_Mosayi_cv_new2Kazadi Mosayi
 
Ronald Edgell_Resume
Ronald Edgell_ResumeRonald Edgell_Resume
Ronald Edgell_ResumeRonald Edgell
 
Resume - Swapnil Shewalkar (1)
Resume - Swapnil Shewalkar (1)Resume - Swapnil Shewalkar (1)
Resume - Swapnil Shewalkar (1)Swapnil Shewalkar
 
Yakaiah_Resume_9Yrs
Yakaiah_Resume_9YrsYakaiah_Resume_9Yrs
Yakaiah_Resume_9YrsYakaiah S
 
Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandra Sekar
 

What's hot (20)

Resume wgb 18 jan 2016
Resume wgb 18 jan 2016Resume wgb 18 jan 2016
Resume wgb 18 jan 2016
 
Ch 111 computer hardware technician
Ch 111 computer hardware technicianCh 111 computer hardware technician
Ch 111 computer hardware technician
 
S M UMER WASI
S M UMER WASIS M UMER WASI
S M UMER WASI
 
RBI for Power Generation
RBI for Power GenerationRBI for Power Generation
RBI for Power Generation
 
D. Medina's CV (01)
D. Medina's CV (01)D. Medina's CV (01)
D. Medina's CV (01)
 
Adil Field Instrument without apprentice Cv
Adil Field Instrument  without apprentice CvAdil Field Instrument  without apprentice Cv
Adil Field Instrument without apprentice Cv
 
Vinoth qb CV
Vinoth qb CVVinoth qb CV
Vinoth qb CV
 
updated munoz resume-noemunoz1
updated munoz resume-noemunoz1updated munoz resume-noemunoz1
updated munoz resume-noemunoz1
 
roshan-CV1
roshan-CV1roshan-CV1
roshan-CV1
 
Thomas Yates Resume
Thomas Yates ResumeThomas Yates Resume
Thomas Yates Resume
 
Eng Raeed Senior Security System Engineer
Eng Raeed Senior Security System EngineerEng Raeed Senior Security System Engineer
Eng Raeed Senior Security System Engineer
 
Professional Experience
Professional ExperienceProfessional Experience
Professional Experience
 
Pa pdf-output-specs-section-c9-biomedical-engineering-final-no
Pa pdf-output-specs-section-c9-biomedical-engineering-final-noPa pdf-output-specs-section-c9-biomedical-engineering-final-no
Pa pdf-output-specs-section-c9-biomedical-engineering-final-no
 
Kazadi_Mosayi_cv_new2
Kazadi_Mosayi_cv_new2Kazadi_Mosayi_cv_new2
Kazadi_Mosayi_cv_new2
 
Ronald Edgell_Resume
Ronald Edgell_ResumeRonald Edgell_Resume
Ronald Edgell_Resume
 
Phong_Vo
Phong_VoPhong_Vo
Phong_Vo
 
Resume - Swapnil Shewalkar (1)
Resume - Swapnil Shewalkar (1)Resume - Swapnil Shewalkar (1)
Resume - Swapnil Shewalkar (1)
 
Yakaiah_Resume_9Yrs
Yakaiah_Resume_9YrsYakaiah_Resume_9Yrs
Yakaiah_Resume_9Yrs
 
Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer new
 
SHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUMESHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUME
 

Similar to Pad for sow ht lab bahria (class assignment)

V 2.0Project Scope StatementProject NameSpeakeasy Ho.docx
V 2.0Project Scope StatementProject NameSpeakeasy Ho.docxV 2.0Project Scope StatementProject NameSpeakeasy Ho.docx
V 2.0Project Scope StatementProject NameSpeakeasy Ho.docx
dickonsondorris
 
Scope of work and terms and conditions fin al
Scope of work and terms and conditions fin alScope of work and terms and conditions fin al
Scope of work and terms and conditions fin al
Ashish Khandelwal
 
The must-have program/project management reporting feature before applying f...
The must-have  program/project management reporting feature before applying f...The must-have  program/project management reporting feature before applying f...
The must-have program/project management reporting feature before applying f...
Shane Emerson
 
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...
Shane Emerson
 
Request for Proposal (RFP) For Deployment of Video ...
Request for Proposal (RFP) For Deployment of Video ...Request for Proposal (RFP) For Deployment of Video ...
Request for Proposal (RFP) For Deployment of Video ...Videoguy
 
Resume of Soham Ghosh
Resume of Soham GhoshResume of Soham Ghosh
Resume of Soham Ghoshsoham ghosh
 
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...
Shane Emerson
 
Kaustubh updated resume 2020- 16th sept. (2)
Kaustubh updated resume   2020- 16th sept. (2)Kaustubh updated resume   2020- 16th sept. (2)
Kaustubh updated resume 2020- 16th sept. (2)
KAUSTUBH KOTHIWAN PMP®️,ITILV3
 
Resume of Soham Ghosh
Resume of Soham GhoshResume of Soham Ghosh
Resume of Soham Ghoshsoham ghosh
 
Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)Mohammad Romzan Ali
 
Network Developement Capstone Project 2009 Sping Quarter
Network Developement Capstone Project 2009 Sping QuarterNetwork Developement Capstone Project 2009 Sping Quarter
Network Developement Capstone Project 2009 Sping Quarter
richlan421
 
Video Conferencing Maintenance Contracts :
Video Conferencing Maintenance Contracts :Video Conferencing Maintenance Contracts :
Video Conferencing Maintenance Contracts :Videoguy
 
The Must-Have Program/Project Management Reporting Feature before Applying fo...
The Must-Have Program/Project Management Reporting Feature before Applying fo...The Must-Have Program/Project Management Reporting Feature before Applying fo...
The Must-Have Program/Project Management Reporting Feature before Applying fo...
Shane Emerson
 

Similar to Pad for sow ht lab bahria (class assignment) (20)

V 2.0Project Scope StatementProject NameSpeakeasy Ho.docx
V 2.0Project Scope StatementProject NameSpeakeasy Ho.docxV 2.0Project Scope StatementProject NameSpeakeasy Ho.docx
V 2.0Project Scope StatementProject NameSpeakeasy Ho.docx
 
Scope of work and terms and conditions fin al
Scope of work and terms and conditions fin alScope of work and terms and conditions fin al
Scope of work and terms and conditions fin al
 
DCP_RESUME
DCP_RESUMEDCP_RESUME
DCP_RESUME
 
The must-have program/project management reporting feature before applying f...
The must-have  program/project management reporting feature before applying f...The must-have  program/project management reporting feature before applying f...
The must-have program/project management reporting feature before applying f...
 
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...
 
Request for Proposal (RFP) For Deployment of Video ...
Request for Proposal (RFP) For Deployment of Video ...Request for Proposal (RFP) For Deployment of Video ...
Request for Proposal (RFP) For Deployment of Video ...
 
Anthony_M._Antigulas
Anthony_M._AntigulasAnthony_M._Antigulas
Anthony_M._Antigulas
 
Kaustubh updated resume 2021- 20th march
Kaustubh updated resume   2021- 20th marchKaustubh updated resume   2021- 20th march
Kaustubh updated resume 2021- 20th march
 
Resume of Soham Ghosh
Resume of Soham GhoshResume of Soham Ghosh
Resume of Soham Ghosh
 
Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...Technical functional requirements every contractor must adhere to before appl...
Technical functional requirements every contractor must adhere to before appl...
 
Kaustubh updated resume 2020- 16th sept. (2)
Kaustubh updated resume   2020- 16th sept. (2)Kaustubh updated resume   2020- 16th sept. (2)
Kaustubh updated resume 2020- 16th sept. (2)
 
Resume of Soham Ghosh
Resume of Soham GhoshResume of Soham Ghosh
Resume of Soham Ghosh
 
Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)
 
CV
CVCV
CV
 
Network Developement Capstone Project 2009 Sping Quarter
Network Developement Capstone Project 2009 Sping QuarterNetwork Developement Capstone Project 2009 Sping Quarter
Network Developement Capstone Project 2009 Sping Quarter
 
Stretton CV
Stretton CVStretton CV
Stretton CV
 
Video Conferencing Maintenance Contracts :
Video Conferencing Maintenance Contracts :Video Conferencing Maintenance Contracts :
Video Conferencing Maintenance Contracts :
 
The Must-Have Program/Project Management Reporting Feature before Applying fo...
The Must-Have Program/Project Management Reporting Feature before Applying fo...The Must-Have Program/Project Management Reporting Feature before Applying fo...
The Must-Have Program/Project Management Reporting Feature before Applying fo...
 
CubeXS Weatherly Pvt
CubeXS Weatherly PvtCubeXS Weatherly Pvt
CubeXS Weatherly Pvt
 
veera (updated)
veera (updated)veera (updated)
veera (updated)
 

Recently uploaded

快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
ahcitycouncil
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
JSchaus & Associates
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
oklahomajudicialproc1
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
AjayVejendla3
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
ARCResearch
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
evkovas
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
ILC- UK
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
ukyewh
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
ehbuaw
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 

Recently uploaded (20)

快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 

Pad for sow ht lab bahria (class assignment)

  • 1. Project Appraisal Document (PAD) Title: Installation of Home-Theater & Video Conferencing System in the Newly Constructed Auditorium at Bahria University, Islamabad Campus. The objective of the AV and HT systems installation & interior development activity is to make available state-of-the –art facilities for Bahria University members for inter-university communication at global level and recreational purposes at local level for the university academia, staff and students. Bahria University Islamabad Campus intends to install a state-of-the–art Home theater (HT) system to give a cinematic functionality to the venue and to provide the subject facility of video conferencing and entertainment for its members. The size of the auditorium is 150’x80’. The structure includes the audio-visual (AV) system, sitting arrangement through reclining chairs and the noise-cancelling wall paneling as interior development activities. The University also intends to have a video conferencing system for two-way communication with world’s leading universities. All the sub-activities will be executed in a single contract, with multiple work packages. The project will be funded by Government funds under the Federal PPRA Rules 2004. The tasks include Interior Development Works for the reclining chairs, Interior Development Works for noise-canceling wall paneling, Electrical works for the new HT system wiring, Electrical works for the new VC system wiring, Installation of Home Theater (HT) Equipment, Installation of Video Conferencing (VC) Equipment, Civil works for installation fixtures, Electrical works for Uninterrupted power supply, Plumbing works/waste water flushing, Maintenance /repair of the facility, Patio Tiling and Vehicle Parking. The Work Requirements for the this contract include the contractual service which must be accomplished through single point of contact through contractor’s project manager who will liaise with the University’s Project Director for precise measurements, tolerances, materials, quality control requirements, and other Government requirements that control the processes of the Contractor. The Contractor shall install the hardware and software for both the systems for testing in the Auditorium to determine digital capability of the systems with the ability to record at least five streams of input simultaneously. The upgrade shall include a digital face camera that video records a participant’s face, feed from an overhead camera, an audio input component, The Contractor’s system shall have the ability to record voice notes over the combined recording after the fact, and include some sort of logging recording along with these other five streams of data. • The software described above shall allow real-time flagging of digital data feed so that later coding can be done where the feed was flagged. This later coding will entail detailed behavior coding. • 50” LED high definition TV for VC with all cables included capable of picture-in-picture display of screen and participant. • Streamline the wiring feed between the control room and the center stage to eliminate wire cluttering. • Ensure all hardware and software communicates across systems and software. The HT System will be installed as per technical specifications given in the Technical Specification Section of the Standard Bidding Documents (SBDs).
  • 2. Hardware and software shall be delivered free of defects and viruses and shall be installed and demonstrated to work is accordance with the above requirements prior to acceptance. Program Manager and Project Director will notify vendor in writing of acceptance. NOTE: In this section, remote computer access refers to any number of services where the vendor is able to view the screen of the lab computers remotely and walk the user through the trouble-shooting process while looking at the same screen. The maintenance contract is for the period of one fiscal year with one (1) option year to renew at the end of the initial year. The contractor shall give an estimate for one year of maintenance service only. The Contractor shall also Provide two site visits during the period of performance to 1) ensure that all of the hardware and software in the Auditorium is functioning correctly, efficiently and in accordance with the specifications and standards provided in each component’s manual and according to industry standards and, 2) solve equipment or software problems as reported in writing by the program manager. He shall maintain functional control of the two installed systems from the control room during testing sessions as well as bi-directional audio video communication between the control room and the connected station (s). He shall maintain functional transmission of participant video and audio feed along with screen shot feed in real time to the observation screen. He shall respond to requests for maintenance within 24 hours of request. He shall respond to basic questions about hardware and software within 12 business hours of request. He shall provide trouble-shooting/remote assistance on an unlimited basis during period of performance. The hardware required to achieve this remote control from the control room shall include updated and streamlined hardware. The University expects to accomplish under the contract the completion of the tasks at the same time within the budgetary allocation for new systems installation and interior development, both within four months under the Lump sum Fixed price contract. Place of performance will be the North-East side of the University on Plot coordinates latitude 37’-09 and 14’-38 Longitude. The said coordinates will be indicated by the PD on the Coordinates map and will be given to the Contractor after contract award. A combination of hardware and software/firmware that performs a dedicated function serving a Government requirement, including, but not limited to electronics equipment, networks, shelters, ground support equipment, and support structures. These also include all University-furnished property, as mentioned in the lists at the time of contract award. Certain University office or laboratory space may be made available for performance of specific Tasks. Contractor may be required to establish operations and support facilities and warehouses within a University-provided facility that comply with Product or process certification and accreditation requirements The unique security requirements associated with contract performance: • Special pass for identification requirements will be issued by the University management. Project Director will sign the said passes. • All contractor personnel will require special security clearance as the contract performance site belongs to an Defence establishment; • Special escort requirements arranged by the PD will be required for the Contractor’s specialized technical staff to University’s server rooms, IT installations and electricity facilities. Including generator room. The signaling and ICT gadgets are required to be inspected by the University’s Security staff before giving a green flag to the same for their entry into the premises. Such equipment whose frequency may interfere with the frequency of the signaling equipment of the Defence establishments, will be treated as Special materials and their transport, entry and handling will be treated differently as per the SOPs issued by the PD in this regard. The Contractor may describe requirements for any other special materials that are to be encountered in the performance of the service(s).
  • 3. The Contractor must deliver its technical input on the schematic drawings of the new structure for civil, plumbing and electrical works 7 days after the contract award. The Contractor must deliver the work schedule in Primavera Project Planner not more than 7 days after the submission of its technical input. The deliverables shall include complete, functional system including hardware and software as described above. The whole system should function to support the daily workflow of the functions, maintenance both remotely and on-site twice per fiscal year, provision by contractor before installation, of upgrade, detailed diagrams and descriptions of the work that will be done as well as contact information for the person to be contacted for trouble-shooting for each component of the system. After installation, he needs to provide detailed specs, diagrams, and manuals to document the new equipment setup and functionality. Contractor shall give 2-3 hours training on the new equipment and at least 4 hours training on the new integrated software system for up to 8 University employees. He shall visit two site visits during contract performance. In order to maintain the hassle-free traffic of vehicles and undisturbed flow of student entry into the university premises, the Contractor’s personnel will be allowed to travel to the back gate of the University through the passage which is otherwise exclusively reserved for the defence personnel for reaching the Bahria and Air Force establishments. The Contractor may require to tell any other travel requirements that are to be encountered in the performance of the service(s). The Contractor may describe requirements for any other unique materials that are to be encountered in the performance of the service(s) or considerations. The period of performance is not more than four months from the date of award of contract.