Environmental Management System and Green Productivity
(EMS_GP) Implementation in Kurdistan Cement Plant
Jahanbakhsh Balist1*
, Ebrahim Sargazi2
, Hassan Hoveidi3
, Shahrzad Faryadi4
1
(Ms.C Student, Environmental Planning And Management, University Of Tehran, Iran)
2
(Ms.C Student, Environmental Planning And Management, University Of Tehran, Iran)
3
(Assistant Professor, Environmental Planning And Management, University Of Tehran, Iran)
4
(Associated Professor, Environmental Planning And Management, University Of Tehran, Iran)
Abstract: the cement plant has many environmental aspect that can lead to pollution. For managing this effects
we must use of environmental and productivity technique to minimize this effects. In this study, the Kurdistan
cement plant as a case study had studied by use of two important technique: green productivity and
environmental management systems as ISO. For there more, this plant environmental aspect had identified by
brainstorming and specialist opinion. Then those causes are specified and for each one proposed an option for
controlling it. Finally in order to applying this options, these are prioritized by ranking them. The spraying
water on dust from mining and transportation is first option to applying.
Keywords–green productivity, environmental management system, cement plant, environmental aspect
I. Introduction
In the context of debate on the considerable human and material damage generated by environmental
degradation, the role of the environmental performance of companies merits attention [1]. To identify the main
factors able to influence the maturity of the environmental management practiced by each organisation [2]. The
maturity of the environmental management of companies concerns the environmental level or stage of evolution
in the environmental management of the companies [3]. This environmental maturity (EMM) may be influenced
by many factors, not only technical (e.g., „cleaner‟ technologies) but also organisational and human, related to
the motivation and training of employees to achieve the goals of environmental management, leading companies
to better environmental maturity [4, 5, 6]. Among the organisational and human factors relevant to
environmental management, environmental training (ET) stands out as one of the most relevant ones [7, 5, 8].
And paradoxically as one that has received less attention from experts [9].
Green Productivity and Environmental Management Systems are complementary systems and both help
improve the environmental performance of an organization. GP is an analytical methodology to help identify
opportunities to prevent pollution and improve productivity, especially resource productivity. GP uses a number
of different analytical tools, but it does not require development of a specific management structure or
documentation. The process specifies how an organization can review its operations to look for waste and poor
resource productivity, but is not a comprehensive set of policies or procedures for an organization[10].
An EMS in contrast, is a management system designed to help identify environmental impacts and implement
improvements. An EMS consists of policies and procedures to help minimise a company‟s impacts on the
environment on a routine basis. An EMS does dictate how to improve performance, but provides an internal
system to manage environmental performance and to ensure continual improvement. Successful
implementation of an EMS will require the use of analytical methodologies such as GP, but EMS itself is not an
analytical tool. Rather it is a process for ensuring a company takes action to continually improve its
environmental performance.
The GP assessment methodology works within the framework of an EMS to help a company concentrate on
opportunities to prevent pollution and improve material productivity. The process of developing and running a
GP program for several „cycles‟ is an excellent foundation for developing a broader EMS. To move from GP to
EMS appropriate documentation needs to be developed and the GP assessment practices needs to be integrated
into the company‟s daily operations (eg. add audit procedures to operation manuals, adjust job descriptions). In
addition, the scope of environmental assessment activities may need to be broadened. Although the GP
methodology can be used in any part of a company, many organizations use it primarily for manufacturing
areas. A complete EMS however requires a company to address all the potential environmental impacts in all
departments. This would include office areas, transportation, storage and even product distribution.
Environmental Management System And Green Productivity (EMS_GP) Implementation In Kurdistan
www.ijbmi.org 2 | Page
II. Material and methods:
2.1 Case study
Kurdistan Cement Company, the largest industrial unit roof of Iranian Kurdistan province in the northwest city
of Bijar. The production capacity of 3,200 tons of clinker per day to continue its activities.
Geographical location and general specifications of factory
• the factories km northwest 5 Bijar
• Plant capacity: 3,200 tons of clinker per day
• Altitude: 2017 meters
• The average minimum and maximum temperature maximum and minimum -24° C +37° C
• Wind speed and direction dominant: 32 meters per second
• The annual rainfall: 619 mm
• potential severity of the earthquake: 98 Mercalli
2.2 Methods
The methodology of the project broadly followed the GP methodology introduced by the Asian Productivity
Organization (APO) and the ISO 14001 standard requirements to establish an Environmental Management
System. The GP methodology was used as a foundation for implementing ISO 14001 in KurdistanCement
Company. In this way the methodology diverges from the traditional GP methodology. Each step of
methodology has been further divided in to a number of tasks as follow:
Step 1: Getting Started
Task 1: GP – EMS team formation
GP methodology is based on a participatory approach, where by environmental management and solutions are
carried out by a team of employees. It is necessary, when initiating a GP process that management sponsors
and facilitates team formation in the relevant departments, and that roles within these teams are assigned and
resources are provided to undertake their responsibilities. These roles should focus on the skills and
experiences of the employees, in relation to their role within the enterprise. A broad range of members that are
involved in the widest verity of processes and tasks is optimum. The teams should encourage all levels of
employees to input into the process. A steering committee is also necessary to oversee the program, which
should have representation from both internal and external personnel. External personal may include members
of organisations who are providing technical advice as well as from other effected parties, for instance the local
community.
Task 2: Walk through survey of the production process
A preliminary audit of the business should be undertaken, that compiles basic information about the resources
available and the processes involved. It will include such information as personnel, machinery, equipment and
processes. It will also briefly detail possible sources of environmental problem or areas of inefficient use of
resources. It should include a flow diagram of the processes involved as well as all inputs and outputs,
including waste and products.
Step 2: Planning
Task 3: Training on GP methodology and ISO 14000 standard.
The objective of the training workshop was to train the senior management of the cement factory on GP
methodology and Environmental Management System. The following topics were covered in the training:
 GP methodology tools and techniques
 Environmental Management System according to ISO 14001 standard (awareness and documentation).
 Identification of problems and causes/environmental legal and other requirements, Aspect and impacts.
 Generation, evaluation and prioritisation of GP options;
Task 4: Identification of Problems and Causes
Building on the preliminary audit an in depth discussion of the areas that require improvement is undertaken.
Identifying and recording specific problems is carried out using analysis techniques including brainstorming to
locate and then pinpoint the cause of problems existing in the system.
Task 5: Setting Objectives and Targets
After identifying the problems and their causes, it is necessary to set objectives and targets to ameliorate them.
 Objectives should be based on problems and causes identified.
 One objective can have multiple targets.
 Targets should be based on „needs‟.
 Indicators should be established to track the progress of each objective.
It is necessary to prioritise the problems, with relation to their feasibility, costs and the resources and
technologies that are available.
Step 3: Generation, Evaluation and Prioritisation of GP Options
Environmental Management System And Green Productivity (EMS_GP) Implementation In Kurdistan
www.ijbmi.org 3 | Page
Task 6: Generation of GP Options
The most significant task in GP methodology relates to the development of GP options. These options emerge
directly from the cause analysis. The use of techniques such as brainstorming and group discussions improve the
quality of ideas. A logical approach to generating options is as follows:
 Establishing a brainstorming exercise for generating options, based on the identification of causative
factors,
 Determine the nature of the solution required.
Task 7: Screening, Evaluation and Prioritisation of GP options
Not all GP options generated need a detailed evaluation. Some of the GP options can be eliminated on the basis
of certain criteria, or by the process of screening. GP implementation at community level has many different
features in comparison with other sectors, especially in technical skill and funding fields. That is why these
options need to be carefully evaluated; otherwise the success of GP options may be negligible. The option
evaluation needs to directly relate to feasibility. This includes technology, economic viability (rate of turnover
from investment, payback period), environmental aspects and social aspects.
After assessing the option based on this criteria the options may be divided into 3 categories:
Options to be applied. These options are usually inexpensive, efficient and easy to implement and maintain.
Options needing further analysis. These options usually require a significant financial investment and/or the
expected outcomes are not clear.
Options which are not suitable. These options are usually very expensive and complicated. Often technical
expertise that is not present within the organisation would be required, even after project implementation for
maintenance.
Step 4: Implementation of GP Options
Task 8: Formulation of GP plan
The development of a document that considers important logistical aspects of GP implementation is required.
Some topics in the GP plan will include finances, resources, technology and timeframe. The implementation
plan should also contain a detailed activity plan, input, required time frame and the persons responsible for
implementation. It may combine the work of various GP teams in different sections.
A plan will be most effectively implemented if all members involved in the implementation are interested and
aware of all the factors involved. The GP team needs to answer the following questions when designing the
plan.
 What needs to be done?
 What is the timetable for implementation?
 Who will be responsible for each task?
 How will each option be implemented?
 How/Where will equipment and expertise be sourced?
 What support is available (are there others have implemented in a similar industry, or is other external
technical advice available)?
Task 9: Implementation of selected Options
The GP team together with experts and the support of the management strata implement all steps detailed in the
implementation plan. Training needs should be identified and provided where required.
Task 10: Training, awareness building and developing competence
The provision of training may cover a broad range of topics. It will be required for the GP – EMS teams in the
methodology and environmental management strategies EMS internal audit, but also for those on site using
equipment and procedures that may be altered in the GP process. The degree of training required will vary
between GP options and may also take a variety of forms from formal seminars to informal on the spot
instruction. Some options will require no training, implementation can be immediately and others may require a
significant training period. Options will therefore be implemented at various stages. Some options may be
interdependent.
Step 5: Monitoring and Review
Task 11: Monitoring and Evaluation of Results
The monitoring and evaluation of GP options is an important task in the project cycle. It enables a comparison
to be made between the objectives and the outcomes of the project. Project coordinators from the VPC have a
responsibility to review the project, and external experts are also invited to evaluate these results. Any problems
identified within the project need to be assessed and possible solutions identified. Monitoring should be an
ongoing task of a GP program, it should occur at all stages of implementation, ensuring that problems are
identified and solved as soon as possible. The aim of GP projects is to achieve sustainability, which is only
possible if problems are identified and if possible solved quickly.
Environmental Management System And Green Productivity (EMS_GP) Implementation In Kurdistan
www.ijbmi.org 4 | Page
Task 12: Management review
Management reviews are necessary to evaluate the progress of the GP project. All activities must be recorded
during the implementation of project for future reference. After implementation, management together with the
steering committee must examine the GP program to determine how effective the project has been at meeting
the specified objectives. When reviewing, management will look at the final report and other ongoing
documentation from the project.
Step 6: Sustaining GP
Task 13: Incorporating changes into the organization’s system of management
GP cannot exist in isolation. It needs to be integrated with regular activities of the management and day-to-day
functioning of the enterprise. Therefore, all employees need to be familiar with the activities and objectives of
the GP program. Participation of the workforce as well as consultation with other interested parties, including
the community in which the industry is based is an important factor contributing to the long-term sustainability
of GP. One way to ensure that GP becomes a regular activity is to document and enforce procedures within each
work area.
Task 14: Identifying new/ additional problem areas for continualimprovement
Once the first cycle of GP is complete within the organisation, the procedures and knowledge should be in place
so that the cycle may be repeated. Green Productivity system specifically designed to facilitate continuous
improvement.
Tools
2.4.1 Management Tools
GP tools provide information on the equipment and devices utilized in implementing GP plans. One of the most
essential elements in GP tools is brainstorming, a process in which ideas are generated from answering critical
questions such as: “What are solutions to reduce dust generation? What is the best choice?” The more people
involved in the brainstorming process, the greater the amount of quality ideas will be available. The best choice
will be selected from a number of solutions. The process flow was a useful tool to see in the detail of each
activity to find out where the waste generated and understand whole the production process. This tool can
identified exactly where have problem.
Equally important to brainstorming is the fish bone diagram, also known as a cause-and-effect diagram. It
displays all the possible reasons and causes that contribute to a specific result. This diagram is used in the
solving most problems, particularly in large-scale problems that have resulted from a number of causes and are
related to a number of activities. Therefore, the fish bone diagram plays a crucial role in pinpointing problems in
order to solve them.
A matrix is often set up to rate the feasibility of a number of options. Not all options are selected for
implementation, due to the difference in priorities. Those options, which are significant and applicable, will
have the first and foremost priorities. Similarly, the less difficult and low-cost options also have advantages over
the more difficult and high-cost ones. In fact, it is not so easy to classify the priorities of options because the
most urgent ones often requires high costs for implementation while the inexpensive ones are not so applicable.
2.4.2 Environment Tools
As one of the two components making up GP tools, environmental tools, often called technical tools require a
number of specific skills such as good housekeeping, solid waste management, wastewater treatment, air
pollution treatment, mass balance and process flow.
Good housekeeping aims to minimize wastes, prevent the loss of material water pollution and money for a
company. This tool requires the involvement of all individuals together, forming a cohesive company. If each
member of the company takes responsibility for using the right way of oil, material transportation as well as rag
oil, the pollution by company contributed to environment will consequently be reduced.
GP tools also focus on oil contamination in wastewater, dust generation and solid waste management. Solid
waste are often collected and separated to hazard waste, recyclable and non-recyclable waste before delivery for
treatment.
III. Result and discussion
3.1 GP implementation
GP implementation in Kurdistan Cement Company was based on the GP methodology that introduced by APO
and integrated with ISO 14001 development process.
- Getting started
GP-EMS Team formation
Establishing a GP team is an effective method for considering all possible aspects the existing problems in a
company. A team should effectively utilise the skills and experiences of many people and incorporates their
various ideas, views and opinions. GP-EMS team was established in Kurdistan Cement Company. These teams
Environmental Management System And Green Productivity (EMS_GP) Implementation In Kurdistan
www.ijbmi.org 5 | Page
consisted of top-level management and managers from all involved departments such as the technical, quality
control and environmental management department, as well as the labour union.
Problem identification
Based on the data collected from survey the GP-EMS team conducted a group discussion to list all problems in
each process related to environment and productivity. See Table 1.
Table.1. Problems of Kurdistancement company
Depart
ment/
Process
Problems
Environmental Productivity
Mining and
transportation of
raw material
-Dust from mining explosions, transportation
and loading and unloading of raw materials
Limestone crusher
process
- Noise pollution
- Dust generation
-Short lifetime of hammer
-Low capacity
Clay crusher
process
- Noise pollution
- Dust generation
Conveyer belt
transportation from
crusher to storage
- Dust generation at direction change
points (from this conveyer to other
conveyer)
Kilns - Waste heat
- Air emissions
- Wastewater
- Waste oil
- Oil leakage
- Solid waste
- Low inefficiency of kiln
- Energy consumption
Compressor room - Noise
- Oil leakage
Cement mill - Production lower than design capability
- Energy consumption
Loading clinker and
cement
- Dust generation
Packaging area - Dust generation
- Solid waste
Maintenance
workshop
- Wastewater
- Solid waste
- Air emissions
All company - Solid waste
Cause identification
This task very important so that the GP-EMS team used GP tools such as brainstorming to find out the root
causes of each problem.
Table.2. Problems of Kurdistan cement company
Depart
ment/
Process
Problems Causes Options
Mining and
transportation of
raw material
- Dust from mining
explosions,
transportation and
loading and unloading
raw materials
Material too dry
A lot of dust on the road
Spray water on the limestone before
upload and unload
Limestone crushing
process.
Clay crushing
process
- Noise pollution Old crushers Wearing ear Protection
equipment
- Dust emissions - Bag filter operate
inefficiency and bag
damaged
- Periodical maintenance of bag
filter and should be change
damaged bags filter diligently.
Short lifetime of the limestone
crusher‟s hammer
Low capacity
- See fish bone diagram - Reduce SiO2 in limestone by
change mixer formula
- Install a pre-crusher and
screen.
Conveyer belt
transportation from
crusher to storage
of line I
- Dust generation at
direction change points
(from this conveyer to
other conveyer)
- The bag filter efficient and
has low capacity
- Not cover all conveyor
belt at that point
- Replace by new bag filter
- Cover the point lack off.
Environmental Management System And Green Productivity (EMS_GP) Implementation In Kurdistan
www.ijbmi.org 6 | Page
Raw material mill - Capacity lower than
design capacity
Material output coarse -decrease size of material out put
Kilns - Low inefficiency of kiln -high energy consumption of
pre heater
- Install auxiliary furnace for
preheater
- Waste heat - Lack of waste heat
recovery system
- Install a waste heat recovery
generation system in both
kilns.
Compressor room - Noise - Old compressor
- Lack of noise prevention
facility
- Install noise protection box to
cover individual compressors
- Build a separate operation
room
- Oil leakage - Old compressors - Increase maintenance activities
- Replace to new compressors
Cement mill - Lower capacity - Install a pre-griding system
upstream of the existing ball
mill.
Clinker Loading - Dust generated when
loading the clinker onto
the ship.
- Existing dust collector‟s
capacity (80 m3
/min) is
too small.
- Dust suction pipe too
small
- The cover of suction head
is not inadequate
- Replace filter with
Electrostatic precipitator (EP)
- Change the cover with one that
has improved material and
design
Packaging area and
cement loading
- Dust generation during
packaging, transporting
on conveyor belt,
loading cement on ship
truck on train
- Modify the dust collection
system at packaging machine
- Education class for employees
All company - Solid waste generation
from all departments
- Lack of solid waste
management regulation.
- Solid waste collection
system inadequate.
- Lack of awareness on
environment protection.
- Lack of environmental
management system.
- Appling Hard Regulation
- Install a new waste collector
system
- Training for employees related
to waste oil generation
In order to prioritization the option for decreasing and management of environmental and productivity, with the
remaining 16 options, GP – EMS team screened, evaluated to set priorities for each options. Some criteria that
were chosen to evaluate them are:
1. Cost of investment: the higher cost of investment, the lower the priority of option
2. The complexity of technique: the more complicated, the lower priority of option
3. The efficiency of option both in terms of environmental performance and productivity: the more efficiency,
the higher priority of option
4. The ability of workers to control and operate system: the easier for worker to operate, the higher priority of
option
5. Suggested options were ranged from 1-5 marks for each criteria, in which 1 represents for the low and 5
presents for higher priority. All options are listed and evaluated by criteria as the table below:
Table.3. priority of option
Criteria 1 Criteria 2 Criteria 2 Criteria 4 multiple priority
Spray water on the limestone before upload
and unload
Periodically spray water on the surface road
4.1 4.52 3.42 3.89 246.5 1
Replace by new bag filter. 2.52 2.94 3.94 2.73 79.69 10
Cover the point lack off. 3.57 4 3.21 3.47 159.06 4
Replace bigger suction pipe. 2.94 3.1 3.26 2.73 81.11 9
Modify the dust collector system in bag car 2.47 2.31 3.79 2.52 54.49 15
Wearing ear protection 4.21 4.21 2.89 3.73 191.06 3
Install sound choker on compressor 2.84 3.37 3.42 3.05 99.83 6
Build up the separate operation room 2.57 3.1 3.1 2.89 71.37 13
Rising maintenance operating 3.1 2.84 3.21 2.94 83.08 7
Change compressor 2.16 3.1 3.52 3.21 75.65 11
Install pre heater 2.42 2.63 3.47 2.79 61.61 14
Install recovering residue temperate in heater 2.21 2.05 3.52 2.68 42.73 16
Install pre crasher and filters 2.73 3 3.31 3 81.32 8
Appling Hard Regulation 3.57 3.57 3.82 2.63 128.04 5
Environmental Management System And Green Productivity (EMS_GP) Implementation In Kurdistan
www.ijbmi.org 7 | Page
Install a new waste collector system 2.63 2.68 3.84 2.73 73.88 12
Training for employees related to waste oil
generation
3.84 4 3.78 3.36 195.08 2
Monitoring and review:
Internal audit reports and assess compliance with legal requirements and other requirements that the
organization is committed applied.
1. Internal audit report:
 Internal audit was conducted on 17 and 18 may 2014, as the non-compliance of environmental management
system follow:
- Non-compliance at this stage should be identified and appropriate corrective action taken on them.
2. Report meetings to assess compliance with legal requirements and specified non-compliance in this respect to
assess compliance with the requirements of environmental law based on the identification and registration
procedure legal requirements, assess the compliance with legal requirements and procedures and aspects of
identified risks, as discussed below have.
2.1.1. Performance monitoring and self-reported in accordance with rules and requirements administered by the
Department of Environment every six months, based on the results in all cases the expected environmental
organization, the company has been consistent.
2.1.2. In relation to other legal requirements relating to the environment in accordance with the accepted
procedure of registration and monitoring of conformity assessment done.
IV. Conclusion
Technology development altered range of human life. However, due to the lack of consistency harmful effects
of technology on the natural interaction, gradually turning the control vital imbalance actually suffered the
effects of these disorders will be affect the man as part of nature. At the global level, especially in developing
countries, issues such as population growth, economic and cultural poverty and lack of environmental programs,
they will be broader problem of environmental conservation. In our country to find a reasonable and effective
solution of all harmful agents in the environment must be identified and evaluated. Then measures and by taking
them to a comprehensive environmental management plan be developed at the country level. So, in order to
improve the quality of the environment in Kurdistan Cement Factory, two techniques, environmental
management systems and green productivity are integrated. Therefore, the first step to form a team and then
identify environmental problems techniques and environmental causes of them in the factory and then to solve
these problems strategies proposed by the executive team and the experts in the field using the options suggested
took priority. It was found that the priorities of options water splashing on the rocks before loading and
unloading of the highest priority and should be in the field adopt necessary measures.the proposed solutions
were prioritized.
References
[1]. Hart, S.L., Dowell, G., 2011. A natural-resource-based view of the firm fifteen years after. J. Manag. 37 (5), 1464e1479.
[2]. González-Benito, J., González-Benito, Ó., 2006. A review of determinant factors of environmental proactivity. Bus. Strat.
Environ. 15 (2), 87e102.
[3]. Jabbour, C.J.C., 2010. Non-linear pathways of corporate environmental management: a survey of ISO 14001-certified companies
in Brazil. J. Clean. Prod. 18 (12), 1222e1225.
[4]. Graves, L.M., Sarkis, J., Zhu, Q., 2013. How transformational leadership and employee motivation combine to predict employee
proenvironmental behaviors in China. J. Environ. Psychol. 35, 81e91.
[5]. Renwick, D.W., Redman, T., Maguire, S., 2013. Green human resource management: a review and research agenda. Int. J.
Manag. Rev. 15 (1), 1e14.
[6]. Wagner, M., 2013. Green human resource benefits: do they matter as determinants of environmental management system
implementation? J. Bus. Ethics 114, 443e456.
[7]. Andersson, L., Jackson, S.E., Russell, S.V., 2013. Greening organizational behavior: an introduction to the special issue. J. Org.
Behav. 34 (2), 151e155.
[8]. Ji, L., Huang, J., Liu, Z., Zhu, H., Cai, Z., 2012. The effects of employee training on the relationship between environmental
attitude and firms‟ performance in sustainable development. Int. J. Hum. Resour. Manag. 23 (14), 2995e3008.
[9]. Jackson, S., Renwick, D., Jabbour, C.J.C., Muller-Camen, M., 2011. State-of-the-art and future directions for green human
resource management. Z. Personalforschung 25, 99e116.
[10]. Technical Report on ISO 14001 & GP Demonstration Project in Hoang Thach and Sai Son Cement Company, Vietnam
Productivity Centre Directorate for Standards and Quality, Vietnam 2002.

More Related Content

What's hot

Theory of Constraints To Improve Labor Productivity. Study Case In Santo Domi...
Theory of Constraints To Improve Labor Productivity. Study Case In Santo Domi...Theory of Constraints To Improve Labor Productivity. Study Case In Santo Domi...
Theory of Constraints To Improve Labor Productivity. Study Case In Santo Domi...CSCJournals
 
Health and Safety Management System at Noyan Lankan Pvt. Ltd. Of Mas Holdings
Health and Safety Management System at Noyan Lankan Pvt. Ltd. Of Mas Holdings Health and Safety Management System at Noyan Lankan Pvt. Ltd. Of Mas Holdings
Health and Safety Management System at Noyan Lankan Pvt. Ltd. Of Mas Holdings Tharushika Ruwangi
 
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET-  	  Ethical Climates as a Moderator on the Relationship between Lean M...IRJET-  	  Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...IRJET Journal
 
Tqm chaos and complexity
Tqm chaos and complexityTqm chaos and complexity
Tqm chaos and complexityAhmed Moussa
 
195846452 work-study-layout
195846452 work-study-layout195846452 work-study-layout
195846452 work-study-layouthomeworkping3
 
Fisioterapia laboral (1)
Fisioterapia laboral (1)Fisioterapia laboral (1)
Fisioterapia laboral (1)salvado52
 
IRJET- Total Quality Management and Organizational Performance
IRJET- Total Quality Management and Organizational PerformanceIRJET- Total Quality Management and Organizational Performance
IRJET- Total Quality Management and Organizational PerformanceIRJET Journal
 
Assessment and Analysis of GSCM Barriers using AHP
Assessment and Analysis of GSCM Barriers using AHPAssessment and Analysis of GSCM Barriers using AHP
Assessment and Analysis of GSCM Barriers using AHPIRJET Journal
 
IRJET- Plant Evaluation using OEE & ORE
IRJET-  	  Plant Evaluation using OEE & OREIRJET-  	  Plant Evaluation using OEE & ORE
IRJET- Plant Evaluation using OEE & OREIRJET Journal
 
Wok study
Wok study Wok study
Wok study arunedm
 
T7SR TOTAL QUALITY MANAGEMENT COURSE OUTLINE
T7SR TOTAL QUALITY MANAGEMENT COURSE OUTLINET7SR TOTAL QUALITY MANAGEMENT COURSE OUTLINE
T7SR TOTAL QUALITY MANAGEMENT COURSE OUTLINEMohamed Rashid
 
QULITY ASSURANCE & QULITY MANAGEMENT CONCEPTS
QULITY ASSURANCE & QULITY MANAGEMENT CONCEPTSQULITY ASSURANCE & QULITY MANAGEMENT CONCEPTS
QULITY ASSURANCE & QULITY MANAGEMENT CONCEPTSsnigdharanibehera
 
The Six Sigma Approach for the Development of Accounting Information System P...
The Six Sigma Approach for the Development of Accounting Information System P...The Six Sigma Approach for the Development of Accounting Information System P...
The Six Sigma Approach for the Development of Accounting Information System P...Hendra Gunawan
 
Total Quality Management in Modern Organisations
Total Quality Management in Modern OrganisationsTotal Quality Management in Modern Organisations
Total Quality Management in Modern OrganisationsLucky Ugboko (FCA, ACIT)
 

What's hot (20)

Module3
Module3Module3
Module3
 
Theory of Constraints To Improve Labor Productivity. Study Case In Santo Domi...
Theory of Constraints To Improve Labor Productivity. Study Case In Santo Domi...Theory of Constraints To Improve Labor Productivity. Study Case In Santo Domi...
Theory of Constraints To Improve Labor Productivity. Study Case In Santo Domi...
 
Health and Safety Management System at Noyan Lankan Pvt. Ltd. Of Mas Holdings
Health and Safety Management System at Noyan Lankan Pvt. Ltd. Of Mas Holdings Health and Safety Management System at Noyan Lankan Pvt. Ltd. Of Mas Holdings
Health and Safety Management System at Noyan Lankan Pvt. Ltd. Of Mas Holdings
 
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET-  	  Ethical Climates as a Moderator on the Relationship between Lean M...IRJET-  	  Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
 
Tqm chaos and complexity
Tqm chaos and complexityTqm chaos and complexity
Tqm chaos and complexity
 
Harshit
HarshitHarshit
Harshit
 
195846452 work-study-layout
195846452 work-study-layout195846452 work-study-layout
195846452 work-study-layout
 
Lecture25 30
Lecture25 30Lecture25 30
Lecture25 30
 
Fisioterapia laboral (1)
Fisioterapia laboral (1)Fisioterapia laboral (1)
Fisioterapia laboral (1)
 
IRJET- Total Quality Management and Organizational Performance
IRJET- Total Quality Management and Organizational PerformanceIRJET- Total Quality Management and Organizational Performance
IRJET- Total Quality Management and Organizational Performance
 
Assessment and Analysis of GSCM Barriers using AHP
Assessment and Analysis of GSCM Barriers using AHPAssessment and Analysis of GSCM Barriers using AHP
Assessment and Analysis of GSCM Barriers using AHP
 
Methods Enigeering
Methods EnigeeringMethods Enigeering
Methods Enigeering
 
IRJET- Plant Evaluation using OEE & ORE
IRJET-  	  Plant Evaluation using OEE & OREIRJET-  	  Plant Evaluation using OEE & ORE
IRJET- Plant Evaluation using OEE & ORE
 
Quality management system
Quality management systemQuality management system
Quality management system
 
Wok study
Wok study Wok study
Wok study
 
T7SR TOTAL QUALITY MANAGEMENT COURSE OUTLINE
T7SR TOTAL QUALITY MANAGEMENT COURSE OUTLINET7SR TOTAL QUALITY MANAGEMENT COURSE OUTLINE
T7SR TOTAL QUALITY MANAGEMENT COURSE OUTLINE
 
QULITY ASSURANCE & QULITY MANAGEMENT CONCEPTS
QULITY ASSURANCE & QULITY MANAGEMENT CONCEPTSQULITY ASSURANCE & QULITY MANAGEMENT CONCEPTS
QULITY ASSURANCE & QULITY MANAGEMENT CONCEPTS
 
A Case Study of Quality Measurement System on CSR Capability by Using DMAIC i...
A Case Study of Quality Measurement System on CSR Capability by Using DMAIC i...A Case Study of Quality Measurement System on CSR Capability by Using DMAIC i...
A Case Study of Quality Measurement System on CSR Capability by Using DMAIC i...
 
The Six Sigma Approach for the Development of Accounting Information System P...
The Six Sigma Approach for the Development of Accounting Information System P...The Six Sigma Approach for the Development of Accounting Information System P...
The Six Sigma Approach for the Development of Accounting Information System P...
 
Total Quality Management in Modern Organisations
Total Quality Management in Modern OrganisationsTotal Quality Management in Modern Organisations
Total Quality Management in Modern Organisations
 

Viewers also liked

Prioritizing the Effecting Factors in Organisational Structure of the Iranian...
Prioritizing the Effecting Factors in Organisational Structure of the Iranian...Prioritizing the Effecting Factors in Organisational Structure of the Iranian...
Prioritizing the Effecting Factors in Organisational Structure of the Iranian...inventionjournals
 
IS Plastic Money Matter for Consumer Buying Behavior? An Empirical Analysis f...
IS Plastic Money Matter for Consumer Buying Behavior? An Empirical Analysis f...IS Plastic Money Matter for Consumer Buying Behavior? An Empirical Analysis f...
IS Plastic Money Matter for Consumer Buying Behavior? An Empirical Analysis f...inventionjournals
 
Knowledge Management Strategies and Their Contribution to Small and Medium En...
Knowledge Management Strategies and Their Contribution to Small and Medium En...Knowledge Management Strategies and Their Contribution to Small and Medium En...
Knowledge Management Strategies and Their Contribution to Small and Medium En...inventionjournals
 
Application of Servqual Method in Providing Services of Two Private Education...
Application of Servqual Method in Providing Services of Two Private Education...Application of Servqual Method in Providing Services of Two Private Education...
Application of Servqual Method in Providing Services of Two Private Education...inventionjournals
 
Research on the Trading Strategy Based On Interest Rate Term Structure Change...
Research on the Trading Strategy Based On Interest Rate Term Structure Change...Research on the Trading Strategy Based On Interest Rate Term Structure Change...
Research on the Trading Strategy Based On Interest Rate Term Structure Change...inventionjournals
 
Analysis of The Influence Patient Safety, Service Quality, Marketing Mix, Tow...
Analysis of The Influence Patient Safety, Service Quality, Marketing Mix, Tow...Analysis of The Influence Patient Safety, Service Quality, Marketing Mix, Tow...
Analysis of The Influence Patient Safety, Service Quality, Marketing Mix, Tow...inventionjournals
 
An Analysis of Three Distinct Levels of Studying Africa in International Poli...
An Analysis of Three Distinct Levels of Studying Africa in International Poli...An Analysis of Three Distinct Levels of Studying Africa in International Poli...
An Analysis of Three Distinct Levels of Studying Africa in International Poli...inventionjournals
 
A importância da avaliação quantitativa de agentes químicos na prevenção da s...
A importância da avaliação quantitativa de agentes químicos na prevenção da s...A importância da avaliação quantitativa de agentes químicos na prevenção da s...
A importância da avaliação quantitativa de agentes químicos na prevenção da s...inventionjournals
 
Why Company Does Tax Avoidance? Evidence from a Manufacturing Company in Indo...
Why Company Does Tax Avoidance? Evidence from a Manufacturing Company in Indo...Why Company Does Tax Avoidance? Evidence from a Manufacturing Company in Indo...
Why Company Does Tax Avoidance? Evidence from a Manufacturing Company in Indo...inventionjournals
 
Investigating the individual factors on purchasing the stock share
Investigating the individual factors on purchasing the stock shareInvestigating the individual factors on purchasing the stock share
Investigating the individual factors on purchasing the stock shareinventionjournals
 
Challenges Facing the Adoption of Information Technology in the Management of...
Challenges Facing the Adoption of Information Technology in the Management of...Challenges Facing the Adoption of Information Technology in the Management of...
Challenges Facing the Adoption of Information Technology in the Management of...inventionjournals
 
The Philosophy of Democracy Dividend Delivery: A Push for Government Revenue ...
The Philosophy of Democracy Dividend Delivery: A Push for Government Revenue ...The Philosophy of Democracy Dividend Delivery: A Push for Government Revenue ...
The Philosophy of Democracy Dividend Delivery: A Push for Government Revenue ...inventionjournals
 
A Study on Emerging Challenges & Opportunities for Indian Banking Sector
A Study on Emerging Challenges & Opportunities for Indian Banking SectorA Study on Emerging Challenges & Opportunities for Indian Banking Sector
A Study on Emerging Challenges & Opportunities for Indian Banking Sectorinventionjournals
 
Influence of Occupational Stress on Teachers' Performance in Public Secondary...
Influence of Occupational Stress on Teachers' Performance in Public Secondary...Influence of Occupational Stress on Teachers' Performance in Public Secondary...
Influence of Occupational Stress on Teachers' Performance in Public Secondary...inventionjournals
 
Coordination in Three-Level Supply Chain under Output and Demand Uncertainty
Coordination in Three-Level Supply Chain under Output and Demand UncertaintyCoordination in Three-Level Supply Chain under Output and Demand Uncertainty
Coordination in Three-Level Supply Chain under Output and Demand Uncertaintyinventionjournals
 
Engagement n Commitment to ITQ
Engagement n Commitment to ITQEngagement n Commitment to ITQ
Engagement n Commitment to ITQinventionjournals
 
Social Innovation Applications And The Case Of UCCI (Uşak Chamber Of Commerce...
Social Innovation Applications And The Case Of UCCI (Uşak Chamber Of Commerce...Social Innovation Applications And The Case Of UCCI (Uşak Chamber Of Commerce...
Social Innovation Applications And The Case Of UCCI (Uşak Chamber Of Commerce...inventionjournals
 
The Effect of Social Media Marketing To Brand Loyalty (Case Study at the Univ...
The Effect of Social Media Marketing To Brand Loyalty (Case Study at the Univ...The Effect of Social Media Marketing To Brand Loyalty (Case Study at the Univ...
The Effect of Social Media Marketing To Brand Loyalty (Case Study at the Univ...inventionjournals
 
A Study on Consumer Behaviour towards Branded Garments am ong Male Shoppers
A Study on Consumer Behaviour towards Branded Garments am ong Male ShoppersA Study on Consumer Behaviour towards Branded Garments am ong Male Shoppers
A Study on Consumer Behaviour towards Branded Garments am ong Male Shoppersinventionjournals
 
The Role of Organizational Commitment as Mediator for Individual Characterist...
The Role of Organizational Commitment as Mediator for Individual Characterist...The Role of Organizational Commitment as Mediator for Individual Characterist...
The Role of Organizational Commitment as Mediator for Individual Characterist...inventionjournals
 

Viewers also liked (20)

Prioritizing the Effecting Factors in Organisational Structure of the Iranian...
Prioritizing the Effecting Factors in Organisational Structure of the Iranian...Prioritizing the Effecting Factors in Organisational Structure of the Iranian...
Prioritizing the Effecting Factors in Organisational Structure of the Iranian...
 
IS Plastic Money Matter for Consumer Buying Behavior? An Empirical Analysis f...
IS Plastic Money Matter for Consumer Buying Behavior? An Empirical Analysis f...IS Plastic Money Matter for Consumer Buying Behavior? An Empirical Analysis f...
IS Plastic Money Matter for Consumer Buying Behavior? An Empirical Analysis f...
 
Knowledge Management Strategies and Their Contribution to Small and Medium En...
Knowledge Management Strategies and Their Contribution to Small and Medium En...Knowledge Management Strategies and Their Contribution to Small and Medium En...
Knowledge Management Strategies and Their Contribution to Small and Medium En...
 
Application of Servqual Method in Providing Services of Two Private Education...
Application of Servqual Method in Providing Services of Two Private Education...Application of Servqual Method in Providing Services of Two Private Education...
Application of Servqual Method in Providing Services of Two Private Education...
 
Research on the Trading Strategy Based On Interest Rate Term Structure Change...
Research on the Trading Strategy Based On Interest Rate Term Structure Change...Research on the Trading Strategy Based On Interest Rate Term Structure Change...
Research on the Trading Strategy Based On Interest Rate Term Structure Change...
 
Analysis of The Influence Patient Safety, Service Quality, Marketing Mix, Tow...
Analysis of The Influence Patient Safety, Service Quality, Marketing Mix, Tow...Analysis of The Influence Patient Safety, Service Quality, Marketing Mix, Tow...
Analysis of The Influence Patient Safety, Service Quality, Marketing Mix, Tow...
 
An Analysis of Three Distinct Levels of Studying Africa in International Poli...
An Analysis of Three Distinct Levels of Studying Africa in International Poli...An Analysis of Three Distinct Levels of Studying Africa in International Poli...
An Analysis of Three Distinct Levels of Studying Africa in International Poli...
 
A importância da avaliação quantitativa de agentes químicos na prevenção da s...
A importância da avaliação quantitativa de agentes químicos na prevenção da s...A importância da avaliação quantitativa de agentes químicos na prevenção da s...
A importância da avaliação quantitativa de agentes químicos na prevenção da s...
 
Why Company Does Tax Avoidance? Evidence from a Manufacturing Company in Indo...
Why Company Does Tax Avoidance? Evidence from a Manufacturing Company in Indo...Why Company Does Tax Avoidance? Evidence from a Manufacturing Company in Indo...
Why Company Does Tax Avoidance? Evidence from a Manufacturing Company in Indo...
 
Investigating the individual factors on purchasing the stock share
Investigating the individual factors on purchasing the stock shareInvestigating the individual factors on purchasing the stock share
Investigating the individual factors on purchasing the stock share
 
Challenges Facing the Adoption of Information Technology in the Management of...
Challenges Facing the Adoption of Information Technology in the Management of...Challenges Facing the Adoption of Information Technology in the Management of...
Challenges Facing the Adoption of Information Technology in the Management of...
 
The Philosophy of Democracy Dividend Delivery: A Push for Government Revenue ...
The Philosophy of Democracy Dividend Delivery: A Push for Government Revenue ...The Philosophy of Democracy Dividend Delivery: A Push for Government Revenue ...
The Philosophy of Democracy Dividend Delivery: A Push for Government Revenue ...
 
A Study on Emerging Challenges & Opportunities for Indian Banking Sector
A Study on Emerging Challenges & Opportunities for Indian Banking SectorA Study on Emerging Challenges & Opportunities for Indian Banking Sector
A Study on Emerging Challenges & Opportunities for Indian Banking Sector
 
Influence of Occupational Stress on Teachers' Performance in Public Secondary...
Influence of Occupational Stress on Teachers' Performance in Public Secondary...Influence of Occupational Stress on Teachers' Performance in Public Secondary...
Influence of Occupational Stress on Teachers' Performance in Public Secondary...
 
Coordination in Three-Level Supply Chain under Output and Demand Uncertainty
Coordination in Three-Level Supply Chain under Output and Demand UncertaintyCoordination in Three-Level Supply Chain under Output and Demand Uncertainty
Coordination in Three-Level Supply Chain under Output and Demand Uncertainty
 
Engagement n Commitment to ITQ
Engagement n Commitment to ITQEngagement n Commitment to ITQ
Engagement n Commitment to ITQ
 
Social Innovation Applications And The Case Of UCCI (Uşak Chamber Of Commerce...
Social Innovation Applications And The Case Of UCCI (Uşak Chamber Of Commerce...Social Innovation Applications And The Case Of UCCI (Uşak Chamber Of Commerce...
Social Innovation Applications And The Case Of UCCI (Uşak Chamber Of Commerce...
 
The Effect of Social Media Marketing To Brand Loyalty (Case Study at the Univ...
The Effect of Social Media Marketing To Brand Loyalty (Case Study at the Univ...The Effect of Social Media Marketing To Brand Loyalty (Case Study at the Univ...
The Effect of Social Media Marketing To Brand Loyalty (Case Study at the Univ...
 
A Study on Consumer Behaviour towards Branded Garments am ong Male Shoppers
A Study on Consumer Behaviour towards Branded Garments am ong Male ShoppersA Study on Consumer Behaviour towards Branded Garments am ong Male Shoppers
A Study on Consumer Behaviour towards Branded Garments am ong Male Shoppers
 
The Role of Organizational Commitment as Mediator for Individual Characterist...
The Role of Organizational Commitment as Mediator for Individual Characterist...The Role of Organizational Commitment as Mediator for Individual Characterist...
The Role of Organizational Commitment as Mediator for Individual Characterist...
 

Similar to Environmental Management System and Green Productivity (EMS_GP) Implementation in Kurdistan Cement Plant

Environmental_Management_Systems.pptx
Environmental_Management_Systems.pptxEnvironmental_Management_Systems.pptx
Environmental_Management_Systems.pptxAfrim Alili
 
Environmental_Management_Systems.pptx
Environmental_Management_Systems.pptxEnvironmental_Management_Systems.pptx
Environmental_Management_Systems.pptxJamalJauher1
 
Environmental management systems by Abu Khairul Bashar
Environmental management systems by Abu Khairul BasharEnvironmental management systems by Abu Khairul Bashar
Environmental management systems by Abu Khairul BasharAbu Khairul Bashar
 
Lcscm synopsis- itnesh
Lcscm synopsis- itnesh Lcscm synopsis- itnesh
Lcscm synopsis- itnesh Itnesh Kumar
 
Environmental management
Environmental managementEnvironmental management
Environmental managementManoj Mota
 
Implementation of green manufacturing in industry a case study
Implementation of green manufacturing in industry   a case studyImplementation of green manufacturing in industry   a case study
Implementation of green manufacturing in industry a case studyeSAT Journals
 
sustainability-13-12121-v2.pdf
sustainability-13-12121-v2.pdfsustainability-13-12121-v2.pdf
sustainability-13-12121-v2.pdfSubodhKumar707111
 
Environmental Audits
Environmental AuditsEnvironmental Audits
Environmental AuditsYajush Sonar
 
Environmental Management System - ISO 14001:2015-
Environmental Management System      - ISO 14001:2015-Environmental Management System      - ISO 14001:2015-
Environmental Management System - ISO 14001:2015-Kawther MEKNI
 
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...IRJET Journal
 
Green supply chain management paper
Green supply chain management paperGreen supply chain management paper
Green supply chain management paperEka Darmadi
 
Ems awareness training 25.04.11
Ems awareness training  25.04.11Ems awareness training  25.04.11
Ems awareness training 25.04.11Prabhu Mishra
 
Environmental Management Systems - ISO 14001
Environmental Management Systems - ISO 14001Environmental Management Systems - ISO 14001
Environmental Management Systems - ISO 14001Hector Rodriguez
 
Environmental Management_LEC04.pptx
Environmental Management_LEC04.pptxEnvironmental Management_LEC04.pptx
Environmental Management_LEC04.pptxMonirulIslamEstiak
 
Ems for prince mallamine industry gujranwala
Ems for prince mallamine industry gujranwalaEms for prince mallamine industry gujranwala
Ems for prince mallamine industry gujranwalaPrincessRabiii
 

Similar to Environmental Management System and Green Productivity (EMS_GP) Implementation in Kurdistan Cement Plant (20)

Cleaner production
Cleaner productionCleaner production
Cleaner production
 
Ems
EmsEms
Ems
 
Environmental_Management_Systems.pptx
Environmental_Management_Systems.pptxEnvironmental_Management_Systems.pptx
Environmental_Management_Systems.pptx
 
Environmental_Management_Systems.pptx
Environmental_Management_Systems.pptxEnvironmental_Management_Systems.pptx
Environmental_Management_Systems.pptx
 
Environmental management systems by Abu Khairul Bashar
Environmental management systems by Abu Khairul BasharEnvironmental management systems by Abu Khairul Bashar
Environmental management systems by Abu Khairul Bashar
 
Lcscm synopsis- itnesh
Lcscm synopsis- itnesh Lcscm synopsis- itnesh
Lcscm synopsis- itnesh
 
Environmental management
Environmental managementEnvironmental management
Environmental management
 
Implementation of green manufacturing in industry a case study
Implementation of green manufacturing in industry   a case studyImplementation of green manufacturing in industry   a case study
Implementation of green manufacturing in industry a case study
 
sustainability-13-12121-v2.pdf
sustainability-13-12121-v2.pdfsustainability-13-12121-v2.pdf
sustainability-13-12121-v2.pdf
 
Environmental Audits
Environmental AuditsEnvironmental Audits
Environmental Audits
 
2018 ems
2018 ems2018 ems
2018 ems
 
Environmental Management System - ISO 14001:2015-
Environmental Management System      - ISO 14001:2015-Environmental Management System      - ISO 14001:2015-
Environmental Management System - ISO 14001:2015-
 
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
Factors Affecting the Implementation of Green Manufacturing- A Case Study Ana...
 
Cleaner production
Cleaner productionCleaner production
Cleaner production
 
Green supply chain management paper
Green supply chain management paperGreen supply chain management paper
Green supply chain management paper
 
Ems awareness training 25.04.11
Ems awareness training  25.04.11Ems awareness training  25.04.11
Ems awareness training 25.04.11
 
Cleaner production
Cleaner productionCleaner production
Cleaner production
 
Environmental Management Systems - ISO 14001
Environmental Management Systems - ISO 14001Environmental Management Systems - ISO 14001
Environmental Management Systems - ISO 14001
 
Environmental Management_LEC04.pptx
Environmental Management_LEC04.pptxEnvironmental Management_LEC04.pptx
Environmental Management_LEC04.pptx
 
Ems for prince mallamine industry gujranwala
Ems for prince mallamine industry gujranwalaEms for prince mallamine industry gujranwala
Ems for prince mallamine industry gujranwala
 

Recently uploaded

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 

Environmental Management System and Green Productivity (EMS_GP) Implementation in Kurdistan Cement Plant

  • 1. International Journal of Business and Management Invention ISSN (Online): 2319 – 8028, ISSN (Print): 2319 – 801X www.ijbmi.org || Volume 5 Issue 4 || April. 2016 || PP—01-07 www.ijbmi.org 1 | Page Environmental Management System and Green Productivity (EMS_GP) Implementation in Kurdistan Cement Plant Jahanbakhsh Balist1* , Ebrahim Sargazi2 , Hassan Hoveidi3 , Shahrzad Faryadi4 1 (Ms.C Student, Environmental Planning And Management, University Of Tehran, Iran) 2 (Ms.C Student, Environmental Planning And Management, University Of Tehran, Iran) 3 (Assistant Professor, Environmental Planning And Management, University Of Tehran, Iran) 4 (Associated Professor, Environmental Planning And Management, University Of Tehran, Iran) Abstract: the cement plant has many environmental aspect that can lead to pollution. For managing this effects we must use of environmental and productivity technique to minimize this effects. In this study, the Kurdistan cement plant as a case study had studied by use of two important technique: green productivity and environmental management systems as ISO. For there more, this plant environmental aspect had identified by brainstorming and specialist opinion. Then those causes are specified and for each one proposed an option for controlling it. Finally in order to applying this options, these are prioritized by ranking them. The spraying water on dust from mining and transportation is first option to applying. Keywords–green productivity, environmental management system, cement plant, environmental aspect I. Introduction In the context of debate on the considerable human and material damage generated by environmental degradation, the role of the environmental performance of companies merits attention [1]. To identify the main factors able to influence the maturity of the environmental management practiced by each organisation [2]. The maturity of the environmental management of companies concerns the environmental level or stage of evolution in the environmental management of the companies [3]. This environmental maturity (EMM) may be influenced by many factors, not only technical (e.g., „cleaner‟ technologies) but also organisational and human, related to the motivation and training of employees to achieve the goals of environmental management, leading companies to better environmental maturity [4, 5, 6]. Among the organisational and human factors relevant to environmental management, environmental training (ET) stands out as one of the most relevant ones [7, 5, 8]. And paradoxically as one that has received less attention from experts [9]. Green Productivity and Environmental Management Systems are complementary systems and both help improve the environmental performance of an organization. GP is an analytical methodology to help identify opportunities to prevent pollution and improve productivity, especially resource productivity. GP uses a number of different analytical tools, but it does not require development of a specific management structure or documentation. The process specifies how an organization can review its operations to look for waste and poor resource productivity, but is not a comprehensive set of policies or procedures for an organization[10]. An EMS in contrast, is a management system designed to help identify environmental impacts and implement improvements. An EMS consists of policies and procedures to help minimise a company‟s impacts on the environment on a routine basis. An EMS does dictate how to improve performance, but provides an internal system to manage environmental performance and to ensure continual improvement. Successful implementation of an EMS will require the use of analytical methodologies such as GP, but EMS itself is not an analytical tool. Rather it is a process for ensuring a company takes action to continually improve its environmental performance. The GP assessment methodology works within the framework of an EMS to help a company concentrate on opportunities to prevent pollution and improve material productivity. The process of developing and running a GP program for several „cycles‟ is an excellent foundation for developing a broader EMS. To move from GP to EMS appropriate documentation needs to be developed and the GP assessment practices needs to be integrated into the company‟s daily operations (eg. add audit procedures to operation manuals, adjust job descriptions). In addition, the scope of environmental assessment activities may need to be broadened. Although the GP methodology can be used in any part of a company, many organizations use it primarily for manufacturing areas. A complete EMS however requires a company to address all the potential environmental impacts in all departments. This would include office areas, transportation, storage and even product distribution.
  • 2. Environmental Management System And Green Productivity (EMS_GP) Implementation In Kurdistan www.ijbmi.org 2 | Page II. Material and methods: 2.1 Case study Kurdistan Cement Company, the largest industrial unit roof of Iranian Kurdistan province in the northwest city of Bijar. The production capacity of 3,200 tons of clinker per day to continue its activities. Geographical location and general specifications of factory • the factories km northwest 5 Bijar • Plant capacity: 3,200 tons of clinker per day • Altitude: 2017 meters • The average minimum and maximum temperature maximum and minimum -24° C +37° C • Wind speed and direction dominant: 32 meters per second • The annual rainfall: 619 mm • potential severity of the earthquake: 98 Mercalli 2.2 Methods The methodology of the project broadly followed the GP methodology introduced by the Asian Productivity Organization (APO) and the ISO 14001 standard requirements to establish an Environmental Management System. The GP methodology was used as a foundation for implementing ISO 14001 in KurdistanCement Company. In this way the methodology diverges from the traditional GP methodology. Each step of methodology has been further divided in to a number of tasks as follow: Step 1: Getting Started Task 1: GP – EMS team formation GP methodology is based on a participatory approach, where by environmental management and solutions are carried out by a team of employees. It is necessary, when initiating a GP process that management sponsors and facilitates team formation in the relevant departments, and that roles within these teams are assigned and resources are provided to undertake their responsibilities. These roles should focus on the skills and experiences of the employees, in relation to their role within the enterprise. A broad range of members that are involved in the widest verity of processes and tasks is optimum. The teams should encourage all levels of employees to input into the process. A steering committee is also necessary to oversee the program, which should have representation from both internal and external personnel. External personal may include members of organisations who are providing technical advice as well as from other effected parties, for instance the local community. Task 2: Walk through survey of the production process A preliminary audit of the business should be undertaken, that compiles basic information about the resources available and the processes involved. It will include such information as personnel, machinery, equipment and processes. It will also briefly detail possible sources of environmental problem or areas of inefficient use of resources. It should include a flow diagram of the processes involved as well as all inputs and outputs, including waste and products. Step 2: Planning Task 3: Training on GP methodology and ISO 14000 standard. The objective of the training workshop was to train the senior management of the cement factory on GP methodology and Environmental Management System. The following topics were covered in the training:  GP methodology tools and techniques  Environmental Management System according to ISO 14001 standard (awareness and documentation).  Identification of problems and causes/environmental legal and other requirements, Aspect and impacts.  Generation, evaluation and prioritisation of GP options; Task 4: Identification of Problems and Causes Building on the preliminary audit an in depth discussion of the areas that require improvement is undertaken. Identifying and recording specific problems is carried out using analysis techniques including brainstorming to locate and then pinpoint the cause of problems existing in the system. Task 5: Setting Objectives and Targets After identifying the problems and their causes, it is necessary to set objectives and targets to ameliorate them.  Objectives should be based on problems and causes identified.  One objective can have multiple targets.  Targets should be based on „needs‟.  Indicators should be established to track the progress of each objective. It is necessary to prioritise the problems, with relation to their feasibility, costs and the resources and technologies that are available. Step 3: Generation, Evaluation and Prioritisation of GP Options
  • 3. Environmental Management System And Green Productivity (EMS_GP) Implementation In Kurdistan www.ijbmi.org 3 | Page Task 6: Generation of GP Options The most significant task in GP methodology relates to the development of GP options. These options emerge directly from the cause analysis. The use of techniques such as brainstorming and group discussions improve the quality of ideas. A logical approach to generating options is as follows:  Establishing a brainstorming exercise for generating options, based on the identification of causative factors,  Determine the nature of the solution required. Task 7: Screening, Evaluation and Prioritisation of GP options Not all GP options generated need a detailed evaluation. Some of the GP options can be eliminated on the basis of certain criteria, or by the process of screening. GP implementation at community level has many different features in comparison with other sectors, especially in technical skill and funding fields. That is why these options need to be carefully evaluated; otherwise the success of GP options may be negligible. The option evaluation needs to directly relate to feasibility. This includes technology, economic viability (rate of turnover from investment, payback period), environmental aspects and social aspects. After assessing the option based on this criteria the options may be divided into 3 categories: Options to be applied. These options are usually inexpensive, efficient and easy to implement and maintain. Options needing further analysis. These options usually require a significant financial investment and/or the expected outcomes are not clear. Options which are not suitable. These options are usually very expensive and complicated. Often technical expertise that is not present within the organisation would be required, even after project implementation for maintenance. Step 4: Implementation of GP Options Task 8: Formulation of GP plan The development of a document that considers important logistical aspects of GP implementation is required. Some topics in the GP plan will include finances, resources, technology and timeframe. The implementation plan should also contain a detailed activity plan, input, required time frame and the persons responsible for implementation. It may combine the work of various GP teams in different sections. A plan will be most effectively implemented if all members involved in the implementation are interested and aware of all the factors involved. The GP team needs to answer the following questions when designing the plan.  What needs to be done?  What is the timetable for implementation?  Who will be responsible for each task?  How will each option be implemented?  How/Where will equipment and expertise be sourced?  What support is available (are there others have implemented in a similar industry, or is other external technical advice available)? Task 9: Implementation of selected Options The GP team together with experts and the support of the management strata implement all steps detailed in the implementation plan. Training needs should be identified and provided where required. Task 10: Training, awareness building and developing competence The provision of training may cover a broad range of topics. It will be required for the GP – EMS teams in the methodology and environmental management strategies EMS internal audit, but also for those on site using equipment and procedures that may be altered in the GP process. The degree of training required will vary between GP options and may also take a variety of forms from formal seminars to informal on the spot instruction. Some options will require no training, implementation can be immediately and others may require a significant training period. Options will therefore be implemented at various stages. Some options may be interdependent. Step 5: Monitoring and Review Task 11: Monitoring and Evaluation of Results The monitoring and evaluation of GP options is an important task in the project cycle. It enables a comparison to be made between the objectives and the outcomes of the project. Project coordinators from the VPC have a responsibility to review the project, and external experts are also invited to evaluate these results. Any problems identified within the project need to be assessed and possible solutions identified. Monitoring should be an ongoing task of a GP program, it should occur at all stages of implementation, ensuring that problems are identified and solved as soon as possible. The aim of GP projects is to achieve sustainability, which is only possible if problems are identified and if possible solved quickly.
  • 4. Environmental Management System And Green Productivity (EMS_GP) Implementation In Kurdistan www.ijbmi.org 4 | Page Task 12: Management review Management reviews are necessary to evaluate the progress of the GP project. All activities must be recorded during the implementation of project for future reference. After implementation, management together with the steering committee must examine the GP program to determine how effective the project has been at meeting the specified objectives. When reviewing, management will look at the final report and other ongoing documentation from the project. Step 6: Sustaining GP Task 13: Incorporating changes into the organization’s system of management GP cannot exist in isolation. It needs to be integrated with regular activities of the management and day-to-day functioning of the enterprise. Therefore, all employees need to be familiar with the activities and objectives of the GP program. Participation of the workforce as well as consultation with other interested parties, including the community in which the industry is based is an important factor contributing to the long-term sustainability of GP. One way to ensure that GP becomes a regular activity is to document and enforce procedures within each work area. Task 14: Identifying new/ additional problem areas for continualimprovement Once the first cycle of GP is complete within the organisation, the procedures and knowledge should be in place so that the cycle may be repeated. Green Productivity system specifically designed to facilitate continuous improvement. Tools 2.4.1 Management Tools GP tools provide information on the equipment and devices utilized in implementing GP plans. One of the most essential elements in GP tools is brainstorming, a process in which ideas are generated from answering critical questions such as: “What are solutions to reduce dust generation? What is the best choice?” The more people involved in the brainstorming process, the greater the amount of quality ideas will be available. The best choice will be selected from a number of solutions. The process flow was a useful tool to see in the detail of each activity to find out where the waste generated and understand whole the production process. This tool can identified exactly where have problem. Equally important to brainstorming is the fish bone diagram, also known as a cause-and-effect diagram. It displays all the possible reasons and causes that contribute to a specific result. This diagram is used in the solving most problems, particularly in large-scale problems that have resulted from a number of causes and are related to a number of activities. Therefore, the fish bone diagram plays a crucial role in pinpointing problems in order to solve them. A matrix is often set up to rate the feasibility of a number of options. Not all options are selected for implementation, due to the difference in priorities. Those options, which are significant and applicable, will have the first and foremost priorities. Similarly, the less difficult and low-cost options also have advantages over the more difficult and high-cost ones. In fact, it is not so easy to classify the priorities of options because the most urgent ones often requires high costs for implementation while the inexpensive ones are not so applicable. 2.4.2 Environment Tools As one of the two components making up GP tools, environmental tools, often called technical tools require a number of specific skills such as good housekeeping, solid waste management, wastewater treatment, air pollution treatment, mass balance and process flow. Good housekeeping aims to minimize wastes, prevent the loss of material water pollution and money for a company. This tool requires the involvement of all individuals together, forming a cohesive company. If each member of the company takes responsibility for using the right way of oil, material transportation as well as rag oil, the pollution by company contributed to environment will consequently be reduced. GP tools also focus on oil contamination in wastewater, dust generation and solid waste management. Solid waste are often collected and separated to hazard waste, recyclable and non-recyclable waste before delivery for treatment. III. Result and discussion 3.1 GP implementation GP implementation in Kurdistan Cement Company was based on the GP methodology that introduced by APO and integrated with ISO 14001 development process. - Getting started GP-EMS Team formation Establishing a GP team is an effective method for considering all possible aspects the existing problems in a company. A team should effectively utilise the skills and experiences of many people and incorporates their various ideas, views and opinions. GP-EMS team was established in Kurdistan Cement Company. These teams
  • 5. Environmental Management System And Green Productivity (EMS_GP) Implementation In Kurdistan www.ijbmi.org 5 | Page consisted of top-level management and managers from all involved departments such as the technical, quality control and environmental management department, as well as the labour union. Problem identification Based on the data collected from survey the GP-EMS team conducted a group discussion to list all problems in each process related to environment and productivity. See Table 1. Table.1. Problems of Kurdistancement company Depart ment/ Process Problems Environmental Productivity Mining and transportation of raw material -Dust from mining explosions, transportation and loading and unloading of raw materials Limestone crusher process - Noise pollution - Dust generation -Short lifetime of hammer -Low capacity Clay crusher process - Noise pollution - Dust generation Conveyer belt transportation from crusher to storage - Dust generation at direction change points (from this conveyer to other conveyer) Kilns - Waste heat - Air emissions - Wastewater - Waste oil - Oil leakage - Solid waste - Low inefficiency of kiln - Energy consumption Compressor room - Noise - Oil leakage Cement mill - Production lower than design capability - Energy consumption Loading clinker and cement - Dust generation Packaging area - Dust generation - Solid waste Maintenance workshop - Wastewater - Solid waste - Air emissions All company - Solid waste Cause identification This task very important so that the GP-EMS team used GP tools such as brainstorming to find out the root causes of each problem. Table.2. Problems of Kurdistan cement company Depart ment/ Process Problems Causes Options Mining and transportation of raw material - Dust from mining explosions, transportation and loading and unloading raw materials Material too dry A lot of dust on the road Spray water on the limestone before upload and unload Limestone crushing process. Clay crushing process - Noise pollution Old crushers Wearing ear Protection equipment - Dust emissions - Bag filter operate inefficiency and bag damaged - Periodical maintenance of bag filter and should be change damaged bags filter diligently. Short lifetime of the limestone crusher‟s hammer Low capacity - See fish bone diagram - Reduce SiO2 in limestone by change mixer formula - Install a pre-crusher and screen. Conveyer belt transportation from crusher to storage of line I - Dust generation at direction change points (from this conveyer to other conveyer) - The bag filter efficient and has low capacity - Not cover all conveyor belt at that point - Replace by new bag filter - Cover the point lack off.
  • 6. Environmental Management System And Green Productivity (EMS_GP) Implementation In Kurdistan www.ijbmi.org 6 | Page Raw material mill - Capacity lower than design capacity Material output coarse -decrease size of material out put Kilns - Low inefficiency of kiln -high energy consumption of pre heater - Install auxiliary furnace for preheater - Waste heat - Lack of waste heat recovery system - Install a waste heat recovery generation system in both kilns. Compressor room - Noise - Old compressor - Lack of noise prevention facility - Install noise protection box to cover individual compressors - Build a separate operation room - Oil leakage - Old compressors - Increase maintenance activities - Replace to new compressors Cement mill - Lower capacity - Install a pre-griding system upstream of the existing ball mill. Clinker Loading - Dust generated when loading the clinker onto the ship. - Existing dust collector‟s capacity (80 m3 /min) is too small. - Dust suction pipe too small - The cover of suction head is not inadequate - Replace filter with Electrostatic precipitator (EP) - Change the cover with one that has improved material and design Packaging area and cement loading - Dust generation during packaging, transporting on conveyor belt, loading cement on ship truck on train - Modify the dust collection system at packaging machine - Education class for employees All company - Solid waste generation from all departments - Lack of solid waste management regulation. - Solid waste collection system inadequate. - Lack of awareness on environment protection. - Lack of environmental management system. - Appling Hard Regulation - Install a new waste collector system - Training for employees related to waste oil generation In order to prioritization the option for decreasing and management of environmental and productivity, with the remaining 16 options, GP – EMS team screened, evaluated to set priorities for each options. Some criteria that were chosen to evaluate them are: 1. Cost of investment: the higher cost of investment, the lower the priority of option 2. The complexity of technique: the more complicated, the lower priority of option 3. The efficiency of option both in terms of environmental performance and productivity: the more efficiency, the higher priority of option 4. The ability of workers to control and operate system: the easier for worker to operate, the higher priority of option 5. Suggested options were ranged from 1-5 marks for each criteria, in which 1 represents for the low and 5 presents for higher priority. All options are listed and evaluated by criteria as the table below: Table.3. priority of option Criteria 1 Criteria 2 Criteria 2 Criteria 4 multiple priority Spray water on the limestone before upload and unload Periodically spray water on the surface road 4.1 4.52 3.42 3.89 246.5 1 Replace by new bag filter. 2.52 2.94 3.94 2.73 79.69 10 Cover the point lack off. 3.57 4 3.21 3.47 159.06 4 Replace bigger suction pipe. 2.94 3.1 3.26 2.73 81.11 9 Modify the dust collector system in bag car 2.47 2.31 3.79 2.52 54.49 15 Wearing ear protection 4.21 4.21 2.89 3.73 191.06 3 Install sound choker on compressor 2.84 3.37 3.42 3.05 99.83 6 Build up the separate operation room 2.57 3.1 3.1 2.89 71.37 13 Rising maintenance operating 3.1 2.84 3.21 2.94 83.08 7 Change compressor 2.16 3.1 3.52 3.21 75.65 11 Install pre heater 2.42 2.63 3.47 2.79 61.61 14 Install recovering residue temperate in heater 2.21 2.05 3.52 2.68 42.73 16 Install pre crasher and filters 2.73 3 3.31 3 81.32 8 Appling Hard Regulation 3.57 3.57 3.82 2.63 128.04 5
  • 7. Environmental Management System And Green Productivity (EMS_GP) Implementation In Kurdistan www.ijbmi.org 7 | Page Install a new waste collector system 2.63 2.68 3.84 2.73 73.88 12 Training for employees related to waste oil generation 3.84 4 3.78 3.36 195.08 2 Monitoring and review: Internal audit reports and assess compliance with legal requirements and other requirements that the organization is committed applied. 1. Internal audit report:  Internal audit was conducted on 17 and 18 may 2014, as the non-compliance of environmental management system follow: - Non-compliance at this stage should be identified and appropriate corrective action taken on them. 2. Report meetings to assess compliance with legal requirements and specified non-compliance in this respect to assess compliance with the requirements of environmental law based on the identification and registration procedure legal requirements, assess the compliance with legal requirements and procedures and aspects of identified risks, as discussed below have. 2.1.1. Performance monitoring and self-reported in accordance with rules and requirements administered by the Department of Environment every six months, based on the results in all cases the expected environmental organization, the company has been consistent. 2.1.2. In relation to other legal requirements relating to the environment in accordance with the accepted procedure of registration and monitoring of conformity assessment done. IV. Conclusion Technology development altered range of human life. However, due to the lack of consistency harmful effects of technology on the natural interaction, gradually turning the control vital imbalance actually suffered the effects of these disorders will be affect the man as part of nature. At the global level, especially in developing countries, issues such as population growth, economic and cultural poverty and lack of environmental programs, they will be broader problem of environmental conservation. In our country to find a reasonable and effective solution of all harmful agents in the environment must be identified and evaluated. Then measures and by taking them to a comprehensive environmental management plan be developed at the country level. So, in order to improve the quality of the environment in Kurdistan Cement Factory, two techniques, environmental management systems and green productivity are integrated. Therefore, the first step to form a team and then identify environmental problems techniques and environmental causes of them in the factory and then to solve these problems strategies proposed by the executive team and the experts in the field using the options suggested took priority. It was found that the priorities of options water splashing on the rocks before loading and unloading of the highest priority and should be in the field adopt necessary measures.the proposed solutions were prioritized. References [1]. Hart, S.L., Dowell, G., 2011. A natural-resource-based view of the firm fifteen years after. J. Manag. 37 (5), 1464e1479. [2]. González-Benito, J., González-Benito, Ó., 2006. A review of determinant factors of environmental proactivity. Bus. Strat. Environ. 15 (2), 87e102. [3]. Jabbour, C.J.C., 2010. Non-linear pathways of corporate environmental management: a survey of ISO 14001-certified companies in Brazil. J. Clean. Prod. 18 (12), 1222e1225. [4]. Graves, L.M., Sarkis, J., Zhu, Q., 2013. How transformational leadership and employee motivation combine to predict employee proenvironmental behaviors in China. J. Environ. Psychol. 35, 81e91. [5]. Renwick, D.W., Redman, T., Maguire, S., 2013. Green human resource management: a review and research agenda. Int. J. Manag. Rev. 15 (1), 1e14. [6]. Wagner, M., 2013. Green human resource benefits: do they matter as determinants of environmental management system implementation? J. Bus. Ethics 114, 443e456. [7]. Andersson, L., Jackson, S.E., Russell, S.V., 2013. Greening organizational behavior: an introduction to the special issue. J. Org. Behav. 34 (2), 151e155. [8]. Ji, L., Huang, J., Liu, Z., Zhu, H., Cai, Z., 2012. The effects of employee training on the relationship between environmental attitude and firms‟ performance in sustainable development. Int. J. Hum. Resour. Manag. 23 (14), 2995e3008. [9]. Jackson, S., Renwick, D., Jabbour, C.J.C., Muller-Camen, M., 2011. State-of-the-art and future directions for green human resource management. Z. Personalforschung 25, 99e116. [10]. Technical Report on ISO 14001 & GP Demonstration Project in Hoang Thach and Sai Son Cement Company, Vietnam Productivity Centre Directorate for Standards and Quality, Vietnam 2002.