GTZ-Progress Social &
Environmental Standarts. A Cerdá
1
MOLE Training (TOT) on OHS &
Industrial Relations
Dhaka, 1 to 3 June 2007
Welcome to all participants
Work toguether Occupational Health &
Safety/Industrial Relations (OHS/IR)
3 days Training
3 days Pilot project visit to 4 RMG factories
Final Objective: to learn from eachother with a
practical approach!
GTZ-Progress Social &
Environmental Standarts. A Cerdá
2
MOLE Training on OHS & Industrial
Relations Focused on RMG
We all will share our knowledge:
• Technical Advise Team (TAT)
• Labour Department
• Industrial Relations Institute (IRE)
• Labour Inspectorate
We will look as well to
• Employers/workes approach in Ready Made
Garments (RMG) sector
• Auditor/Inspector/Trainer attitude
GTZ-Progress Social &
Environmental Standarts. A Cerdá
3
Training Pilot Project
• Trained to become Trainers
& aply knowledge to make evaluations
in Pilot Project = visiting 4 RMG factories
• Revise essential technical OSH/IR issues
- Hazards: Temperature, Ventilation, Noise
& Light
- Manual load handdling
- Chemicals, Machines, Fire, Electrical
GTZ-Progress Social &
Environmental Standarts. A Cerdá
4
Training
• Use of Measurement Equipment: Noise/Light
• Use of Personal Protective Equipment
• Rolle Game Exercises: 3 teams 4 members
- Employers Group
- Workers Group
- MOLE Offials Group
Each day participants change their rolle
GTZ-Progress Social &
Environmental Standarts. A Cerdá
5
Training Risk Evaluation: Pilot Project
• Visit to 4 RMG Factories: 3 days
• Days 1 & 2: TAT and Participants
• Day 3: Participants splitt in 2 teams (6/6)
- Meeting with Employers/Workers in charge of
OSH
- Visit and evaluate all relevant RMG work/places
- Reports based on: measurements, chek-lists,
Risk evaluation methodologies, Work-place analysis
GTZ-Progress Social &
Environmental Standarts. A Cerdá
6
Training Risk Evaluation & Reports
• After Evaluations participants splitt in 4 teams (3
members)
• 1 Team Leader, 2 Officials, 1 TAT Coucher
• Each Team will coordinate/adjust results of the
Evaluation/check-lists
- Team Leader will elaborate Final Report &
Propossal for Corrective Action Plan (CAP)
- CAP Discussed with Enterprises/Workers
- TAT Hot Line & Coaching Each Team
- Follow up: up to 3 meetings with
Enterprise/workers representatives to follow up
progress
GTZ-Progress Social &
Environmental Standarts. A Cerdá
7
Follow Up Indicators
• Factory appoints workers in charge of OHS (N.)
• Workers are informed and trained on OHS (%)
• Managers Regularly meet with Workers on OHS
• Follow CAP stepts (%)/ discussed with MOLE
• Buy new Equipment/PPE/Make
Reforms/Improvements
• Managers/workers look for Advise from MOLE
• Workers ask MOLE for Solutions
• MOLE use Measurement Devises
• BGMEA/BKMEA ask for Advise from MOLE
GTZ-Progress Social &
Environmental Standarts. A Cerdá
8
RESULTS ACHIEVED
• TOT: Officials MOLE become Trainers
• October/November Training 3 addressed to
rest of Officials
• TOT Officials participate in Dissemination
Activities
• TOT Officials Are Awarded Project
Certificate
• Participants Gain Professional/Personal
Prestige & Consideration
GTZ-Progress Social &
Environmental Standarts. A Cerdá
9
MOLE Training (TOT) on OHS &
Industrial Relations
Enjoy Seminar/Pilot Project
Do not hesitate to make questions
We will all benefit/learn/become
Good Partners
Alberto Cerda Mico & TAT
THANK YOU
acerdamico@yahoo.es

More Related Content

Viewers also liked

Osh prevention in eu
Osh prevention in euOsh prevention in eu
Osh prevention in eu
Alberto Mico
 
5 supported employement for pwd
5 supported employement for pwd5 supported employement for pwd
5 supported employement for pwd
Alberto Mico
 
Annex a kick off meeting presentation iskur 2006 (240106) tr
Annex a kick off meeting presentation iskur 2006 (240106) trAnnex a kick off meeting presentation iskur 2006 (240106) tr
Annex a kick off meeting presentation iskur 2006 (240106) tr
Alberto Mico
 
2.1 ap lm pwd typical structure content ppp
2.1 ap lm pwd typical structure content ppp2.1 ap lm pwd typical structure content ppp
2.1 ap lm pwd typical structure content ppp
Alberto Mico
 
Trasnational expertv2[1] final
Trasnational expertv2[1] finalTrasnational expertv2[1] final
Trasnational expertv2[1] final
Alberto Mico
 
Kick off meeting turkey presentation4
Kick off meeting turkey presentation4Kick off meeting turkey presentation4
Kick off meeting turkey presentation4
Alberto Mico
 

Viewers also liked (8)

Osh prevention in eu
Osh prevention in euOsh prevention in eu
Osh prevention in eu
 
5 supported employement for pwd
5 supported employement for pwd5 supported employement for pwd
5 supported employement for pwd
 
Annex a kick off meeting presentation iskur 2006 (240106) tr
Annex a kick off meeting presentation iskur 2006 (240106) trAnnex a kick off meeting presentation iskur 2006 (240106) tr
Annex a kick off meeting presentation iskur 2006 (240106) tr
 
Almm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revisedAlmm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revised
 
2.1 ap lm pwd typical structure content ppp
2.1 ap lm pwd typical structure content ppp2.1 ap lm pwd typical structure content ppp
2.1 ap lm pwd typical structure content ppp
 
6.1 csr[1]
6.1 csr[1]6.1 csr[1]
6.1 csr[1]
 
Trasnational expertv2[1] final
Trasnational expertv2[1] finalTrasnational expertv2[1] final
Trasnational expertv2[1] final
 
Kick off meeting turkey presentation4
Kick off meeting turkey presentation4Kick off meeting turkey presentation4
Kick off meeting turkey presentation4
 

Similar to Tot & pilot project program presentation 300507

Resume a.lakshmi narayanan-ehsq expert
Resume a.lakshmi narayanan-ehsq expertResume a.lakshmi narayanan-ehsq expert
Resume a.lakshmi narayanan-ehsq expert
A Lakshmi Narayanan
 
Muhammed First Draft CV_Updated
Muhammed First Draft CV_UpdatedMuhammed First Draft CV_Updated
Muhammed First Draft CV_Updated
Azharu786
 
chadresume[1].wd
chadresume[1].wdchadresume[1].wd
chadresume[1].wd
Chad Rice
 

Similar to Tot & pilot project program presentation 300507 (20)

1 MESH General Assessor - Intro, Overview- 2015.pptx
1 MESH General Assessor -  Intro, Overview- 2015.pptx1 MESH General Assessor -  Intro, Overview- 2015.pptx
1 MESH General Assessor - Intro, Overview- 2015.pptx
 
Resume a.lakshmi narayanan-ehsq expert
Resume a.lakshmi narayanan-ehsq expertResume a.lakshmi narayanan-ehsq expert
Resume a.lakshmi narayanan-ehsq expert
 
Richie Afeno's CV
Richie Afeno's CVRichie Afeno's CV
Richie Afeno's CV
 
My CV
My CVMy CV
My CV
 
Sharad Kumar Singh
Sharad Kumar SinghSharad Kumar Singh
Sharad Kumar Singh
 
Waseem HSE Officer CV
Waseem HSE Officer CVWaseem HSE Officer CV
Waseem HSE Officer CV
 
Reda_6
Reda_6Reda_6
Reda_6
 
edsel resume
edsel resumeedsel resume
edsel resume
 
Resume Suresh Patel
Resume Suresh PatelResume Suresh Patel
Resume Suresh Patel
 
Medaht Cv
Medaht CvMedaht Cv
Medaht Cv
 
Gattu Hari
Gattu HariGattu Hari
Gattu Hari
 
CV
CVCV
CV
 
Health and Safety Management System at Noyan Lankan Pvt. Ltd. Of Mas Holdings
Health and Safety Management System at Noyan Lankan Pvt. Ltd. Of Mas Holdings Health and Safety Management System at Noyan Lankan Pvt. Ltd. Of Mas Holdings
Health and Safety Management System at Noyan Lankan Pvt. Ltd. Of Mas Holdings
 
FINAL CV KASHIF ALI RAJPUT
FINAL CV KASHIF ALI RAJPUTFINAL CV KASHIF ALI RAJPUT
FINAL CV KASHIF ALI RAJPUT
 
Environmental Management System and Green Productivity (EMS_GP) Implementatio...
Environmental Management System and Green Productivity (EMS_GP) Implementatio...Environmental Management System and Green Productivity (EMS_GP) Implementatio...
Environmental Management System and Green Productivity (EMS_GP) Implementatio...
 
UFR Hse supervision Resume
UFR Hse supervision ResumeUFR Hse supervision Resume
UFR Hse supervision Resume
 
Cleaner production
Cleaner productionCleaner production
Cleaner production
 
Muhammed First Draft CV_Updated
Muhammed First Draft CV_UpdatedMuhammed First Draft CV_Updated
Muhammed First Draft CV_Updated
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
chadresume[1].wd
chadresume[1].wdchadresume[1].wd
chadresume[1].wd
 

More from Alberto Mico

4 ap & job integration adaptation pwd
4 ap & job integration adaptation pwd4 ap & job integration adaptation pwd
4 ap & job integration adaptation pwd
Alberto Mico
 
Work injury presentation
Work injury presentationWork injury presentation
Work injury presentation
Alberto Mico
 
Spanish mutual funds osh wi
Spanish mutual funds osh wiSpanish mutual funds osh wi
Spanish mutual funds osh wi
Alberto Mico
 
Job integration disabled persons en cn
Job integration disabled persons en cnJob integration disabled persons en cn
Job integration disabled persons en cn
Alberto Mico
 
Risk evaluation presentation power point ukr
Risk evaluation presentation power point ukrRisk evaluation presentation power point ukr
Risk evaluation presentation power point ukr
Alberto Mico
 
Cost benefit ohs prevention ukrainia ukr[1]
Cost benefit ohs prevention ukrainia ukr[1]Cost benefit ohs prevention ukrainia ukr[1]
Cost benefit ohs prevention ukrainia ukr[1]
Alberto Mico
 
Campaigns ohs promotion methodology ukr
Campaigns ohs promotion methodology ukrCampaigns ohs promotion methodology ukr
Campaigns ohs promotion methodology ukr
Alberto Mico
 
Risk evaluation presentation power point
Risk evaluation presentation power pointRisk evaluation presentation power point
Risk evaluation presentation power point
Alberto Mico
 
European network for workplace health promotion presentation
European network for workplace health promotion presentationEuropean network for workplace health promotion presentation
European network for workplace health promotion presentation
Alberto Mico
 
Eu osha strategy ohs 2002 2006
Eu osha strategy ohs 2002 2006Eu osha strategy ohs 2002 2006
Eu osha strategy ohs 2002 2006
Alberto Mico
 
Campaigns ohs promotion methodology
Campaigns ohs promotion methodologyCampaigns ohs promotion methodology
Campaigns ohs promotion methodology
Alberto Mico
 
Annex a2 kick off meeting presentation iskur 2006 (240106) en
Annex a2 kick off meeting presentation iskur 2006 (240106) enAnnex a2 kick off meeting presentation iskur 2006 (240106) en
Annex a2 kick off meeting presentation iskur 2006 (240106) en
Alberto Mico
 
4 ap job integration adaptation pwd hr
4 ap job integration adaptation pwd hr4 ap job integration adaptation pwd hr
4 ap job integration adaptation pwd hr
Alberto Mico
 
2.2 ap lm pwd typical structure content hr
2.2 ap lm pwd typical structure content hr2.2 ap lm pwd typical structure content hr
2.2 ap lm pwd typical structure content hr
Alberto Mico
 
1.2 presentation for wg training
1.2 presentation for wg training1.2 presentation for wg training
1.2 presentation for wg training
Alberto Mico
 
Almm monitoring and evaluation tools draft[1]acm
Almm monitoring and evaluation tools draft[1]acmAlmm monitoring and evaluation tools draft[1]acm
Almm monitoring and evaluation tools draft[1]acm
Alberto Mico
 
Almm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revisedAlmm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revised
Alberto Mico
 

More from Alberto Mico (20)

1 acm cv EU EN 2021.doc
1 acm cv EU EN 2021.doc1 acm cv EU EN 2021.doc
1 acm cv EU EN 2021.doc
 
7.1 m&e[1]acm
7.1 m&e[1]acm7.1 m&e[1]acm
7.1 m&e[1]acm
 
4 ap & job integration adaptation pwd
4 ap & job integration adaptation pwd4 ap & job integration adaptation pwd
4 ap & job integration adaptation pwd
 
Work injury presentation
Work injury presentationWork injury presentation
Work injury presentation
 
Spanish mutual funds osh wi
Spanish mutual funds osh wiSpanish mutual funds osh wi
Spanish mutual funds osh wi
 
Job integration disabled persons en cn
Job integration disabled persons en cnJob integration disabled persons en cn
Job integration disabled persons en cn
 
Risk evaluation presentation power point ukr
Risk evaluation presentation power point ukrRisk evaluation presentation power point ukr
Risk evaluation presentation power point ukr
 
Cost benefit ohs prevention ukrainia ukr[1]
Cost benefit ohs prevention ukrainia ukr[1]Cost benefit ohs prevention ukrainia ukr[1]
Cost benefit ohs prevention ukrainia ukr[1]
 
Campaigns ohs promotion methodology ukr
Campaigns ohs promotion methodology ukrCampaigns ohs promotion methodology ukr
Campaigns ohs promotion methodology ukr
 
Risk evaluation presentation power point
Risk evaluation presentation power pointRisk evaluation presentation power point
Risk evaluation presentation power point
 
European network for workplace health promotion presentation
European network for workplace health promotion presentationEuropean network for workplace health promotion presentation
European network for workplace health promotion presentation
 
Eu osha strategy ohs 2002 2006
Eu osha strategy ohs 2002 2006Eu osha strategy ohs 2002 2006
Eu osha strategy ohs 2002 2006
 
Campaigns ohs promotion methodology
Campaigns ohs promotion methodologyCampaigns ohs promotion methodology
Campaigns ohs promotion methodology
 
Annex a2 kick off meeting presentation iskur 2006 (240106) en
Annex a2 kick off meeting presentation iskur 2006 (240106) enAnnex a2 kick off meeting presentation iskur 2006 (240106) en
Annex a2 kick off meeting presentation iskur 2006 (240106) en
 
7.1 m&e acm hrv
7.1 m&e acm hrv7.1 m&e acm hrv
7.1 m&e acm hrv
 
4 ap job integration adaptation pwd hr
4 ap job integration adaptation pwd hr4 ap job integration adaptation pwd hr
4 ap job integration adaptation pwd hr
 
2.2 ap lm pwd typical structure content hr
2.2 ap lm pwd typical structure content hr2.2 ap lm pwd typical structure content hr
2.2 ap lm pwd typical structure content hr
 
1.2 presentation for wg training
1.2 presentation for wg training1.2 presentation for wg training
1.2 presentation for wg training
 
Almm monitoring and evaluation tools draft[1]acm
Almm monitoring and evaluation tools draft[1]acmAlmm monitoring and evaluation tools draft[1]acm
Almm monitoring and evaluation tools draft[1]acm
 
Almm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revisedAlmm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revised
 

Recently uploaded

Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdfEnabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Smartinfologiks
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
dollysharma2066
 
Indian Call girl in Dubai 0508644382 Dubai Call girls
Indian Call girl in Dubai 0508644382 Dubai Call girlsIndian Call girl in Dubai 0508644382 Dubai Call girls
Indian Call girl in Dubai 0508644382 Dubai Call girls
Monica Sydney
 
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
ZurliaSoop
 

Recently uploaded (17)

Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdfEnabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
 
EXPERIENCE THE FUTURE OF WORK FOR FUTURE OF BUSINESSES
EXPERIENCE  THE FUTURE OF WORK FOR FUTURE OF BUSINESSESEXPERIENCE  THE FUTURE OF WORK FOR FUTURE OF BUSINESSES
EXPERIENCE THE FUTURE OF WORK FOR FUTURE OF BUSINESSES
 
JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...
JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...
JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...
 
Indian Call girl in Dubai 0508644382 Dubai Call girls
Indian Call girl in Dubai 0508644382 Dubai Call girlsIndian Call girl in Dubai 0508644382 Dubai Call girls
Indian Call girl in Dubai 0508644382 Dubai Call girls
 
Famedesired Project portfolio1 . Fullsail
Famedesired Project portfolio1 . FullsailFamedesired Project portfolio1 . Fullsail
Famedesired Project portfolio1 . Fullsail
 
Supply Chain Location Decision and Management
Supply Chain Location Decision and ManagementSupply Chain Location Decision and Management
Supply Chain Location Decision and Management
 
Bhavnagar Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girl
Bhavnagar Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlBhavnagar Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girl
Bhavnagar Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girl
 
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
 
Dàni Velvet Personal Brand Exploration (1).pptx
Dàni Velvet Personal Brand Exploration (1).pptxDàni Velvet Personal Brand Exploration (1).pptx
Dàni Velvet Personal Brand Exploration (1).pptx
 
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.inEV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
 
How to structure your pitch - B4i template
How to structure your pitch - B4i templateHow to structure your pitch - B4i template
How to structure your pitch - B4i template
 
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
 
CARA BINA PENDAPATAN PASIF HARIAN RM9000 BERMODALKAN RM30 DI TDC
CARA BINA PENDAPATAN PASIF HARIAN RM9000 BERMODALKAN RM30 DI TDCCARA BINA PENDAPATAN PASIF HARIAN RM9000 BERMODALKAN RM30 DI TDC
CARA BINA PENDAPATAN PASIF HARIAN RM9000 BERMODALKAN RM30 DI TDC
 
Amethyst Benifits and Healing Properties.pdf
Amethyst Benifits and Healing Properties.pdfAmethyst Benifits and Healing Properties.pdf
Amethyst Benifits and Healing Properties.pdf
 
How Multicultural Toys Helps in Child Development.pptx
How Multicultural Toys Helps in Child Development.pptxHow Multicultural Toys Helps in Child Development.pptx
How Multicultural Toys Helps in Child Development.pptx
 
MARKETING PLAN RESMI TDC IMUNO INDONESIA 2024
MARKETING PLAN RESMI TDC IMUNO INDONESIA 2024MARKETING PLAN RESMI TDC IMUNO INDONESIA 2024
MARKETING PLAN RESMI TDC IMUNO INDONESIA 2024
 

Tot & pilot project program presentation 300507

  • 1. GTZ-Progress Social & Environmental Standarts. A Cerdá 1 MOLE Training (TOT) on OHS & Industrial Relations Dhaka, 1 to 3 June 2007 Welcome to all participants Work toguether Occupational Health & Safety/Industrial Relations (OHS/IR) 3 days Training 3 days Pilot project visit to 4 RMG factories Final Objective: to learn from eachother with a practical approach!
  • 2. GTZ-Progress Social & Environmental Standarts. A Cerdá 2 MOLE Training on OHS & Industrial Relations Focused on RMG We all will share our knowledge: • Technical Advise Team (TAT) • Labour Department • Industrial Relations Institute (IRE) • Labour Inspectorate We will look as well to • Employers/workes approach in Ready Made Garments (RMG) sector • Auditor/Inspector/Trainer attitude
  • 3. GTZ-Progress Social & Environmental Standarts. A Cerdá 3 Training Pilot Project • Trained to become Trainers & aply knowledge to make evaluations in Pilot Project = visiting 4 RMG factories • Revise essential technical OSH/IR issues - Hazards: Temperature, Ventilation, Noise & Light - Manual load handdling - Chemicals, Machines, Fire, Electrical
  • 4. GTZ-Progress Social & Environmental Standarts. A Cerdá 4 Training • Use of Measurement Equipment: Noise/Light • Use of Personal Protective Equipment • Rolle Game Exercises: 3 teams 4 members - Employers Group - Workers Group - MOLE Offials Group Each day participants change their rolle
  • 5. GTZ-Progress Social & Environmental Standarts. A Cerdá 5 Training Risk Evaluation: Pilot Project • Visit to 4 RMG Factories: 3 days • Days 1 & 2: TAT and Participants • Day 3: Participants splitt in 2 teams (6/6) - Meeting with Employers/Workers in charge of OSH - Visit and evaluate all relevant RMG work/places - Reports based on: measurements, chek-lists, Risk evaluation methodologies, Work-place analysis
  • 6. GTZ-Progress Social & Environmental Standarts. A Cerdá 6 Training Risk Evaluation & Reports • After Evaluations participants splitt in 4 teams (3 members) • 1 Team Leader, 2 Officials, 1 TAT Coucher • Each Team will coordinate/adjust results of the Evaluation/check-lists - Team Leader will elaborate Final Report & Propossal for Corrective Action Plan (CAP) - CAP Discussed with Enterprises/Workers - TAT Hot Line & Coaching Each Team - Follow up: up to 3 meetings with Enterprise/workers representatives to follow up progress
  • 7. GTZ-Progress Social & Environmental Standarts. A Cerdá 7 Follow Up Indicators • Factory appoints workers in charge of OHS (N.) • Workers are informed and trained on OHS (%) • Managers Regularly meet with Workers on OHS • Follow CAP stepts (%)/ discussed with MOLE • Buy new Equipment/PPE/Make Reforms/Improvements • Managers/workers look for Advise from MOLE • Workers ask MOLE for Solutions • MOLE use Measurement Devises • BGMEA/BKMEA ask for Advise from MOLE
  • 8. GTZ-Progress Social & Environmental Standarts. A Cerdá 8 RESULTS ACHIEVED • TOT: Officials MOLE become Trainers • October/November Training 3 addressed to rest of Officials • TOT Officials participate in Dissemination Activities • TOT Officials Are Awarded Project Certificate • Participants Gain Professional/Personal Prestige & Consideration
  • 9. GTZ-Progress Social & Environmental Standarts. A Cerdá 9 MOLE Training (TOT) on OHS & Industrial Relations Enjoy Seminar/Pilot Project Do not hesitate to make questions We will all benefit/learn/become Good Partners Alberto Cerda Mico & TAT THANK YOU acerdamico@yahoo.es