The document defines various time categories used to calculate utilization metrics for semiconductor manufacturing operations. It includes productive time, non-scheduled time like idle or engineering time, scheduled downtime, and standby time. Overall utilization is calculated as the actual output divided by the ideal cycle time, total time is the sum of all time categories, and utilization percentages provide insights into operations, planning, and tester equipment efficiency.