SlideShare a Scribd company logo
1 of 4
Muhammad Idrees
Email: smidrees78@gmail.com
Iqama Status: Transferable
Mob: +966-596946626
Career Objective
A challenging opportunity with a dynamic organization, which can comprehensively, utilizes the
entrepreneurial potentials and capabilities for the professional growth, aligned with its values and
corporate objectives.
Education and Qualification.
2000 to 2002 MSc Electronics, University of Peshawar
Technical modules covered the full range of Electrical and
Electronic Engineering, including Electronic Communications,
Industrial Electronics, Computer Networking, Laser & Fiber
Optics, Digital logic design, Digital signal processing,
Microprocessors & Microcontrollers, Control Systems,
Embedded C.
Research Project Microcontroller based temperature sensing device.
Skills & Experience ( 8 years +)
1 Over eight years of experience in various Multinational telecom companies.
2 Background experience in various telecom network architectures: optical transport, MSAG,
and CDMA.
3 Completion of workforce time sheets and maintenance of work schedule.
4 Can effectively manage multi-skilled teams of staff including allocating, activating and
monitoring their work assignments, ensuring compliance with Health and Safety standards,
training and carrying out performance appraisals.
5 To make out the strategy
6 Project reporting and progress tracking from management team.
7 Skilled in preparing operating procedures and safe systems of work for tools and
equipment
8 One month practical training certificate conducted by National institute of design and
analysis ministry of production, Govt of Pakistan.
International & BICSI standards awareness:
• Closed awareness & understanding of SAUDI ARAMCO Engineering
standards for communication (SAES-T).
• Hand on knowledge on international standards for communications
(BICSI, TIA/EIA).
Employment History:
Services Offered as QC Inspector ( Communication) & Site Engineer ( Low Current)
• L&T Automation , KASC Jeddah (1st
April 2015 – 7th
October -2015)
• Al-Fouzan Trading & General Construction CO ( 1st
Feb’14 – 26th
March’ 15)
• Al-Latifiya Trading & Contracting (20th
September’12 – 25th
March’ 13)
• ZETAS zemin teknolojisi A.S, (Dubai)(July 2011 –June 2012)
• ZTE Telecom Pakistan :( Sep 2008 to july2011)
Hands On Experience on the Following Systems
1. Structured Cabling System,
2. AV (Audio Video System),
3. PAVA ( Public Address & Voice Alarm System)
4. Data Communication System,
5. Security Access Control System.
6. CCTV & WLAN Systems.
7. Outside Broadcast System.
8. Communication Grounding System.
9. ELV Containment System.
10. Communication Underground Duct System.
11. Copper Communication System
KEY RESPONSIBILITIES
Out Side Plant (OSP):
• Familiarization with overall construction scope of work (Duct banks, Handholes, Manholes &
Embedded Accessories).
• Monitor the underground installation; check the burial depth and spacing requirement to adjust
spacing prior to backfilling.
• Conduct internal inspection of all activities and record inspection findings in the internal inspection
logbook; follow up with the construction to ensure that the activities comply with the requirements.
• Familiar with Engineering standards and procedures and applicable National and International codes
and Standard as TIA/EIA, NEMA, BICSE etc.
• Reporting both verbally and written any non-conformance (NCR) discovered.
• To prepare RFI for client inspection for the completed activities.
• Taking immediate remedial to clear inspection log book comments.
• Preparation of relevant QA/QC documents for inspection before approving .
• Coordinate and verify the Punch List items and make sure that all the concern Parties are informed and
make the necessary documentation for clearing the punch list items.
• Preparing daily, weekly & Monthly reports.
In Side Plant (ISP):
• Conduit installation (EMT, RGS and PVC).
• Containment System Installation (Cable Trays, Trunk & Ladders).
• Cable Pulling (Copper, Optical Fiber & Co-Axial Cables).
• Equipment Rack & Cabinet installation.
• Patch Panel, CMS & Accessories installation.
• Cable Dressing & Termination.
• Cable Testing with Fluke Multi Meter, OTDR, Power Meter, Site Master etc.
• Pre-Commissioning of the deployed Systems as per Project Specs Requirements.
ZTE Telecom Pakistan : :( Sep 2008 to july2011)
1 Transforming business strategy in to road maps and ultimately to projects /program, executing as
per PMO knowledge centre and quantifying the results in to KPI to assess the value added.
2 Provide support internally and externally to Operators to understand their technical needs.
3 Project roll out formulation and track & control of each activity.
4 Coordination with Vendors regarding project scope, timelines & risks identification, impact
analysis and mitigation
5 Planning/ standardizing/ executing project acceptance criteria with customer.
6 Subcontract & 3rd party supplier management, Defined scope/ execution & accept criteria.
7 Project Time/ Cost/ Quality/ Resource & Planning management as per PM Methodology.
ZTE Telecom Pakistan
Worked as a Technical Manager in ZTE Pakistan.
1 Responsible for meeting sales goals and overall quality of service.
2 Maintained a high profile in the professional and business communities.
3 Skilled in cold calling, consultative selling, negotiating contracts, forming alliances and
partnering with others.
4 Responsible for the service workflows establishment, RFQ, RFP, RM, Proposals and calculating
the cost for services, warranty as well as maintenance cost, etc.
5 Experience in preparing/evaluating RFPs, SLAs, SOCs and proposals.
6 Making out the human resource requirement plan, establishing the management team and
maintenance team, conducting routine management and performance review on the team
member, on the team members, the financial management, customer relationship

More Related Content

What's hot (20)

POCV16
POCV16POCV16
POCV16
 
CV Mosaddaque Sabri
CV Mosaddaque SabriCV Mosaddaque Sabri
CV Mosaddaque Sabri
 
UNAEGBU CHRISTIANA 2015 NEW RESUME
UNAEGBU CHRISTIANA 2015 NEW RESUMEUNAEGBU CHRISTIANA 2015 NEW RESUME
UNAEGBU CHRISTIANA 2015 NEW RESUME
 
Santhosh adari_Resume
Santhosh adari_ResumeSanthosh adari_Resume
Santhosh adari_Resume
 
Cory Ilchuk - Resume-1 (4)
Cory Ilchuk - Resume-1 (4)Cory Ilchuk - Resume-1 (4)
Cory Ilchuk - Resume-1 (4)
 
BOLA RESUME (1)
BOLA RESUME (1)BOLA RESUME (1)
BOLA RESUME (1)
 
JUAN CAREER OBJECTIVE 2016
JUAN CAREER OBJECTIVE 2016JUAN CAREER OBJECTIVE 2016
JUAN CAREER OBJECTIVE 2016
 
MAHDI CV
MAHDI CVMAHDI CV
MAHDI CV
 
Ashutosh Kumar Mishra CV
Ashutosh  Kumar Mishra CVAshutosh  Kumar Mishra CV
Ashutosh Kumar Mishra CV
 
Ronald_Jones_Jr._(1)RESUME
Ronald_Jones_Jr._(1)RESUMERonald_Jones_Jr._(1)RESUME
Ronald_Jones_Jr._(1)RESUME
 
Jun-Jun ( my resume )
Jun-Jun ( my resume )Jun-Jun ( my resume )
Jun-Jun ( my resume )
 
Jason Limoges Resume
Jason Limoges ResumeJason Limoges Resume
Jason Limoges Resume
 
New - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year ExpNew - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year Exp
 
Site Manager - Mohamed Aly ElSharkawy
Site Manager - Mohamed Aly ElSharkawySite Manager - Mohamed Aly ElSharkawy
Site Manager - Mohamed Aly ElSharkawy
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
CV_Umer Haneef
CV_Umer HaneefCV_Umer Haneef
CV_Umer Haneef
 
CV.RTDeang.2016
CV.RTDeang.2016CV.RTDeang.2016
CV.RTDeang.2016
 
Ganesh Wankhede CV
Ganesh Wankhede CVGanesh Wankhede CV
Ganesh Wankhede CV
 
Dan Ketchem Resume - Copy
Dan Ketchem Resume - CopyDan Ketchem Resume - Copy
Dan Ketchem Resume - Copy
 
Michael l smith resume
Michael l smith resumeMichael l smith resume
Michael l smith resume
 

Viewers also liked

Follow the glider_english
Follow the glider_englishFollow the glider_english
Follow the glider_englishMedclic
 
Good Practice Projectsturing
Good Practice ProjectsturingGood Practice Projectsturing
Good Practice ProjectsturingPeter A. De Jong
 
Slide share class reflection
Slide share class reflectionSlide share class reflection
Slide share class reflectiontysonwhatley
 
(EOR/MEOR/BERO/oil recovery) Zw oilfield zw2 2-1 injection well bero™ floodin...
(EOR/MEOR/BERO/oil recovery) Zw oilfield zw2 2-1 injection well bero™ floodin...(EOR/MEOR/BERO/oil recovery) Zw oilfield zw2 2-1 injection well bero™ floodin...
(EOR/MEOR/BERO/oil recovery) Zw oilfield zw2 2-1 injection well bero™ floodin...Jany Li
 
SarahOwenCVOctober2015A
SarahOwenCVOctober2015ASarahOwenCVOctober2015A
SarahOwenCVOctober2015ASarah Owen
 
ทฤษฎีพัฒนาการของอีริค อีริคสัน
ทฤษฎีพัฒนาการของอีริค อีริคสันทฤษฎีพัฒนาการของอีริค อีริคสัน
ทฤษฎีพัฒนาการของอีริค อีริคสันmekshak
 
Nonprofit executive compensation - Part 2
Nonprofit executive compensation  - Part 2Nonprofit executive compensation  - Part 2
Nonprofit executive compensation - Part 2Michael Jones
 
Ppt bab asmaul husna
Ppt bab asmaul husnaPpt bab asmaul husna
Ppt bab asmaul husnawiki_tuwi23
 
Curriculum Vitae - Kitsios Spyros 11-2015
Curriculum Vitae - Kitsios Spyros 11-2015Curriculum Vitae - Kitsios Spyros 11-2015
Curriculum Vitae - Kitsios Spyros 11-2015Spyros Kitsios
 

Viewers also liked (15)

Follow the glider_english
Follow the glider_englishFollow the glider_english
Follow the glider_english
 
Good Practice Projectsturing
Good Practice ProjectsturingGood Practice Projectsturing
Good Practice Projectsturing
 
Slide share class reflection
Slide share class reflectionSlide share class reflection
Slide share class reflection
 
(EOR/MEOR/BERO/oil recovery) Zw oilfield zw2 2-1 injection well bero™ floodin...
(EOR/MEOR/BERO/oil recovery) Zw oilfield zw2 2-1 injection well bero™ floodin...(EOR/MEOR/BERO/oil recovery) Zw oilfield zw2 2-1 injection well bero™ floodin...
(EOR/MEOR/BERO/oil recovery) Zw oilfield zw2 2-1 injection well bero™ floodin...
 
SarahOwenCVOctober2015A
SarahOwenCVOctober2015ASarahOwenCVOctober2015A
SarahOwenCVOctober2015A
 
جيل واعد
جيل واعد  جيل واعد
جيل واعد
 
ทฤษฎีพัฒนาการของอีริค อีริคสัน
ทฤษฎีพัฒนาการของอีริค อีริคสันทฤษฎีพัฒนาการของอีริค อีริคสัน
ทฤษฎีพัฒนาการของอีริค อีริคสัน
 
Class review
Class reviewClass review
Class review
 
6-
6-6-
6-
 
ijazahmadCv
ijazahmadCvijazahmadCv
ijazahmadCv
 
Arquitectura futurista.
Arquitectura futurista. Arquitectura futurista.
Arquitectura futurista.
 
Nonprofit executive compensation - Part 2
Nonprofit executive compensation  - Part 2Nonprofit executive compensation  - Part 2
Nonprofit executive compensation - Part 2
 
Ppt bab asmaul husna
Ppt bab asmaul husnaPpt bab asmaul husna
Ppt bab asmaul husna
 
Curriculum Vitae - Kitsios Spyros 11-2015
Curriculum Vitae - Kitsios Spyros 11-2015Curriculum Vitae - Kitsios Spyros 11-2015
Curriculum Vitae - Kitsios Spyros 11-2015
 
Ashu sharma
Ashu sharmaAshu sharma
Ashu sharma
 

Similar to Muhammad Idrees Telecom Engineer Resume

Similar to Muhammad Idrees Telecom Engineer Resume (20)

Archana Mishra Resume
Archana Mishra ResumeArchana Mishra Resume
Archana Mishra Resume
 
Shahid Ali Telecom CV
Shahid Ali Telecom CVShahid Ali Telecom CV
Shahid Ali Telecom CV
 
Majid Ali_original
Majid Ali_originalMajid Ali_original
Majid Ali_original
 
Cv eng mohammed fayed
Cv eng mohammed fayedCv eng mohammed fayed
Cv eng mohammed fayed
 
M.athar malik
M.athar malikM.athar malik
M.athar malik
 
JADE SANTOS CV
JADE SANTOS CVJADE SANTOS CV
JADE SANTOS CV
 
Adeel Technical Project management
Adeel Technical Project managementAdeel Technical Project management
Adeel Technical Project management
 
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECTCV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
 
Yuvarajkumar CV
Yuvarajkumar CVYuvarajkumar CV
Yuvarajkumar CV
 
ELV Engineer
ELV EngineerELV Engineer
ELV Engineer
 
Suresh rajalingam resume
Suresh rajalingam resumeSuresh rajalingam resume
Suresh rajalingam resume
 
BI CV 6 June 2016 [448161]
BI CV 6 June 2016 [448161]BI CV 6 June 2016 [448161]
BI CV 6 June 2016 [448161]
 
Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016
 
Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016
 
AMIT _RESUME
AMIT _RESUMEAMIT _RESUME
AMIT _RESUME
 
CV AMIT KUMAR R4G
CV AMIT KUMAR R4GCV AMIT KUMAR R4G
CV AMIT KUMAR R4G
 
Hossam_Fahmy_CV
Hossam_Fahmy_CVHossam_Fahmy_CV
Hossam_Fahmy_CV
 
Sanjeet_CV
Sanjeet_CVSanjeet_CV
Sanjeet_CV
 
Santhi Vinnakota_Resume
Santhi Vinnakota_ResumeSanthi Vinnakota_Resume
Santhi Vinnakota_Resume
 
Kashif
KashifKashif
Kashif
 

Muhammad Idrees Telecom Engineer Resume

  • 1. Muhammad Idrees Email: smidrees78@gmail.com Iqama Status: Transferable Mob: +966-596946626 Career Objective A challenging opportunity with a dynamic organization, which can comprehensively, utilizes the entrepreneurial potentials and capabilities for the professional growth, aligned with its values and corporate objectives. Education and Qualification. 2000 to 2002 MSc Electronics, University of Peshawar Technical modules covered the full range of Electrical and Electronic Engineering, including Electronic Communications, Industrial Electronics, Computer Networking, Laser & Fiber Optics, Digital logic design, Digital signal processing, Microprocessors & Microcontrollers, Control Systems, Embedded C. Research Project Microcontroller based temperature sensing device. Skills & Experience ( 8 years +) 1 Over eight years of experience in various Multinational telecom companies. 2 Background experience in various telecom network architectures: optical transport, MSAG, and CDMA. 3 Completion of workforce time sheets and maintenance of work schedule. 4 Can effectively manage multi-skilled teams of staff including allocating, activating and monitoring their work assignments, ensuring compliance with Health and Safety standards, training and carrying out performance appraisals. 5 To make out the strategy 6 Project reporting and progress tracking from management team. 7 Skilled in preparing operating procedures and safe systems of work for tools and equipment 8 One month practical training certificate conducted by National institute of design and analysis ministry of production, Govt of Pakistan.
  • 2. International & BICSI standards awareness: • Closed awareness & understanding of SAUDI ARAMCO Engineering standards for communication (SAES-T). • Hand on knowledge on international standards for communications (BICSI, TIA/EIA). Employment History: Services Offered as QC Inspector ( Communication) & Site Engineer ( Low Current) • L&T Automation , KASC Jeddah (1st April 2015 – 7th October -2015) • Al-Fouzan Trading & General Construction CO ( 1st Feb’14 – 26th March’ 15) • Al-Latifiya Trading & Contracting (20th September’12 – 25th March’ 13) • ZETAS zemin teknolojisi A.S, (Dubai)(July 2011 –June 2012) • ZTE Telecom Pakistan :( Sep 2008 to july2011) Hands On Experience on the Following Systems 1. Structured Cabling System, 2. AV (Audio Video System), 3. PAVA ( Public Address & Voice Alarm System) 4. Data Communication System, 5. Security Access Control System. 6. CCTV & WLAN Systems. 7. Outside Broadcast System. 8. Communication Grounding System. 9. ELV Containment System. 10. Communication Underground Duct System. 11. Copper Communication System KEY RESPONSIBILITIES Out Side Plant (OSP): • Familiarization with overall construction scope of work (Duct banks, Handholes, Manholes & Embedded Accessories).
  • 3. • Monitor the underground installation; check the burial depth and spacing requirement to adjust spacing prior to backfilling. • Conduct internal inspection of all activities and record inspection findings in the internal inspection logbook; follow up with the construction to ensure that the activities comply with the requirements. • Familiar with Engineering standards and procedures and applicable National and International codes and Standard as TIA/EIA, NEMA, BICSE etc. • Reporting both verbally and written any non-conformance (NCR) discovered. • To prepare RFI for client inspection for the completed activities. • Taking immediate remedial to clear inspection log book comments. • Preparation of relevant QA/QC documents for inspection before approving . • Coordinate and verify the Punch List items and make sure that all the concern Parties are informed and make the necessary documentation for clearing the punch list items. • Preparing daily, weekly & Monthly reports. In Side Plant (ISP): • Conduit installation (EMT, RGS and PVC). • Containment System Installation (Cable Trays, Trunk & Ladders). • Cable Pulling (Copper, Optical Fiber & Co-Axial Cables). • Equipment Rack & Cabinet installation. • Patch Panel, CMS & Accessories installation. • Cable Dressing & Termination. • Cable Testing with Fluke Multi Meter, OTDR, Power Meter, Site Master etc. • Pre-Commissioning of the deployed Systems as per Project Specs Requirements. ZTE Telecom Pakistan : :( Sep 2008 to july2011) 1 Transforming business strategy in to road maps and ultimately to projects /program, executing as per PMO knowledge centre and quantifying the results in to KPI to assess the value added. 2 Provide support internally and externally to Operators to understand their technical needs. 3 Project roll out formulation and track & control of each activity. 4 Coordination with Vendors regarding project scope, timelines & risks identification, impact analysis and mitigation 5 Planning/ standardizing/ executing project acceptance criteria with customer. 6 Subcontract & 3rd party supplier management, Defined scope/ execution & accept criteria. 7 Project Time/ Cost/ Quality/ Resource & Planning management as per PM Methodology. ZTE Telecom Pakistan Worked as a Technical Manager in ZTE Pakistan. 1 Responsible for meeting sales goals and overall quality of service. 2 Maintained a high profile in the professional and business communities. 3 Skilled in cold calling, consultative selling, negotiating contracts, forming alliances and
  • 4. partnering with others. 4 Responsible for the service workflows establishment, RFQ, RFP, RM, Proposals and calculating the cost for services, warranty as well as maintenance cost, etc. 5 Experience in preparing/evaluating RFPs, SLAs, SOCs and proposals. 6 Making out the human resource requirement plan, establishing the management team and maintenance team, conducting routine management and performance review on the team member, on the team members, the financial management, customer relationship