CURRICULUM VITAE
MECHANICAL ENGINEER
PERSONAL DATA
Name Arshad Mehmood
Father Name Shahpal Khan
Date of Birth 15-04-1987
Marital status Single
Religion Islam
Nationality Pakistani
CNIC.No 81203-1404829-3
Passport no SEO158291
Mobile# 00966-0534171551
Email id Arshadme20@hotmail.com
CERTIFICATES OF REGISTRATION:
1) Pakistan Engineering Council (PEC) Registration # MECH/24554
2) Saudi Engineering Council (SCE)I.D No: (134908)
CAREER OBJECTIVES
To gain as much practical knowledge as possible and to use my skills and abilities efficiently. To
utilize and enhance my capabilities, knowledge and skills in a viable manner for the benefit of
the organization that encourages innovation and creativeness in the job process.
QUALIFICATION
BSC Mechanical Engineering (C GPA 3.96,88%) (University of Azad Jammu & Kashmir)
DAE Mechanical ( K.R.L Institute of Technology, Kahuta) PK. ( ,78%)
COMPANY NAME /PROJECT NAME / JOB TITLE/POSITION/WORK DESCRIPTION
SAUDI TECHNICAL GROUP OF COMPANIES:
Prince Moshin Hospital Reheabilition Project Ul-Ulha KSA (Ministry Of Health
KSA). June 2013 To Present……
Senior Mechanical Project Engineer.
Familiar Engineering standards and procedures and applicable National and
International codes and standard as SMACNA /ASHRAE.
Attend meetings with main contractors and discuss with site issues, planning and solve site
problems. Give presentation to update work status.
Responsibilities: Submitting Materials, Drawing to Consultant, also checking Design and Capacities of
Mechanical system and Guiding the designers according to Site Installation and Specification,
Schedules, Classes and Capacities and follow the International, ASTM, ANSI, SAMACNA,ASHARE
Standards. Reviewing the quality documentations(procedures, drawings ,material specifications ).
a. and other quality related documents submitted by contractor) pertaining to HVAC
b. activities.
Responsible for following Mechanical System Installation:
• Site Work Installation:
• Check Quantities and Making Order for Material Purchaser:
• Quality Control Inspector:
1- HVACs System: Installation, Test And Commissioning Of Main Hospital, and also related
buildings Duct Fittings Guage 24,22, as per International Standards, Chill & Hot Water Black
Steel pipe Sch 40, Two Way Control System, Wield Joint, DRV Valves, Air Handling Units,
Package Air Units, Post Treatment Units, Fan Coil Units, Chillers, Extract Fans, According To
ASTM and SAMCANA , ASHARI.
2- Installation and testing Commissioning of HVAC Variable Speed Drive Pumps, Primary and
Secondary sets with Pneumatic Pressure Vessels..
3- Installation and testing Commissioning of HVAC Air Cooled Screw Type Chillers 600 tons four
Pieces three working one stand by all Piping, Water Balancing, DRV Valves, Accessories, BMS
Control System.
4- Installation and testing Commissioning of HVAC Air Handling Units, Post Treatment Units, Fresh
Air Intake Units With Duct Accessories(Filters,Hepa Filters,Bag Filters, Sound Atenventor,
Dampers, Fire Dampers, MOTORIZED Damper) Piping ,Valves, Two Way Control with Variable
Speed Control System, Hot Water, Chill Water, Steam Humidifier, BMS Control Systems.
5- Installation and testing Commissioning of HVAC Fan Coils Units, Concealed Type and Floor
Mounted two way control System Valves, Fittings, BMS Control System.
6- Installation, Test And Commissioning of Steam Boiler System 1600kg/hr, Design Standard BS
EN 12953, Boiler Thermal Efficeny 88%, Fire Tubes Three Pass, Wet back,88 Tubes, Shell Boiler,
2 Boiler Set Working one stand by, Design Working Pressure 10 Bar., Automatic Blow down
Control System ,Pressure Reducing Bench and Steam Supply for , calorifers, Heat Exchangers,
O,R Sterilization, Air Handling Units Humidifier, Kitchen, Laundry Areas, also black steel Steam
pipe Sch 80 installation.
7- Installation, Test And Commissioning of Main Hospital Operation Theatres Laminar Air Supply
With HEPA Filters.
8- Installation, Test And Commissioning of Heat Exchangers, Calorifers, Condensation Tank.
9- Installation, Test And Commissioning of Submersible Pump Set.
10- Installation, Test And Commissioning of Package Air Units With all Duct Fittings.
11- Installation, Test And Commissioning of FM200 Of Main Hospital Electrical Rooms and
Transformer Areas.
12- Installation, Test And Commissioning of Medical Gases pipeline, Medical Machinery,
AGSS,Triplex Compressor System(Medical Compressed Air, Medical Vaccum,Medical Oxygen,
Nitrous Oxide) piping, Area Vlave Service Units, Bed Head Units for operation theaters and all
Patient Wards.
13- Installation, Test And Commissioning of Automatic Kitchen Hood Fire Extinguisher System for
Main Building.
14- Installation, Test And Commissioning of Plumbing portable water Reverse Osmic filtration
Plant , Pump set and Pvc,Cpvc Pipelining to whole Hospital and Buildings.
15- Installation Testing and Commissioning of Booster Pump Set, Raw Water Pump Set Variable
Speed Drive, Irrigation Pump Sets, Central Hot Water Circulating Pump Sets With Pneumatic
Pressure Vessels.
16- Installation testing and Commissioning of HVAC Extract Fan Up-Blast and Down Blast 50 PSC.
17- Drainage(Vent,Wc,Soil) and Water Supply Piping Hot and Cold Water Supply for all Hospital
Building.
18- Installation and Testing Commissioning Of SEWAGE Treatment Plant.
19- Installation, Testing and Commissioning of Fire Fighting Pumps, Electrical Motor, Diesel
Generator, Jockey Pump of Pressure of 11 bar and also SCH 40 Black Steel Piping Groove Lock,
Fire Hose Cabinet, Landing Valves, Fire Hydrant..
10 Make the payments of all Mechanical Work(HVAC, Fire fighting,,, Plumbing work ,Medical Gas,
Steam Boiler System.) according to B.O.Q. Material installation, material delivery and approve
from consultant.
13- Study the catalogs of AHU,FCU,Chillers,Exaust Fans and analyze that all loops of chiller water
and Air Handling Units is according to drawings.
13-Mechanical shop drawing reading and make amendments coordinating with team
members on requirement.
14- Raise RFI of all mechanical system(HVAC ,Fire fighting, STP,LPG, Plumbing work ,Medical Gas,
Steam Boiler System) installation. Coordinate with Consultant for inspection and responsible for
approve installation.
15- Give the materials purchasing demand. Check the need quantity according with drawings and
make the demand quantity of all mechanical systems.
16- Coordination with other departments (Civil, Electrical &Architecture in the line of
project).
SAUDI TECHNICAL GROUP OF COMPANIES :
King Abdullah Sports City ,Jeddah (saudi Aramco) Janvary 2012
to May 2013.
Mechanical Project Engineer:
 Maintain the daily progress report following the execution of work on daily activities.
 Monitor and coordination with subcontractor for work progress reporting.
 Study the project in terms of engineering design and check its validity on present
conditions.

.
 Reporting to client on daily, weekly and monthly activities.
 Maintain the quality of work according to National & international standards.
 Reporting to higher officials on daily, weekly and monthly activities.
 Coordination with company management for project expanses.
 Visit sites on daily bases, note discrepancies and inform related one for their removal.
 Coordination with quality department for quality assurance.
 Prepare the project equipment plan and their approval from client.
 Manage the availability of equipment on time.
 Perform equipment testing check.
 Coordination with other departments (Civil, Electrical &Architecture in the line of
project).
 Work under Pressure and in emergency conditions.
 Attending acceptance with client and fulfill their requirements.
 Work as team member and team lead.
 Preparation of bill of quantities, financial effects and interim payment certificates.
 Site surveillance to check the construction work and give comments if necessary
according to standards.
Familiarization with overall construction scope of work.
 To prepare request for inspection for client inspection for completed activities.
 Highlighting all discrepancies detected during monitoring inspection and
informing the same to QC Manager.
SAUDI TECHNICAL GROUP OF COMPANIES:
King Abdullah Petroleum Studies & Research Center (Saudi Aramco)
Riyadh,KSA
Mechanical Site Engineer : June 2011 to Jan 2012
 Familiar Engineering standards and procedures and applicable national and
International codes and standard as SMACNA.
Raising violation/INCR against construction if any non conformance find at site.
 Taking immediate remedial to clear inspection log book comments.
 Closing the violation and INCR in case of compliance with standards on LBE.
 Duct installation, alignment according to Aramco standards.
 Duct leakage inspection, smoke test, light test, according to Aramco standards.
 Fire fighting installation, have knowledge of Aramco standards.
 Have experience of Plumbing and sanitary installation.
 Air balancing of the whole building as per design.
 Analysis the problem of Air balancing and maintainence to meet the design
requirement.
Chill water piping installation setting of flow according to design of air balancing.
 Chill water pump room installation setting and testing the pressure.
 Chiller installation, compressor installation, compressor capacity according to load,
Evaporator, coils testing, condenser tank and coils calibration, refrigerants types,
Behavior & characteristics.
 Chiller maintenance experience.
 Having a knowledge of BMS controllers like VAV,CAV,VFD.
 Familiar with the installation of AHU,FCU,ERU,Chiller & EHC .
 Having a experience of elevator controllers .
SAUDI TECHNICAL GROUP OF COMPANIES:
Group Of Colleges RAFAH Society Colleges Project (K.S.A Ministry Of
Education).
Mechanical Site Engineer :
Join first site from Saudi Technical Group Of Companies.
.
TESLA TECHNOLOGIES COMPANIES ISLAMABAD
Section manager :
Deals in production and export Engineering products to UK .Production of Cng
kits,Dispensor, Hose section, Automobile parts.
Production of water immersion heater ,CNC machines fabrication,automotive production
according to IS.
RESPONSIBILITIES: To cover daily production 1000 pcs daily.
Maintain quality.
To manage the inventory record raw materials and also deal to labour to control cost
factor.
Manage to produce product with quality and time.
AL RAUF AIR CONDITIONING COMPANY LAHORE .
Mechanical Site Engineer :
Installation of central Hvac system.compressors,centrifugal and reciprocating,chillers,chill
water pipes cast iron,low cabon steel,pumps,cooling towers,AHU,control system. Ducting
installation(round and square)VAV,VCD,insulation,cladding,alignment,fixtures,grills,wall
registers.
Year season maintenance program compressors bearings, lubricant change, chiller
refrigerant testing, expansion valve cleaning, chill water insulation,AHU cleaning, filter
trays cleaning. Ducting cleaning,testing,alignment checking.
HABIB RAFIQUE CONSTRUCTION COMPANY ISLAMABAD:
Mechanical Site Engineer Trainee Engineer.
Hvac,Piping installation section engineer install ac units according to
drawing,window packet, central AC,installation of chillers,compressors
temperature control system control, manufacturing of duct square or
triangular. Installation of piping multi storey buildings also management the
labor daily installation.
TOYOTA MOTORS AZAD KASHMIRS (I.C ENGINES AUTOMOBILES PARTS)
ECONOMIA AGECO PVT ISLAMABD. Trainee Engineer.
Installation of Ac units in different hotels,hospitals, manufacturing of ac units in
factory.Production of wind and solar turbine.
COMPUTER SKILLS
Good command over using MS Office including MS Word, MS
Power Point MS Excel.
Good command over using Pro-E Engineering, AutoCAD.
Good command over using the internet.
FINAL YEAR PROJECT
HYDRAULIC OPERATED RADIAL WIND POWER PLANT
Low speed wind turbine starting 3m/s wind velocity and radial Rotor maximum wind attack of
wind .Low economical cost . Specially design for hilly and AZAD KASHMIRE rural areas for
lighting purpose.
INDUSTRIAL VISITS
HMC: Heavy Mechanical Complex Taxila.
KSB pump: Hazara Road, Hassanabdal.
RASTGAR: RASTGAR Engineering Company (Pvt) Limited
Islamabad.
Mangle Hydro Power Plant.
OTHER SKILLS
Leader, Team Member, Communicator, Motivator.
Good in written and spoken Urdu and English.
Social and have good administration skills.
HOBBIES
• Play volley Ball
• Watching geographic channel

Mechanical Project Enginner CV

  • 1.
    CURRICULUM VITAE MECHANICAL ENGINEER PERSONALDATA Name Arshad Mehmood Father Name Shahpal Khan Date of Birth 15-04-1987 Marital status Single Religion Islam Nationality Pakistani CNIC.No 81203-1404829-3 Passport no SEO158291 Mobile# 00966-0534171551 Email id Arshadme20@hotmail.com CERTIFICATES OF REGISTRATION: 1) Pakistan Engineering Council (PEC) Registration # MECH/24554 2) Saudi Engineering Council (SCE)I.D No: (134908) CAREER OBJECTIVES To gain as much practical knowledge as possible and to use my skills and abilities efficiently. To utilize and enhance my capabilities, knowledge and skills in a viable manner for the benefit of the organization that encourages innovation and creativeness in the job process. QUALIFICATION BSC Mechanical Engineering (C GPA 3.96,88%) (University of Azad Jammu & Kashmir) DAE Mechanical ( K.R.L Institute of Technology, Kahuta) PK. ( ,78%) COMPANY NAME /PROJECT NAME / JOB TITLE/POSITION/WORK DESCRIPTION SAUDI TECHNICAL GROUP OF COMPANIES: Prince Moshin Hospital Reheabilition Project Ul-Ulha KSA (Ministry Of Health KSA). June 2013 To Present…… Senior Mechanical Project Engineer. Familiar Engineering standards and procedures and applicable National and
  • 2.
    International codes andstandard as SMACNA /ASHRAE. Attend meetings with main contractors and discuss with site issues, planning and solve site problems. Give presentation to update work status. Responsibilities: Submitting Materials, Drawing to Consultant, also checking Design and Capacities of Mechanical system and Guiding the designers according to Site Installation and Specification, Schedules, Classes and Capacities and follow the International, ASTM, ANSI, SAMACNA,ASHARE Standards. Reviewing the quality documentations(procedures, drawings ,material specifications ). a. and other quality related documents submitted by contractor) pertaining to HVAC b. activities. Responsible for following Mechanical System Installation: • Site Work Installation: • Check Quantities and Making Order for Material Purchaser: • Quality Control Inspector: 1- HVACs System: Installation, Test And Commissioning Of Main Hospital, and also related buildings Duct Fittings Guage 24,22, as per International Standards, Chill & Hot Water Black Steel pipe Sch 40, Two Way Control System, Wield Joint, DRV Valves, Air Handling Units, Package Air Units, Post Treatment Units, Fan Coil Units, Chillers, Extract Fans, According To ASTM and SAMCANA , ASHARI. 2- Installation and testing Commissioning of HVAC Variable Speed Drive Pumps, Primary and Secondary sets with Pneumatic Pressure Vessels.. 3- Installation and testing Commissioning of HVAC Air Cooled Screw Type Chillers 600 tons four Pieces three working one stand by all Piping, Water Balancing, DRV Valves, Accessories, BMS Control System. 4- Installation and testing Commissioning of HVAC Air Handling Units, Post Treatment Units, Fresh Air Intake Units With Duct Accessories(Filters,Hepa Filters,Bag Filters, Sound Atenventor, Dampers, Fire Dampers, MOTORIZED Damper) Piping ,Valves, Two Way Control with Variable Speed Control System, Hot Water, Chill Water, Steam Humidifier, BMS Control Systems. 5- Installation and testing Commissioning of HVAC Fan Coils Units, Concealed Type and Floor Mounted two way control System Valves, Fittings, BMS Control System. 6- Installation, Test And Commissioning of Steam Boiler System 1600kg/hr, Design Standard BS EN 12953, Boiler Thermal Efficeny 88%, Fire Tubes Three Pass, Wet back,88 Tubes, Shell Boiler, 2 Boiler Set Working one stand by, Design Working Pressure 10 Bar., Automatic Blow down Control System ,Pressure Reducing Bench and Steam Supply for , calorifers, Heat Exchangers, O,R Sterilization, Air Handling Units Humidifier, Kitchen, Laundry Areas, also black steel Steam pipe Sch 80 installation. 7- Installation, Test And Commissioning of Main Hospital Operation Theatres Laminar Air Supply With HEPA Filters. 8- Installation, Test And Commissioning of Heat Exchangers, Calorifers, Condensation Tank. 9- Installation, Test And Commissioning of Submersible Pump Set. 10- Installation, Test And Commissioning of Package Air Units With all Duct Fittings. 11- Installation, Test And Commissioning of FM200 Of Main Hospital Electrical Rooms and Transformer Areas. 12- Installation, Test And Commissioning of Medical Gases pipeline, Medical Machinery, AGSS,Triplex Compressor System(Medical Compressed Air, Medical Vaccum,Medical Oxygen,
  • 3.
    Nitrous Oxide) piping,Area Vlave Service Units, Bed Head Units for operation theaters and all Patient Wards. 13- Installation, Test And Commissioning of Automatic Kitchen Hood Fire Extinguisher System for Main Building. 14- Installation, Test And Commissioning of Plumbing portable water Reverse Osmic filtration Plant , Pump set and Pvc,Cpvc Pipelining to whole Hospital and Buildings. 15- Installation Testing and Commissioning of Booster Pump Set, Raw Water Pump Set Variable Speed Drive, Irrigation Pump Sets, Central Hot Water Circulating Pump Sets With Pneumatic Pressure Vessels. 16- Installation testing and Commissioning of HVAC Extract Fan Up-Blast and Down Blast 50 PSC. 17- Drainage(Vent,Wc,Soil) and Water Supply Piping Hot and Cold Water Supply for all Hospital Building. 18- Installation and Testing Commissioning Of SEWAGE Treatment Plant. 19- Installation, Testing and Commissioning of Fire Fighting Pumps, Electrical Motor, Diesel Generator, Jockey Pump of Pressure of 11 bar and also SCH 40 Black Steel Piping Groove Lock, Fire Hose Cabinet, Landing Valves, Fire Hydrant.. 10 Make the payments of all Mechanical Work(HVAC, Fire fighting,,, Plumbing work ,Medical Gas, Steam Boiler System.) according to B.O.Q. Material installation, material delivery and approve from consultant. 13- Study the catalogs of AHU,FCU,Chillers,Exaust Fans and analyze that all loops of chiller water and Air Handling Units is according to drawings. 13-Mechanical shop drawing reading and make amendments coordinating with team members on requirement. 14- Raise RFI of all mechanical system(HVAC ,Fire fighting, STP,LPG, Plumbing work ,Medical Gas, Steam Boiler System) installation. Coordinate with Consultant for inspection and responsible for approve installation. 15- Give the materials purchasing demand. Check the need quantity according with drawings and make the demand quantity of all mechanical systems. 16- Coordination with other departments (Civil, Electrical &Architecture in the line of project). SAUDI TECHNICAL GROUP OF COMPANIES : King Abdullah Sports City ,Jeddah (saudi Aramco) Janvary 2012 to May 2013. Mechanical Project Engineer:  Maintain the daily progress report following the execution of work on daily activities.  Monitor and coordination with subcontractor for work progress reporting.  Study the project in terms of engineering design and check its validity on present conditions.
  • 4.
     .  Reporting toclient on daily, weekly and monthly activities.  Maintain the quality of work according to National & international standards.  Reporting to higher officials on daily, weekly and monthly activities.  Coordination with company management for project expanses.  Visit sites on daily bases, note discrepancies and inform related one for their removal.  Coordination with quality department for quality assurance.  Prepare the project equipment plan and their approval from client.  Manage the availability of equipment on time.  Perform equipment testing check.  Coordination with other departments (Civil, Electrical &Architecture in the line of project).  Work under Pressure and in emergency conditions.  Attending acceptance with client and fulfill their requirements.  Work as team member and team lead.  Preparation of bill of quantities, financial effects and interim payment certificates.  Site surveillance to check the construction work and give comments if necessary according to standards. Familiarization with overall construction scope of work.  To prepare request for inspection for client inspection for completed activities.  Highlighting all discrepancies detected during monitoring inspection and informing the same to QC Manager. SAUDI TECHNICAL GROUP OF COMPANIES: King Abdullah Petroleum Studies & Research Center (Saudi Aramco) Riyadh,KSA Mechanical Site Engineer : June 2011 to Jan 2012  Familiar Engineering standards and procedures and applicable national and International codes and standard as SMACNA. Raising violation/INCR against construction if any non conformance find at site.  Taking immediate remedial to clear inspection log book comments.  Closing the violation and INCR in case of compliance with standards on LBE.  Duct installation, alignment according to Aramco standards.
  • 5.
     Duct leakageinspection, smoke test, light test, according to Aramco standards.  Fire fighting installation, have knowledge of Aramco standards.  Have experience of Plumbing and sanitary installation.  Air balancing of the whole building as per design.  Analysis the problem of Air balancing and maintainence to meet the design requirement. Chill water piping installation setting of flow according to design of air balancing.  Chill water pump room installation setting and testing the pressure.  Chiller installation, compressor installation, compressor capacity according to load, Evaporator, coils testing, condenser tank and coils calibration, refrigerants types, Behavior & characteristics.  Chiller maintenance experience.  Having a knowledge of BMS controllers like VAV,CAV,VFD.  Familiar with the installation of AHU,FCU,ERU,Chiller & EHC .  Having a experience of elevator controllers . SAUDI TECHNICAL GROUP OF COMPANIES: Group Of Colleges RAFAH Society Colleges Project (K.S.A Ministry Of Education). Mechanical Site Engineer : Join first site from Saudi Technical Group Of Companies. . TESLA TECHNOLOGIES COMPANIES ISLAMABAD Section manager :
  • 6.
    Deals in productionand export Engineering products to UK .Production of Cng kits,Dispensor, Hose section, Automobile parts. Production of water immersion heater ,CNC machines fabrication,automotive production according to IS. RESPONSIBILITIES: To cover daily production 1000 pcs daily. Maintain quality. To manage the inventory record raw materials and also deal to labour to control cost factor. Manage to produce product with quality and time. AL RAUF AIR CONDITIONING COMPANY LAHORE . Mechanical Site Engineer : Installation of central Hvac system.compressors,centrifugal and reciprocating,chillers,chill water pipes cast iron,low cabon steel,pumps,cooling towers,AHU,control system. Ducting installation(round and square)VAV,VCD,insulation,cladding,alignment,fixtures,grills,wall registers. Year season maintenance program compressors bearings, lubricant change, chiller refrigerant testing, expansion valve cleaning, chill water insulation,AHU cleaning, filter trays cleaning. Ducting cleaning,testing,alignment checking. HABIB RAFIQUE CONSTRUCTION COMPANY ISLAMABAD: Mechanical Site Engineer Trainee Engineer. Hvac,Piping installation section engineer install ac units according to drawing,window packet, central AC,installation of chillers,compressors temperature control system control, manufacturing of duct square or triangular. Installation of piping multi storey buildings also management the labor daily installation. TOYOTA MOTORS AZAD KASHMIRS (I.C ENGINES AUTOMOBILES PARTS) ECONOMIA AGECO PVT ISLAMABD. Trainee Engineer. Installation of Ac units in different hotels,hospitals, manufacturing of ac units in factory.Production of wind and solar turbine. COMPUTER SKILLS Good command over using MS Office including MS Word, MS Power Point MS Excel. Good command over using Pro-E Engineering, AutoCAD. Good command over using the internet. FINAL YEAR PROJECT HYDRAULIC OPERATED RADIAL WIND POWER PLANT Low speed wind turbine starting 3m/s wind velocity and radial Rotor maximum wind attack of
  • 7.
    wind .Low economicalcost . Specially design for hilly and AZAD KASHMIRE rural areas for lighting purpose. INDUSTRIAL VISITS HMC: Heavy Mechanical Complex Taxila. KSB pump: Hazara Road, Hassanabdal. RASTGAR: RASTGAR Engineering Company (Pvt) Limited Islamabad. Mangle Hydro Power Plant. OTHER SKILLS Leader, Team Member, Communicator, Motivator. Good in written and spoken Urdu and English. Social and have good administration skills. HOBBIES • Play volley Ball • Watching geographic channel