(Sign and Seal of the bidder)
Page 1 of 31
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff
SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt
dduurriinngg tthhee yyeeaarr 22001122--1133..
((PPaarrtt --22))
GGuujjaarraatt EEnneerrggyy DDeevveellooppmmeenntt AAggeennccyy
4th Floor, Block No.11 and 12, Udyog Bhavan, Sector - 11
Gandhinagar – 382 017, Gujarat, India
Phone : +91 79 23257251/2/3/4
Fax: +91 79 23257255, 23247097
website:www.geda.org.in
Page 2 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
TABLE OF CONTENTS for part -2 of the tender
7.0 TECHNICAL SPECIFICATIONS ............................................................................................................3
SOLAR PV ROOFTOP SYSTEM- 1kW, 2kW, 3kW, 5kW ........................................................................3
GRID CONNECT SOLAR POWER GENERATING SYSTEM ......................................................................8
SOLAR PV HOME SYSTEMS................................................................................................................21
SOLAR PV STREET LIGHTING SYSTEM ...............................................................................................25
FINANCIAL BID GUIDELINES.................................................................................................................30
Annexure 7 : Price Bid..........................................................................................................................31
(Sign and Seal of the bidder)
Page 3 of 31
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
7.0 TECHNICAL SPECIFICATIONS SOLAR PV ROOFTOP SYSTEM- 1kW, 2kW, 3kW, 5kW
DEFINITION
Solar PV – AC hybrid power pack comprises of Solar PV modules, lead acid battery bank and intelligent on line inverter which feeds
uninterrupted quality AC power to electrical loads taking energy from PV, grid or battery bank as the case may be. Batteries will be charged from
solar energy as well as grid by multi stage charger integrated in the inverter or external charge controller.
Sr.No. Specification
i) DUTY CYCLE: The system should be designed to operate for specified Nos. hours and automatically switch to
grid in case of non-sunshine days, under average daily insolation of 5 kWh/sq.m. on a horizontal surface.
6 Hours
For 1 kW system For 2 kW system For 3kW System For 5 kW system
ii) LOAD: The system should be
connected to the Specified
available load.
400 W 600 W 900kW 2000 W
iii) PV MODULE (S)
i.The PV module bidder should have IEC 61215-2nd
Edition and IEC 61730-2 qualification certification for PV modules.
ii.The PV module(s) shall contain crystalline silicon solar cells.
iii.The terminal box on the module should have a provision for opening for replacing the cable, if required.
iv.Modules of minimum 200 W output each or above output should be used.
v.A strip containing the following details should be laminated inside the module so as to be clearly visible from the front side.
a. Name of the Supplier or distinctive Logo b. Model or Type No. c. Serial No. d. Year of make.
vi.Identification and traceability
Each PV module must use a RF identification tag (RFID), which must contain the following information:
(i) Name of the manufacturer of PV Module and GEDA’s monogram (symbol).
(ii) Name of the Manufacturer of Solar cells
(iii) Month and year of the manufacture (separately for solar cells and module)
(iv) Country of origin (separately for solar cells and module)
(v) I-V curve for the module
(vi) Peak Wattage, Im, Vm and FF for the module
(vii) Unique Serial No and Model No of the module
(viii) Date and year of obtaining IEC PV module qualification certificate
(ix) Name of the test lab issuing IEC certificate
(x) Other relevant information on traceability of solar cells and module as per ISO 9000 series.
The RFID can be inside or outside the module laminate, but must be able to withstand harsh environmental conditions.
Page 4 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
iv) BATTERY
Flooded electrolyte type, positive tubular plate, low maintenance lead acid battery.
Following IEC/IS certificates are mandatory for the battery: (Copy to be provided with tender.)
General Requirements & Methods of Test - IEC 61427
Tubular Lead Acid- IS 1651/IS 133369
Rating of the Battery (a) The battery will
have a minimum
rating of 24V, 300 Ah
(at C/10 at 27 o
C)
discharge rate or 48
V, 150 Ah (at C/10 at
27 o
C) discharge rate,
consisting of 2V cells.
(b) 75% of the rated
capacity of the
battery should be
between fully
charged & load cut
off conditions.
(a) The battery
will have a
minimum rating
of 24V, 600 Ah
(at C/10 at 27 o
C discharge rate
or 48 V, 300 Ah
(at C/10 at 27 o
C) discharge
rate, consisting
of 2V cells.
(b) 75% of the
rated capacity
of the battery
should be
between fully
charged & load
cut off
conditions.
(a) The battery
will have a
minimum rating of
48 V, 500 Ah (at
C/10 at 27 o
C)
discharge rate,
consisting of 2V
cells.
(b) 75% of the
rated capacity of
the battery should
be between fully
charged & load
cut off conditions.
(a) The battery will
have a minimum
rating of 48 V, 750
Ah (at C/10 at 27 o
C) discharge rate
or 120V, 300 Ah
(at C/10 at 27 o
C)
discharge rate,
consisting of 2V
cells.
(b) 75% of the
rated capacity of
the battery should
be between fully
charged & load cut
off conditions.
v) The power output of the
module (s) under STC should
be a minimum of
- Mismatch amongst
modules <3%.
- Tolerance in rated
power of modules: 3%
1000 W 2000W 3000 W 5000W
Page 5 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
vi) ELECTRONICS
The single phase bi-directional on line inverter shall provide AC power to the load, DC power to the battery bank and energy
management to ensure that the battery will be remained in fully charged condition in all feasible circumstances.
For Power Conditioners/Inverters* following certificates are mandatory: (Copy to be provided with tender.)
Efficiency Measurements- IEC 61683
Environmental Testing- IEC 60068 2 (6,21,27,30,75,78)
* Must additionally conform to the relevant national/international Electrical Safety Standards.
PCU specifications : For 1 kW system For 2 kW system For 3kW
System
For 5 kW system
Rating: 1 kVA 1kVA 1.5 kVA 3.5kVA
Waveform : Pure sine wave. Pure sine wave. Pure sine wave. Pure sine wave.
Battery Voltage: 24/ 48 V DC nominal. 24/ 48 V DC
nominal.
48 V DC
nominal.
120 V DC nominal.
Charger Type : DSP/ PWM / MPPT
technology.
DSP/ PWM /
MPPT
technology.
DSP/ PWM /
MPPT
technology.
DSP/ PWM / MPPT
technology.
Output voltage: 230 V AC +/- 3%, 50 Hz 230 V AC +/- 3%,
50 Hz
230 V AC +/-
3%, 50 Hz
230 V AC +/- 3%,
50 Hz
Efficiency: 90% 90% 90% 90%
Overload capacity: 125% for 5 min 125% for 5 min 125% for 5 min 125% for 5 min
Necessary lengths of wires/cables and fuses should be provided and wiring of cables should be through the pole with no
open access to cables.
Page 6 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
vii) ELECTRONIC PROTECTIONS
a) Adequate protection is to be incorporated under over load conditions.
b) The system should have protection against battery overcharge and deep discharge conditions.
c) Fuses should be provided to protect against short circuit conditions.
d) A blocking diode should be provided as part of the electronics, to prevent reverse flow of current through the PV module (s), in case such
a diode is not provided with the solar module (s).
e) Full protection against open circuit accident, short circuit and reverse polarity should be provided.
viii) MECHANICAL HARDWARE
a) The material should be rust proof and long lasting preferably hot dip galvanized iron. The frame structure should have provision to adjust
its angle of inclination to the horizontal between 0 and 45, so that it can be installed at the specified tilt angle in the desired direction.
b) The structure should be able to with stand wind speeds up to 150 kmph.
c) The Battery rack made up of angles with wooden base and sides covered with net or ventilated MS sheet of minimum 18 SWG. All
hardware, nuts, bolts should be cadmium passivated.
d) Detailed drawings with specifications of each component should be submitted with the Technical Bid.
ix) OTHER FEATURES
a) The system should be provided with 2 LED indicators a green light to indicate charging in progress and a red LED to indicate deep
discharge condition of the battery. The green LED should glow only when the battery is actually being charged.
b) There will be a Name Plate on the system which will give
c) Name of the Supplier or Distinctive Logo
d) Serial Number
e) Components and parts used in the solar rooftop systems should conform to the latest BIS specifications, whenever such specifications
are available and applicable.
f) The PV module (s) will be warranted for a minimum period of 25 years from the date of supply.
Page 7 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
g) The Warranty Card to be supplied with the system must contain the details of the system supplied, as given in the Appendix-I. The
Suppliers can also provide additional information about the system and conditions of warranty as necessary.
h) An Operation, Instruction and Maintenance Manual, in English and the local language should be provided with the system.
i) The following minimum details must be provided in the manual:
I. About Photovoltaics
II. About solar rooftop system – its components and expected performance.
III. About PV module
IV. About CFL
V. About battery
VI. Clear instructions about erection of pole and mounting of PV module and lamp housing assembly on the pole.
VII. About electronics
VIII. About charging and significance of indicators.
IX. DO’s and DONT’s
X. Clear instructions on regular maintenance and trouble shooting of solar rooftop system.
XI. Name and address of the contact person in case of non-functionality of the solar rooftop system.
x) BILL OF MATERIAL
The bidder should provide the bill of material mentioning the quantity of each of the item consisting in each system, along with the offer.
Page 8 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
GRID CONNECT SOLAR POWER GENERATING SYSTEM
I DEFINITION
The Grid Connect Solar Power Generating System consists of mainly three components viz. the solar photovoltaic (SPV) array, module mounting
structure and the power conditioning unit (PCU)/ inverter. The SPV array converts the solar energy into DC electrical energy. The module
mounting structure holds the modules in required position and the DC electrical energy is converted to AC power by the PCU, which is
connected to the power grid. The AC power output of the inverter is fed to the AC distribution board through metering panel and isolation
panel. The 415 V AC output-3Ø of the system can be utilized or as an option it could be stepped up to the required voltage level and after
synchronizing with the grid, can be exported to the grid.
II PV MODULE (S)
i) The PV module bidder should have IEC 61215-2nd
Edition and IEC 61730-2 qualification certification for PV modules. Copy to be provided
with tender.
ii) The PV module(s) shall contain crystalline silicon solar cells.
iii) All materials used shall have a proven history of reliable and stable operation in external applications. It shall perform satisfactorily in
relative humidity up to 100% with temperatures between -10 Deg C and +85 Deg C and with stand gust up to 200km/h from back side of
the panel. The terminal box on the module should have a provision for opening for replacing the cable, if required.
iv) A strip containing the following details should be laminated inside the module so as to be clearly visible from the front side.
b. Name of the Supplier or distinctive Logo
c. Model or Type No.
d. Serial No.
e. Year of make.
v) Modules of minimum 200 W output each or above output should be used. Photo / electrical conversion efficiency of SPV module shall be
greater than 13.5%.
vi) IDENTIFICATION AND TRACEABILITY
Each PV module must use a RF identification tag (RFID), which must contain the following information:
(i) Name of the manufacturer of PV Module and GEDA’s monogram (symbol).
(ii) Name of the Manufacturer of Solar cells
(iii) Month and year of the manufacture (separately for solar cells and module)
Page 9 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
(iv) Country of origin (separately for solar cells and module)
(v) I-V curve for the module
(vi) Peak Wattage, Im, Vm and FF for the module
(vii) Unique Serial No and Model No of the module
(viii) Date and year of obtaining IEC PV module qualification certificate
(ix) Name of the test lab issuing IEC certificate
(x) Other relevant information on traceability of solar cells and module as per ISO 9000 series.
The RFID can be inside or outside the module laminate, but must be able to withstand harsh environmental conditions.
III EARTHING AND SURGE PROTECTIONS
Surge Protection Device (SPD): Internal surge protection shall consist of three MOV type arrestors connected from +ve and –ve terminals
to earth (via Y arrangement) for higher withstand of the continuous PV-DC voltage during earth fault condition. SPD shall have safe
disconnection and short circuit interruption arrangements through integrated DC in-built bypass fuse (parallel) which should get tripped
during failure mode of MOV, extinguishing DC arc safely in order to protect the installation against fire hazards. Nominal discharge
current (In) at 8/20 micro seconds shall be minimum 10 kA with maximum discharge (Imax) at 8/20 micro seconds minimum 20 kA with
visual indication (through mechanical flag) in modules to monitor the life of SPD.
EARTHING FOR PV ARRAY
 The photovoltaic modules, BOS and other components of power plant requires adequate earthing for protecting against any serious
faults as guided by IEC 60364.
 The earthing for array and LT power system shall be made with GI pipe, 4.5 m long 40 mm diameter including accessories, and providing
masonry enclosure with cast iron cover plate having locking arrangement, watering pipe using charcoal or coke and salt as required as
per provisions of IS: 3043.
 Necessary provision shall be made for bolted isolating joints of each earthing pit for periodic checking of earth resistance.
 Each string/ array and MMS of the plant shall be grounded properly. The array structures are to be connected to earth pits as per IS
standards. Necessary provision shall be made for bolted isolating joints of each earthing pit for periodic checking of earth resistance.
Sr.No. Specification For 10 kW
system
For 15 kW system For 20 kW
system
For 25 kW system
1 The power output of the
module (s) under STC
should be a minimum of
10,000W 15,000 W 20,000 W 25,000 W
Page 10 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
 The complete earthing system shall be mechanically & electrically connected to provide independent return to earth.
 For each earth pit, a necessary test point shall be provided.
 In compliance to Rule 11 and 61 of Indian Electricity Rules, 1956 (as amended up to date), all non-current carrying metal parts shall be
earthed with two separate and distinct earth continuity conductors to an efficient earth electrode.
 The Bidder shall submit the detailed specifications of the array earthing.
LIGHTNING PROTECTION FOR PV ARRAY
 The source of over voltage can be lightning or other atmospheric disturbance. Main aim of over voltage protection is to reduce the over
voltage to a tolerable level before it reaches the PV or other sub-system components as per IEC 60099.
 Necessary concrete foundation for holding the lightning conductor in position to be made after giving due consideration to shadow on
PV array, maximum wind speed and maintenance requirement at site in future.
 The lightning conductor shall be earthed through flats and connected to the earth mats as per applicable Indian Standards with earth
pits. Each lightning conductor shall be fitted with individual earth pit as per required Standards including accessories, and providing
masonry enclosure with cast iron cover plate having locking arrangement, watering pipe using charcoal or coke and salt as required as
per provisions of IS.
 If necessary more numbers of lightning conductors may be provided.
 The Bidder shall submit the drawings and detailed specifications of the PV array lightning protection equipment.
IV MECHANICAL COMPONENTS
(i) Metallic frame structure of galvanized steel with stands to be fixed on the roof of the building to hold the SPV module (s) one feet above
roof level. The frame structure should have provision to adjust its angle of inclination to the horizontal between 0 and 45, so that it can
be installed at the specified tilt angle i.e. inclined at 25 degree to horizontal facing due south. All hardware, nuts, bolts should be
cadmium passivated.
V OTHER FEATURES
(i) The PV module (s) will be warranted for a minimum period of 10 years from the date of supply.
(ii) An Operation, Instruction and Maintenance Manual in English and the local language should be provided with the system.
The following minimum details must be provided in the Manual
(a) About Photovoltaics
(b) About solar PV system – its components and expected performance.
Page 11 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
(c) About PV module
(d) Clear instructions about mounting of PV module (s)
(e) About electronics
(f) DO’s and DONT’s
(g) Clear instructions on regular maintenance and trouble shooting of solar power plant.
(h) Name and address of the person or service center to be contacted in case of failure or complaint.
The details of the Power Conditioning Unit are as given below:
For Power Conditioners/Inverters* following certificates are mandatory: (Copy to be provided with tender.)
Efficiency Measurements- IEC 61683
Environmental Testing- IEC 60068 2 (6,21,27,30,75,78)
* Must additionally conform to the relevant national/international Electrical Safety Standards.
Purpose The power conditioner unit shall convert DC produced by SPV array and adjust the voltage &
frequency levels to suit the Grid.
Grid supervision All three phases shall be supervised with respect to rise / fall in programmable threshold values
of frequency & the power section of the plant. The plant shall get disconnected / connected from
the grid in case of a grid fault / after normal grid conditions have resumed. The grid supervision
must comply with VDEW or other relevant/equivalent regulations.
Type & technology IGBT based.
Utilize a circuit topology and components suitable for meeting the specifications.
Output voltage
on AC side
415 +10%, - 15% V AC
A dedicated isolation transformer housed in the PCU enclosure shall be supplied to match the
PCU output voltage to the utility grid voltage. PCU/ Solar Inverter voltage range should be
reconfigured as per site requirements.
Sr.No. Specification For 10 kW system For 15 kW system For 20 kW
system
For 25 kW system
1 PCU rating (NOMINAL) 10 kW/10 kVA
VAC, grid
interactive output
15 kW/15kVA VAC,
grid interactive
output
20 kW/20kVA
VAC, grid
interactive
output
25 kW/25kVA VAC,
grid interactive output
Page 12 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
Output voltage 415 V ,50 Hz AC
Output Frequency 50 + 1.5Hz, - 3.5 Hz
DC system voltage The electrical safety of the array installation is of the utmost importance. Array electrical
configuration shall be in such a way that, the MPPT shall operate with maximum efficiency,
between the low and high temperature of the site.
Maximal Current ripple 5% PP
Power Factor 0.95 inductive to 0.95 capacitive
Ambient room
temperature
5 to 55 deg C
Housing Cabinet a) PCU is housed in suitable switch cabinet, with min
IP 21 degree of Ingress Protection.
b) Weatherproof, rodents & insect proof
c) Components and circuit boards mounted inside the enclosures clearly identified with
appropriate permanent designations, which shall also serve to identify the items on the supplied
drawings.
d) All doors, covers, panels and cable exists shall be gasketed or otherwise designed to limit the
entry of dust and moisture. All doors shall be equipped with locks. All openings shall be provided
with grills or screens with openings no larger than 0.95 cm (about 3x8 inch).
Other important features
Electrical safety
Protections
a)General
b) Over/under voltage
The PCU shall include appropriate self protective and self diagnostic feature to protect itself and
the PV array from damage in the event of PCU component failure or from parameters beyond the
PCU’s safe operating range due to internal or external causes. The self-protective features shall not
allow signals from the PCU front panel to cause the PCU to be operated in a manner which may be
unsafe or damaging. Faults due to malfunctioning within the PCU, including commutation failure,
shall be cleared by the PCU protective devices and not by the existing site utility grid service circuit
breaker.
a)Mains (Grid) over-under voltage and frequency protection.
Page 13 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
c) Fool Proof
Protection
d) Accidental open
circuit
e) Internal Faults
f) Galvanic Isolation
b) Over voltage protection against atmospheric lightning
c) Protection against voltage fluctuations in the grid itself and internal faults in the power
conditioner, operational errors and switching transients.
Against ISLANDING. Note : MOV type surge arrestors on AC and DC terminals for over voltage
protection from lightning-induced surges
Full protection against accidental open circuit and reverse polarity at the input.
Inbuilt protection for internal faults including excess temperature, commutation failure, overload
and cooling fan failure is obligatory
Galvanic isolation is provided to avoid any DC component being injected into the grid and the
potential for AC components appearing at the array.
- Galvanic isolation shall be provided between the inverter/ PCU and grid to avoid any DC
component being injected into the grid and the potential for AC components appearing at the
array.
- The specification of the isolation transformer shall be as follows:
 Capacity: 125% of capacity of the PV modules (i.e. a 12.5 kVA
transformer shall be used for a 10 kW PV system, and so on)
 System: 3-phase, 4-wire
 Input voltage range: 320-480 V AC
 Output voltage range:380-435 V AC
 Output voltage for single phase: 220-240 V AC
 Tap change: Manual, V+/-20%, V+/-10%, V+/-0%
 Operating frequency: 48-52 Hz
 Efficiency; >98.5%
 Impedance: 4-10%
 Output waveform: Zero distortion
 Insulation class: Class F
 Leakage current: <20 mA
 Cooling: AN
Page 14 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
g) Earth Fault
Supervision
h) Disconnection &
Islanding
 Enclosure: IP 21 (if indoors)
IP 54 (if outdoors)
 Normal Operating Temperature: 0-60°C
 Cable entry: Separate input/ output enclosed cable entry
 Standard: IS 2026
- Further, it is also observed at various locations throughout the distribution grid that the grid
voltage would consistently be greater or less than the acceptable voltage window of many
inverters and PCUs. Moreover, this variation may be only for particular days of a week, seasonal,
or for a limited time.
- In such a case, the Contractor shall study/ measure the point of interconnection of the PV system
consistently for at least one week to identify the voltage range experienced at the interconnection
point of the distribution grid.
Consequently, the Contractor shall adjust the input/ output of the isolation transformer to
appropriate tap settings so that the voltage on the inverter side of the transformer is always
within the acceptable voltage window of the inverter. The appropriate tap setting shall be
conveyed to GEDA by the contractor.
An integrated earth fault detection device is provided to detect eventual earth fault on DC side
and shall send message to the supervisory system
Disconnection of the PV generator in the event of loss of the main grid supply is achieved by in
built protection within the power conditioner. This may be achieved through rate of change of
current, phase angle, unbalanced voltages, or reactive load variants.
Operation outside the limits of power quality as described in technical data sheet shall cause the
power conditioner to disconnect the grid. Additional parameters requiring automatic
disconnection are:
 Neutral voltage displacement
 Over current
 Earth fault &
 Reverse power
In each of the above cases, tripping time shall be less than 0.5 seconds. Response time in case of
Page 15 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
i) Automatic
reconnection after the
Grid failure is resorted.
grid failure due to switch off or failure based shutdown should be well within 60 seconds.
PCU has facility to reconnect the Inverter automatically to the grid following restoration of grid,
subsequent to grid failure condition.
Array Ground fault Provided
Operator interface LCD and keypad operator interface, Menu driven.
Fault conditions Automatic fault conditions reset for all parameters like voltage, frequency and /or black out.
Control Logic Failure
detection
via watch dog timers.
Parameter access All parameters accessible through an industry standard communication link.
DC-AC conversion
efficiency
93% for output ranging from 20% to full load
Idling current at no load shall not exceed 2% of the full load current.
DC isolation Provided at the output by means of a suitable isolating transformer
Parallel operation with
Grid
Provided & capable of interrupting line-to-line fault currents and line to ground fault currents.
Unbalanced output
load
PCU is able to withstand an unbalanced output load to the extent of 30%.
Shut down / Standby
mode
Shut down / standby mode with its contact open under the following conditions before
attempting an automatic restart after an appropriate time delay; in sufficient solar power output.
a) Insufficient solar power input :
When the power available from the PV array is insufficient to supply the losses of the PCU, the
PCU shall go to a standby/shutdown mode. The PCU control shall prevent excessive cycling during
rightly shut down or extended periods of insufficient solar radiation.
b) Utility -Grid over or under voltage :
The PCU shall restart after an over or under voltage shutdown when the utility grid voltage has
returned to within limits for a minimum of two minutes.
c) Utility-Grid over or under frequency :
The PCU shall restart after an over or under frequency shutdown when the utility grid voltage has
returned to the within limits for minimum of two minutes.
PCU generated
harmonics
Shall not exceed a total harmonic current distortion of 5%, a single frequency current distortion of
3%, and single frequency current distortion of 1%, when the first through the fiftieth integer
Page 16 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
harmonics of 50Hz are considered.
Circuit separation High voltage & power circuits separated from low voltage
& control circuits.
Internal wiring Standard Cu wiring, with flame resistant insulation .
Cabling practice a) Cables :PVC Cu cables as per relevant international Standards)
b) Cable connections : suitable terminations
c) PVC channel with covers to house the cables.
High voltage test PCU with stand high voltage test of 2000 Vrms between either the input or the output terminals
and the cabinet (chassis).
EMI (Electromagnetic
interface)
PCU shall not produce EMI which cause malfunctioning of electronic & electrical instruments
including communication equipments which are located within the facility in which the PCU is
housed.
Display on front panel
& indicators
a) instantaneous PCU ac power output and the DC
voltage current and power input
b) Accuracy of display : 3% of full scale factor or better
c) Display visible from outside the PCU enclosure.
d) Operational status of the PCU, alarms, trouble indicators and AC and DC disconnect switch
positions shall also be communicated by appropriate messages or indicator lights on the front
cover of the PCU enclosure.
Emergency OFF Emergency OFF button is located at an appropriate position on the unit
Grounding PCU includes ground lugs for equipment and PV array groundings. The DC circuit ground is a solid
single point ground connection.
Exposed surfaces Exposed surfaces of ferrous parts are thoroughly cleaned, primed, and painted and suitably
protected to survive a nominal 30 years design life of the unit.
Factory Testing a) Tested to demonstrate operation of its control system and the ability to be automatically
synchronized and connected in parallel with a utility service, prior to its shipment.
b) Operation of all controls, protective and instrumentation circuits demonstrated by direct test if
feasible or by simulation operation conditions for all parameters that can not be directly tested.
c) Demonstration of utility service interface protection circuits and functions, including calibration
and functional trip tests of faults and isolation protection equipment.
d) Operation of start up , disconnect and shutdown
controls also to be tested and demonstrated, stable operation of the PCU and response to control
Page 17 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
signals shall also be tested and demonstrated.
e) Factory testing include measurement of phase
currents, efficiencies, harmonic content and power factor. All tests shall be performed 25, 50, 75
and 100% of the rated nominal power.
f) Factory test report (FTR) : Should be supplied with the unit after all tests. The FTR shall include
detailed description of all parameters tested qualified and warranted.
Operating Modes a) Night or sleep mode : where the Inverter is almost completely turned off, with just the timer
and control system still in operation, losses < 2 W per 5 kW
b) Standby mode: where the control system continuously monitors the output of the solar
generator until pre-set value is exceeded (typically 10 W).
Operational of MPP tracking mode: the control system continuously adjust the voltage of the
generator to optimize the power available. The power conditioner shall automatically re-enter
standby mode input power reduces below the standby mode threshold. Front panel display
providing the status of the PCU, including AC power output & DC current voltage and power input,
and unit fault indication.
Codes & Standards The quality of equipment supplied shall be controlled to meet the guidelines for engineering
design included in the standards and codes listed in the relevant ISI and other standards, such as :
a) IEEE 928: Recommended Criteria for terrestrial PV power systems.
b) IEEE 929 Recommended practice for utility interface of residential and intermediate PV
systems.
c) IEEE 519 Guide for harmonic control and reactive compensation of Static Power Controllers.
d) National Electrical NFPA 70-1990 (USA) or equipment national standard.
e) National Electrical Safety Code ANSI C2 (USA) or equipment national standard.
Inverter / Array Size
ratio
The ratio of the Inverter continuous power rating and the array peak power rating shall be
between 80 to 90% or any other value found suitable. This is because better overall annual yield
can be obtained by allowing the Inverter to operate for longer periods closer to optimal efficiency.
Inverter efficiency should exceed 90% except when operating at less than 10% of maximum
output.
MPPT Maximum power point tracker is integrated in the power conditioner unit to maximize energy
drawn from the array. The MPPT shall be micro processor based to minimize power losses. The
MPPT shall have provision (manual setting) for constant voltage operation.
Page 18 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
Metering a) PV array energy production: Meter to log the actual amount of AC energy generated /
consumed by the PV system shall have to be provided.
b) Solar irradiance :
An integrating pyranometer (Class II or better) to be provided, with the sensor mounted in the
plane of the array. Readout shall be integrated with data logging,
Data Logging System a) All major parameters available on the digital bus and logging facility for energy auditing
through the internal microprocessor and can be read on the digital front panel at any time the
current values, previous values for up to a month and the average values.
The following parameters shall be accessible via the operating interface display :
 AC voltage
 AC output current
 Output power
 DC input voltage
 DC input current
 Time active
 Time disabled
 Time Idle
 temperatures (C)
 Converter status
Protective function limits (VIZ-AC over voltage, AC under voltage, Over frequency, under
frequency, ground fault, PV starting voltage, PV stopping voltage, over voltage delay, under
voltage delay over frequency, ground fault delay, PV starting delay, PV stopping delay.
Remote Monitoring
System
- A remote monitoring system shall be included with each photovoltaic system.
- Usually such monitoring systems are connected and synchronized with the inverters.
- Such monitoring services are provided by many leading inverter manufacturers and also third
party service providers.
- The monitoring system should transmit the following data in real-time to a central server and
store it:
 DC currents, voltages and power.
 AC currents, voltages and power.
 Irradiation, ambient temperature, module temperature and wind speed.
 Error logs.
Page 19 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
- This data may be transmitted either using the available LAN or GSM/ GPRS, or any other mode
of connectivity available at the site.
- The contractor shall be responsible for data connectivity for monitoring up to the warranty/
O&M period of the PV system, after which, the Contractor shall transfer all ownership rights,
SIM card, account information, instructions, etc. to GEDA.
- The contractor shall ensure that GEDA is aware of the contracts required to maintain
connectivity post-warranty/ O&M period.
- This data shall be accessible by GEDA through a secure login account.
- The stored data should be represented through hourly, daily, monthly, etc. graphs and easily
downloadable in .csv or .xls format.
CABLES & ACCESSORIES
For Cables & Accessories following certificates are mandatory: (Copy to be provided with tender.)
General Test and Measuring Methods PVC insulated
cables for working Voltages up to and including 1100
and UV resistant for outdoor installation
IEC 60189
IS 694/ IS 1554
IS/IEC 69947
All the cables which shall be supplied shall be conforming to IS 1554 / 694 Part 1 of 1988 & shall be of 650 V/ 1.1 kV grade as per requirement.
Only PVC copper cables shall be used. The size of the cables between array interconnections, array to junction boxes, junction boxes to PCU etc
shall be so selected to keep the voltage drop and losses to the minimum. Certification of cables should be submitted in the tender.
CONTROL ROOM
The required control room shall be constructed at additional cost if required. Otherwise, PCU/ Solar Inverter should be placed/ mounted in
suitable housing.
SPARE PARTS
One set of essential spares for the PCU shall be provided and made available at the plant.
Page 20 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
DOCUMENTATION
Two sets of installation manual / user manual shall be supplied along with the each power plant. The manual shall include complete system
details such as array lay out, schematic of the system, inverter details, working principle etc. Step by step maintenance and trouble shooting
procedures shall be given in the manuals.
Module layout drawing has to be submitted to GEDA for each site.
7 nos. set of line diagram and licensed electrical contractors’ certificate has to be submitted for each site.
BILL OF MATERIAL
The bidder should provide the bill of material for grid connect SPV power plant mentioning the quantity of each of the item consisting in the
system, along with the offer.
SHADOW ANALYSIS
The shadow analysis of each site has to be carried out by bidder and shall be submitted to GEDA, after placement of work order.
Page 21 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
SOLAR PV HOME SYSTEMS
1. DEFINITION
A solar PV home system aims at providing solar electricity for operating lights and/or fan or energizing a DC operated portable TV set for
specified hours of operation per day.
MODEL – 2 (2 Lights)
Component Specifications
PV Module 1x37 Wp under STC
Lamps 2xCFLs (9W/11W)
Battery 1x12V, 40 AH Tubular Plate, low maintenance type Lead Acid Battery
Other Components Control electronics, Module mounting hardware, Battery box, Inter-
connecting wires/cables, switches, Operation, instruction and maintenance
manual
Notes :
i) Small white LED may be provided as an optional feature, with an independent switch.
2. DUTY CYCLE
MODEL AVERAGE HOURS OF OPERATION/DAY
Model 2 2 Lights, 3-4 Hours
3. LAMPS
(i) The lamps will be of compact fluorescent (CFL) type, either 4 – Pin or 2 Pin types with ratings of 9W. For the 4 Pin type CFLs, a suitable
pre-heating circuit must be provided.
(ii) The light output from the lamps should be around 600 +/- 5% lumens (for 9W CFL). Also please see (iii) of VI given below.
(iii) The lamps should be housed in an assembly suitable for indoor use, with a reflector on its back. While fixing the assembly, the lamp
should be held in a base up configuration.
Page 22 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
4. BATTERY
Following IEC/IS certificates are mandatory for the battery: (Copy to be provided with tender.)
General Requirements & Methods of Test - IEC 61427
Tubular Lead Acid- IS 1651/IS 133369
(i) The battery will be of flooded electrolyte type positive tubular plate, low maintenance lead acid battery.
(ii) The battery will have a minimum rating of 12V, 40 Ah (at C/10) discharge rate depending on Model.
(iii) 75% of the rated capacity of the battery should be between fully charged and load cut off conditions.
5. ELECTRONICS
1. The inverter should be of quasi sine wave/sine wave type, with frequency in the range of 20-35 KHz Half-wave operation is not
acceptable.
2. The total electronic efficiency should be at least 80%.
3. No blackening or reduction in the lumen output by more than 10% should be observed after 1000 ON/OFF cycles (two minutes ON
followed by four minutes OFF is one cycle.
4. The idle current consumption should not be more than 10 ma
5. Electronics should operate at 12 V and should have temperature compensation for proper charging of the battery through out the year.
6. 2.5 sq.mm., 2 core, multi strand copper cable of 20 mtr length for Solar Home Systems Model 2 should be provided. Switches suitable
for DC use and fuses should be provided. All wiring shall be concealed in Rigid PVC pipe/ PVC patti as per the requirement of site.
7. PV MODULE (S)
(a) The PV module (s) shall contain crystalline silicon solar cells.
(b) The PV module bidder should have IEC 61215-2nd Edition and IEC 61730-2 qualification certification for PV modules. Copy to be provided with tender.
(c) The power output of the module (s) under STC should be a minimum of 37 W.
(d) The operating voltage corresponding to the power output mentioned above should be 16.4V
(e) The open circuit voltage of the PV modules under STC should be at least 21.0 Volts.
(f) The terminal box on the module should have a provision for opening for replacing the cable, if required.
(g) A strip containing the following details should be laminated inside the module as as to be clearly visible from the front side.
a) Name of the Bidder or distinctive Logo
b) Model or Type No.
c) Serial No.
Page 23 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
d) Year of make.
8. ELECTRONIC PROTECTIONS
(i) Adequate protection is to be incorporated under no load conditions, e.g. when the lamps are removed and the system is switched ON.
(ii) The system should have protection against battery overcharge and deep discharge conditions.
(iii) Fuses should be provided to protect against short circuit conditions.
(iv) A blocking diode should be provided as part of the electronics, to prevent reverse flow of current through the PV module (s) in case such
a diode is not provided with the PV module (s).
(v) Full protection against open circuit, accidental short circuit and reverse polarity should be provided.
9. MECHANICAL COMPONENTS
(i) Metallic frame structure (with corrosion resistance epoxy paint) with 25 mm X 25 mm X 3 mm MS angle with stands to be fixed on the
roof of the house to hold the SPV module (s) one feet above roof level. The frame structure should have provision to adjust its angle of
inclination to the horizontal between 0 and 45, so that it can be installed at the specified tilt angle. All hardware, nuts, bolts should be
cadmium passivated.
(ii) The battery box provided should be of a vented (pp-cp material) plastics/ metallic with acid proof corrosion resistance epoxy paint for
housing the storage battery indoors. The thickness of MS Sheet of battery box shall be of minimum 22 SWG with locking arrangements.
(iii) DISPLAY BOARD: A display board should be installed in the village/ hamlet near community building, of min. size 4’ x 3’ on two poles. MS
Sheet of board shall be of minimum 22 SWG. The text should include GEDA address as well as Manufacturer’s name and address, Phone,
fax and mobile number for immediate contact in case of any failure of systems. The board should be spray painted, with vinyl letter
pasting.
10. OTHER FEATURES
(i) The system should be provided with 2 LED indicators: a green light to indicate charging in progress and a red LED to indicate deep
discharge condition of the battery. The green LED should glow only when the battery is actually being charged.
(ii) There will be a Name Plate on the system which will give :
(a) Name of the Bidder or Distinctive Logo (b) Serial Number
(iii) Components and parts used in solar home systems should conform to the latest BIS specifications, whenever such specifications are
available and applicable.
(iv) The PV module (s) will be warranted for a minimum period of 10 years from the date of supply and the solar home system (including the
battery) will be warranted for a period of five years from the date of supply.
Page 24 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
The Warranty Card to be supplied with the system must contain the details of the system supplied as given in the Appendix-I. The Bidder
can also provide additional information about the system and conditions of warranty as necessary.
(v) An Operation, Instruction and Maintenance Manual in English and the local language should be provided with the system.
The following minimum details must be provided in the Manual
(a) About Photovoltaics
(b) About solar home system – its components and expected performance.
(c) About PV module
(d) About CFL
(e) About battery
(f) Clear instructions about mounting of PV module (s)
(g) About electronics
(h) About charging and significance of indicators.
(i) DO’s and DONT’s
(j) Clear instructions on regular maintenance and trouble shooting of solar home system.
(k) Name and address of the person or service center to be contacted in case of failure or complaint.
Page 25 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
SOLAR PV STREET LIGHTING SYSTEM
1. DEFINITION
A standard alone solar photovoltaic street lighting system comprises a compact fluorescent lamp, lead acid battery, PV module(s),
control electronics, inter-connecting wires/cables, module mounting hardware, battery box, operation instruction and maintenance
manual.
2. DUTY CYCLE
The system should be designed to automatically switch ON at dusk, operate throughout the night and automatically switch OFF at the
dawn, under average daily insolation of 5 kWh/sq.m. on a horizontal surface.
3. LAMP
(i) The lamp will be of compact fluorescent (CFL) type, either 4 – Pin or 2 Pin type, with a rating of 2 x 11W. For the 4 – Pin type CFL,
adequate pre-heating circuit must be provided.
(ii) The light output from the lamp should be around 1800 +/- 5% lumens. Also please see (iii) of V given below.
(iii) The lamp should be housed in a weather proof assembly suitable for outdoor use, with a reflector on its back. While fixing the
assembly, the lamp should be held in a base up configuration.
OR
3. LED fixture -Specifications for 16W/18W LED Street Light: (Supporting Documents Required)
1. LED Type: High power of 1 W each
2. Power Consumption: 16W/18W ± 10%, maximum 1.35 W per LED with 85% driver efficiency.
3. Luminous flux efficacy ≥ 110 lm/Watt
4. Color Rendering Index ≥ 75
5. Color Temperature : 5500 K- 7500 K (White)
6. Circuit Efficiency : ≥ 85%
7. Life expectancy/Lumen maintenance : 50000 burning hours at ambient temperature with 70% Lumen maintenance
8. Construction : IP 65
9. Control Circuit : Compatible with LED
10. Operating temperature : - 40 0
C to 59 0
C
Following testing parameters shall be carried out at National/NABL accredited laboratory (For luminaries):
Page 26 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
1. Marking
2. Luminaire Power
3. Circuit Efficiency
4. Polar Curve
5. Chromaticity co-ordinates and correlated color temperature
6. Color Rendering Index
Note: 1) Polar curve is a lux distribution pattern which shows whether the luminaire matches Pole height and pole span.
4. BATTERY
Following IEC/IS certificates are mandatory for the battery: (Copy to be provided with tender.)
General Requirements & Methods of Test - IEC 61427
Tubular Lead Acid- IS 1651/IS 13369
(i) Flooded electrolyte type, positive tubular plate, low maintenance lead acid battery.
(ii) The battery will have a minimum rating of 12V, 100 Ah/ 100Ah (at C/10) discharge rate.
(iii) 75% of the rated capacity of the battery should be between fully charged and load cut off conditions.
5. ELECTRONICS
(i) The inverter should be of quasi sine wave/sine wave type, with frequency in the range of 20-35 KHz-Half-wave operation is not
acceptable.
(ii) The total electronic efficiency should be at least 85%
(iii) No blackening or reduction in the lumen output by more than 10% should be observed after 1000 ON/OFF cycles (two minutes ON
followed by four minutes OFF is one cycle.
(iv) The idle current consumption should not be more than 10mA.
(v) Electronics should operate at 12 V and should have temperature compensation for proper charging of the battery through out the year.
(vi) Necessary lengths of wires/cables and fuses should be provided and wiring of cables should be through the pole with no open access to
cables.
(vii) The PV module will be used to sense the ambient light level for switching ON and OFF the lamp.
6. ELECTRONIC PROTECTIONS
(i) Adequate protection is to be incorporated under no load conditions e.g. when the lamp is removed and the system is switched ON.
Page 27 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
(ii) The system should have protection against battery overcharge and deep discharge conditions.
(iii) Fuses should be provided to protect against short circuit conditions.
(iv) A blocking diode, should be provided as part of the electronics, to prevent reverse flow of current through the PV module (s), in case
such a diode is not provided with the solar module (s).
(v) Full protection against open circuit accident, short circuit and reverse polarity should be provided.
7. PV MODULE (S)
a. The PV module (s) shall contain crystalline silicon solar cells.
b. The PV module bidder should have IEC 61215-2nd Edition and IEC 61730-2 qualification certification for PV modules. Copy to be provided with tender.
c. The power output of the module (s) under STC should be a minimum of 120 W.
d. The operating voltage corresponding to the power output mentioned above should be 16.4V
e. The open circuit voltage of the PV modules under STC should be at least 21.0 Volts.
f. The terminal box on the module should have a provision for opening for replacing the cable, if required.
g. A strip containing the following details should be laminated inside the module as as to be clearly visible from the front side.
1. Name of the Bidder or distinctive Logo
2. Model or Type No.
3. Serial No.
4. Year of make.
8. MECHANICAL HARDWARE
(i) Metallic frame structure (with corrosion resistance paint) with 25 mm X 25 mm X 3 mm MS angle to be fixed on the top of the poll to
hold the SPV module (s). The frame structure should have provision to adjust its angle of inclination to the horizontal between 0 and 45,
so that it can be installed at the specified tilt angle in the desired direction.
(ii) The pole should be made of GI medium class pipe with a height of minimum 7 meters & 6 mtrs above the ground level after grouting
(details shall be furnished in the offer) and final installation. The pole, will be consisting of three portions with lower portion (length 4 m)
of 114.3 mm dia. with wall thickness of 3.65 mm, and middle portion (length 1.5 m) of 88.9 mm dia with wall thickness of 3.25 mm and
top portion (length 1.5 m) of 76.1 mm dia. with wall thickness of 3.25 mm and base plate of 175 mm X 175 mm X 6 mm. The 1 ½ inch dia.
bend pipe for fixing up the lamp assembly with suitable clamps to mount on the pole should be G.I. medium class pipe and should be
adjustable. The pole should have the provision to hold the weather proof lamp housing. It should be painted with a corrosion resistant
paint.
(iii) The battery box provided should be of a vented metallic with acid proof corrosion resistance paint (epoxy paint) for housing the storage
battery outdoors with locking arrangement. The battery box should be tightly clamped with the pole. The thickness of MS Sheet of
battery box shall be of minimum 18 SWG. All hardware, nuts, bolts should be cadmium passivated.
Page 28 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
(iv) The grouting of the pole should be done by PCC 1:2:3, pit must be 0.3 X 0.3 X 1 m deep below ground level and a collar of 0.3 m above
ground level must be of 0.3 m dia.
(v) Detailed drawings with specifications of each component should be submitted with the Technical Bid.
9. OTHER FEATURES
(i) The system should be provided with 2 LED indicators a green light to indicate charging in progress and a red LED to indicate deep
discharge condition of the battery. The green LED should glow only when the battery is actually being charged.
(ii) There will be a Name Plate on the system which will give
(a) Name of the Supplier or Distinctive Logo
(b) Serial Number
(iii) Components and parts used in the solar street lighting systems should conform to the latest BIS specifications, whenever such
specifications are available and applicable.
(iv) The PV module (s) will be warranted for a minimum period of 10 years from the date of supply and the street lighting system (including
the battery) will be warranted for a period of two years from the date of supply.
Page 29 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
General Conditions: applicable to all the systems.
 PV modules used in solar power plants/systems must be warranted for their output peak watt capacity, which should not be less than
90% at the end of 12 years and 80% at the end of the 25 years.
 The BoS items/components of the SPV power plants/systems deployed must confirm to the latest edition of IEC/equivalent BIS standards
as specified below:
BoS item/component Applicable IEC/equivalent BIS Standard
Standard Description Standard Number
Power
Conditioners/Inverters*
Efficiency Measurements
Environmental Testing
IEC 61683
IEC 60068 2 (6,21,27,30,75,78)
Charge controller/MPPT
units*
Design Qualification Environmental Testing IEC 62093
IEC 60068 2 (6,21,27,30,75,78)
Storage Batteries General Requirements & Methods of Test
Tubular Lead Acid
IEC 61427
IS 1651/IS 13369
Cables General Test and Measuring Methods PVC insulated
cables for working Voltages up to and including 1100
VDo-, UV resistant for outdoor installation
IEC 60227/IS 694
IEC 60502/ IS 1554(part I & II)
Switches/ Circuit
Breakers/Connectors
General Requirements Connectors -safety IS/IEC 60947 part I,II,III
EN 50521
Junction Boxes/Enclosures
for inverter/ charge
controller/ luminaries
General Requirements Enclosures IP 54 (for outdoor)/IP 21 (for
indoor) as per IEC 529
* Must additionally conform to the relevant national/international Electrical Safety Standards.
Page 30 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
PART - II
FINANCIAL BID GUIDELINES
 Rates quoted by tenderer will be FOR destination prices inclusive of taxes, levies, duties, packing, forwarding, freight, insurance, loading
unloading, supply, installation, commissioning, and any/ all charges for successful Supply and Installation of the systems at any locations
in the State of Gujarat and all other miscellaneous expenses of marketing, commissions etc, if any.
 The rates quoted by the tenderer will be inclusive of Service Tax, Work Contract Tax, VAT or any other taxes applicable to such work. Any
escalation in such taxes/ levies during the tenure of the contract/ order will not be paid by GEDA and tenderers are advised to take in to
consideration any such escalations in the prevailing taxes/levies/duties.
 In no circumstances, escalation in the prices will be entertained.
 Your rates are to be submitted as per the enclosed Performa of schedule of rates (online only). Physical submission of price bid will
disqualify the bidder.
Page 31 of 31
(Sign and Seal of the bidder)
TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))
Annexure 7 : Price Bid
Sr.No. Item Unit rate
(in Rs.)
Installation &
commissioning
charges
(in Rs.)
CMC
charges for
5 years
(in Rs.)
VAT/ CST
(in Rs.)
Total Amount
(in Rs.)
1 SOLAR PV ROOFTOP SYSTEM WITH BATTERY BANK
a 1 kW system
b 2 kW system
c 3 kW system
d 5 kW system
2 GRID CONNECT SOLAR POWER GENERATING SYSTEM
a 10 kW System
b 15 kW system
c 20 kW system
d 25 kW system
3 SOLAR PV HOME SYSTEMS
(Model -2)
4 SOLAR PV STREET LIGHT
SYSTEMS with CFL
5 SOLAR PV STREET LIGHT
SYSTEMS with LED

More Related Content

What's hot

Bc547
Bc547Bc547
BC548/BC548A/BC548B/BC548C Transistor data sheet
BC548/BC548A/BC548B/BC548C Transistor data sheetBC548/BC548A/BC548B/BC548C Transistor data sheet
BC548/BC548A/BC548B/BC548C Transistor data sheet
Microtech Solutions
 
Bc557
Bc557Bc557
BD135/BD139 Transistor Data sheet
BD135/BD139 Transistor Data sheetBD135/BD139 Transistor Data sheet
BD135/BD139 Transistor Data sheet
Microtech Solutions
 
Hv9821 db2 led_driver_demoboard
Hv9821 db2 led_driver_demoboardHv9821 db2 led_driver_demoboard
Hv9821 db2 led_driver_demoboard
Mallickarjuna A.S
 
Original PNP Transistor BD244TU BD244 244 TO-220 New Fairchild Semiconductor
Original PNP Transistor BD244TU BD244 244 TO-220 New Fairchild SemiconductorOriginal PNP Transistor BD244TU BD244 244 TO-220 New Fairchild Semiconductor
Original PNP Transistor BD244TU BD244 244 TO-220 New Fairchild Semiconductor
AUTHELECTRONIC
 
Kraus &amp; naimer emc-co mpliant conne-ction-kn_emc_gb_dienhathe.vn
Kraus &amp; naimer emc-co mpliant conne-ction-kn_emc_gb_dienhathe.vnKraus &amp; naimer emc-co mpliant conne-ction-kn_emc_gb_dienhathe.vn
Kraus &amp; naimer emc-co mpliant conne-ction-kn_emc_gb_dienhathe.vn
Dien Ha The
 
Original NPN Transistor A44 TO-92 New
Original NPN Transistor A44 TO-92 NewOriginal NPN Transistor A44 TO-92 New
Original NPN Transistor A44 TO-92 New
AUTHELECTRONIC
 
Product Drawings
Product DrawingsProduct Drawings
Product Drawings
Content Rules, Inc.
 
Original NPN Transistor KSP10 KSP 10 TO-92 New
Original NPN Transistor KSP10 KSP 10 TO-92 NewOriginal NPN Transistor KSP10 KSP 10 TO-92 New
Original NPN Transistor KSP10 KSP 10 TO-92 New
AUTHELECTRONIC
 
Bta08 600 bw3-d tiristor bidireccional
Bta08 600 bw3-d  tiristor bidireccionalBta08 600 bw3-d  tiristor bidireccional
Bta08 600 bw3-d tiristor bidireccional
8525
 
ABB WBT Indoor Fuses IEC Standard 1.9kV-4kV - ABB Medium Voltage Indoor Railw...
ABB WBT Indoor Fuses IEC Standard 1.9kV-4kV - ABB Medium Voltage Indoor Railw...ABB WBT Indoor Fuses IEC Standard 1.9kV-4kV - ABB Medium Voltage Indoor Railw...
ABB WBT Indoor Fuses IEC Standard 1.9kV-4kV - ABB Medium Voltage Indoor Railw...
Thorne & Derrick International
 
Catalogue mitsubishi thiet bi dien acb dienhathe.vn
Catalogue mitsubishi thiet bi dien acb dienhathe.vnCatalogue mitsubishi thiet bi dien acb dienhathe.vn
Catalogue mitsubishi thiet bi dien acb dienhathe.vn
Dien Ha The
 
Catalog mcb fuji electric
Catalog mcb fuji electricCatalog mcb fuji electric
Catalog mcb fuji electric
CTY TNHH HẠO PHƯƠNG
 
Three cell battery manager module
Three cell battery manager moduleThree cell battery manager module
Three cell battery manager module
louayalhomsi
 
Mcb c60 h dc
Mcb c60 h dcMcb c60 h dc
Mcb c60 h dc
Strato Varius
 
Comelit SK9031 Data Sheet
Comelit SK9031 Data SheetComelit SK9031 Data Sheet
Comelit SK9031 Data Sheet
JMAC Supply
 
Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...
Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...
Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...
authelectroniccom
 
Batterybox
BatteryboxBatterybox
Batterybox
natec1
 
LS Circuit Breaker Catalogue
LS Circuit Breaker CatalogueLS Circuit Breaker Catalogue
LS Circuit Breaker Catalogue
hairxoawn
 

What's hot (20)

Bc547
Bc547Bc547
Bc547
 
BC548/BC548A/BC548B/BC548C Transistor data sheet
BC548/BC548A/BC548B/BC548C Transistor data sheetBC548/BC548A/BC548B/BC548C Transistor data sheet
BC548/BC548A/BC548B/BC548C Transistor data sheet
 
Bc557
Bc557Bc557
Bc557
 
BD135/BD139 Transistor Data sheet
BD135/BD139 Transistor Data sheetBD135/BD139 Transistor Data sheet
BD135/BD139 Transistor Data sheet
 
Hv9821 db2 led_driver_demoboard
Hv9821 db2 led_driver_demoboardHv9821 db2 led_driver_demoboard
Hv9821 db2 led_driver_demoboard
 
Original PNP Transistor BD244TU BD244 244 TO-220 New Fairchild Semiconductor
Original PNP Transistor BD244TU BD244 244 TO-220 New Fairchild SemiconductorOriginal PNP Transistor BD244TU BD244 244 TO-220 New Fairchild Semiconductor
Original PNP Transistor BD244TU BD244 244 TO-220 New Fairchild Semiconductor
 
Kraus &amp; naimer emc-co mpliant conne-ction-kn_emc_gb_dienhathe.vn
Kraus &amp; naimer emc-co mpliant conne-ction-kn_emc_gb_dienhathe.vnKraus &amp; naimer emc-co mpliant conne-ction-kn_emc_gb_dienhathe.vn
Kraus &amp; naimer emc-co mpliant conne-ction-kn_emc_gb_dienhathe.vn
 
Original NPN Transistor A44 TO-92 New
Original NPN Transistor A44 TO-92 NewOriginal NPN Transistor A44 TO-92 New
Original NPN Transistor A44 TO-92 New
 
Product Drawings
Product DrawingsProduct Drawings
Product Drawings
 
Original NPN Transistor KSP10 KSP 10 TO-92 New
Original NPN Transistor KSP10 KSP 10 TO-92 NewOriginal NPN Transistor KSP10 KSP 10 TO-92 New
Original NPN Transistor KSP10 KSP 10 TO-92 New
 
Bta08 600 bw3-d tiristor bidireccional
Bta08 600 bw3-d  tiristor bidireccionalBta08 600 bw3-d  tiristor bidireccional
Bta08 600 bw3-d tiristor bidireccional
 
ABB WBT Indoor Fuses IEC Standard 1.9kV-4kV - ABB Medium Voltage Indoor Railw...
ABB WBT Indoor Fuses IEC Standard 1.9kV-4kV - ABB Medium Voltage Indoor Railw...ABB WBT Indoor Fuses IEC Standard 1.9kV-4kV - ABB Medium Voltage Indoor Railw...
ABB WBT Indoor Fuses IEC Standard 1.9kV-4kV - ABB Medium Voltage Indoor Railw...
 
Catalogue mitsubishi thiet bi dien acb dienhathe.vn
Catalogue mitsubishi thiet bi dien acb dienhathe.vnCatalogue mitsubishi thiet bi dien acb dienhathe.vn
Catalogue mitsubishi thiet bi dien acb dienhathe.vn
 
Catalog mcb fuji electric
Catalog mcb fuji electricCatalog mcb fuji electric
Catalog mcb fuji electric
 
Three cell battery manager module
Three cell battery manager moduleThree cell battery manager module
Three cell battery manager module
 
Mcb c60 h dc
Mcb c60 h dcMcb c60 h dc
Mcb c60 h dc
 
Comelit SK9031 Data Sheet
Comelit SK9031 Data SheetComelit SK9031 Data Sheet
Comelit SK9031 Data Sheet
 
Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...
Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...
Original DARLING TRANSISTOR ARRAY IC ULQ2003A 2003A 2003 SOP-16 New Texas Ins...
 
Batterybox
BatteryboxBatterybox
Batterybox
 
LS Circuit Breaker Catalogue
LS Circuit Breaker CatalogueLS Circuit Breaker Catalogue
LS Circuit Breaker Catalogue
 

Viewers also liked

10 kwp-solar-rooftop-system
10 kwp-solar-rooftop-system10 kwp-solar-rooftop-system
10 kwp-solar-rooftop-system
Exergy
 
GCCC contracts experience to date 08'03'11
GCCC contracts experience to date 08'03'11GCCC contracts experience to date 08'03'11
GCCC contracts experience to date 08'03'11
cmcgoverntobin
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
Sumaiya Jabin
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
guestdb5e498
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentation
nipuna_bopage
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
마 이환
 
4 types of solar power
4 types of solar power4 types of solar power
4 types of solar power
Captain Green Pty Ltd
 
Fitting Clean Energy into a Reformed Tax Code
Fitting Clean Energy into a Reformed Tax CodeFitting Clean Energy into a Reformed Tax Code
Fitting Clean Energy into a Reformed Tax Code
GW Solar Institute
 
Different Types of Dance Rhythms
Different Types of Dance RhythmsDifferent Types of Dance Rhythms
Different Types of Dance Rhythms
Captain Green Pty Ltd
 
Solar Schools: Potential Savings by District
Solar Schools: Potential Savings by DistrictSolar Schools: Potential Savings by District
Solar Schools: Potential Savings by District
The Solar Foundation
 
State Solar Jobs 2013: All State Profiles
State Solar Jobs 2013: All State ProfilesState Solar Jobs 2013: All State Profiles
State Solar Jobs 2013: All State Profiles
The Solar Foundation
 
Setting the Tone: National Perspective on Solar
Setting the Tone: National Perspective on SolarSetting the Tone: National Perspective on Solar
Setting the Tone: National Perspective on Solar
The Solar Foundation
 
India's National Solar Mission - Phase 1 Guidelines
India's National Solar Mission - Phase 1 GuidelinesIndia's National Solar Mission - Phase 1 Guidelines
India's National Solar Mission - Phase 1 Guidelines
Headway Solar
 
Fact Sheet: Community Choice Aggregation
Fact Sheet: Community Choice AggregationFact Sheet: Community Choice Aggregation
Fact Sheet: Community Choice Aggregation
The Solar Foundation
 
UP Solar Power Policy 2013
UP Solar Power Policy 2013UP Solar Power Policy 2013
UP Solar Power Policy 2013
Headway Solar
 
Philips Solar Installation - Reference
Philips Solar Installation -  ReferencePhilips Solar Installation -  Reference
Philips Solar Installation - Reference
Shivendra Kumar
 
National Solar Jobs Census 2010 Executive Summary
National Solar Jobs Census 2010 Executive SummaryNational Solar Jobs Census 2010 Executive Summary
National Solar Jobs Census 2010 Executive Summary
The Solar Foundation
 
Softer Solar Landings: Options to Avoid the Investment Tax Credit Cliff
Softer Solar Landings: Options to Avoid the Investment Tax Credit CliffSofter Solar Landings: Options to Avoid the Investment Tax Credit Cliff
Softer Solar Landings: Options to Avoid the Investment Tax Credit Cliff
GW Solar Institute
 
Captain Green Solar - Saving Electricity Bills
Captain Green Solar - Saving Electricity Bills Captain Green Solar - Saving Electricity Bills
Captain Green Solar - Saving Electricity Bills
Captain Green Pty Ltd
 

Viewers also liked (20)

10 kwp-solar-rooftop-system
10 kwp-solar-rooftop-system10 kwp-solar-rooftop-system
10 kwp-solar-rooftop-system
 
GCCC contracts experience to date 08'03'11
GCCC contracts experience to date 08'03'11GCCC contracts experience to date 08'03'11
GCCC contracts experience to date 08'03'11
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentation
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
4 types of solar power
4 types of solar power4 types of solar power
4 types of solar power
 
Fitting Clean Energy into a Reformed Tax Code
Fitting Clean Energy into a Reformed Tax CodeFitting Clean Energy into a Reformed Tax Code
Fitting Clean Energy into a Reformed Tax Code
 
Different Types of Dance Rhythms
Different Types of Dance RhythmsDifferent Types of Dance Rhythms
Different Types of Dance Rhythms
 
Solar Schools: Potential Savings by District
Solar Schools: Potential Savings by DistrictSolar Schools: Potential Savings by District
Solar Schools: Potential Savings by District
 
State Solar Jobs 2013: All State Profiles
State Solar Jobs 2013: All State ProfilesState Solar Jobs 2013: All State Profiles
State Solar Jobs 2013: All State Profiles
 
Setting the Tone: National Perspective on Solar
Setting the Tone: National Perspective on SolarSetting the Tone: National Perspective on Solar
Setting the Tone: National Perspective on Solar
 
India's National Solar Mission - Phase 1 Guidelines
India's National Solar Mission - Phase 1 GuidelinesIndia's National Solar Mission - Phase 1 Guidelines
India's National Solar Mission - Phase 1 Guidelines
 
Fact Sheet: Community Choice Aggregation
Fact Sheet: Community Choice AggregationFact Sheet: Community Choice Aggregation
Fact Sheet: Community Choice Aggregation
 
UP Solar Power Policy 2013
UP Solar Power Policy 2013UP Solar Power Policy 2013
UP Solar Power Policy 2013
 
Philips Solar Installation - Reference
Philips Solar Installation -  ReferencePhilips Solar Installation -  Reference
Philips Solar Installation - Reference
 
National Solar Jobs Census 2010 Executive Summary
National Solar Jobs Census 2010 Executive SummaryNational Solar Jobs Census 2010 Executive Summary
National Solar Jobs Census 2010 Executive Summary
 
Census 2013 Infographic
Census 2013 InfographicCensus 2013 Infographic
Census 2013 Infographic
 
Softer Solar Landings: Options to Avoid the Investment Tax Credit Cliff
Softer Solar Landings: Options to Avoid the Investment Tax Credit CliffSofter Solar Landings: Options to Avoid the Investment Tax Credit Cliff
Softer Solar Landings: Options to Avoid the Investment Tax Credit Cliff
 
Captain Green Solar - Saving Electricity Bills
Captain Green Solar - Saving Electricity Bills Captain Green Solar - Saving Electricity Bills
Captain Green Solar - Saving Electricity Bills
 

Similar to Tender Document for Solar Power Plant in Gujarat Part 2

Suntech 300w solar panel
Suntech 300w solar panelSuntech 300w solar panel
Suntech 300w solar panel
Optimus Energy Philippines
 
Dienhathe.com catalogue epcos-capacitor_phasecap
Dienhathe.com catalogue epcos-capacitor_phasecapDienhathe.com catalogue epcos-capacitor_phasecap
Dienhathe.com catalogue epcos-capacitor_phasecap
Dien Ha The
 
Ct2000 es manual_english_version_1[1].0
Ct2000 es manual_english_version_1[1].0Ct2000 es manual_english_version_1[1].0
Ct2000 es manual_english_version_1[1].0
Toàn Huỳnh
 
784144_Thyrotronic_gb
784144_Thyrotronic_gb784144_Thyrotronic_gb
784144_Thyrotronic_gb
Angelina Villafuerte
 
Ct2000 pro plus_manual_english[1]
Ct2000 pro plus_manual_english[1]Ct2000 pro plus_manual_english[1]
Ct2000 pro plus_manual_english[1]
Toàn Huỳnh
 
3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf
ShahrukhKhan424745
 
Trio 27.6
Trio 27.6Trio 27.6
2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revised2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revised
Basudev patra
 
66 k v_sf6_bkr_r3_may12
66 k v_sf6_bkr_r3_may1266 k v_sf6_bkr_r3_may12
66 k v_sf6_bkr_r3_may12
Yendapalli Chinnarao
 
Emmvee Crystal Off-grid Module:
Emmvee Crystal Off-grid Module:Emmvee Crystal Off-grid Module:
Emmvee Crystal Off-grid Module:
Emmvee India
 
Bergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - FinalBergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - Final
David Hults
 
Vfd a manual-en
Vfd a manual-enVfd a manual-en
Vfd a manual-en
Toàn Huỳnh
 
SolarEdge 82.8kW inverter with WiFi & SetApp - Primary unit
SolarEdge 82.8kW inverter with WiFi & SetApp - Primary unitSolarEdge 82.8kW inverter with WiFi & SetApp - Primary unit
SolarEdge 82.8kW inverter with WiFi & SetApp - Primary unit
Optimus Energy Philippines
 
Ct2000 f manual_english
Ct2000 f manual_englishCt2000 f manual_english
Ct2000 f manual_english
Toàn Huỳnh
 
samsung_bn44-00523b_pd55b2qcdy.pdf
samsung_bn44-00523b_pd55b2qcdy.pdfsamsung_bn44-00523b_pd55b2qcdy.pdf
samsung_bn44-00523b_pd55b2qcdy.pdf
freznell
 
Aurora Medium
Aurora MediumAurora Medium
11.docx
11.docx11.docx
TRANSISTORES
TRANSISTORESTRANSISTORES
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.comFed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
Dien Ha The
 
Cdvr service manual renr7941-00 _ sis - caterpillar
Cdvr   service manual   renr7941-00 _ sis - caterpillarCdvr   service manual   renr7941-00 _ sis - caterpillar
Cdvr service manual renr7941-00 _ sis - caterpillar
Otorongosabroso
 

Similar to Tender Document for Solar Power Plant in Gujarat Part 2 (20)

Suntech 300w solar panel
Suntech 300w solar panelSuntech 300w solar panel
Suntech 300w solar panel
 
Dienhathe.com catalogue epcos-capacitor_phasecap
Dienhathe.com catalogue epcos-capacitor_phasecapDienhathe.com catalogue epcos-capacitor_phasecap
Dienhathe.com catalogue epcos-capacitor_phasecap
 
Ct2000 es manual_english_version_1[1].0
Ct2000 es manual_english_version_1[1].0Ct2000 es manual_english_version_1[1].0
Ct2000 es manual_english_version_1[1].0
 
784144_Thyrotronic_gb
784144_Thyrotronic_gb784144_Thyrotronic_gb
784144_Thyrotronic_gb
 
Ct2000 pro plus_manual_english[1]
Ct2000 pro plus_manual_english[1]Ct2000 pro plus_manual_english[1]
Ct2000 pro plus_manual_english[1]
 
3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf
 
Trio 27.6
Trio 27.6Trio 27.6
Trio 27.6
 
2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revised2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revised
 
66 k v_sf6_bkr_r3_may12
66 k v_sf6_bkr_r3_may1266 k v_sf6_bkr_r3_may12
66 k v_sf6_bkr_r3_may12
 
Emmvee Crystal Off-grid Module:
Emmvee Crystal Off-grid Module:Emmvee Crystal Off-grid Module:
Emmvee Crystal Off-grid Module:
 
Bergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - FinalBergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - Final
 
Vfd a manual-en
Vfd a manual-enVfd a manual-en
Vfd a manual-en
 
SolarEdge 82.8kW inverter with WiFi & SetApp - Primary unit
SolarEdge 82.8kW inverter with WiFi & SetApp - Primary unitSolarEdge 82.8kW inverter with WiFi & SetApp - Primary unit
SolarEdge 82.8kW inverter with WiFi & SetApp - Primary unit
 
Ct2000 f manual_english
Ct2000 f manual_englishCt2000 f manual_english
Ct2000 f manual_english
 
samsung_bn44-00523b_pd55b2qcdy.pdf
samsung_bn44-00523b_pd55b2qcdy.pdfsamsung_bn44-00523b_pd55b2qcdy.pdf
samsung_bn44-00523b_pd55b2qcdy.pdf
 
Aurora Medium
Aurora MediumAurora Medium
Aurora Medium
 
11.docx
11.docx11.docx
11.docx
 
TRANSISTORES
TRANSISTORESTRANSISTORES
TRANSISTORES
 
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.comFed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
 
Cdvr service manual renr7941-00 _ sis - caterpillar
Cdvr   service manual   renr7941-00 _ sis - caterpillarCdvr   service manual   renr7941-00 _ sis - caterpillar
Cdvr service manual renr7941-00 _ sis - caterpillar
 

More from Headway Solar

Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Headway Solar
 
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Headway Solar
 
RERC Net metering Regulations 2015
RERC Net metering Regulations 2015RERC Net metering Regulations 2015
RERC Net metering Regulations 2015
Headway Solar
 
Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015
Headway Solar
 
DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014
Headway Solar
 
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Headway Solar
 
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft GuidelinesFinal draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Headway Solar
 
Renewable policy 2012 of West Bengal
Renewable policy 2012 of West BengalRenewable policy 2012 of West Bengal
Renewable policy 2012 of West Bengal
Headway Solar
 
Tender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, UttarakhandTender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, Uttarakhand
Headway Solar
 
Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013
Headway Solar
 
RFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar PradeshRFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar Pradesh
Headway Solar
 
Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014
Headway Solar
 
Telangana solar RFS Document 2014
Telangana solar RFS Document 2014Telangana solar RFS Document 2014
Telangana solar RFS Document 2014
Headway Solar
 
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Headway Solar
 
Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012
Headway Solar
 
RFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanRFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project Rajasthan
Headway Solar
 
Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015
Headway Solar
 
Rajasthan solar policy of 2014
Rajasthan solar policy of 2014Rajasthan solar policy of 2014
Rajasthan solar policy of 2014
Headway Solar
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in Punjab
Headway Solar
 
New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012
Headway Solar
 

More from Headway Solar (20)

Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
 
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
 
RERC Net metering Regulations 2015
RERC Net metering Regulations 2015RERC Net metering Regulations 2015
RERC Net metering Regulations 2015
 
Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015
 
DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014
 
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
 
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft GuidelinesFinal draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
 
Renewable policy 2012 of West Bengal
Renewable policy 2012 of West BengalRenewable policy 2012 of West Bengal
Renewable policy 2012 of West Bengal
 
Tender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, UttarakhandTender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, Uttarakhand
 
Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013
 
RFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar PradeshRFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar Pradesh
 
Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014
 
Telangana solar RFS Document 2014
Telangana solar RFS Document 2014Telangana solar RFS Document 2014
Telangana solar RFS Document 2014
 
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
 
Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012
 
RFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanRFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project Rajasthan
 
Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015
 
Rajasthan solar policy of 2014
Rajasthan solar policy of 2014Rajasthan solar policy of 2014
Rajasthan solar policy of 2014
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in Punjab
 
New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012
 

Recently uploaded

CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
Congressional Budget Office
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
This Is Reno
 
CFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon CanadaCFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon Canada
pmenzies
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
ResolutionFoundation
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
Cuyahoga County Planning Commission
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
JSchaus & Associates
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
9d5c8i83
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
3woawyyl
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
SERUDS INDIA
 
About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).
Christina Parmionova
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
ahcitycouncil
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
JSchaus & Associates
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Christina Parmionova
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
DanielOliver74
 
Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024
Texas Alliance of Groundwater Districts
 
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Jamesadhikaram land matter consultancy 9447464502
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
ahcitycouncil
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
fundraising4
 
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
ssuser05e8f3
 
IEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- StatisticsIEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- Statistics
Energy for One World
 

Recently uploaded (20)

CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
 
CFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon CanadaCFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon Canada
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
 
About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
 
2024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 412024: The FAR - Federal Acquisition Regulations, Part 41
2024: The FAR - Federal Acquisition Regulations, Part 41
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
 
Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024
 
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
 
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
 
IEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- StatisticsIEA World Energy Investment June 2024- Statistics
IEA World Energy Investment June 2024- Statistics
 

Tender Document for Solar Power Plant in Gujarat Part 2

  • 1. (Sign and Seal of the bidder) Page 1 of 31 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133.. ((PPaarrtt --22)) GGuujjaarraatt EEnneerrggyy DDeevveellooppmmeenntt AAggeennccyy 4th Floor, Block No.11 and 12, Udyog Bhavan, Sector - 11 Gandhinagar – 382 017, Gujarat, India Phone : +91 79 23257251/2/3/4 Fax: +91 79 23257255, 23247097 website:www.geda.org.in
  • 2. Page 2 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) TABLE OF CONTENTS for part -2 of the tender 7.0 TECHNICAL SPECIFICATIONS ............................................................................................................3 SOLAR PV ROOFTOP SYSTEM- 1kW, 2kW, 3kW, 5kW ........................................................................3 GRID CONNECT SOLAR POWER GENERATING SYSTEM ......................................................................8 SOLAR PV HOME SYSTEMS................................................................................................................21 SOLAR PV STREET LIGHTING SYSTEM ...............................................................................................25 FINANCIAL BID GUIDELINES.................................................................................................................30 Annexure 7 : Price Bid..........................................................................................................................31
  • 3. (Sign and Seal of the bidder) Page 3 of 31 TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) 7.0 TECHNICAL SPECIFICATIONS SOLAR PV ROOFTOP SYSTEM- 1kW, 2kW, 3kW, 5kW DEFINITION Solar PV – AC hybrid power pack comprises of Solar PV modules, lead acid battery bank and intelligent on line inverter which feeds uninterrupted quality AC power to electrical loads taking energy from PV, grid or battery bank as the case may be. Batteries will be charged from solar energy as well as grid by multi stage charger integrated in the inverter or external charge controller. Sr.No. Specification i) DUTY CYCLE: The system should be designed to operate for specified Nos. hours and automatically switch to grid in case of non-sunshine days, under average daily insolation of 5 kWh/sq.m. on a horizontal surface. 6 Hours For 1 kW system For 2 kW system For 3kW System For 5 kW system ii) LOAD: The system should be connected to the Specified available load. 400 W 600 W 900kW 2000 W iii) PV MODULE (S) i.The PV module bidder should have IEC 61215-2nd Edition and IEC 61730-2 qualification certification for PV modules. ii.The PV module(s) shall contain crystalline silicon solar cells. iii.The terminal box on the module should have a provision for opening for replacing the cable, if required. iv.Modules of minimum 200 W output each or above output should be used. v.A strip containing the following details should be laminated inside the module so as to be clearly visible from the front side. a. Name of the Supplier or distinctive Logo b. Model or Type No. c. Serial No. d. Year of make. vi.Identification and traceability Each PV module must use a RF identification tag (RFID), which must contain the following information: (i) Name of the manufacturer of PV Module and GEDA’s monogram (symbol). (ii) Name of the Manufacturer of Solar cells (iii) Month and year of the manufacture (separately for solar cells and module) (iv) Country of origin (separately for solar cells and module) (v) I-V curve for the module (vi) Peak Wattage, Im, Vm and FF for the module (vii) Unique Serial No and Model No of the module (viii) Date and year of obtaining IEC PV module qualification certificate (ix) Name of the test lab issuing IEC certificate (x) Other relevant information on traceability of solar cells and module as per ISO 9000 series. The RFID can be inside or outside the module laminate, but must be able to withstand harsh environmental conditions.
  • 4. Page 4 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) iv) BATTERY Flooded electrolyte type, positive tubular plate, low maintenance lead acid battery. Following IEC/IS certificates are mandatory for the battery: (Copy to be provided with tender.) General Requirements & Methods of Test - IEC 61427 Tubular Lead Acid- IS 1651/IS 133369 Rating of the Battery (a) The battery will have a minimum rating of 24V, 300 Ah (at C/10 at 27 o C) discharge rate or 48 V, 150 Ah (at C/10 at 27 o C) discharge rate, consisting of 2V cells. (b) 75% of the rated capacity of the battery should be between fully charged & load cut off conditions. (a) The battery will have a minimum rating of 24V, 600 Ah (at C/10 at 27 o C discharge rate or 48 V, 300 Ah (at C/10 at 27 o C) discharge rate, consisting of 2V cells. (b) 75% of the rated capacity of the battery should be between fully charged & load cut off conditions. (a) The battery will have a minimum rating of 48 V, 500 Ah (at C/10 at 27 o C) discharge rate, consisting of 2V cells. (b) 75% of the rated capacity of the battery should be between fully charged & load cut off conditions. (a) The battery will have a minimum rating of 48 V, 750 Ah (at C/10 at 27 o C) discharge rate or 120V, 300 Ah (at C/10 at 27 o C) discharge rate, consisting of 2V cells. (b) 75% of the rated capacity of the battery should be between fully charged & load cut off conditions. v) The power output of the module (s) under STC should be a minimum of - Mismatch amongst modules <3%. - Tolerance in rated power of modules: 3% 1000 W 2000W 3000 W 5000W
  • 5. Page 5 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) vi) ELECTRONICS The single phase bi-directional on line inverter shall provide AC power to the load, DC power to the battery bank and energy management to ensure that the battery will be remained in fully charged condition in all feasible circumstances. For Power Conditioners/Inverters* following certificates are mandatory: (Copy to be provided with tender.) Efficiency Measurements- IEC 61683 Environmental Testing- IEC 60068 2 (6,21,27,30,75,78) * Must additionally conform to the relevant national/international Electrical Safety Standards. PCU specifications : For 1 kW system For 2 kW system For 3kW System For 5 kW system Rating: 1 kVA 1kVA 1.5 kVA 3.5kVA Waveform : Pure sine wave. Pure sine wave. Pure sine wave. Pure sine wave. Battery Voltage: 24/ 48 V DC nominal. 24/ 48 V DC nominal. 48 V DC nominal. 120 V DC nominal. Charger Type : DSP/ PWM / MPPT technology. DSP/ PWM / MPPT technology. DSP/ PWM / MPPT technology. DSP/ PWM / MPPT technology. Output voltage: 230 V AC +/- 3%, 50 Hz 230 V AC +/- 3%, 50 Hz 230 V AC +/- 3%, 50 Hz 230 V AC +/- 3%, 50 Hz Efficiency: 90% 90% 90% 90% Overload capacity: 125% for 5 min 125% for 5 min 125% for 5 min 125% for 5 min Necessary lengths of wires/cables and fuses should be provided and wiring of cables should be through the pole with no open access to cables.
  • 6. Page 6 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) vii) ELECTRONIC PROTECTIONS a) Adequate protection is to be incorporated under over load conditions. b) The system should have protection against battery overcharge and deep discharge conditions. c) Fuses should be provided to protect against short circuit conditions. d) A blocking diode should be provided as part of the electronics, to prevent reverse flow of current through the PV module (s), in case such a diode is not provided with the solar module (s). e) Full protection against open circuit accident, short circuit and reverse polarity should be provided. viii) MECHANICAL HARDWARE a) The material should be rust proof and long lasting preferably hot dip galvanized iron. The frame structure should have provision to adjust its angle of inclination to the horizontal between 0 and 45, so that it can be installed at the specified tilt angle in the desired direction. b) The structure should be able to with stand wind speeds up to 150 kmph. c) The Battery rack made up of angles with wooden base and sides covered with net or ventilated MS sheet of minimum 18 SWG. All hardware, nuts, bolts should be cadmium passivated. d) Detailed drawings with specifications of each component should be submitted with the Technical Bid. ix) OTHER FEATURES a) The system should be provided with 2 LED indicators a green light to indicate charging in progress and a red LED to indicate deep discharge condition of the battery. The green LED should glow only when the battery is actually being charged. b) There will be a Name Plate on the system which will give c) Name of the Supplier or Distinctive Logo d) Serial Number e) Components and parts used in the solar rooftop systems should conform to the latest BIS specifications, whenever such specifications are available and applicable. f) The PV module (s) will be warranted for a minimum period of 25 years from the date of supply.
  • 7. Page 7 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) g) The Warranty Card to be supplied with the system must contain the details of the system supplied, as given in the Appendix-I. The Suppliers can also provide additional information about the system and conditions of warranty as necessary. h) An Operation, Instruction and Maintenance Manual, in English and the local language should be provided with the system. i) The following minimum details must be provided in the manual: I. About Photovoltaics II. About solar rooftop system – its components and expected performance. III. About PV module IV. About CFL V. About battery VI. Clear instructions about erection of pole and mounting of PV module and lamp housing assembly on the pole. VII. About electronics VIII. About charging and significance of indicators. IX. DO’s and DONT’s X. Clear instructions on regular maintenance and trouble shooting of solar rooftop system. XI. Name and address of the contact person in case of non-functionality of the solar rooftop system. x) BILL OF MATERIAL The bidder should provide the bill of material mentioning the quantity of each of the item consisting in each system, along with the offer.
  • 8. Page 8 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) GRID CONNECT SOLAR POWER GENERATING SYSTEM I DEFINITION The Grid Connect Solar Power Generating System consists of mainly three components viz. the solar photovoltaic (SPV) array, module mounting structure and the power conditioning unit (PCU)/ inverter. The SPV array converts the solar energy into DC electrical energy. The module mounting structure holds the modules in required position and the DC electrical energy is converted to AC power by the PCU, which is connected to the power grid. The AC power output of the inverter is fed to the AC distribution board through metering panel and isolation panel. The 415 V AC output-3Ø of the system can be utilized or as an option it could be stepped up to the required voltage level and after synchronizing with the grid, can be exported to the grid. II PV MODULE (S) i) The PV module bidder should have IEC 61215-2nd Edition and IEC 61730-2 qualification certification for PV modules. Copy to be provided with tender. ii) The PV module(s) shall contain crystalline silicon solar cells. iii) All materials used shall have a proven history of reliable and stable operation in external applications. It shall perform satisfactorily in relative humidity up to 100% with temperatures between -10 Deg C and +85 Deg C and with stand gust up to 200km/h from back side of the panel. The terminal box on the module should have a provision for opening for replacing the cable, if required. iv) A strip containing the following details should be laminated inside the module so as to be clearly visible from the front side. b. Name of the Supplier or distinctive Logo c. Model or Type No. d. Serial No. e. Year of make. v) Modules of minimum 200 W output each or above output should be used. Photo / electrical conversion efficiency of SPV module shall be greater than 13.5%. vi) IDENTIFICATION AND TRACEABILITY Each PV module must use a RF identification tag (RFID), which must contain the following information: (i) Name of the manufacturer of PV Module and GEDA’s monogram (symbol). (ii) Name of the Manufacturer of Solar cells (iii) Month and year of the manufacture (separately for solar cells and module)
  • 9. Page 9 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) (iv) Country of origin (separately for solar cells and module) (v) I-V curve for the module (vi) Peak Wattage, Im, Vm and FF for the module (vii) Unique Serial No and Model No of the module (viii) Date and year of obtaining IEC PV module qualification certificate (ix) Name of the test lab issuing IEC certificate (x) Other relevant information on traceability of solar cells and module as per ISO 9000 series. The RFID can be inside or outside the module laminate, but must be able to withstand harsh environmental conditions. III EARTHING AND SURGE PROTECTIONS Surge Protection Device (SPD): Internal surge protection shall consist of three MOV type arrestors connected from +ve and –ve terminals to earth (via Y arrangement) for higher withstand of the continuous PV-DC voltage during earth fault condition. SPD shall have safe disconnection and short circuit interruption arrangements through integrated DC in-built bypass fuse (parallel) which should get tripped during failure mode of MOV, extinguishing DC arc safely in order to protect the installation against fire hazards. Nominal discharge current (In) at 8/20 micro seconds shall be minimum 10 kA with maximum discharge (Imax) at 8/20 micro seconds minimum 20 kA with visual indication (through mechanical flag) in modules to monitor the life of SPD. EARTHING FOR PV ARRAY  The photovoltaic modules, BOS and other components of power plant requires adequate earthing for protecting against any serious faults as guided by IEC 60364.  The earthing for array and LT power system shall be made with GI pipe, 4.5 m long 40 mm diameter including accessories, and providing masonry enclosure with cast iron cover plate having locking arrangement, watering pipe using charcoal or coke and salt as required as per provisions of IS: 3043.  Necessary provision shall be made for bolted isolating joints of each earthing pit for periodic checking of earth resistance.  Each string/ array and MMS of the plant shall be grounded properly. The array structures are to be connected to earth pits as per IS standards. Necessary provision shall be made for bolted isolating joints of each earthing pit for periodic checking of earth resistance. Sr.No. Specification For 10 kW system For 15 kW system For 20 kW system For 25 kW system 1 The power output of the module (s) under STC should be a minimum of 10,000W 15,000 W 20,000 W 25,000 W
  • 10. Page 10 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22))  The complete earthing system shall be mechanically & electrically connected to provide independent return to earth.  For each earth pit, a necessary test point shall be provided.  In compliance to Rule 11 and 61 of Indian Electricity Rules, 1956 (as amended up to date), all non-current carrying metal parts shall be earthed with two separate and distinct earth continuity conductors to an efficient earth electrode.  The Bidder shall submit the detailed specifications of the array earthing. LIGHTNING PROTECTION FOR PV ARRAY  The source of over voltage can be lightning or other atmospheric disturbance. Main aim of over voltage protection is to reduce the over voltage to a tolerable level before it reaches the PV or other sub-system components as per IEC 60099.  Necessary concrete foundation for holding the lightning conductor in position to be made after giving due consideration to shadow on PV array, maximum wind speed and maintenance requirement at site in future.  The lightning conductor shall be earthed through flats and connected to the earth mats as per applicable Indian Standards with earth pits. Each lightning conductor shall be fitted with individual earth pit as per required Standards including accessories, and providing masonry enclosure with cast iron cover plate having locking arrangement, watering pipe using charcoal or coke and salt as required as per provisions of IS.  If necessary more numbers of lightning conductors may be provided.  The Bidder shall submit the drawings and detailed specifications of the PV array lightning protection equipment. IV MECHANICAL COMPONENTS (i) Metallic frame structure of galvanized steel with stands to be fixed on the roof of the building to hold the SPV module (s) one feet above roof level. The frame structure should have provision to adjust its angle of inclination to the horizontal between 0 and 45, so that it can be installed at the specified tilt angle i.e. inclined at 25 degree to horizontal facing due south. All hardware, nuts, bolts should be cadmium passivated. V OTHER FEATURES (i) The PV module (s) will be warranted for a minimum period of 10 years from the date of supply. (ii) An Operation, Instruction and Maintenance Manual in English and the local language should be provided with the system. The following minimum details must be provided in the Manual (a) About Photovoltaics (b) About solar PV system – its components and expected performance.
  • 11. Page 11 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) (c) About PV module (d) Clear instructions about mounting of PV module (s) (e) About electronics (f) DO’s and DONT’s (g) Clear instructions on regular maintenance and trouble shooting of solar power plant. (h) Name and address of the person or service center to be contacted in case of failure or complaint. The details of the Power Conditioning Unit are as given below: For Power Conditioners/Inverters* following certificates are mandatory: (Copy to be provided with tender.) Efficiency Measurements- IEC 61683 Environmental Testing- IEC 60068 2 (6,21,27,30,75,78) * Must additionally conform to the relevant national/international Electrical Safety Standards. Purpose The power conditioner unit shall convert DC produced by SPV array and adjust the voltage & frequency levels to suit the Grid. Grid supervision All three phases shall be supervised with respect to rise / fall in programmable threshold values of frequency & the power section of the plant. The plant shall get disconnected / connected from the grid in case of a grid fault / after normal grid conditions have resumed. The grid supervision must comply with VDEW or other relevant/equivalent regulations. Type & technology IGBT based. Utilize a circuit topology and components suitable for meeting the specifications. Output voltage on AC side 415 +10%, - 15% V AC A dedicated isolation transformer housed in the PCU enclosure shall be supplied to match the PCU output voltage to the utility grid voltage. PCU/ Solar Inverter voltage range should be reconfigured as per site requirements. Sr.No. Specification For 10 kW system For 15 kW system For 20 kW system For 25 kW system 1 PCU rating (NOMINAL) 10 kW/10 kVA VAC, grid interactive output 15 kW/15kVA VAC, grid interactive output 20 kW/20kVA VAC, grid interactive output 25 kW/25kVA VAC, grid interactive output
  • 12. Page 12 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) Output voltage 415 V ,50 Hz AC Output Frequency 50 + 1.5Hz, - 3.5 Hz DC system voltage The electrical safety of the array installation is of the utmost importance. Array electrical configuration shall be in such a way that, the MPPT shall operate with maximum efficiency, between the low and high temperature of the site. Maximal Current ripple 5% PP Power Factor 0.95 inductive to 0.95 capacitive Ambient room temperature 5 to 55 deg C Housing Cabinet a) PCU is housed in suitable switch cabinet, with min IP 21 degree of Ingress Protection. b) Weatherproof, rodents & insect proof c) Components and circuit boards mounted inside the enclosures clearly identified with appropriate permanent designations, which shall also serve to identify the items on the supplied drawings. d) All doors, covers, panels and cable exists shall be gasketed or otherwise designed to limit the entry of dust and moisture. All doors shall be equipped with locks. All openings shall be provided with grills or screens with openings no larger than 0.95 cm (about 3x8 inch). Other important features Electrical safety Protections a)General b) Over/under voltage The PCU shall include appropriate self protective and self diagnostic feature to protect itself and the PV array from damage in the event of PCU component failure or from parameters beyond the PCU’s safe operating range due to internal or external causes. The self-protective features shall not allow signals from the PCU front panel to cause the PCU to be operated in a manner which may be unsafe or damaging. Faults due to malfunctioning within the PCU, including commutation failure, shall be cleared by the PCU protective devices and not by the existing site utility grid service circuit breaker. a)Mains (Grid) over-under voltage and frequency protection.
  • 13. Page 13 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) c) Fool Proof Protection d) Accidental open circuit e) Internal Faults f) Galvanic Isolation b) Over voltage protection against atmospheric lightning c) Protection against voltage fluctuations in the grid itself and internal faults in the power conditioner, operational errors and switching transients. Against ISLANDING. Note : MOV type surge arrestors on AC and DC terminals for over voltage protection from lightning-induced surges Full protection against accidental open circuit and reverse polarity at the input. Inbuilt protection for internal faults including excess temperature, commutation failure, overload and cooling fan failure is obligatory Galvanic isolation is provided to avoid any DC component being injected into the grid and the potential for AC components appearing at the array. - Galvanic isolation shall be provided between the inverter/ PCU and grid to avoid any DC component being injected into the grid and the potential for AC components appearing at the array. - The specification of the isolation transformer shall be as follows:  Capacity: 125% of capacity of the PV modules (i.e. a 12.5 kVA transformer shall be used for a 10 kW PV system, and so on)  System: 3-phase, 4-wire  Input voltage range: 320-480 V AC  Output voltage range:380-435 V AC  Output voltage for single phase: 220-240 V AC  Tap change: Manual, V+/-20%, V+/-10%, V+/-0%  Operating frequency: 48-52 Hz  Efficiency; >98.5%  Impedance: 4-10%  Output waveform: Zero distortion  Insulation class: Class F  Leakage current: <20 mA  Cooling: AN
  • 14. Page 14 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) g) Earth Fault Supervision h) Disconnection & Islanding  Enclosure: IP 21 (if indoors) IP 54 (if outdoors)  Normal Operating Temperature: 0-60°C  Cable entry: Separate input/ output enclosed cable entry  Standard: IS 2026 - Further, it is also observed at various locations throughout the distribution grid that the grid voltage would consistently be greater or less than the acceptable voltage window of many inverters and PCUs. Moreover, this variation may be only for particular days of a week, seasonal, or for a limited time. - In such a case, the Contractor shall study/ measure the point of interconnection of the PV system consistently for at least one week to identify the voltage range experienced at the interconnection point of the distribution grid. Consequently, the Contractor shall adjust the input/ output of the isolation transformer to appropriate tap settings so that the voltage on the inverter side of the transformer is always within the acceptable voltage window of the inverter. The appropriate tap setting shall be conveyed to GEDA by the contractor. An integrated earth fault detection device is provided to detect eventual earth fault on DC side and shall send message to the supervisory system Disconnection of the PV generator in the event of loss of the main grid supply is achieved by in built protection within the power conditioner. This may be achieved through rate of change of current, phase angle, unbalanced voltages, or reactive load variants. Operation outside the limits of power quality as described in technical data sheet shall cause the power conditioner to disconnect the grid. Additional parameters requiring automatic disconnection are:  Neutral voltage displacement  Over current  Earth fault &  Reverse power In each of the above cases, tripping time shall be less than 0.5 seconds. Response time in case of
  • 15. Page 15 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) i) Automatic reconnection after the Grid failure is resorted. grid failure due to switch off or failure based shutdown should be well within 60 seconds. PCU has facility to reconnect the Inverter automatically to the grid following restoration of grid, subsequent to grid failure condition. Array Ground fault Provided Operator interface LCD and keypad operator interface, Menu driven. Fault conditions Automatic fault conditions reset for all parameters like voltage, frequency and /or black out. Control Logic Failure detection via watch dog timers. Parameter access All parameters accessible through an industry standard communication link. DC-AC conversion efficiency 93% for output ranging from 20% to full load Idling current at no load shall not exceed 2% of the full load current. DC isolation Provided at the output by means of a suitable isolating transformer Parallel operation with Grid Provided & capable of interrupting line-to-line fault currents and line to ground fault currents. Unbalanced output load PCU is able to withstand an unbalanced output load to the extent of 30%. Shut down / Standby mode Shut down / standby mode with its contact open under the following conditions before attempting an automatic restart after an appropriate time delay; in sufficient solar power output. a) Insufficient solar power input : When the power available from the PV array is insufficient to supply the losses of the PCU, the PCU shall go to a standby/shutdown mode. The PCU control shall prevent excessive cycling during rightly shut down or extended periods of insufficient solar radiation. b) Utility -Grid over or under voltage : The PCU shall restart after an over or under voltage shutdown when the utility grid voltage has returned to within limits for a minimum of two minutes. c) Utility-Grid over or under frequency : The PCU shall restart after an over or under frequency shutdown when the utility grid voltage has returned to the within limits for minimum of two minutes. PCU generated harmonics Shall not exceed a total harmonic current distortion of 5%, a single frequency current distortion of 3%, and single frequency current distortion of 1%, when the first through the fiftieth integer
  • 16. Page 16 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) harmonics of 50Hz are considered. Circuit separation High voltage & power circuits separated from low voltage & control circuits. Internal wiring Standard Cu wiring, with flame resistant insulation . Cabling practice a) Cables :PVC Cu cables as per relevant international Standards) b) Cable connections : suitable terminations c) PVC channel with covers to house the cables. High voltage test PCU with stand high voltage test of 2000 Vrms between either the input or the output terminals and the cabinet (chassis). EMI (Electromagnetic interface) PCU shall not produce EMI which cause malfunctioning of electronic & electrical instruments including communication equipments which are located within the facility in which the PCU is housed. Display on front panel & indicators a) instantaneous PCU ac power output and the DC voltage current and power input b) Accuracy of display : 3% of full scale factor or better c) Display visible from outside the PCU enclosure. d) Operational status of the PCU, alarms, trouble indicators and AC and DC disconnect switch positions shall also be communicated by appropriate messages or indicator lights on the front cover of the PCU enclosure. Emergency OFF Emergency OFF button is located at an appropriate position on the unit Grounding PCU includes ground lugs for equipment and PV array groundings. The DC circuit ground is a solid single point ground connection. Exposed surfaces Exposed surfaces of ferrous parts are thoroughly cleaned, primed, and painted and suitably protected to survive a nominal 30 years design life of the unit. Factory Testing a) Tested to demonstrate operation of its control system and the ability to be automatically synchronized and connected in parallel with a utility service, prior to its shipment. b) Operation of all controls, protective and instrumentation circuits demonstrated by direct test if feasible or by simulation operation conditions for all parameters that can not be directly tested. c) Demonstration of utility service interface protection circuits and functions, including calibration and functional trip tests of faults and isolation protection equipment. d) Operation of start up , disconnect and shutdown controls also to be tested and demonstrated, stable operation of the PCU and response to control
  • 17. Page 17 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) signals shall also be tested and demonstrated. e) Factory testing include measurement of phase currents, efficiencies, harmonic content and power factor. All tests shall be performed 25, 50, 75 and 100% of the rated nominal power. f) Factory test report (FTR) : Should be supplied with the unit after all tests. The FTR shall include detailed description of all parameters tested qualified and warranted. Operating Modes a) Night or sleep mode : where the Inverter is almost completely turned off, with just the timer and control system still in operation, losses < 2 W per 5 kW b) Standby mode: where the control system continuously monitors the output of the solar generator until pre-set value is exceeded (typically 10 W). Operational of MPP tracking mode: the control system continuously adjust the voltage of the generator to optimize the power available. The power conditioner shall automatically re-enter standby mode input power reduces below the standby mode threshold. Front panel display providing the status of the PCU, including AC power output & DC current voltage and power input, and unit fault indication. Codes & Standards The quality of equipment supplied shall be controlled to meet the guidelines for engineering design included in the standards and codes listed in the relevant ISI and other standards, such as : a) IEEE 928: Recommended Criteria for terrestrial PV power systems. b) IEEE 929 Recommended practice for utility interface of residential and intermediate PV systems. c) IEEE 519 Guide for harmonic control and reactive compensation of Static Power Controllers. d) National Electrical NFPA 70-1990 (USA) or equipment national standard. e) National Electrical Safety Code ANSI C2 (USA) or equipment national standard. Inverter / Array Size ratio The ratio of the Inverter continuous power rating and the array peak power rating shall be between 80 to 90% or any other value found suitable. This is because better overall annual yield can be obtained by allowing the Inverter to operate for longer periods closer to optimal efficiency. Inverter efficiency should exceed 90% except when operating at less than 10% of maximum output. MPPT Maximum power point tracker is integrated in the power conditioner unit to maximize energy drawn from the array. The MPPT shall be micro processor based to minimize power losses. The MPPT shall have provision (manual setting) for constant voltage operation.
  • 18. Page 18 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) Metering a) PV array energy production: Meter to log the actual amount of AC energy generated / consumed by the PV system shall have to be provided. b) Solar irradiance : An integrating pyranometer (Class II or better) to be provided, with the sensor mounted in the plane of the array. Readout shall be integrated with data logging, Data Logging System a) All major parameters available on the digital bus and logging facility for energy auditing through the internal microprocessor and can be read on the digital front panel at any time the current values, previous values for up to a month and the average values. The following parameters shall be accessible via the operating interface display :  AC voltage  AC output current  Output power  DC input voltage  DC input current  Time active  Time disabled  Time Idle  temperatures (C)  Converter status Protective function limits (VIZ-AC over voltage, AC under voltage, Over frequency, under frequency, ground fault, PV starting voltage, PV stopping voltage, over voltage delay, under voltage delay over frequency, ground fault delay, PV starting delay, PV stopping delay. Remote Monitoring System - A remote monitoring system shall be included with each photovoltaic system. - Usually such monitoring systems are connected and synchronized with the inverters. - Such monitoring services are provided by many leading inverter manufacturers and also third party service providers. - The monitoring system should transmit the following data in real-time to a central server and store it:  DC currents, voltages and power.  AC currents, voltages and power.  Irradiation, ambient temperature, module temperature and wind speed.  Error logs.
  • 19. Page 19 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) - This data may be transmitted either using the available LAN or GSM/ GPRS, or any other mode of connectivity available at the site. - The contractor shall be responsible for data connectivity for monitoring up to the warranty/ O&M period of the PV system, after which, the Contractor shall transfer all ownership rights, SIM card, account information, instructions, etc. to GEDA. - The contractor shall ensure that GEDA is aware of the contracts required to maintain connectivity post-warranty/ O&M period. - This data shall be accessible by GEDA through a secure login account. - The stored data should be represented through hourly, daily, monthly, etc. graphs and easily downloadable in .csv or .xls format. CABLES & ACCESSORIES For Cables & Accessories following certificates are mandatory: (Copy to be provided with tender.) General Test and Measuring Methods PVC insulated cables for working Voltages up to and including 1100 and UV resistant for outdoor installation IEC 60189 IS 694/ IS 1554 IS/IEC 69947 All the cables which shall be supplied shall be conforming to IS 1554 / 694 Part 1 of 1988 & shall be of 650 V/ 1.1 kV grade as per requirement. Only PVC copper cables shall be used. The size of the cables between array interconnections, array to junction boxes, junction boxes to PCU etc shall be so selected to keep the voltage drop and losses to the minimum. Certification of cables should be submitted in the tender. CONTROL ROOM The required control room shall be constructed at additional cost if required. Otherwise, PCU/ Solar Inverter should be placed/ mounted in suitable housing. SPARE PARTS One set of essential spares for the PCU shall be provided and made available at the plant.
  • 20. Page 20 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) DOCUMENTATION Two sets of installation manual / user manual shall be supplied along with the each power plant. The manual shall include complete system details such as array lay out, schematic of the system, inverter details, working principle etc. Step by step maintenance and trouble shooting procedures shall be given in the manuals. Module layout drawing has to be submitted to GEDA for each site. 7 nos. set of line diagram and licensed electrical contractors’ certificate has to be submitted for each site. BILL OF MATERIAL The bidder should provide the bill of material for grid connect SPV power plant mentioning the quantity of each of the item consisting in the system, along with the offer. SHADOW ANALYSIS The shadow analysis of each site has to be carried out by bidder and shall be submitted to GEDA, after placement of work order.
  • 21. Page 21 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) SOLAR PV HOME SYSTEMS 1. DEFINITION A solar PV home system aims at providing solar electricity for operating lights and/or fan or energizing a DC operated portable TV set for specified hours of operation per day. MODEL – 2 (2 Lights) Component Specifications PV Module 1x37 Wp under STC Lamps 2xCFLs (9W/11W) Battery 1x12V, 40 AH Tubular Plate, low maintenance type Lead Acid Battery Other Components Control electronics, Module mounting hardware, Battery box, Inter- connecting wires/cables, switches, Operation, instruction and maintenance manual Notes : i) Small white LED may be provided as an optional feature, with an independent switch. 2. DUTY CYCLE MODEL AVERAGE HOURS OF OPERATION/DAY Model 2 2 Lights, 3-4 Hours 3. LAMPS (i) The lamps will be of compact fluorescent (CFL) type, either 4 – Pin or 2 Pin types with ratings of 9W. For the 4 Pin type CFLs, a suitable pre-heating circuit must be provided. (ii) The light output from the lamps should be around 600 +/- 5% lumens (for 9W CFL). Also please see (iii) of VI given below. (iii) The lamps should be housed in an assembly suitable for indoor use, with a reflector on its back. While fixing the assembly, the lamp should be held in a base up configuration.
  • 22. Page 22 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) 4. BATTERY Following IEC/IS certificates are mandatory for the battery: (Copy to be provided with tender.) General Requirements & Methods of Test - IEC 61427 Tubular Lead Acid- IS 1651/IS 133369 (i) The battery will be of flooded electrolyte type positive tubular plate, low maintenance lead acid battery. (ii) The battery will have a minimum rating of 12V, 40 Ah (at C/10) discharge rate depending on Model. (iii) 75% of the rated capacity of the battery should be between fully charged and load cut off conditions. 5. ELECTRONICS 1. The inverter should be of quasi sine wave/sine wave type, with frequency in the range of 20-35 KHz Half-wave operation is not acceptable. 2. The total electronic efficiency should be at least 80%. 3. No blackening or reduction in the lumen output by more than 10% should be observed after 1000 ON/OFF cycles (two minutes ON followed by four minutes OFF is one cycle. 4. The idle current consumption should not be more than 10 ma 5. Electronics should operate at 12 V and should have temperature compensation for proper charging of the battery through out the year. 6. 2.5 sq.mm., 2 core, multi strand copper cable of 20 mtr length for Solar Home Systems Model 2 should be provided. Switches suitable for DC use and fuses should be provided. All wiring shall be concealed in Rigid PVC pipe/ PVC patti as per the requirement of site. 7. PV MODULE (S) (a) The PV module (s) shall contain crystalline silicon solar cells. (b) The PV module bidder should have IEC 61215-2nd Edition and IEC 61730-2 qualification certification for PV modules. Copy to be provided with tender. (c) The power output of the module (s) under STC should be a minimum of 37 W. (d) The operating voltage corresponding to the power output mentioned above should be 16.4V (e) The open circuit voltage of the PV modules under STC should be at least 21.0 Volts. (f) The terminal box on the module should have a provision for opening for replacing the cable, if required. (g) A strip containing the following details should be laminated inside the module as as to be clearly visible from the front side. a) Name of the Bidder or distinctive Logo b) Model or Type No. c) Serial No.
  • 23. Page 23 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) d) Year of make. 8. ELECTRONIC PROTECTIONS (i) Adequate protection is to be incorporated under no load conditions, e.g. when the lamps are removed and the system is switched ON. (ii) The system should have protection against battery overcharge and deep discharge conditions. (iii) Fuses should be provided to protect against short circuit conditions. (iv) A blocking diode should be provided as part of the electronics, to prevent reverse flow of current through the PV module (s) in case such a diode is not provided with the PV module (s). (v) Full protection against open circuit, accidental short circuit and reverse polarity should be provided. 9. MECHANICAL COMPONENTS (i) Metallic frame structure (with corrosion resistance epoxy paint) with 25 mm X 25 mm X 3 mm MS angle with stands to be fixed on the roof of the house to hold the SPV module (s) one feet above roof level. The frame structure should have provision to adjust its angle of inclination to the horizontal between 0 and 45, so that it can be installed at the specified tilt angle. All hardware, nuts, bolts should be cadmium passivated. (ii) The battery box provided should be of a vented (pp-cp material) plastics/ metallic with acid proof corrosion resistance epoxy paint for housing the storage battery indoors. The thickness of MS Sheet of battery box shall be of minimum 22 SWG with locking arrangements. (iii) DISPLAY BOARD: A display board should be installed in the village/ hamlet near community building, of min. size 4’ x 3’ on two poles. MS Sheet of board shall be of minimum 22 SWG. The text should include GEDA address as well as Manufacturer’s name and address, Phone, fax and mobile number for immediate contact in case of any failure of systems. The board should be spray painted, with vinyl letter pasting. 10. OTHER FEATURES (i) The system should be provided with 2 LED indicators: a green light to indicate charging in progress and a red LED to indicate deep discharge condition of the battery. The green LED should glow only when the battery is actually being charged. (ii) There will be a Name Plate on the system which will give : (a) Name of the Bidder or Distinctive Logo (b) Serial Number (iii) Components and parts used in solar home systems should conform to the latest BIS specifications, whenever such specifications are available and applicable. (iv) The PV module (s) will be warranted for a minimum period of 10 years from the date of supply and the solar home system (including the battery) will be warranted for a period of five years from the date of supply.
  • 24. Page 24 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) The Warranty Card to be supplied with the system must contain the details of the system supplied as given in the Appendix-I. The Bidder can also provide additional information about the system and conditions of warranty as necessary. (v) An Operation, Instruction and Maintenance Manual in English and the local language should be provided with the system. The following minimum details must be provided in the Manual (a) About Photovoltaics (b) About solar home system – its components and expected performance. (c) About PV module (d) About CFL (e) About battery (f) Clear instructions about mounting of PV module (s) (g) About electronics (h) About charging and significance of indicators. (i) DO’s and DONT’s (j) Clear instructions on regular maintenance and trouble shooting of solar home system. (k) Name and address of the person or service center to be contacted in case of failure or complaint.
  • 25. Page 25 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) SOLAR PV STREET LIGHTING SYSTEM 1. DEFINITION A standard alone solar photovoltaic street lighting system comprises a compact fluorescent lamp, lead acid battery, PV module(s), control electronics, inter-connecting wires/cables, module mounting hardware, battery box, operation instruction and maintenance manual. 2. DUTY CYCLE The system should be designed to automatically switch ON at dusk, operate throughout the night and automatically switch OFF at the dawn, under average daily insolation of 5 kWh/sq.m. on a horizontal surface. 3. LAMP (i) The lamp will be of compact fluorescent (CFL) type, either 4 – Pin or 2 Pin type, with a rating of 2 x 11W. For the 4 – Pin type CFL, adequate pre-heating circuit must be provided. (ii) The light output from the lamp should be around 1800 +/- 5% lumens. Also please see (iii) of V given below. (iii) The lamp should be housed in a weather proof assembly suitable for outdoor use, with a reflector on its back. While fixing the assembly, the lamp should be held in a base up configuration. OR 3. LED fixture -Specifications for 16W/18W LED Street Light: (Supporting Documents Required) 1. LED Type: High power of 1 W each 2. Power Consumption: 16W/18W ± 10%, maximum 1.35 W per LED with 85% driver efficiency. 3. Luminous flux efficacy ≥ 110 lm/Watt 4. Color Rendering Index ≥ 75 5. Color Temperature : 5500 K- 7500 K (White) 6. Circuit Efficiency : ≥ 85% 7. Life expectancy/Lumen maintenance : 50000 burning hours at ambient temperature with 70% Lumen maintenance 8. Construction : IP 65 9. Control Circuit : Compatible with LED 10. Operating temperature : - 40 0 C to 59 0 C Following testing parameters shall be carried out at National/NABL accredited laboratory (For luminaries):
  • 26. Page 26 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) 1. Marking 2. Luminaire Power 3. Circuit Efficiency 4. Polar Curve 5. Chromaticity co-ordinates and correlated color temperature 6. Color Rendering Index Note: 1) Polar curve is a lux distribution pattern which shows whether the luminaire matches Pole height and pole span. 4. BATTERY Following IEC/IS certificates are mandatory for the battery: (Copy to be provided with tender.) General Requirements & Methods of Test - IEC 61427 Tubular Lead Acid- IS 1651/IS 13369 (i) Flooded electrolyte type, positive tubular plate, low maintenance lead acid battery. (ii) The battery will have a minimum rating of 12V, 100 Ah/ 100Ah (at C/10) discharge rate. (iii) 75% of the rated capacity of the battery should be between fully charged and load cut off conditions. 5. ELECTRONICS (i) The inverter should be of quasi sine wave/sine wave type, with frequency in the range of 20-35 KHz-Half-wave operation is not acceptable. (ii) The total electronic efficiency should be at least 85% (iii) No blackening or reduction in the lumen output by more than 10% should be observed after 1000 ON/OFF cycles (two minutes ON followed by four minutes OFF is one cycle. (iv) The idle current consumption should not be more than 10mA. (v) Electronics should operate at 12 V and should have temperature compensation for proper charging of the battery through out the year. (vi) Necessary lengths of wires/cables and fuses should be provided and wiring of cables should be through the pole with no open access to cables. (vii) The PV module will be used to sense the ambient light level for switching ON and OFF the lamp. 6. ELECTRONIC PROTECTIONS (i) Adequate protection is to be incorporated under no load conditions e.g. when the lamp is removed and the system is switched ON.
  • 27. Page 27 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) (ii) The system should have protection against battery overcharge and deep discharge conditions. (iii) Fuses should be provided to protect against short circuit conditions. (iv) A blocking diode, should be provided as part of the electronics, to prevent reverse flow of current through the PV module (s), in case such a diode is not provided with the solar module (s). (v) Full protection against open circuit accident, short circuit and reverse polarity should be provided. 7. PV MODULE (S) a. The PV module (s) shall contain crystalline silicon solar cells. b. The PV module bidder should have IEC 61215-2nd Edition and IEC 61730-2 qualification certification for PV modules. Copy to be provided with tender. c. The power output of the module (s) under STC should be a minimum of 120 W. d. The operating voltage corresponding to the power output mentioned above should be 16.4V e. The open circuit voltage of the PV modules under STC should be at least 21.0 Volts. f. The terminal box on the module should have a provision for opening for replacing the cable, if required. g. A strip containing the following details should be laminated inside the module as as to be clearly visible from the front side. 1. Name of the Bidder or distinctive Logo 2. Model or Type No. 3. Serial No. 4. Year of make. 8. MECHANICAL HARDWARE (i) Metallic frame structure (with corrosion resistance paint) with 25 mm X 25 mm X 3 mm MS angle to be fixed on the top of the poll to hold the SPV module (s). The frame structure should have provision to adjust its angle of inclination to the horizontal between 0 and 45, so that it can be installed at the specified tilt angle in the desired direction. (ii) The pole should be made of GI medium class pipe with a height of minimum 7 meters & 6 mtrs above the ground level after grouting (details shall be furnished in the offer) and final installation. The pole, will be consisting of three portions with lower portion (length 4 m) of 114.3 mm dia. with wall thickness of 3.65 mm, and middle portion (length 1.5 m) of 88.9 mm dia with wall thickness of 3.25 mm and top portion (length 1.5 m) of 76.1 mm dia. with wall thickness of 3.25 mm and base plate of 175 mm X 175 mm X 6 mm. The 1 ½ inch dia. bend pipe for fixing up the lamp assembly with suitable clamps to mount on the pole should be G.I. medium class pipe and should be adjustable. The pole should have the provision to hold the weather proof lamp housing. It should be painted with a corrosion resistant paint. (iii) The battery box provided should be of a vented metallic with acid proof corrosion resistance paint (epoxy paint) for housing the storage battery outdoors with locking arrangement. The battery box should be tightly clamped with the pole. The thickness of MS Sheet of battery box shall be of minimum 18 SWG. All hardware, nuts, bolts should be cadmium passivated.
  • 28. Page 28 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) (iv) The grouting of the pole should be done by PCC 1:2:3, pit must be 0.3 X 0.3 X 1 m deep below ground level and a collar of 0.3 m above ground level must be of 0.3 m dia. (v) Detailed drawings with specifications of each component should be submitted with the Technical Bid. 9. OTHER FEATURES (i) The system should be provided with 2 LED indicators a green light to indicate charging in progress and a red LED to indicate deep discharge condition of the battery. The green LED should glow only when the battery is actually being charged. (ii) There will be a Name Plate on the system which will give (a) Name of the Supplier or Distinctive Logo (b) Serial Number (iii) Components and parts used in the solar street lighting systems should conform to the latest BIS specifications, whenever such specifications are available and applicable. (iv) The PV module (s) will be warranted for a minimum period of 10 years from the date of supply and the street lighting system (including the battery) will be warranted for a period of two years from the date of supply.
  • 29. Page 29 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) General Conditions: applicable to all the systems.  PV modules used in solar power plants/systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 12 years and 80% at the end of the 25 years.  The BoS items/components of the SPV power plants/systems deployed must confirm to the latest edition of IEC/equivalent BIS standards as specified below: BoS item/component Applicable IEC/equivalent BIS Standard Standard Description Standard Number Power Conditioners/Inverters* Efficiency Measurements Environmental Testing IEC 61683 IEC 60068 2 (6,21,27,30,75,78) Charge controller/MPPT units* Design Qualification Environmental Testing IEC 62093 IEC 60068 2 (6,21,27,30,75,78) Storage Batteries General Requirements & Methods of Test Tubular Lead Acid IEC 61427 IS 1651/IS 13369 Cables General Test and Measuring Methods PVC insulated cables for working Voltages up to and including 1100 VDo-, UV resistant for outdoor installation IEC 60227/IS 694 IEC 60502/ IS 1554(part I & II) Switches/ Circuit Breakers/Connectors General Requirements Connectors -safety IS/IEC 60947 part I,II,III EN 50521 Junction Boxes/Enclosures for inverter/ charge controller/ luminaries General Requirements Enclosures IP 54 (for outdoor)/IP 21 (for indoor) as per IEC 529 * Must additionally conform to the relevant national/international Electrical Safety Standards.
  • 30. Page 30 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) PART - II FINANCIAL BID GUIDELINES  Rates quoted by tenderer will be FOR destination prices inclusive of taxes, levies, duties, packing, forwarding, freight, insurance, loading unloading, supply, installation, commissioning, and any/ all charges for successful Supply and Installation of the systems at any locations in the State of Gujarat and all other miscellaneous expenses of marketing, commissions etc, if any.  The rates quoted by the tenderer will be inclusive of Service Tax, Work Contract Tax, VAT or any other taxes applicable to such work. Any escalation in such taxes/ levies during the tenure of the contract/ order will not be paid by GEDA and tenderers are advised to take in to consideration any such escalations in the prevailing taxes/levies/duties.  In no circumstances, escalation in the prices will be entertained.  Your rates are to be submitted as per the enclosed Performa of schedule of rates (online only). Physical submission of price bid will disqualify the bidder.
  • 31. Page 31 of 31 (Sign and Seal of the bidder) TTeennddeerr ffoorr IInnssttaallllaattiioonn ooff SSoollaarr PPhhoottoovvoollttaaiicc SSyysstteemmss iinn tthhee SSttaattee ooff GGuujjaarraatt dduurriinngg tthhee yyeeaarr 22001122--1133..((PPaarrtt--22)) Annexure 7 : Price Bid Sr.No. Item Unit rate (in Rs.) Installation & commissioning charges (in Rs.) CMC charges for 5 years (in Rs.) VAT/ CST (in Rs.) Total Amount (in Rs.) 1 SOLAR PV ROOFTOP SYSTEM WITH BATTERY BANK a 1 kW system b 2 kW system c 3 kW system d 5 kW system 2 GRID CONNECT SOLAR POWER GENERATING SYSTEM a 10 kW System b 15 kW system c 20 kW system d 25 kW system 3 SOLAR PV HOME SYSTEMS (Model -2) 4 SOLAR PV STREET LIGHT SYSTEMS with CFL 5 SOLAR PV STREET LIGHT SYSTEMS with LED