1. Uthia Bragasam S/o Chandran
No. 37 Jalan Uda Utama 6/9, Bandar Uda Utama 81200 Johor
+60 127303219 (M’sia)
Date of Birth : 25 Dec,1975
Singapore : Permanent Residence (PR) Holder-S7581143H
Email: utaya_prakash@yahoo.com.sg
ENGINEERING INSPECTOR
CAREER OBJECTIVE
Seeking the position of Structural and Piping Lead Inspector in the Offshore &
Marine / Oil & Gas industry where I can utilize my skills and experience and be a value
added asset to an organizations growth.
EXECUTIVE SUMMARY
Quality Lead / Senior Welding Inspector with hands on working experience in performing
multi- discipline in quality management & inspection functions. I have an accumulative more
than 21 years vast working experience in construction and petrochemical industry. Key strength
in leading a quality team lies on my strong technical knowledge in various disciplines and
diverse exposure to overall segments of petrochemical industry which contribute to successful
completion of each EPCC projects undertaken.
My working experience includes;
i. Onshore Construction of EPCC and Maintenance Projects,
♦ Installations of Cross country Pipeline.
ii. Fabrication yards of Topside, jackets legs, modules, Subsea
Manifold, Crane Support structures, pipe rack and Piping system.
iii Modification and conversion of vessel (Pipe lay barge, Oil
Rig & FPSO)
Page | 1
2. I have held various positions in Quality Assurance and Quality Control
(QA/QC) ranging from Inspector, Lead Inspector, QC Supervisor, Senior
QA/QC Coordinator.
I also preformed as a Quality Representative for Client/Owner,
Contractor, Consultant and Third-party Certification body.
In addition to the above current qualification, I also have in-depth
knowledge and experience in multiple NDT method that comprise of
ASNT Level II UT, RT, PT & MPI.
My Quality Assurance function was to develop various Construction and
Quality Procedures, Inspection Test Plan, QA/QC forms and Reports. I
have extensive experience in writing and preparing project
documentation from the initial phase of a project (Project deliverable) to
the end phase of the project (Final documentation). Coordinate Source
Inspection activity liaising with third-party inspection agency,
procurement department, vendor and assign Inspectors.
I am qualified and experienced to assess, evaluate and resolve
construction related issues based of existing and new conditions. I also
manage the site/project QA/QC department by monitoring and managing
sub-contractor. My detail functions to conduct Welding Procedure
Qualification, WQT for welders and Coordinate & monitor QA/QC
Inspector, Coating contractors and NDT Inspection contractor.
My versatile nature in performing multiple tasks extends my involvement on, in-service
inspection relating to assessment, modification, recommendation and rectification. The
inspection includes various pressure vessels and piping system at various plants and offshore
facilities on Shutdown and Turnarounds. Competent in evaluate various NDT and destructive
testing for the welding qualifications.
I have experience and familiar with specification and Standard Practice of Shell,
Petronas, BP, Woodside Energy, Inpex, Ensco, Maersk and Total.
Page | 2
3. Interpersonal skill and motivation:
As a QA/QC Welding Professional, I am competent in field of welding Inspections. Deft
in handling QA/QC Inspections, Welding, Piping, Pipeline, Inspection of Pressure
Vessel. Undergone & handled many prestigious projects. Goods exposure to
international Codes and Standards with knowledge on SMAW, GMAW, GTAW and
FCAW with all positions.
A glance trough my resume attached along, shall familiarize you with my credentials. I
am confident of fitting in the slot as well as in the team. However, should you desire
personal interaction.
CORE COMPETENCIES:
Structural and Piping Inspector ( from development of project charter, project
execution plan, construction methodology to project close out) of multimillion
dollar turnkey projects
Excellent in aligning organizational internal and external values with client value
system to deliver optimal project outcomes exceeding stakeholder expectations.
Adept at identifying and optimizing multinational professional teams to resolve
conflicts enabling project objectives to be achieved.
Composed negotiator excelling in achieving buy in from stakeholders and
influencing customers and team members to align to stated project objectives.
Excellent Communication Skills - Oral, Written, Executive Presentation to
achieve project and organizational targets.
Excellent organizational skills to manage and lead multinational cross functional
teams and coordinate across departments to deliver turnkey multi million dollar
projects.
Management Experience – Customer Centric, Process Oriented, Team
Page | 3
4. Oriented, Strategic and Operational Planning.
Strong resource allocation, vendor management and supplier and sub
contractor management skills.
General Attributes - Impeccable Business Ethics, Professional image,
Exceptional Organizational Skills, Innovative, Customer Focused, Good
Business Judgment.
CAREER HIGHLIGHTS:
Successfully delivered new build modular jack up unit, Semi-submersible
drilling, Drill ship and SUBSEA Manifold with zero loss time incidents achieving
client, project and organizational objectives.
Successfully delivered all Projects to clients: Shell, BP, Petrobrass, Inpex, Woodside
and marathon. Ahead of schedule and with an impressive safety records.
Recognized Expertise in:
i. Performing Inspection for equipments such as Fabrication and manufacturing of Top
Sides, wellhead, Platforms and their Jackets, Offshore Pedestal Cranes, Pressure
vessels, pipings, Heat exchanger, Columns, Boilers (Water Tube, Fire tube), HRSG,
Super Heater, Economizer, Headers, Skids Piping, Control valves, Actuators functions
and Boiler Steel Structures. Mechanical Equipments inspections, in-services inspection
during shut down activities.
ii. Performing Inspection for equipments such as Fabrication of Sub Sea Manifold &
Equipments, PLET/PLEM, Risers Assembly, Riser Piping (Main Pipe, Hydraulic, Choke
& Kill), Christmas Trees assembly & FAT, piping, tubing, valve assembly, Tie-in
equipments (Jumpers piping, Umbilical Hubs, Inboard &Outboard Hubs
termination),Top Sides, wellhead, Platforms and their Jackets, Offshore Pedestal
Cranes, Pressure vessels, pipings, Heat exchanger, Columns, Boilers (Water Tube,
Fire Tube), HRSG, Super Heater, Economizer, Headers, Skids Piping and Boiler Steel
Structures. Mechanical Equipments inspections, in-services inspection during shut
down activities.
iii. Have sound experience in dealing with Carbon Steel, Stainless steel, Duplex, Super
Page | 4
5. Duplex and CRA materials.
iv. Knowledge in the following standards and code:-
Pressure Vessels ASME Section VIII DIV. 1 and ASME Section II, V & IX
Piping B31.3,B31.4, B31.8, API 1104, API 6A, DNV, NORSOK
Structural Steel Welding Code -AWS D1.1
RESPONSIBILITY:
Client Approved as behalf of client representative and the inspection task as per
approved ITP, International Code & standard & Specifications and P.O contract. (Work
Packs)
i. Witness/monitor and review the MRIR, MVR, fit up, welding, PWPS, WQT, NDT (RT,
PAUT, UT, PWHT, MT, PT, PMI, HT, Pressure Test, weld repair, Production test coupon
for weld, visual, dimensional, blasting & painting, pre-shipment and delivery.
ii. Witness, monitor and review the Assembly Inspection and Mechanical Completion
Inspection for complete final assembly inspection, final inspection, and ensuring that
ITP points were being all followed trough by procedure to final document review and
acceptance (MDR).
CURRENT EMPLOYMENT HISTORY
Freelance Inspector
PROJECT INVOLVED:
CLIENT : ENI Muara Bakau B.V
VENDOR/SUPLLIER : ROTATING OFFSHORE SOLUTIONS PTE
LTD
PROJECT INVOLVED : JANGKRIK COMPLEX PROJECT (FPU)
MATERIAL/EQUIPMENT : FIREWATER PUMP (ENGINE)
INSPECTED/TESTED ITEMS : (FAT/FUNTION TEST and
Page | 5
6. MECHANICALTEST)
1
ST
COMPANY: ENS CONSULTANT - SECONDED ENI
Client Approved inspector to Witness and verified and various Valves manufacture, HEATING
Cooler and Shut down valve, Control valves and assembly premises to confirm the projects
orders to meet various code and standards.
i. To verification and review of Material certificates, random critical dimensional and
visual check
ii. To witness NDE on welded surfaces on the pipe fittings, pipe to pipe joints and
flange to pup pieces
iii. To review and verified Material certificates ,NDT test report, painting reports and
QC inspection reports
iv. To witness pressure test for valve, body and seat leak test and endorsed the final
reports
v. To witness FAT and Functional test for positioning, open and close valve test with
allowed timing
Vii. Witness, and physically check before and after witness and review the
assembly Inspection and Mechanical Completion Inspection for complete
functional test of running engine (FWP), dimension check and final
Documentation.
PROJECT INVOLVED:
CLIENT : Abu Dhabi Company for Onshore
Petroleum
Page | 6
7. (ADCO) Ltd.
VENDOR/SUPLLIER : WILMAX Control system Pte Ltd / GS
E&C
Dodsal
PROJECT INVOLVED : EPC FOR RUMAITHA / SHANAYEL
FACILITIES
- PHASE II
MATERIAL/EQUIPMENT : PRESSURE VESSEL , STORAGE TANK
AND
CHEMICAL INJECTION PIPING
SPOOL
PACKAGE
INSPECTED/TESTED ITEMS : 52 SETS SKID STORAGE TANK &
PIPING
SPOOL FOR CHEMICAL INJECTION
SKID
1
ST
COMPANY: ENS CONSULTANT - SECONDED as (TPI) TUV NORD behalf
of
(Dodsal)
Client Approved as client Representative and the inspection task as per approved ITP,
International Code & standard & Specifications and P.O contract. (Work Packs)
i. Witness/monitor and review the MRIR, MVR, fit up, welding, PWPS, WQT, NDT (RT, UT,
PWHT, MT, PT, PMI, HT, Pressure Test, weld repair, Production Test test coupon for
weld, visual, dimensional, blasting & painting, Pre shipment and delivery.
ii. Witness, monitor and review the Assembly Inspection and Mechanical Completion
Inspection for complete intermediate test and final test (FAT) and functioning test,
weight test, Buoyancy & fin assembly inspection, final inspection, and final
documentation.
Page | 7
8. PROJECT INVOLVED:
CLIENT : BUMI ARMADA SDN. BHD
VENDOR/SUPLLIER : PROCESS GROUP / DCF
ENGINEERING
PROJECT INVOLVED : MADURA BD FIELD DEVELOPMENT
MATERIAL/EQUIPMENT : PRESSURE VESSEL
INSPECTED/TESTED ITEMS : SOUR WATER INLET FILETR & SOUR
WATER
STRIPPER VESSEL
1
ST
COMPANY: ENS CONSULTANT - SECONDED PROCESS GROUP PTE
LTD
Client Approved Resident Senior welding Inspector and the inspection task as per
approved ITP, International Code & standard & Specifications and P.O contract. (Work
Packs)
i. Witness/monitor and review the MRIR, MVR, fit up, welding, PWPS, WQT, NDT (RT, UT,
PWHT, MT, PT, PMI, HT, Pressure Test, weld repair, Production Test test coupon for
weld, visual, dimensional, blasting & painting, Pre shipment and delivery.
ii. Witness, monitor and review the Assembly Inspection and Mechanical Completion
Inspection for complete test, weight test, Buoyancy & fin assembly inspection, final
inspection, and final documentation.
PROJECT INVOLVED:
CLIENT : ENI Saipem
VENDOR/SUPLLIER : SIEMENS / EMERSON PROCESS
MANAGEMENT
WASCO / DCF ENGINEERING
SIEMENS / DYNAGLASS SDN.BHD
PROJECT INVOLVED : OCTP FPSO - GHANA
Page | 8
9. MATERIAL/EQUIPMENT : FIBER GLASS TANK / HEATING MEDIUM
DUMP
COOLER / SHUT DOWN BALL VALVE
PACKAGE
& CONTROL VALVE
INSPECTED/TESTED ITEMS : HEATING MEDIUM, BALL VALVE &
CONTROL
VALVE AND CLEAN IN PLACE
CIRCULAR TANK
(FAT/FUNTION TEST and
MECHANICALTEST)
1
ST
COMPANY: ENS CONSULTANT - SECONDED ENI SAIPEM
Client Approved inspector to Witness and verified and various Valves manufacture, HEATING
Cooler and Shut down valve, Control valves and Fiber glass (FRP) tank and assembly
premises to confirm the projects orders to meet various clients requirements and code and
standards.
vi. To verification and review of Material certificates, random critical dimensional and
visual check
vii. To witness NDE on welded surfaces on the pipe fittings, pipe to pipe joints and
flange to pup pieces
viii. To review and verified Material certificates ,NDT test report, painting reports and
QC inspection reports
ix. To witness pressure test for valve, body and seat leak test and endorsed the final
reports
x. To witness FAT and Functional test for positioning, open and close valve test with
allowed timing
Vii. Witness, and physically check before and after witness and review the
assembly Inspection and Mechanical Completion Inspection for complete
functional test of valve with actuator, hydrostatic test, seat leak test and
dimension check painting DFT and final inspection, and final Documentation.
viii. To witness final inspection orientation, all instruments and valve / actuators before
packing and delivery.
Page | 9
10. PROJECT INVOLVED:
CLIENT : SONATRACH (FCP)
VENDOR/SUPLLIER : DAEWOO ENGINEERING
CONSTRUCTION /
MHE DEMAG (M) SDN.BHD
PROJECT INVOLVED : CAFC - ALGERIA - G50 - YA-26
MATERIAL/EQUIPMENT : OVERHEAD TRAVELLING CRANE
INSPECTED/TESTED ITEMS : DOCUMENT REVIEW FOR OVERHEAD
TRAVELLING CRANE MECHANICAL
FABRICATION COMPLETION
INSPECTION REPORTS AND
FAT/FUNTION
and MECHANICALTEST
1
ST
COMPANY: ENS CONSULTANT - SECONDED ENI SAIPEM (End user)
Client Approved inspector to Witness as client Representative and verified and assembly
premises to confirm the projects orders to meet various clients requirements and code and
standards.
i. To verification and review of Material certificates, random critical dimensional and
visual check.
ii. To review and verified Material certificates ,NDT test report, painting reports and
QC inspection reports.
iii. To witness FAT and Functional test for positioning, lifting with/without load test,
Page | 10
11. mechanical running test, traveling test and electrical control function with allowed
timing.
vi. Witness, and physically check before and after witness and review the
assembly Inspection and Mechanical Completion Inspection for complete
functional test of overhead crane and dimension check painting DFT and
final inspection, and final Documentation.
PROJECT : Portable Water Pipeline
FABRICATOR : Oriental Steel Pipe
Seconded to: Cutech Inspection Services
Client : PUB Singapore
POSITION : PUB Representative
DURATION : Sept 2015 - Nov 2015
RESPONSIBILITY:
I was appointed as PUB representative for PORTABLE WATER PIPELINE.
Monitoring all site activity & Shop fabrication and reporting all activity to QA/QC
Manager and Pipeline Superintendent. Ensure construction, fabrication, inspection
and testing activity is performed in accordance with all Project Procedure, Schedule,
Planning, Specification & Construction Drawings. Monitoring, overseeing and
coordinate various inspection scope on various project at site.
PROJECT: Rise Base and Production Manifolds
6Slot, Dual Header Production Manifolds & 4Slot, Riser Base Manifold
FABRICATOR: SAPURA KENCANA PETROLEUM
Seconded to: FMC Technologies
Client: Shell Prelude
Page | 11
12. POSITION: QA Inspector
DURATION: Dec 2014 - Sept 2015
RESPONSIBILITY:
I was appointed as Senior Welding Inspector for Subsea Manifold Fabrication.To
ensure and maintain all quality standards in structural and piping system fabrication
and installation as detailed in QA/QC procedures, client’s specification and applicable
codes by planning, coordinating and execution of inspection and through effective
implementation of quality system and procedures.
Actively involved an all aspects as the subsea Manifold & Foundation
construction from material verification, monitoring of the sub-contractors,
ensuring that ITP points and factory acceptance test (FAT), final factory
inspection (FFI) were being all followed trough by procedure to final document
review and acceptance (MRB).
• Coordinate closely with CONTRACTOR to minimize work interference due to
testing or procedure qualification requirements
• Interpret results of radiography and other NDT methods
• Monitor Project welding quality
• Witness welding procedure qualification and welder performance tests
• Maintain records on test, evaluation and measurements
• Participate in the resolution of the quality problems as directed by QA Engineer
• Maintain records of works performed within assigned responsibility and ensure
quality of material used, verify qualification of personnel performing the work,
ensure approved methods are used, ensure advance warnings of possible problem
areas of items is provided to the QA Engineer and verify that corrective actions
including repair are taken. Keep the QA Engineer informed of the current quality
status
• Review and approval of Welding Procedure Specification
• Preparation of Welding Procedure Specification in accordance with ASME IX and
AWS D.1
• Review and approval of Welder Qualification Certification
• Review of Welder Rejection Ratio of Data
Page | 12
13. • Cooperate with an assist CONTRACTOR and others, where possible, in the
achievement of quality goals
• Prepare schedules covering his works when required by project controls section
• Assist in preparation of field change notices, extra work orders and back charges
notices when required
• Evaluate, verify or check adequacy of welding equipment
• Review electrode selection, storage and maintenance
• Monitor, verify or check supplies and materials (including grinding and back-
gouging) to be welded and the type of weld to be produced
• Ensure acceptable fit ups including joint edge preparation and configuration
• Conduct dimensional inspections as required for verifications
• Visually inspect and monitor welding operations (including grinding and back
gouging) and finished works
• Determine use of appropriate NDT methods and evaluate test results
• Follow up on non-conformance and corrective actions including administrative
verification
• Check or otherwise verify heat treatment if required
• Enforce safety in welding, hot work and NDT operations
• Witness and document hydrostatic testing of vessels, piping and pipeline systems
i) To witness pressure test for valve, body and seat leak test and endorsed the final
reports.
ii) To witness FAT and Functional test for positioning, open and close valve test with
allowed timing.
iii). Witness, and physically check before and after witness and review the
assembly Inspection and Mechanical Completion Inspection for complete
functional test of valve with actuator, hydrostatic test, seat leak test.
• Witness vessel and pipeline flushing and gauging
• Establish and maintain records of Welding Procedures, Welder Qualifications /
disqualifications, rejects and repairs to ensure that factual and complete information
is available to respond to requests and recommendations of Quality Assurance
Auditors
• Make provisions to be informed of any special materials which arrive at site for
welding so that new procedures and welder’s test can be formatted if necessary.
• Monitor repair rates of all welders so as to avoid excessive delays due to high
Page | 13
14. rejection rates and recommend, through QA Engineer, for welder re-testing or
replacement
• Maintain records of progress of welding operations if required
• Assist in ensuring requirements of regulatory authorities and/or Quality Assurance
Auditors are implemented and satisfactory
• Submit daily work activity report and other reports as required
• Ensure safety standards and requirements are observed and bring policy matters to
attention of superior
PROJECT: SPS Manifold Fabrication ICHTHYS INPEX
SDH –Subsea Distribution Hub (Manifold)
ISP - 6SLOT Production Manifold – BDC1A / BDC1B / BDC1C / BDC4 and
BDC5
FABRICATOR: SAPURA KENCANA PETROLEUM
Seconded to: GE Oil & Gas, Vetco Gray Scandinavia, AS
Client: INPEX
POSITION: LEAD PIPING INSPECTOR
DURATION: APRIL 2014 – Dec 2014
JOB DESCRIPTION:
Actively involved an all aspects as the subsea Manifold & Foundation
construction from material verification, monitoring of the sub-contractors,
ensuring that ITP points and factory acceptance test (FAT), final factory
inspection (FFI) were being all followed trough by procedure to final document
review and acceptance (MRB).
Attended Production and QA/QC meetings and project with vendors with CSR.
Cross check the insurance of Approved and contraction drawing flows to various
departments.
Witness and verify new and prequalification WQT, WPS AMD PQR for piping
Page | 14
15. and steel structural.
Witness the insulation of piping, Tubing and structural joints fit up and welding
(Before, During, After welding).
Witness and monitor the NDT inspections and Review NDT reports.
Witness and approve dimension survey. Raise technical queries for engineering
related issues. Follow up on Non compliance activities status and Site memo for
the violation of contraction standard and specification.
Witness Line walk check and Re-instatement (Raise punch-list) of piping
systems.
Witness and verified various punch list activities and ensure issues resolved
prior to Testing & Commissioning and delivery.
i) To witness pressure test for valve, body and seat leak test and endorsed the final
reports.
ii) To witness FAT and Functional test for positioning, open and close valve test with
allowed timing.
iii). Witness, and physically check before and after witness and review the
assembly Inspection and Mechanical Completion Inspection for complete
functional test of valve with actuator, hydrostatic test, seat leak test.
Prepare daily (Flush and weekly progress report and submit to the Site Project
Manager and CSR.
PROJECT: GREATER WESTERN FLANK (GWF) PROJECT ( 4 SUBSEA
MANIFOLDS)
TPA, GDA, GSA (SKID) & SSIV (SKID)
FABRICATOR : SAPURA KENCANA PETROLEUM
CLIENT: FMC TECHNOLOGIES
OWNER: WOODSIDE ENERGY
POSITION : LEAD INSPECTOR
DURATION : FEB 2013 – March 2014
Page | 15
16. JOB DESCRIPTION :
Actively involved an all aspects as the subsea Manifold & Foundation
construction from material verification, monitoring of the sub-contractors,
ensuring that ITP points and factory acceptance test (FAT), final factory
inspection (FFI) were being all followed trough by procedure to final document
review and acceptance (MRB).
RESPONSIBILITY:
Lead a team of QAQC Inspectors in ensuring all QAQC related activities are being
carried out accordingly which includes Fabrication & Inspection (Structural & Piping)
as per Inspection & Test Plan.
Reviewing mill certificate as per applicable code and standards. This include verifying
material strength, chemical composition, mill certification, mechanical testing,
classification signature and other verifications.
Ensuring all incoming materials has been properly documented in IMR & MVR.
Verifying all NDT activities been carried out as per NDT matrix.
Ensure all structural testing such as tank air test, hydro test, flood test, vacuum test and
other applicable testing has been carried out as per applicable procedure.
Coordinate all daily QAQC activities for effective implementation for fabrication,
inspection & testing.
i) To witness pressure test for valve, body and seat leak test and endorsed the final
reports.
ii) To witness FAT and Functional test for positioning, open and close valve test with
allowed timing.
iii). Witness, and physically check before and after witness and review the
assembly Inspection and Mechanical Completion Inspection for complete
functional test of valve with actuator, hydrostatic test, seat leak test.
Liaise with QAQC Manager for daily implementation of QAQC activities.
Ensuring all Non Destructive Testing (NDT) being carried out accordingly for each
testing.
Page | 16
17. Highlight
Awarded Certificate of Recognition from – Woodside Greater Western Flank
Project (GWF) Manifold Fabrication Project.
Awarded Certificate of Recognition from – Shell Prelute Project Manifold
Fabrication Project.
Senior Engineering Inspector, for Structural and Piping Setsco Services Pte Ltd • Oct
2007 – Jan 2013)
Ahead of schedule and within budget.
Managing, planning, coordinating and executing the construction with shipyard,
Operation and Vendor.
Ensuring prototype design fulfills requirements of drilling rig in Brazil (Imaba
Requirements and safety requirements) before each construction activity.
Carried out Tank inspection for steel work, piping and painting at offshore. Ensure the
entire thickness gauge was carried in offshore. Finalize work scope required before she
comes to Singapore.
Prepare scope of work as required for the project accordingly.
Assign vendors and shipyard work scope for the renewal survey. Coordinate with DNV
class for the 5 years renewal survey. Monitor with operation for the DNV renewal
survey. Ensure the entire DNV check list closed and get approve renewal cert from
DNV.
Ensuring construction and commissioning activities are coordinated and executed safely
for per vessel manpower (vendors, yard personnel, and operation and class personnel).
Ensured that appropriate production, operation, safety and quality control processes
were implemented to fulfill contractual as well as operational requirements.
Managed a group production team, commissioning team, sub contractors and vendors to
deliver the rig ahead of schedule and within budget
Resolved onsite interferences, engineering design oversights and project bottlenecks
Review and approval of Welding Procedure Specification
Preparation of Welding Procedure Specification in accordance with ASME IX AND
AWS D1.1
Review and approval of Welder Qualification Certification
Review of Welder Rejection Ratio Data
Welding Inspector, CPG Labotories Pte Ltd • May 2005 – Oct 2007
Coordinate and Supervise all the steel work fabrication, installation and erection
According to the Noble standard and procedure.
Page | 17
18. Responsibilities included material inspection, Fit-up inspection and visual inspection of
work completed of the structure.
Review and coordinate non destructive testing.
Review and approval of Welding Procedure Specification
Preparation of Welding Procedure Specification in accordance with ASME IX AND
AWS D1.1
Review and approval of Welder Qualification Certification
Review of Welder Rejection Ratio Data
Ensuring the availability of all batch certificates concerning with all materials,
product data sheet, Material safety data sheets, inspection warier approval, and
calibration certificates for all inspection tools.
Surveillance and final inspection of insulation activities.
Evaluate and resolve technical problems from production related error in
construction, Initiate action to prevent the occurrence of product non-
conformities.
Interpret drawings, prepare, review and oversee the execution of visual
inspection and NDT test plans.
Leak test witness and review the entire calibration cert for the gauge.
Arrange meeting with shipyard and contractor to coordinate the work.
Credited with improvement, integration and consolidation of parent yard manufacturing
work processes with Jurung Shipyard increasing productivity yard workforce.
Led the shipyard Supervisors & workers to achieve similar productivity performance
and safety standards to ensure timely deliveries the rig.
QA /QC Inspector, Keppel Fels, Singapore • December 1995 – May 2005
Leading the work in the activities of fabrication, preparation of material requirement
listing, Daily progress details, ensuring the inspection requirement as mention in the
drawing, planning and execution of job task as suggestion giving by the engineering
department.
Involved in Fabrication and Erection of Piping spools in the sites as per the
Isometric drawings, Installation of valves and other Instrument assemblies as
per the P&ID drawings, Installation of piping supports and pipe sleepers as per
the plot plan drawings, Daily routine task allocation to the working crew,
Preparation of as-Built drawings, attending the punch list items on the pipe
works, execution of hydro tests, Pad reinforcement test, revalidation of post test
reinstatements after hydro test, hook ups.
Involved in Fabrication and erection of hull for jack up rig blocks, Leg , helideck ,
Crane Column, spud can, cantilever and drill floor.
Involved in fabrication and erection of hull for semi-submersible rigs, spoons structure,
upper hull blocks, tubular structure, column structure and outfitting item.
Coordination with client and third party inspectors in performance of final inspection &
Page | 18
19. Hand over.
Performing inspection as per the project specifications such as of concerned
quality test reports & documenting those reports as per Quality Control Plan and
Inspection Test Plan.
Evaluate and resolve technical problems from production related error in
construction, Initiate action to prevent the occurrence of product non-
conformities.
Executed installation and commissioning of all jack up drilling rig and semi- equipment
and HVAC systems’ as per project schedule
Highlight
Awarded letter of excellence from Clients- Keppel Offshore and Marine for
excellent individual contribution
Projects
Ensco Offshore International
Gulf Drilling International
Seadrill
Transocean International
Maersk Contractors
Skeie Drilling and Production
Gold Start Equities LTD
Diamond Offshore Drilling
Braspetro Oil Service Co
PT APEXINDO
Asian Lift
Santa Fe
Wandoo Allliance
PROFESSIONAL QUALIFICATION
CSWIP 3.2 SENIOR WELDING INSPECTOR
Page | 19
20. CERIFICATE NO. : 68805
CSWIP 3.4 RADIOGRAPHIC INTERPRETATION (RI) GROUP (A) / (B)
CSWIP 3.1 ULTRASONIC TESTING (LEVEL II)
ASNT LEVEL II : RADIOGRAPHIC INTERPRETATION (RI)
ASNT LEVEL II : MAGNETIC PARTICLE TESTING (MT)
ASNT LEVEL II : RADIOGRAPHIC TESTING (RT)
ASNT LEVEL II : ULTRASONIC TESTING (UT)
ASNT LEVEL II : LIQUID PENETRANT TESTING (PT)
Certificate Of attend Steel Structure TWI
Certificate and Training by Jotun Paint and School
SAFETY & HEALTH INDUCTION COURSE BY (CIDB) – CONSTRUCTION
INDUSTRY DEVELOPMENT BOARD MALAYSIA
EDUCATIONAL BACKGROUND
HIGHEST LEVEL
LEVEL : PROFESIONAL DIPLOMA IN INDUSTRIAL ENGINEERING
UNIVERSITY : UNIVERSITY TECHNOLOGY OF MALAYSIA
FIELD OF STUDY : ENGINEERING
MAJOR : INDUSTRIAL MANAGEMENT ENGINEERING
GCE ‘O’ Level : (SPM)’ Malaysia high school (Secondary)
NTC Grade 3 : Steel Fabrication (ITE)’ Singapore
NTC Grade 2 : Marine Steel Fabrication (ITE)’ Singapore
Page | 20
21. OTHER
Proficient in Microsoft Office Applications, Auto Cad, Pro-E, Unigraphics,
Nationality: Malaysian
Singapore (PR) I/C No: S7581143H
Marital Status: Married
Languages known: English, Tamil, Malayalam and Bahasa Melayu
Interests: Badminton and Fishing
References:
Ariel D. Cabawatan
Assistant Manager
Inspection Department | Mechanical Technology Division
Setsco Services Pte Ltd
HP : (+65) 98736595
E : arieldc@setsco.com | E : cabawatan@yahoo.com.sg
Eng MH (Daniel)
Site Manager
Manifold & Pipeline Systems
Asia Pacific Region | Subsea Systems
E: minghooi.eng@fmcti.com
Mobile: +6012 - 3519 427
Gawing Jenggie
QA Engineer
Manifolds & Pipeline System
E : Gawing.Jenggie@fmcti.com
Mobile: +6010- 8278279
Paul Ulyett
Subsea Engineer Subsea & Pipelines Function
Subsea Engineering Group Woodside Energy Ltd.
Woodside Plaza 240 St Georges Terrace | Perth WA 6000 Australia
T: +61 8 9348 3023
M: +61 4 2853 3674
E: Paul.Ulyett@Woodside.com.au
Nino Amato
Manifold Construction Site Representative
Subsea & Pipelines | Woodside Energy Ltd | Woodside Plaza
240 St Georges Terrace Perth WA 6000 Australia
T: +61 8 938483749 | M: +61 418 191 728
E: nino.amato@woodside.com.au
Page | 21