Solar Power Policy
Uttar Pradesh
2013
2
Table of Contents
1 PREAMBLE 3
2 OBJECTIVES 3
3 OPERATIVE PERIOD 3
4 GRID CONNECTED SOLAR POWER 4
4.1 PROJECT SIZE ................................................................................................ 4
4.2 SALE OF ENERGY ......................................................................................... 4
4.3 SALE OF ENERGY to THIRD PARTY.......................................................... 4
4.4 CAPTIVE POWER PLANTS........................................................................5
4.5 TIME-FRAME FOR IMPLEMENTATION OF PROJECTS.......................... 5
4.6 GRID CONNECTIVITY AND EVACUATION INFRASTRUCTURE ........ 5
4.7 RESTRICTION ON USE OF FOSSIL FUEL.................................................. 5
5. SOLAR FARMS.........................................................................................5
6. INCENTIVES UNDER INDUSTRIAL POLICY........................................5
7. INCENTIVES FOR BUNDELKHAND REGION.....................................5
8 TARGET CAPACITY...............................................................................6
9 SINGLE WINDOW CLEARANCE SYSTEM.................................................6
10 ROLE OF NODAL AGENCY..........................................................................6
10.1 BIDDING OF PROJECTS ............................................................................... 6
10.2 LAND BANK ................................................................................................... 6
10.3 FACILITATION FOR GOVERNMENT LAND/SPACE............................... 6
10.4 ASSISTANCE IN OTHER INFRASTRUCTURE .......................................... 6
10.5 TRAINING ....................................................................................................... 6
10.6 FINANCIAL ARRANGEMENT ..................................................................... 7
11 EMPOWERED COMMITTEE 7
11.1 FREQUENCY OF MEETINGS ....................................................................... 7
11.2 FUNCTIONS OF THE EMPOWERED COMMITTEE.................................. 7
11.2.1 Permission for bidding .......................................................................... 7
11.2.2 Approval of third party sale project proposals...................................... 7
11.2.3 Monitoring of single window................................................................ 8
11.2.4 Coordination.......................................................................................... 8
11.2.5 Other...................................................................................................... 8
Glossary 9
3
1 PREAMBLE
Electric power and its easy availability is an established benchmark of development
and an essential prerequisite for all-round prosperity. No major economic activity
can be sustained without adequate and reliable source of power.
In view of the fact that the conventional sources of power are fast depleting and
pose a threat of environment pollution too, the challenge before the State
Government is not only to meet the ever growing demand for power but also to
progressively increase the share of renewable sources in the power-mix so as to
achieve overall energy security.
The State of Uttar Pradesh is endowed with vast potential of solar power and the
Government is keen to tap this resource to improve the availability of power in the
State by promoting the establishment of solar energy based power projects, both
grid connected and off-grid type. For the attainment of this goal, a comprehensive
policy framework is an imperative requirement. Therefore, the Government of Uttar
Pradesh adopts and announces the Solar Power Policy-2013 as under:
2 OBJECTIVES
a. To promote generation and use of clean and green power in the State by
harnessing solar energy.
b. To put in place an appropriate investment climate which could stimulate
private sector participation in development of solar power
c. To spread environmental awareness among the general public.
d. To contribute to productive use of wastelands
e. To enhance skills and create employment opportunities.
f. To promote establishment of local manufacturing facilities.
g. To build capacity in the State to initiate and sustain, use and effective
management of newer technologies.
3 OPERATIVE PERIOD
This policy will come into effect from the date of issuance and shall remain in
operation up to 31st
March 2017. Solar power plants approved, installed and
commissioned during this period alone shall be eligible for benefits of this policy.
However, no benefit of this policy will be available to projects set up under any
incentive scheme of MNRE.
4
4 GRID CONNECTED SOLAR POWER
Grid connected solar power projects will be implemented on suitable land banks
identified and procured by the developer. In case of Projects to be set up on
government land or space, selection of the developer will be done by the department
or nodal agency through a transparent process.
4.1 PROJECT SIZE
Minimum five megawatt capacity solar power projects will be covered under this
policy
4.2 SALE OF ENERGY
Energy generated from solar power projects that are commissioned during this
policy period may be sold to distribution utility of UPPCL or to third party or used
for captive purpose. Project developers who are interested in selling energy
generated from Solar Power Plants to distribution utility of UPPCL will have to
compulsorily participate in competitive bidding for the total megawatt capacity they
wish to offer at the tariff discovered by bidding, subject to approval by UPERC.
In the event, the total aggregate capacity of the bids received is more than 200 MW
selection of the bidders shall be done on the basis of lowest quoted tariff in
ascending order. UPPCL will sign PPA with successful bidders for a period of ten
years.
For PPAs signed as a result of competitive bidding, difference in the case I bidding
tariff arrived at by UPPCL for purchase of conventional power and the price of solar
power discovered through this bidding shall be payable to the distribution utility for
power purchased from solar power projects for first 200 MW of solar power
commissioned under this policy for a period of ten years. Budgetary support
provided by the State Government to the Nodal Agency under the budgetary head
“Incentive scheme for Solar Power Generation” will be utilised for these purposes.
Empowered committee constituted will oversee the overall implementation of this
scheme and shall be empowered to issue any directions to remove any difficulties
with regards to its implementation.
4.3 SALE OF ENERGY to THIRD PARTY
Solar Power Developers who want to set up projects under this policy and do not
want to sign a PPA with distribution utility of UPPCL and want to sell power to a
third party, can set up plants under this policy without a bidding process but will not
be allowed to sign a PPA even at a future date with distribution utility of UPPCL.
These plants, who want to avail the incentives as per this policy will have to register
with the nodal agency, sign an agreement and furnish a performance bank guarantee
till the commissioning of the project as per the time frame given in this policy.
5
However, the subsidy or generation based incentive as mentioned in clause 4.2 shall
not be available to such projects.
4.4 CAPTIVE POWER PLANTS
Solar power plants of above 5 MW capacity to be built for captive use will also be
eligible for the incentives under this policy either within the premises of the user
plant or outside with wheeling arrangement.
4.5 TIME-FRAME FOR IMPLEMENTATION OF PROJECTS
Time limit for commissioning of Solar PV projects will be within 13 months and 28
months in case of solar thermal projects from the date of signing of PPA.
4.6 GRID CONNECTIVITY AND EVACUATION INFRASTRUCTURE
The grid connectivity and associated evacuation facilities from the solar power plant
substation/switchyard to distribution/transmission system “feed in substation” will
be provided in accordance with UPERC (Grant of Connectivity to Intra-State
Transmission System) Regulations 2010 as amended from time to time.
The responsibility of getting connectivity with the transmission system owned by
the Discom/STU will lie with the Project Developer. The cost of the transmission
line up to the “feed in substation” viz the point of interconnection where the
metering is done shall be borne by the Solar Project Developer . This
transmission line shall be constructed by the STU or Discom, whoever owns the
feed in substation. However the entire cost of transmission including cost of
construction of line, wheeling charges, losses etc. will be borne by the Project
Developer and will not be met by the STU/Discom.
4.7 RESTRICTION ON USE OF FOSSIL FUEL
No fossil fuel viz: coal, gas, lignite, naphtha, wood etc. shall be allowed to be used
in a solar thermal power project.
5.SOLAR FARMS
Provision of special incentive will be made by the State Government on case to
case basis for such solar farms where many power plants based on solar energy are
installed and the total investment is more than Rs.500crores.
6. INCENTIVES UNDER SOLAR POLICY
All the incentives provided under the Uttar Pradesh State Industrial Policy,2012
will be applicable on the power plants based on solar energy.
7. INCENTIVES FOR BUNDELKHAND REGION
Expenditure on the construction of transmission line and substation will be borne
by the State Government on all the projects in the Bundelkhand region.
6
8 TARGET CAPACITY
Target capacity of 500 MW of Grid connected solar power plant will be achieved
till March 2017.
9 SINGLE WINDOW CLEARANCE SYSTEM
Nodal Agency will act as single window clearance for Solar Power Projects. Nodal
Agency will ensure that all relevant government orders pertaining to this policy are
issued in a time bound manner by concerned departments. Facilitation in all
clearances approvals, permissions and consents required from the State
Government/its agencies will be the main task of the nodal agency as single
window. Some of the tasks of single window clearance may be outsourced by the
Nodal Agency. Review of pending clearances will be done by the Empowered
committee from time to time.
10 ROLE OF NODALAGENCY
The Nodal Agency will facilitate and assist the project developers and undertake the
following activities to achieve the objectives of the policy:
10.1BIDDING OF PROJECTS
The Nodal agency will be responsible for carrying out all the tasks related to
bidding process for solar power projects in the state. Bidding for departments other
than Energy department who decide to set up solar power projects on land/space
available with them will also be done by UPNEDA if requested by the concerned
department. Departments will bear the cost related to feasibility report preparation
and bid process management. Nodal Agency may charge a nominal facilitation
charge for providing this service.
10.2 LAND BANK
Identification of suitable locations and creation of land bank.
10.3 FACILITATION FOR GOVERNMENT LAND/SPACE
Facilitation for allotment of suitable land/space in control of State Government or
its agencies.
10.4 ASSISTANCE IN OTHER INFRASTRUCTURE
Assistance in arranging right of way, if any, water supply and connecting
infrastructure like roads etc.
10.5 TRAINING
Develop appropriate manpower skills by tying up with training and educational
institutions.
7
10.6 FINANCIAL ARRANGEMENT
Utilization of funds provided under budgetary head “Incentive scheme for Solar
Power Generation” for activities like hiring of consultants for Bid process
management, Outsourcing of single window system and other incentives to be made
available through this policy or on any other activity or works which are required
for implementation of Solar Policy in the State.
11 EMPOWERED COMMITTEE
To oversee, monitor and resolve various issues arising out of this policy, an
Empowered committee will be constituted under the chairmanship of the Chief
Secretary of the State. The committee will have the following members:-
o Chief Secretary - Chairman
o Infrastructure & Industrial Development Commissioner Member
o Secretary /Principal Secretary, Additional Energy Sources Member
o Secretary /Principal Secretary, Finance Member
o Secretary /Principal Secretary, Planning Member
o Secretary /Principal Secretary, Irrigation Member
o Secretary /Principal Secretary, Revenue Member
o Secretary /Principal Secretary, Energy Member
o Managing Director, UPPCL Member
o Managing Director, UPPTCL Member
o Managing Director, Concerned DISCOM Member
o Director, UPNEDA – Member Secretary
11.1 FREQUENCY OF MEETINGS
The committee shall meet on a quarterly basis and also as and when required.
11.2 FUNCTIONS OF THE EMPOWERED COMMITTEE
The committee will deliberate and decide on the following issues
11.2.1 Permission for bidding
Granting permission for bidding for Solar Power Projects bid out under competitive
bidding for the total megawatt capacity.
11.2.2 Approval of third party sale project proposals
All proposals of third party sale solar power projects desirous of availing incentives
under this policy will be approved as eligible projects for incentives by the
empowered committee.
8
11.2.3 Monitoring of single window
Monitoring of working of single window system.
11.2.4 Coordination
Resolve any other Inter departmental issues that may arise from time to time.
11.2.5 Other
Any other relevant matter.
9
Glossary
1. “CERC” means Central Electricity Regulatory Commission.
2. “Distribution utility” means State owned power Distribution Company i.e.
Madhayanchal Vidyut Vitran Nigam Ltd, Purvanchal Vidyut Vitran Nigam Ltd,
Pashchimanchal Vidyut Vitaran Nigam Ltd, Dakshinanchal Vidyut Vitaran
Nigam Ltd or Kanpur Electricity Supply Company whichever is applicable in a
particular case.
3. “Government” and “State” means the Government of Uttar Pradesh and State of
Uttar Pradesh respectively.
4. “MNRE” mean Ministry of New and Renewable Energy, Government of India.
5. “Nodal Agency” means Uttar Pradesh New and Renewable Energy Development
Agency (UPNEDA) designated as such by Government of Uttar Pradesh for
promotion of renewable sources of energy in case of Group –I type of projects
and State Irrigation Department in case of Group-II (Pilot)
6. “PPA” means Power Purchase Agreement.
7. “Transmission utility” means State owned Uttar Pradesh Power Transmission
Corporation Ltd.
8. “UPERC” means Uttar Pradesh Electricity Regulatory Commission.
----------------

More Related Content

What's hot

Kerala solar energy policy 2013
Kerala solar energy policy 2013Kerala solar energy policy 2013
Kerala solar energy policy 2013Headway Solar
 
India solar-policy-element-casting-shadow-on-harnessing-the-potential
India solar-policy-element-casting-shadow-on-harnessing-the-potentialIndia solar-policy-element-casting-shadow-on-harnessing-the-potential
India solar-policy-element-casting-shadow-on-harnessing-the-potentialRajapandiS
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.antastoya
 
Solar power in India - A financial analysis
Solar power in India - A financial analysisSolar power in India - A financial analysis
Solar power in India - A financial analysisAnkur Agarwal
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policiesNaresh Goud
 
Solar policys in india and state comparison
Solar policys in india and state comparison Solar policys in india and state comparison
Solar policys in india and state comparison Nilesh Dayalapwar
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012Bakul Haria
 
Bridge to-india the-india-solar-handbook-june-2014-edition
Bridge to-india the-india-solar-handbook-june-2014-editionBridge to-india the-india-solar-handbook-june-2014-edition
Bridge to-india the-india-solar-handbook-june-2014-editionSanman Rajput
 
Haryana solar power policy 2014
Haryana solar power policy 2014Haryana solar power policy 2014
Haryana solar power policy 2014Headway Solar
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantDr Naim R Kidwai
 
Adv seci april2013
Adv seci april2013Adv seci april2013
Adv seci april2013kamal2286
 
Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar Private Consultants
 
20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDAHarish Sharma
 
Final Report Biomass
Final Report BiomassFinal Report Biomass
Final Report BiomassNeel Patel
 
Tender Document for 1 MW Solar at Daman
Tender Document for 1 MW Solar at DamanTender Document for 1 MW Solar at Daman
Tender Document for 1 MW Solar at DamanHeadway Solar
 

What's hot (20)

Kerala solar energy policy 2013
Kerala solar energy policy 2013Kerala solar energy policy 2013
Kerala solar energy policy 2013
 
Solar power plant Opportunity and Costing
Solar power plant Opportunity and CostingSolar power plant Opportunity and Costing
Solar power plant Opportunity and Costing
 
India solar-policy-element-casting-shadow-on-harnessing-the-potential
India solar-policy-element-casting-shadow-on-harnessing-the-potentialIndia solar-policy-element-casting-shadow-on-harnessing-the-potential
India solar-policy-element-casting-shadow-on-harnessing-the-potential
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.
 
Solar power in India - A financial analysis
Solar power in India - A financial analysisSolar power in India - A financial analysis
Solar power in India - A financial analysis
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policies
 
Solar policys in india and state comparison
Solar policys in india and state comparison Solar policys in india and state comparison
Solar policys in india and state comparison
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
 
Bridge to-india the-india-solar-handbook-june-2014-edition
Bridge to-india the-india-solar-handbook-june-2014-editionBridge to-india the-india-solar-handbook-june-2014-edition
Bridge to-india the-india-solar-handbook-june-2014-edition
 
Haryana solar power policy 2014
Haryana solar power policy 2014Haryana solar power policy 2014
Haryana solar power policy 2014
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plant
 
Adv seci april2013
Adv seci april2013Adv seci april2013
Adv seci april2013
 
Presentation by MNRE on Solar Parks
Presentation by MNRE on Solar ParksPresentation by MNRE on Solar Parks
Presentation by MNRE on Solar Parks
 
JNNSM Solar Power in India
JNNSM Solar Power in IndiaJNNSM Solar Power in India
JNNSM Solar Power in India
 
Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar
 
20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA
 
Gseg project
Gseg projectGseg project
Gseg project
 
Final Report Biomass
Final Report BiomassFinal Report Biomass
Final Report Biomass
 
Tender Document for 1 MW Solar at Daman
Tender Document for 1 MW Solar at DamanTender Document for 1 MW Solar at Daman
Tender Document for 1 MW Solar at Daman
 
REAR_Newsletter_202204.pdf
REAR_Newsletter_202204.pdfREAR_Newsletter_202204.pdf
REAR_Newsletter_202204.pdf
 

Viewers also liked

First Solar School in Rural Maharashtra, India
First Solar School in Rural Maharashtra, India First Solar School in Rural Maharashtra, India
First Solar School in Rural Maharashtra, India TERRE Policy Centre
 
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-Videos
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-VideosQuantifying WOM Diffusion – Who gains, Who loses, from Viral-Videos
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-VideosBSI
 
Agenda - GW Solar Symposium 2012
Agenda - GW Solar Symposium 2012 Agenda - GW Solar Symposium 2012
Agenda - GW Solar Symposium 2012 GW Solar Institute
 
Jharkhand solar power policy 2013
Jharkhand solar power policy 2013Jharkhand solar power policy 2013
Jharkhand solar power policy 2013Headway Solar
 
Softer Solar Landings: Options to Avoid the Investment Tax Credit Cliff
Softer Solar Landings: Options to Avoid the Investment Tax Credit CliffSofter Solar Landings: Options to Avoid the Investment Tax Credit Cliff
Softer Solar Landings: Options to Avoid the Investment Tax Credit CliffGW Solar Institute
 
India's National Solar Mission - Phase 1 Guidelines
India's National Solar Mission - Phase 1 GuidelinesIndia's National Solar Mission - Phase 1 Guidelines
India's National Solar Mission - Phase 1 GuidelinesHeadway Solar
 
Solar Schools: Potential Savings by District
Solar Schools: Potential Savings by DistrictSolar Schools: Potential Savings by District
Solar Schools: Potential Savings by DistrictThe Solar Foundation
 
Proposal for Procurement Officer at Daleel Field
Proposal for Procurement Officer at Daleel FieldProposal for Procurement Officer at Daleel Field
Proposal for Procurement Officer at Daleel FieldMahmood Said Al Amri
 
State Solar Jobs 2013: All State Profiles
State Solar Jobs 2013: All State ProfilesState Solar Jobs 2013: All State Profiles
State Solar Jobs 2013: All State ProfilesThe Solar Foundation
 
Specification No. 119440: RFP for New 311 System for the Municipal Government...
Specification No. 119440: RFP for New 311 System for the Municipal Government...Specification No. 119440: RFP for New 311 System for the Municipal Government...
Specification No. 119440: RFP for New 311 System for the Municipal Government...Smart Chicago Collaborative
 
Rajasthan solar policy of 2014
Rajasthan solar policy of 2014Rajasthan solar policy of 2014
Rajasthan solar policy of 2014Headway Solar
 

Viewers also liked (20)

4 types of solar power
4 types of solar power4 types of solar power
4 types of solar power
 
National Solar Jobs Census 2012
National Solar Jobs Census 2012National Solar Jobs Census 2012
National Solar Jobs Census 2012
 
First Solar School in Rural Maharashtra, India
First Solar School in Rural Maharashtra, India First Solar School in Rural Maharashtra, India
First Solar School in Rural Maharashtra, India
 
Census 2013 Infographic
Census 2013 InfographicCensus 2013 Infographic
Census 2013 Infographic
 
Minnesota Solar Jobs Census 2013
Minnesota Solar Jobs Census 2013Minnesota Solar Jobs Census 2013
Minnesota Solar Jobs Census 2013
 
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-Videos
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-VideosQuantifying WOM Diffusion – Who gains, Who loses, from Viral-Videos
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-Videos
 
Agenda - GW Solar Symposium 2012
Agenda - GW Solar Symposium 2012 Agenda - GW Solar Symposium 2012
Agenda - GW Solar Symposium 2012
 
National Solar Jobs Census 2011
National Solar Jobs Census 2011National Solar Jobs Census 2011
National Solar Jobs Census 2011
 
Solar State Jobs 2013 Fact Sheet
Solar State Jobs 2013 Fact SheetSolar State Jobs 2013 Fact Sheet
Solar State Jobs 2013 Fact Sheet
 
Jharkhand solar power policy 2013
Jharkhand solar power policy 2013Jharkhand solar power policy 2013
Jharkhand solar power policy 2013
 
California Solar Jobs Census 2013
California Solar Jobs Census 2013California Solar Jobs Census 2013
California Solar Jobs Census 2013
 
Softer Solar Landings: Options to Avoid the Investment Tax Credit Cliff
Softer Solar Landings: Options to Avoid the Investment Tax Credit CliffSofter Solar Landings: Options to Avoid the Investment Tax Credit Cliff
Softer Solar Landings: Options to Avoid the Investment Tax Credit Cliff
 
India's National Solar Mission - Phase 1 Guidelines
India's National Solar Mission - Phase 1 GuidelinesIndia's National Solar Mission - Phase 1 Guidelines
India's National Solar Mission - Phase 1 Guidelines
 
Solar Schools: Potential Savings by District
Solar Schools: Potential Savings by DistrictSolar Schools: Potential Savings by District
Solar Schools: Potential Savings by District
 
California Solar Jobs Census 2013
California Solar Jobs Census 2013California Solar Jobs Census 2013
California Solar Jobs Census 2013
 
Proposal for Procurement Officer at Daleel Field
Proposal for Procurement Officer at Daleel FieldProposal for Procurement Officer at Daleel Field
Proposal for Procurement Officer at Daleel Field
 
State Solar Jobs 2013: All State Profiles
State Solar Jobs 2013: All State ProfilesState Solar Jobs 2013: All State Profiles
State Solar Jobs 2013: All State Profiles
 
Get started with solar
Get started with solarGet started with solar
Get started with solar
 
Specification No. 119440: RFP for New 311 System for the Municipal Government...
Specification No. 119440: RFP for New 311 System for the Municipal Government...Specification No. 119440: RFP for New 311 System for the Municipal Government...
Specification No. 119440: RFP for New 311 System for the Municipal Government...
 
Rajasthan solar policy of 2014
Rajasthan solar policy of 2014Rajasthan solar policy of 2014
Rajasthan solar policy of 2014
 

Similar to UP Solar Power Policy 2013

Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Headway Solar
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014Headway Solar
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeSanman Rajput
 
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - DraftHeadway Solar
 
Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Spark Network
 
Odisha solar policy 2013 draft
Odisha solar policy 2013 draftOdisha solar policy 2013 draft
Odisha solar policy 2013 draftHeadway Solar
 
Odisha solar-power-policy
Odisha solar-power-policyOdisha solar-power-policy
Odisha solar-power-policyJay Ranvir
 
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...Harish Sharma
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Gensol Engineering Limited
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabHarish Sharma
 
Bihar policy for promotion of new and renewable energy sources 2011
Bihar policy for promotion of new and renewable energy sources 2011Bihar policy for promotion of new and renewable energy sources 2011
Bihar policy for promotion of new and renewable energy sources 2011Headway Solar
 
PM_kusum_yojna.pdf
PM_kusum_yojna.pdfPM_kusum_yojna.pdf
PM_kusum_yojna.pdfbhupesh Dave
 
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIHarish Sharma
 
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...Harish Sharma
 
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVHarish Sharma
 
Net energy metering manual for three schemes
Net energy metering manual for three schemesNet energy metering manual for three schemes
Net energy metering manual for three schemesPrivate Consultants
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentivesChirag Jain
 

Similar to UP Solar Power Policy 2013 (20)

Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014
 
Draft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-schemeDraft guidelines-of-2000 mw-vgf-scheme
Draft guidelines-of-2000 mw-vgf-scheme
 
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
 
Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013
 
Odisha solar policy 2013 draft
Odisha solar policy 2013 draftOdisha solar policy 2013 draft
Odisha solar policy 2013 draft
 
Odisha solar-power-policy
Odisha solar-power-policyOdisha solar-power-policy
Odisha solar-power-policy
 
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
 
1 final com.sum
1 final com.sum1 final com.sum
1 final com.sum
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
 
SOLAR MISSION
SOLAR MISSION SOLAR MISSION
SOLAR MISSION
 
Bihar policy for promotion of new and renewable energy sources 2011
Bihar policy for promotion of new and renewable energy sources 2011Bihar policy for promotion of new and renewable energy sources 2011
Bihar policy for promotion of new and renewable energy sources 2011
 
PM_kusum_yojna.pdf
PM_kusum_yojna.pdfPM_kusum_yojna.pdf
PM_kusum_yojna.pdf
 
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
 
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
 
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
 
Net energy metering manual for three schemes
Net energy metering manual for three schemesNet energy metering manual for three schemes
Net energy metering manual for three schemes
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
 

More from Headway Solar

Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...Headway Solar
 
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Headway Solar
 
RERC Net metering Regulations 2015
RERC Net metering Regulations 2015RERC Net metering Regulations 2015
RERC Net metering Regulations 2015Headway Solar
 
Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015Headway Solar
 
DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014Headway Solar
 
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...Headway Solar
 
Renewable policy 2012 of West Bengal
Renewable policy 2012 of West BengalRenewable policy 2012 of West Bengal
Renewable policy 2012 of West BengalHeadway Solar
 
Tender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, UttarakhandTender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, UttarakhandHeadway Solar
 
Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013Headway Solar
 
RFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar PradeshRFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar PradeshHeadway Solar
 
Telangana solar RFS Document 2014
Telangana solar RFS Document 2014Telangana solar RFS Document 2014
Telangana solar RFS Document 2014Headway Solar
 
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Headway Solar
 
Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012Headway Solar
 
RFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanRFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanHeadway Solar
 
Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015Headway Solar
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabHeadway Solar
 
New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012Headway Solar
 
RFP Document of Solar Power Project in Karnataka
RFP Document of Solar Power Project in KarnatakaRFP Document of Solar Power Project in Karnataka
RFP Document of Solar Power Project in KarnatakaHeadway Solar
 
Karnataka solar policy 2014-2021
Karnataka solar policy 2014-2021Karnataka solar policy 2014-2021
Karnataka solar policy 2014-2021Headway Solar
 
Bid document for Solar Plant in Jharkhand
Bid document for Solar Plant in JharkhandBid document for Solar Plant in Jharkhand
Bid document for Solar Plant in JharkhandHeadway Solar
 

More from Headway Solar (20)

Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
 
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
 
RERC Net metering Regulations 2015
RERC Net metering Regulations 2015RERC Net metering Regulations 2015
RERC Net metering Regulations 2015
 
Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015
 
DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014
 
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
 
Renewable policy 2012 of West Bengal
Renewable policy 2012 of West BengalRenewable policy 2012 of West Bengal
Renewable policy 2012 of West Bengal
 
Tender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, UttarakhandTender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, Uttarakhand
 
Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013
 
RFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar PradeshRFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar Pradesh
 
Telangana solar RFS Document 2014
Telangana solar RFS Document 2014Telangana solar RFS Document 2014
Telangana solar RFS Document 2014
 
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
 
Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012
 
RFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanRFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project Rajasthan
 
Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in Punjab
 
New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012
 
RFP Document of Solar Power Project in Karnataka
RFP Document of Solar Power Project in KarnatakaRFP Document of Solar Power Project in Karnataka
RFP Document of Solar Power Project in Karnataka
 
Karnataka solar policy 2014-2021
Karnataka solar policy 2014-2021Karnataka solar policy 2014-2021
Karnataka solar policy 2014-2021
 
Bid document for Solar Plant in Jharkhand
Bid document for Solar Plant in JharkhandBid document for Solar Plant in Jharkhand
Bid document for Solar Plant in Jharkhand
 

Recently uploaded

Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceHigh Profile Call Girls
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCongressional Budget Office
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28JSchaus & Associates
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...Suhani Kapoor
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Roomishabajaj13
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxaaryamanorathofficia
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 

Recently uploaded (20)

Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
 
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptx
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
How to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the ThreatHow to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the Threat
 
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 

UP Solar Power Policy 2013

  • 2. 2 Table of Contents 1 PREAMBLE 3 2 OBJECTIVES 3 3 OPERATIVE PERIOD 3 4 GRID CONNECTED SOLAR POWER 4 4.1 PROJECT SIZE ................................................................................................ 4 4.2 SALE OF ENERGY ......................................................................................... 4 4.3 SALE OF ENERGY to THIRD PARTY.......................................................... 4 4.4 CAPTIVE POWER PLANTS........................................................................5 4.5 TIME-FRAME FOR IMPLEMENTATION OF PROJECTS.......................... 5 4.6 GRID CONNECTIVITY AND EVACUATION INFRASTRUCTURE ........ 5 4.7 RESTRICTION ON USE OF FOSSIL FUEL.................................................. 5 5. SOLAR FARMS.........................................................................................5 6. INCENTIVES UNDER INDUSTRIAL POLICY........................................5 7. INCENTIVES FOR BUNDELKHAND REGION.....................................5 8 TARGET CAPACITY...............................................................................6 9 SINGLE WINDOW CLEARANCE SYSTEM.................................................6 10 ROLE OF NODAL AGENCY..........................................................................6 10.1 BIDDING OF PROJECTS ............................................................................... 6 10.2 LAND BANK ................................................................................................... 6 10.3 FACILITATION FOR GOVERNMENT LAND/SPACE............................... 6 10.4 ASSISTANCE IN OTHER INFRASTRUCTURE .......................................... 6 10.5 TRAINING ....................................................................................................... 6 10.6 FINANCIAL ARRANGEMENT ..................................................................... 7 11 EMPOWERED COMMITTEE 7 11.1 FREQUENCY OF MEETINGS ....................................................................... 7 11.2 FUNCTIONS OF THE EMPOWERED COMMITTEE.................................. 7 11.2.1 Permission for bidding .......................................................................... 7 11.2.2 Approval of third party sale project proposals...................................... 7 11.2.3 Monitoring of single window................................................................ 8 11.2.4 Coordination.......................................................................................... 8 11.2.5 Other...................................................................................................... 8 Glossary 9
  • 3. 3 1 PREAMBLE Electric power and its easy availability is an established benchmark of development and an essential prerequisite for all-round prosperity. No major economic activity can be sustained without adequate and reliable source of power. In view of the fact that the conventional sources of power are fast depleting and pose a threat of environment pollution too, the challenge before the State Government is not only to meet the ever growing demand for power but also to progressively increase the share of renewable sources in the power-mix so as to achieve overall energy security. The State of Uttar Pradesh is endowed with vast potential of solar power and the Government is keen to tap this resource to improve the availability of power in the State by promoting the establishment of solar energy based power projects, both grid connected and off-grid type. For the attainment of this goal, a comprehensive policy framework is an imperative requirement. Therefore, the Government of Uttar Pradesh adopts and announces the Solar Power Policy-2013 as under: 2 OBJECTIVES a. To promote generation and use of clean and green power in the State by harnessing solar energy. b. To put in place an appropriate investment climate which could stimulate private sector participation in development of solar power c. To spread environmental awareness among the general public. d. To contribute to productive use of wastelands e. To enhance skills and create employment opportunities. f. To promote establishment of local manufacturing facilities. g. To build capacity in the State to initiate and sustain, use and effective management of newer technologies. 3 OPERATIVE PERIOD This policy will come into effect from the date of issuance and shall remain in operation up to 31st March 2017. Solar power plants approved, installed and commissioned during this period alone shall be eligible for benefits of this policy. However, no benefit of this policy will be available to projects set up under any incentive scheme of MNRE.
  • 4. 4 4 GRID CONNECTED SOLAR POWER Grid connected solar power projects will be implemented on suitable land banks identified and procured by the developer. In case of Projects to be set up on government land or space, selection of the developer will be done by the department or nodal agency through a transparent process. 4.1 PROJECT SIZE Minimum five megawatt capacity solar power projects will be covered under this policy 4.2 SALE OF ENERGY Energy generated from solar power projects that are commissioned during this policy period may be sold to distribution utility of UPPCL or to third party or used for captive purpose. Project developers who are interested in selling energy generated from Solar Power Plants to distribution utility of UPPCL will have to compulsorily participate in competitive bidding for the total megawatt capacity they wish to offer at the tariff discovered by bidding, subject to approval by UPERC. In the event, the total aggregate capacity of the bids received is more than 200 MW selection of the bidders shall be done on the basis of lowest quoted tariff in ascending order. UPPCL will sign PPA with successful bidders for a period of ten years. For PPAs signed as a result of competitive bidding, difference in the case I bidding tariff arrived at by UPPCL for purchase of conventional power and the price of solar power discovered through this bidding shall be payable to the distribution utility for power purchased from solar power projects for first 200 MW of solar power commissioned under this policy for a period of ten years. Budgetary support provided by the State Government to the Nodal Agency under the budgetary head “Incentive scheme for Solar Power Generation” will be utilised for these purposes. Empowered committee constituted will oversee the overall implementation of this scheme and shall be empowered to issue any directions to remove any difficulties with regards to its implementation. 4.3 SALE OF ENERGY to THIRD PARTY Solar Power Developers who want to set up projects under this policy and do not want to sign a PPA with distribution utility of UPPCL and want to sell power to a third party, can set up plants under this policy without a bidding process but will not be allowed to sign a PPA even at a future date with distribution utility of UPPCL. These plants, who want to avail the incentives as per this policy will have to register with the nodal agency, sign an agreement and furnish a performance bank guarantee till the commissioning of the project as per the time frame given in this policy.
  • 5. 5 However, the subsidy or generation based incentive as mentioned in clause 4.2 shall not be available to such projects. 4.4 CAPTIVE POWER PLANTS Solar power plants of above 5 MW capacity to be built for captive use will also be eligible for the incentives under this policy either within the premises of the user plant or outside with wheeling arrangement. 4.5 TIME-FRAME FOR IMPLEMENTATION OF PROJECTS Time limit for commissioning of Solar PV projects will be within 13 months and 28 months in case of solar thermal projects from the date of signing of PPA. 4.6 GRID CONNECTIVITY AND EVACUATION INFRASTRUCTURE The grid connectivity and associated evacuation facilities from the solar power plant substation/switchyard to distribution/transmission system “feed in substation” will be provided in accordance with UPERC (Grant of Connectivity to Intra-State Transmission System) Regulations 2010 as amended from time to time. The responsibility of getting connectivity with the transmission system owned by the Discom/STU will lie with the Project Developer. The cost of the transmission line up to the “feed in substation” viz the point of interconnection where the metering is done shall be borne by the Solar Project Developer . This transmission line shall be constructed by the STU or Discom, whoever owns the feed in substation. However the entire cost of transmission including cost of construction of line, wheeling charges, losses etc. will be borne by the Project Developer and will not be met by the STU/Discom. 4.7 RESTRICTION ON USE OF FOSSIL FUEL No fossil fuel viz: coal, gas, lignite, naphtha, wood etc. shall be allowed to be used in a solar thermal power project. 5.SOLAR FARMS Provision of special incentive will be made by the State Government on case to case basis for such solar farms where many power plants based on solar energy are installed and the total investment is more than Rs.500crores. 6. INCENTIVES UNDER SOLAR POLICY All the incentives provided under the Uttar Pradesh State Industrial Policy,2012 will be applicable on the power plants based on solar energy. 7. INCENTIVES FOR BUNDELKHAND REGION Expenditure on the construction of transmission line and substation will be borne by the State Government on all the projects in the Bundelkhand region.
  • 6. 6 8 TARGET CAPACITY Target capacity of 500 MW of Grid connected solar power plant will be achieved till March 2017. 9 SINGLE WINDOW CLEARANCE SYSTEM Nodal Agency will act as single window clearance for Solar Power Projects. Nodal Agency will ensure that all relevant government orders pertaining to this policy are issued in a time bound manner by concerned departments. Facilitation in all clearances approvals, permissions and consents required from the State Government/its agencies will be the main task of the nodal agency as single window. Some of the tasks of single window clearance may be outsourced by the Nodal Agency. Review of pending clearances will be done by the Empowered committee from time to time. 10 ROLE OF NODALAGENCY The Nodal Agency will facilitate and assist the project developers and undertake the following activities to achieve the objectives of the policy: 10.1BIDDING OF PROJECTS The Nodal agency will be responsible for carrying out all the tasks related to bidding process for solar power projects in the state. Bidding for departments other than Energy department who decide to set up solar power projects on land/space available with them will also be done by UPNEDA if requested by the concerned department. Departments will bear the cost related to feasibility report preparation and bid process management. Nodal Agency may charge a nominal facilitation charge for providing this service. 10.2 LAND BANK Identification of suitable locations and creation of land bank. 10.3 FACILITATION FOR GOVERNMENT LAND/SPACE Facilitation for allotment of suitable land/space in control of State Government or its agencies. 10.4 ASSISTANCE IN OTHER INFRASTRUCTURE Assistance in arranging right of way, if any, water supply and connecting infrastructure like roads etc. 10.5 TRAINING Develop appropriate manpower skills by tying up with training and educational institutions.
  • 7. 7 10.6 FINANCIAL ARRANGEMENT Utilization of funds provided under budgetary head “Incentive scheme for Solar Power Generation” for activities like hiring of consultants for Bid process management, Outsourcing of single window system and other incentives to be made available through this policy or on any other activity or works which are required for implementation of Solar Policy in the State. 11 EMPOWERED COMMITTEE To oversee, monitor and resolve various issues arising out of this policy, an Empowered committee will be constituted under the chairmanship of the Chief Secretary of the State. The committee will have the following members:- o Chief Secretary - Chairman o Infrastructure & Industrial Development Commissioner Member o Secretary /Principal Secretary, Additional Energy Sources Member o Secretary /Principal Secretary, Finance Member o Secretary /Principal Secretary, Planning Member o Secretary /Principal Secretary, Irrigation Member o Secretary /Principal Secretary, Revenue Member o Secretary /Principal Secretary, Energy Member o Managing Director, UPPCL Member o Managing Director, UPPTCL Member o Managing Director, Concerned DISCOM Member o Director, UPNEDA – Member Secretary 11.1 FREQUENCY OF MEETINGS The committee shall meet on a quarterly basis and also as and when required. 11.2 FUNCTIONS OF THE EMPOWERED COMMITTEE The committee will deliberate and decide on the following issues 11.2.1 Permission for bidding Granting permission for bidding for Solar Power Projects bid out under competitive bidding for the total megawatt capacity. 11.2.2 Approval of third party sale project proposals All proposals of third party sale solar power projects desirous of availing incentives under this policy will be approved as eligible projects for incentives by the empowered committee.
  • 8. 8 11.2.3 Monitoring of single window Monitoring of working of single window system. 11.2.4 Coordination Resolve any other Inter departmental issues that may arise from time to time. 11.2.5 Other Any other relevant matter.
  • 9. 9 Glossary 1. “CERC” means Central Electricity Regulatory Commission. 2. “Distribution utility” means State owned power Distribution Company i.e. Madhayanchal Vidyut Vitran Nigam Ltd, Purvanchal Vidyut Vitran Nigam Ltd, Pashchimanchal Vidyut Vitaran Nigam Ltd, Dakshinanchal Vidyut Vitaran Nigam Ltd or Kanpur Electricity Supply Company whichever is applicable in a particular case. 3. “Government” and “State” means the Government of Uttar Pradesh and State of Uttar Pradesh respectively. 4. “MNRE” mean Ministry of New and Renewable Energy, Government of India. 5. “Nodal Agency” means Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) designated as such by Government of Uttar Pradesh for promotion of renewable sources of energy in case of Group –I type of projects and State Irrigation Department in case of Group-II (Pilot) 6. “PPA” means Power Purchase Agreement. 7. “Transmission utility” means State owned Uttar Pradesh Power Transmission Corporation Ltd. 8. “UPERC” means Uttar Pradesh Electricity Regulatory Commission. ----------------