SlideShare a Scribd company logo
www.gcequipment.com
GlobeCore High Vacuum Degasifier CMM(UVM) 4
Technical and Price Offer
GlobeCore Mobile High Vacuum Degasifier CMM (UVM) 4
GlobeCore Europe
8 Sadovskogo Street
Poltava
36034, Ukraine
Tel: +380532 241211
Fax: +380532241211
Mob: +380500131317
Email: sales@gcequipment.com
CMM (UVM) 4 - is supplied:
mounted on a roadworthy trailer with torsion suspension, appropriate reflectors and
tail lights and capable of being towed at speeds of up to 80km/h. It will be enclosed
with water proof metal covers (protection class IP45) and have a mechanism to secure
plant in stationary position while in operation.
Maximum noise level emitted by the unit will be below 80 db.
Production capacity of the unit is 4000 L/H allowing to process up to 96000 L of
transformer oil per day and provide:
• Removal of Water from 100 ppm down to 10 ppm and from 50 ppm to 5
ppm in a single pass and down to 3 ppm after 3 passes (ASTM method D-1533).
• Reduction of Gas content from fully saturated with air (10 to 12% by
volume) to less than 0.1 % (ASTM D-2945).
• Removal of Particulate Matter to 5 microns
• Improvement in dielectric strength up to 75 kV
COMPONENTS DESCRIPTION:
I. VACUUM SYSTEM
CMM (UVM) 4 has the following vacuum facilities:
1. “GlobeCore” Rotary Vane Positive Displacement Pump
Pumping Speed 100 m3/h
Ultimate Pressure 0.5 mbar
2. “Globe Corel” Vacuum Booster
Pumping Speed 270 m3/h
Ultimate Pressure 0.01 mbar
II. VACUUM CHAMBER
This Oil Purification plant has horizontal Vacuum Column with Coalescers.
Vacuum Chamber Vessels and all internal parts are made of carbon steel and
feature Coalescers, Sight Glass, Oil Level Controller and Vacuum Gauge.
Vacuum Chamber’s rigid design makes it suitable for stationary and mobile
installation. Appropriate flexible connections are provided to the outlet pump and
inlet pump to minimize negative effect of vibration during plant operation and
transportation.
Vacuum Chamber
1–Oil Inlet
2–Vacuum Pump Connection
3–Coalescers
4–Oil Outlet
5–Level Sensor
6–Sight Glass
Coalescers - four built-in coalescers are provided for the maximum exposure of
oil to the effect of vacuum. Due to reduced pressure dissolved water and gases
are vaporised through secondary chamber and filter into atmosphere.
Secondary Chamber (Oil Trap) - serves as safety feature to ensure that no oil
is pulled into the vacuum pump. It is equipped with oil level sensor which will
activate the alarm in case of oil presence.
Oil Level Controller - consists of three capacitive probes provided to maintain
required level of oil in the Vacuum Chamber.
Vacuum Gauge - is provided to monitor Vacuum level in the Vacuum
Chamber. Vacuum gauge will be absolute type with display in mbar.
Vacuum ports – vacuum connection is provided to pull vacuum on transformer.
Sampling Ports – inlet and outlet oil ports are provided for incoming and
processed oil.
III. OIL HEATER
The electric oil heating facility is provided in 2 stages offering a total of 55 kW
of power. A low watt density encapsulated heating elements (1.2 W/cm²) are
used to prevent heat degradation of oil. The Heater is controlled by electronic
temperature controller.
IV. INLET AND OUTLET OIL PUMPS
Inlet Oil Pump: “Calpeda” Centrifugal Pump with power consumption of 1.5
kW and maximum capacity of 7 m³/h.
Outlet Oil Pump: “Calpeda” Centrifugal Pump with power consumption of 2.2
kW and maximum capacity of 7 m³/h.
V. FILTERS
A 90 micron Mesh Strainer is provided to remove large particles that could
cause damage to the Inlet Pump. 25 micron Coarse Filter is installed on entry
to the Vacuum Chamber. Oil receives its final treatment by passing through the
5 micron Fine Filter designed to remove 99.9% of particles larger than 5
microns.
Oil Heater
1–Vessel
2–Heater’s cover
3–Heating Elements
4–Oil Outlet
5–Oil Inlet
6–Drainage and Safety Valve
7–Thermal Converters
Coarse and fine Filters
1–Oil Inlet
2–Oil Outlet;
3–Drain Valve
4–Air Valve
5–Manual Air Discharge
6–Magnets
7–Clamp
8–Filter Cartridge
VI. ALARMS AND INTERLOCKS
GlobeCore’s CMM plants feature the following safety devises which ensure
simple and reliable operation and will safely shut down the system in case of any
alarm situation:
High Level Alarm - will alert plant’s operator by activating sound and light
alarms and shut down the system safely should high level of oil persist.
Low Level Alarm – interlocked with the inlet pump low level alarm will safely
shut down the plant in case of insufficient oil level.
Flow Sensor - only activates the Heater when oil flow is detected.
Overloads – all motors are protected by overloads.
Alarms – sound and light alarm with silence button will alert plant’s operator of
any emergency situations.
VII. INSTRUMENTATION AND CONTROLS
Control panel is a dust proof enclosure (protection class IP 54) featuring the
following elements:
Vacuum meters - monitor vacuum level in the vacuum chamber and secondary
chamber.
Manometers - are installed to monitor the state of Coarse and Fine Filters and oil
pressure on outlet.
Temperature controller – takes an input from temperature sensor and connected
to a control element of the heater. Measuring and control parameters are pre-set
by the manufacturer.
Power and Heating Indicators and Switches, Inlet and Outlet Oil Pumps
Switches, Vacuum Pump and Vacuum Booster switches
Emergency Stop Button – is provided for safe shut down of the plant in case of
emergency.
VIII. FLOW DIAGRAM
Typical Flow Diagram CMM (UVM) 4
СV – Vacuum Chamber; P1 – P2 – Oil Pumps; K1 – K12 – Ball Valves; K2 –
Vacuum Valve, MN – Oil Heater; ВV– Back Valve; F1, F2 – Fine Filter; М1,
М2, М3– Manometers; ТP – Temperature Sensor; ТS – Thermostat; RF – Flow
relay; EV1- EV6 – Electromagnetic Valves; VG1 , VG2 – Vacuum Relay; L1 –
L4– Level Sensors; VP1, VP2 – Vacuum Pumps; РF – Mesh Filter; R – Oil Trap,
RP– Pressure Relay.
OPERATIONAL PRINCIPLE
The unit can be operated in the following modes:
- oil heating and filtration
- filtration, heating and thermo-vacuum oil purification
- vacuummising of a transformer tank
Heating and filtration mode: oil goes through the unit via valve K1, mesh filter РF,
valve K10 pumped by oil pump P1 through the oil heater MN, cartridge filter F1, ball
valve K2, K5 to the unit output.
Filtration, heating and thermo-vacuum oil purification: transformer oil is fed
through valve K1, mesh filter РF, valve K10, oil pump P1 through oil heater MN,
cartridge filter F1. Heated to temperature (50…60ºС) and purified from mechanical
impurities oil is fed through ball valve K3, comes into vacuum column CV, passes
through coalescers. Vacuum in the chamber is created by vacuum pump VP. Vacuum
value in the chamber is maintained by means of the valve К11 and controlled by
vacuum gage VM. Air is supplied into chamber through moisture eliminator FV,
ascending air carries out gases and water vapour from the oil surface and in this way
the oil is dried. Wet air is subsequently removed into atmosphere via vacuum pump.
Oil from the column is fed to the transformer by oil pump P2 through valves K8, K9,
cartridge filter F2, return valve SV and ball valve K5 into the tank for clean oil. The K3
valve establishes necessary flow rate. The vacuum in the column is created by vacuum
pump VP1 and maintained at 0,8 bar during operation.
Vacuumizing of transformer: is carried out by pump VP through valve for
vacuumizing of the external equipment.
SPECIFICATIONS
Name of parameter Value
1 Productivity, m3
/h, minimum
- in thermo-vacuum dehydration and filtration mode 4
- in heating and filtration mode 7
2* Processed oil parameters :
- maximum gas content, %, max. 0.1
- maximum moisture content, ppm, after 3 passes 5
3 Maximum oil outlet temperature in heating mode , ºС 70
4 Outlet pressure, MPa 0,2
5 Oil heater power, kWt, max. 55
6 Maximum power consumption, kWt, max. 65
7 Electric current parameters,
- voltage, V 400/220
- AC frequency, Hz 60
8 Dimensions СММ(UVM) 4, mm,
- length 1650
- width 1250
- height 1590
9 Weight, kg 990
3D DIAGRAM and PICTURES
1 – Vacuum Chamber; 2 – Inlet Oil Pump ; 3 – Outlet Oil Pump; 4 – Pipes and Connections;
5 – Oil Heater; 6 – Fine Filter; 7 – Vacuum Pump; 8 – Vacuum Booster
GlobeCore High Vacuum Degasifier CMM (UVM) 4
GlobeCore Mobile High Vacuum Degasifier CMM (UVM) 4
Vacuum Column Vacuum Pumps
Warranty: GlobeCore warrants the machinery supplied under this specification
against defects in material and workmanship under normal use and service for a
period of 12 months from date of shipment.
Yours sincerely,
Stanislav Sukhar
Sales Manager
Globe Core Ltd
Tel/Fax: +380532241211
Mob: +380500131317
Email: sales@gcequipment.com

More Related Content

What's hot

Sf6 handling procedure
Sf6 handling procedureSf6 handling procedure
Sf6 handling procedure
Kevin Ducusin
 
V 1 presentation on safety aspects of lpg handling and storage
V 1 presentation on safety aspects of lpg handling  and storageV 1 presentation on safety aspects of lpg handling  and storage
V 1 presentation on safety aspects of lpg handling and storage
Imran Bokhari
 
Generator Set Operation and Maintenance Training .pdf
Generator Set Operation and Maintenance Training .pdfGenerator Set Operation and Maintenance Training .pdf
Generator Set Operation and Maintenance Training .pdf
ShanzaAsif
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTING
Ashish Kumar Jain
 
Gas tester
Gas testerGas tester
Gas tester
智 李
 
Water spray system
Water spray systemWater spray system
Water spray system
FIRE KNOCK
 
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
Emerson Exchange
 
Mobile transformer oil purification plant with high vacuum globecore cmm(uvm)...
Mobile transformer oil purification plant with high vacuum globecore cmm(uvm)...Mobile transformer oil purification plant with high vacuum globecore cmm(uvm)...
Mobile transformer oil purification plant with high vacuum globecore cmm(uvm)...
GlobeCore
 
Fire pump controllers
Fire pump controllersFire pump controllers
Fire pump controllers
michaeljmack
 
Steam generator part 3
Steam generator part 3Steam generator part 3
Steam generator part 3
Mohammad Shoeb Siddiqui
 
Introductory training on fire water pumping system
Introductory training  on fire water pumping systemIntroductory training  on fire water pumping system
Introductory training on fire water pumping system
Sabrul Jamil
 
Pumps
Pumps Pumps
PREPARATION OF C&I CABLE SCHEDULES FOR DCS PANELS
PREPARATION OF C&I CABLE SCHEDULES FOR DCS PANELSPREPARATION OF C&I CABLE SCHEDULES FOR DCS PANELS
PREPARATION OF C&I CABLE SCHEDULES FOR DCS PANELS
Ajit Kumar
 
Hazardous Area Classification
Hazardous Area ClassificationHazardous Area Classification
Hazardous Area Classification
Gaurav Singh Rajput
 
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingThermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations Training
Manohar Tatwawadi
 
Inspection, Testing and Maintenance of fire pump
Inspection, Testing and Maintenance of fire pumpInspection, Testing and Maintenance of fire pump
Inspection, Testing and Maintenance of fire pump
klsmani
 
Boiler explosion at exxon mobil singapore
Boiler explosion at exxon mobil singaporeBoiler explosion at exxon mobil singapore
Boiler explosion at exxon mobil singapore
Saudi International Petrochemical Company
 

What's hot (20)

Sf6 handling procedure
Sf6 handling procedureSf6 handling procedure
Sf6 handling procedure
 
Boiler operation (2)
Boiler operation (2)Boiler operation (2)
Boiler operation (2)
 
V 1 presentation on safety aspects of lpg handling and storage
V 1 presentation on safety aspects of lpg handling  and storageV 1 presentation on safety aspects of lpg handling  and storage
V 1 presentation on safety aspects of lpg handling and storage
 
Generator Set Operation and Maintenance Training .pdf
Generator Set Operation and Maintenance Training .pdfGenerator Set Operation and Maintenance Training .pdf
Generator Set Operation and Maintenance Training .pdf
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTING
 
Gas tester
Gas testerGas tester
Gas tester
 
Water spray system
Water spray systemWater spray system
Water spray system
 
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
 
Mobile transformer oil purification plant with high vacuum globecore cmm(uvm)...
Mobile transformer oil purification plant with high vacuum globecore cmm(uvm)...Mobile transformer oil purification plant with high vacuum globecore cmm(uvm)...
Mobile transformer oil purification plant with high vacuum globecore cmm(uvm)...
 
Fire pump controllers
Fire pump controllersFire pump controllers
Fire pump controllers
 
Steam generator part 3
Steam generator part 3Steam generator part 3
Steam generator part 3
 
Introductory training on fire water pumping system
Introductory training  on fire water pumping systemIntroductory training  on fire water pumping system
Introductory training on fire water pumping system
 
Pumps
Pumps Pumps
Pumps
 
Fire pumps
Fire pumpsFire pumps
Fire pumps
 
PREPARATION OF C&I CABLE SCHEDULES FOR DCS PANELS
PREPARATION OF C&I CABLE SCHEDULES FOR DCS PANELSPREPARATION OF C&I CABLE SCHEDULES FOR DCS PANELS
PREPARATION OF C&I CABLE SCHEDULES FOR DCS PANELS
 
Hazardous Area Classification
Hazardous Area ClassificationHazardous Area Classification
Hazardous Area Classification
 
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingThermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations Training
 
Inspection, Testing and Maintenance of fire pump
Inspection, Testing and Maintenance of fire pumpInspection, Testing and Maintenance of fire pump
Inspection, Testing and Maintenance of fire pump
 
Boiler explosion at exxon mobil singapore
Boiler explosion at exxon mobil singaporeBoiler explosion at exxon mobil singapore
Boiler explosion at exxon mobil singapore
 
S81-HS Panel Presentation
S81-HS Panel PresentationS81-HS Panel Presentation
S81-HS Panel Presentation
 

Similar to Transformer oil purification plant globecore CMM(UVM) 4-7

Globe core oil purification plant SMM 0.6
Globe core oil purification plant SMM 0.6Globe core oil purification plant SMM 0.6
Globe core oil purification plant SMM 0.6GlobeCore
 
Transformer oil regeneration plant globecore cmm r
Transformer oil regeneration plant globecore cmm rTransformer oil regeneration plant globecore cmm r
Transformer oil regeneration plant globecore cmm r
GlobeCore
 
Transformer oil regeneration plant CMM R
Transformer oil regeneration plant CMM RTransformer oil regeneration plant CMM R
Transformer oil regeneration plant CMM R
GlobeCore
 
GlobeCore transformer oil regeneration plant CMM 12R_ 4000
GlobeCore transformer oil regeneration plant CMM 12R_ 4000 GlobeCore transformer oil regeneration plant CMM 12R_ 4000
GlobeCore transformer oil regeneration plant CMM 12R_ 4000
GlobeCore
 
Globecore transformer oil regeneration and purification equipment
Globecore transformer oil regeneration and purification equipmentGlobecore transformer oil regeneration and purification equipment
Globecore transformer oil regeneration and purification equipmentGlobeCore
 
Wind turbine gearbox oil changers
Wind turbine gearbox oil changersWind turbine gearbox oil changers
Wind turbine gearbox oil changers
GlobeCore
 
We produce the Equipment to ginger up the Power Transformers!
We produce the Equipment to ginger up the Power Transformers!We produce the Equipment to ginger up the Power Transformers!
We produce the Equipment to ginger up the Power Transformers!
Igor Bevza
 
Globe core complete showreel
Globe core complete showreelGlobe core complete showreel
Globe core complete showreelGlobeCore
 
Oil regeneration system uvr 450 16
Oil regeneration system uvr 450 16Oil regeneration system uvr 450 16
Oil regeneration system uvr 450 16
GlobeCore
 
ZYD Series Double Stage Vacuum Transformer Oil Purifier.pdf
ZYD Series Double Stage Vacuum Transformer Oil Purifier.pdfZYD Series Double Stage Vacuum Transformer Oil Purifier.pdf
ZYD Series Double Stage Vacuum Transformer Oil Purifier.pdf
ssusera27da01
 
Technical description vg 2014 (en) light
Technical description vg 2014 (en) lightTechnical description vg 2014 (en) light
Technical description vg 2014 (en) light
Adicomp s.r.l
 
Bitumen emulsion plant GlobeCore UVB 8
Bitumen emulsion plant GlobeCore UVB 8 Bitumen emulsion plant GlobeCore UVB 8
Bitumen emulsion plant GlobeCore UVB 8
GlobeCore
 
Lesson4- 3500B series engines OPERATION.ppt
Lesson4- 3500B series engines OPERATION.pptLesson4- 3500B series engines OPERATION.ppt
Lesson4- 3500B series engines OPERATION.ppt
ssuser2ec709
 
VORTEX ELECTROMAGNETIC FIELD SYSTEM
 VORTEX ELECTROMAGNETIC FIELD SYSTEM  VORTEX ELECTROMAGNETIC FIELD SYSTEM
VORTEX ELECTROMAGNETIC FIELD SYSTEM
NadiiaHubar
 
Bitumen emulsion plant globe core uvb 8
Bitumen emulsion plant globe core uvb 8Bitumen emulsion plant globe core uvb 8
Bitumen emulsion plant globe core uvb 8
GlobeCore
 
SEG Series.pptx
SEG Series.pptxSEG Series.pptx
SEG Series.pptx
JayeshChand2
 
Globe core polymer modified bitumen
Globe core polymer modified bitumen Globe core polymer modified bitumen
Globe core polymer modified bitumen
GlobeCore
 
Series ZYD Double-stage Vacuum Transformer Oil Filtration Machine
Series ZYD Double-stage Vacuum Transformer Oil Filtration MachineSeries ZYD Double-stage Vacuum Transformer Oil Filtration Machine
Series ZYD Double-stage Vacuum Transformer Oil Filtration Machine
FuooTech Oil Filtration Group (kevinnchiang@gmail.com)
 
GlobeCore Bitumen emulsion plant UVB 1
GlobeCore Bitumen emulsion plant  UVB 1 GlobeCore Bitumen emulsion plant  UVB 1
GlobeCore Bitumen emulsion plant UVB 1
GlobeCore
 

Similar to Transformer oil purification plant globecore CMM(UVM) 4-7 (20)

Globe core oil purification plant SMM 0.6
Globe core oil purification plant SMM 0.6Globe core oil purification plant SMM 0.6
Globe core oil purification plant SMM 0.6
 
Transformer oil regeneration plant globecore cmm r
Transformer oil regeneration plant globecore cmm rTransformer oil regeneration plant globecore cmm r
Transformer oil regeneration plant globecore cmm r
 
Transformer oil regeneration plant CMM R
Transformer oil regeneration plant CMM RTransformer oil regeneration plant CMM R
Transformer oil regeneration plant CMM R
 
GlobeCore transformer oil regeneration plant CMM 12R_ 4000
GlobeCore transformer oil regeneration plant CMM 12R_ 4000 GlobeCore transformer oil regeneration plant CMM 12R_ 4000
GlobeCore transformer oil regeneration plant CMM 12R_ 4000
 
Globecore transformer oil regeneration and purification equipment
Globecore transformer oil regeneration and purification equipmentGlobecore transformer oil regeneration and purification equipment
Globecore transformer oil regeneration and purification equipment
 
Wind turbine gearbox oil changers
Wind turbine gearbox oil changersWind turbine gearbox oil changers
Wind turbine gearbox oil changers
 
We produce the Equipment to ginger up the Power Transformers!
We produce the Equipment to ginger up the Power Transformers!We produce the Equipment to ginger up the Power Transformers!
We produce the Equipment to ginger up the Power Transformers!
 
Globe core complete showreel
Globe core complete showreelGlobe core complete showreel
Globe core complete showreel
 
Oil regeneration system uvr 450 16
Oil regeneration system uvr 450 16Oil regeneration system uvr 450 16
Oil regeneration system uvr 450 16
 
ZYD Series Double Stage Vacuum Transformer Oil Purifier.pdf
ZYD Series Double Stage Vacuum Transformer Oil Purifier.pdfZYD Series Double Stage Vacuum Transformer Oil Purifier.pdf
ZYD Series Double Stage Vacuum Transformer Oil Purifier.pdf
 
Automate
AutomateAutomate
Automate
 
Technical description vg 2014 (en) light
Technical description vg 2014 (en) lightTechnical description vg 2014 (en) light
Technical description vg 2014 (en) light
 
Bitumen emulsion plant GlobeCore UVB 8
Bitumen emulsion plant GlobeCore UVB 8 Bitumen emulsion plant GlobeCore UVB 8
Bitumen emulsion plant GlobeCore UVB 8
 
Lesson4- 3500B series engines OPERATION.ppt
Lesson4- 3500B series engines OPERATION.pptLesson4- 3500B series engines OPERATION.ppt
Lesson4- 3500B series engines OPERATION.ppt
 
VORTEX ELECTROMAGNETIC FIELD SYSTEM
 VORTEX ELECTROMAGNETIC FIELD SYSTEM  VORTEX ELECTROMAGNETIC FIELD SYSTEM
VORTEX ELECTROMAGNETIC FIELD SYSTEM
 
Bitumen emulsion plant globe core uvb 8
Bitumen emulsion plant globe core uvb 8Bitumen emulsion plant globe core uvb 8
Bitumen emulsion plant globe core uvb 8
 
SEG Series.pptx
SEG Series.pptxSEG Series.pptx
SEG Series.pptx
 
Globe core polymer modified bitumen
Globe core polymer modified bitumen Globe core polymer modified bitumen
Globe core polymer modified bitumen
 
Series ZYD Double-stage Vacuum Transformer Oil Filtration Machine
Series ZYD Double-stage Vacuum Transformer Oil Filtration MachineSeries ZYD Double-stage Vacuum Transformer Oil Filtration Machine
Series ZYD Double-stage Vacuum Transformer Oil Filtration Machine
 
GlobeCore Bitumen emulsion plant UVB 1
GlobeCore Bitumen emulsion plant  UVB 1 GlobeCore Bitumen emulsion plant  UVB 1
GlobeCore Bitumen emulsion plant UVB 1
 

Recently uploaded

Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Thierry Lestable
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
OnBoard
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
RTTS
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
Elena Simperl
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
ControlCase
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Product School
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Inflectra
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
Paul Groth
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Product School
 

Recently uploaded (20)

Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 

Transformer oil purification plant globecore CMM(UVM) 4-7

  • 1. www.gcequipment.com GlobeCore High Vacuum Degasifier CMM(UVM) 4 Technical and Price Offer GlobeCore Mobile High Vacuum Degasifier CMM (UVM) 4 GlobeCore Europe 8 Sadovskogo Street Poltava 36034, Ukraine Tel: +380532 241211 Fax: +380532241211 Mob: +380500131317 Email: sales@gcequipment.com
  • 2. CMM (UVM) 4 - is supplied: mounted on a roadworthy trailer with torsion suspension, appropriate reflectors and tail lights and capable of being towed at speeds of up to 80km/h. It will be enclosed with water proof metal covers (protection class IP45) and have a mechanism to secure plant in stationary position while in operation. Maximum noise level emitted by the unit will be below 80 db. Production capacity of the unit is 4000 L/H allowing to process up to 96000 L of transformer oil per day and provide: • Removal of Water from 100 ppm down to 10 ppm and from 50 ppm to 5 ppm in a single pass and down to 3 ppm after 3 passes (ASTM method D-1533). • Reduction of Gas content from fully saturated with air (10 to 12% by volume) to less than 0.1 % (ASTM D-2945). • Removal of Particulate Matter to 5 microns • Improvement in dielectric strength up to 75 kV COMPONENTS DESCRIPTION: I. VACUUM SYSTEM CMM (UVM) 4 has the following vacuum facilities: 1. “GlobeCore” Rotary Vane Positive Displacement Pump Pumping Speed 100 m3/h Ultimate Pressure 0.5 mbar 2. “Globe Corel” Vacuum Booster Pumping Speed 270 m3/h Ultimate Pressure 0.01 mbar
  • 3. II. VACUUM CHAMBER This Oil Purification plant has horizontal Vacuum Column with Coalescers. Vacuum Chamber Vessels and all internal parts are made of carbon steel and feature Coalescers, Sight Glass, Oil Level Controller and Vacuum Gauge. Vacuum Chamber’s rigid design makes it suitable for stationary and mobile installation. Appropriate flexible connections are provided to the outlet pump and inlet pump to minimize negative effect of vibration during plant operation and transportation. Vacuum Chamber 1–Oil Inlet 2–Vacuum Pump Connection 3–Coalescers 4–Oil Outlet 5–Level Sensor 6–Sight Glass Coalescers - four built-in coalescers are provided for the maximum exposure of oil to the effect of vacuum. Due to reduced pressure dissolved water and gases are vaporised through secondary chamber and filter into atmosphere. Secondary Chamber (Oil Trap) - serves as safety feature to ensure that no oil is pulled into the vacuum pump. It is equipped with oil level sensor which will activate the alarm in case of oil presence. Oil Level Controller - consists of three capacitive probes provided to maintain required level of oil in the Vacuum Chamber. Vacuum Gauge - is provided to monitor Vacuum level in the Vacuum Chamber. Vacuum gauge will be absolute type with display in mbar. Vacuum ports – vacuum connection is provided to pull vacuum on transformer. Sampling Ports – inlet and outlet oil ports are provided for incoming and processed oil.
  • 4. III. OIL HEATER The electric oil heating facility is provided in 2 stages offering a total of 55 kW of power. A low watt density encapsulated heating elements (1.2 W/cm²) are used to prevent heat degradation of oil. The Heater is controlled by electronic temperature controller. IV. INLET AND OUTLET OIL PUMPS Inlet Oil Pump: “Calpeda” Centrifugal Pump with power consumption of 1.5 kW and maximum capacity of 7 m³/h. Outlet Oil Pump: “Calpeda” Centrifugal Pump with power consumption of 2.2 kW and maximum capacity of 7 m³/h. V. FILTERS A 90 micron Mesh Strainer is provided to remove large particles that could cause damage to the Inlet Pump. 25 micron Coarse Filter is installed on entry to the Vacuum Chamber. Oil receives its final treatment by passing through the 5 micron Fine Filter designed to remove 99.9% of particles larger than 5 microns. Oil Heater 1–Vessel 2–Heater’s cover 3–Heating Elements 4–Oil Outlet 5–Oil Inlet 6–Drainage and Safety Valve 7–Thermal Converters Coarse and fine Filters 1–Oil Inlet 2–Oil Outlet; 3–Drain Valve 4–Air Valve 5–Manual Air Discharge 6–Magnets 7–Clamp 8–Filter Cartridge
  • 5. VI. ALARMS AND INTERLOCKS GlobeCore’s CMM plants feature the following safety devises which ensure simple and reliable operation and will safely shut down the system in case of any alarm situation: High Level Alarm - will alert plant’s operator by activating sound and light alarms and shut down the system safely should high level of oil persist. Low Level Alarm – interlocked with the inlet pump low level alarm will safely shut down the plant in case of insufficient oil level. Flow Sensor - only activates the Heater when oil flow is detected. Overloads – all motors are protected by overloads. Alarms – sound and light alarm with silence button will alert plant’s operator of any emergency situations. VII. INSTRUMENTATION AND CONTROLS Control panel is a dust proof enclosure (protection class IP 54) featuring the following elements: Vacuum meters - monitor vacuum level in the vacuum chamber and secondary chamber. Manometers - are installed to monitor the state of Coarse and Fine Filters and oil pressure on outlet. Temperature controller – takes an input from temperature sensor and connected to a control element of the heater. Measuring and control parameters are pre-set by the manufacturer. Power and Heating Indicators and Switches, Inlet and Outlet Oil Pumps Switches, Vacuum Pump and Vacuum Booster switches Emergency Stop Button – is provided for safe shut down of the plant in case of emergency.
  • 6. VIII. FLOW DIAGRAM Typical Flow Diagram CMM (UVM) 4 СV – Vacuum Chamber; P1 – P2 – Oil Pumps; K1 – K12 – Ball Valves; K2 – Vacuum Valve, MN – Oil Heater; ВV– Back Valve; F1, F2 – Fine Filter; М1, М2, М3– Manometers; ТP – Temperature Sensor; ТS – Thermostat; RF – Flow relay; EV1- EV6 – Electromagnetic Valves; VG1 , VG2 – Vacuum Relay; L1 – L4– Level Sensors; VP1, VP2 – Vacuum Pumps; РF – Mesh Filter; R – Oil Trap, RP– Pressure Relay. OPERATIONAL PRINCIPLE The unit can be operated in the following modes: - oil heating and filtration - filtration, heating and thermo-vacuum oil purification - vacuummising of a transformer tank Heating and filtration mode: oil goes through the unit via valve K1, mesh filter РF, valve K10 pumped by oil pump P1 through the oil heater MN, cartridge filter F1, ball valve K2, K5 to the unit output.
  • 7. Filtration, heating and thermo-vacuum oil purification: transformer oil is fed through valve K1, mesh filter РF, valve K10, oil pump P1 through oil heater MN, cartridge filter F1. Heated to temperature (50…60ºС) and purified from mechanical impurities oil is fed through ball valve K3, comes into vacuum column CV, passes through coalescers. Vacuum in the chamber is created by vacuum pump VP. Vacuum value in the chamber is maintained by means of the valve К11 and controlled by vacuum gage VM. Air is supplied into chamber through moisture eliminator FV, ascending air carries out gases and water vapour from the oil surface and in this way the oil is dried. Wet air is subsequently removed into atmosphere via vacuum pump. Oil from the column is fed to the transformer by oil pump P2 through valves K8, K9, cartridge filter F2, return valve SV and ball valve K5 into the tank for clean oil. The K3 valve establishes necessary flow rate. The vacuum in the column is created by vacuum pump VP1 and maintained at 0,8 bar during operation. Vacuumizing of transformer: is carried out by pump VP through valve for vacuumizing of the external equipment. SPECIFICATIONS Name of parameter Value 1 Productivity, m3 /h, minimum - in thermo-vacuum dehydration and filtration mode 4 - in heating and filtration mode 7 2* Processed oil parameters : - maximum gas content, %, max. 0.1 - maximum moisture content, ppm, after 3 passes 5 3 Maximum oil outlet temperature in heating mode , ºС 70 4 Outlet pressure, MPa 0,2 5 Oil heater power, kWt, max. 55 6 Maximum power consumption, kWt, max. 65 7 Electric current parameters, - voltage, V 400/220 - AC frequency, Hz 60 8 Dimensions СММ(UVM) 4, mm, - length 1650 - width 1250 - height 1590 9 Weight, kg 990
  • 8. 3D DIAGRAM and PICTURES 1 – Vacuum Chamber; 2 – Inlet Oil Pump ; 3 – Outlet Oil Pump; 4 – Pipes and Connections; 5 – Oil Heater; 6 – Fine Filter; 7 – Vacuum Pump; 8 – Vacuum Booster GlobeCore High Vacuum Degasifier CMM (UVM) 4
  • 9. GlobeCore Mobile High Vacuum Degasifier CMM (UVM) 4 Vacuum Column Vacuum Pumps
  • 10. Warranty: GlobeCore warrants the machinery supplied under this specification against defects in material and workmanship under normal use and service for a period of 12 months from date of shipment. Yours sincerely, Stanislav Sukhar Sales Manager Globe Core Ltd Tel/Fax: +380532241211 Mob: +380500131317 Email: sales@gcequipment.com