SlideShare a Scribd company logo
1 of 1
Download to read offline
Welltest Specialists : Welltest Excellence
TechTips
Mini-Frac’ DFIT Doubles for Initial Test... Mini-frac’ or Diagnostic
Fracture Injection Tests (DFIT) help double your testing efficiency if pressure recorders
are installed on bottom. First, a successful DFIT helps estimate hydraulic fracture closure
pressure and reservoir flow properties—valuable information for stimulation programs. Second,
the pressure fall-off can be analyzed to comply with AER Initial Pressure Oil or Gas requirements.
Keep Test Simple & Quick
Program pressure recorders for rapid
data sampling (1 sec). Leak-off Test
(LOT) for ≈60 min to confirm wellbore
integrity. Acid spearhead if necessary.
Start mini-frac’ at 0.5–1.0 m3
/minute,
establish breakdown, hold injection
rate constant, maximum 5–10 m3
of
Newtonian fluid (N2, oil, water). Hard
shut-down, close all wellhead valves.
Wait ≈60 min before rigging out pump.
Minimum Shut-in 8 h
Required for the transient gauge PAS
file (TRG.pas) flagged as test purpose
“Initial.” If the final pressure passes the
Board’s 2 kPa Rule (pressure changing
<2 kPa/h/6 h) then you are done. If not
pressure transient analysis (PTA) will be
required to provide the extrapolated p*
to satisfy Initial Pressure requirements
for new Oil or Gas wells.
Shut-in Time vs. p*
As operational logistics allow, longer
shut-in times are better. However, the
pressure fall-off does not have to pass
the 2 kPa Rule, nor does the well have
to be shut-in >14 days. The AER will
accept PAS files flagged as analyzed,
with input extrapolated pressure (p*).
Micro-permeability systems probably
will never reveal pseudo-radial flow.
Step-Rate Tests
Changing injection rate, either step-up
or step-down, is not recommended as
the critical closure pressure signature
can be masked by the rate change.
Static Gradient Survey
A final reverse static gradient survey
should be conducted, when recovering
subsurface pressure recorders, to end
the mini-frac’ fall-off test.
G-Function Analysis
Estimate closure stress, pore pressure,
leak-off, and possibly a permeability for
use in fracture stimulation design.
Pressure Transient Analysis
What isn’t specifically clear in AER D40
is that pressure transient analysis (PTA)
is acceptable for estimating both Initial
Pressure Oil and Initial Pressure Gas
conditions (p*). Analytically the DFIT is
similar to a closed chamber drill stem
test (DST) where an impulse (opening
valve) generates a pressure response.
This also corresponds to the positive
impulse generated by under-balanced
perforating, both resulting in a pressure
build-up. The mini-frac’ is opposite: a
negative impulse causing the
pressure to fall-off.
www.welltestspecialists.com

More Related Content

Similar to TechTips-Mini-Frac-DFIT. Mini-frac’ or Diagnostic Fracture Injection Tests (DFIT)

2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...
2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...
2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...
Komandur Sunder Raj, P.E.
 
SPD12 Pipeline Dynamic Simulation
SPD12 Pipeline Dynamic SimulationSPD12 Pipeline Dynamic Simulation
SPD12 Pipeline Dynamic Simulation
Saleh Lari Mojarrad
 
RX 7 DP Transmitter Upgrade
RX 7 DP Transmitter UpgradeRX 7 DP Transmitter Upgrade
RX 7 DP Transmitter Upgrade
Watkins1j
 
Emerson Rosemount™ 708 Wireless Acoustic Transmitter, the most reliable, effe...
Emerson Rosemount™ 708 Wireless Acoustic Transmitter, the most reliable, effe...Emerson Rosemount™ 708 Wireless Acoustic Transmitter, the most reliable, effe...
Emerson Rosemount™ 708 Wireless Acoustic Transmitter, the most reliable, effe...
Fritz Valencia
 
Ai Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection TrainingAi Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection Training
ernestvictor
 

Similar to TechTips-Mini-Frac-DFIT. Mini-frac’ or Diagnostic Fracture Injection Tests (DFIT) (20)

Introduction To Pressure Surge In Liquid Systems
Introduction To Pressure Surge In Liquid SystemsIntroduction To Pressure Surge In Liquid Systems
Introduction To Pressure Surge In Liquid Systems
 
NONG YAO PROJECT SUBSEA VALVE Rev 0
NONG YAO PROJECT SUBSEA VALVE Rev 0NONG YAO PROJECT SUBSEA VALVE Rev 0
NONG YAO PROJECT SUBSEA VALVE Rev 0
 
pipefitting pressure-test
pipefitting pressure-testpipefitting pressure-test
pipefitting pressure-test
 
BVAA presentation 2015: The Use of CFD to assess valve performance and operat...
BVAA presentation 2015: The Use of CFD to assess valve performance and operat...BVAA presentation 2015: The Use of CFD to assess valve performance and operat...
BVAA presentation 2015: The Use of CFD to assess valve performance and operat...
 
2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...
2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...
2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...
 
mn03010.pdf
mn03010.pdfmn03010.pdf
mn03010.pdf
 
IRJET- A Review of Design and Analysis of Retainerless Dual Plate Check Valve...
IRJET- A Review of Design and Analysis of Retainerless Dual Plate Check Valve...IRJET- A Review of Design and Analysis of Retainerless Dual Plate Check Valve...
IRJET- A Review of Design and Analysis of Retainerless Dual Plate Check Valve...
 
well control (1)
 well control (1) well control (1)
well control (1)
 
High integrity pressure protection system ( HIPPS)
High integrity  pressure protection  system  ( HIPPS)High integrity  pressure protection  system  ( HIPPS)
High integrity pressure protection system ( HIPPS)
 
SPD12 Pipeline Dynamic Simulation
SPD12 Pipeline Dynamic SimulationSPD12 Pipeline Dynamic Simulation
SPD12 Pipeline Dynamic Simulation
 
Presentation-api-521.ppt
Presentation-api-521.pptPresentation-api-521.ppt
Presentation-api-521.ppt
 
RX 7 DP Transmitter Upgrade
RX 7 DP Transmitter UpgradeRX 7 DP Transmitter Upgrade
RX 7 DP Transmitter Upgrade
 
Twin Anti surge system
Twin Anti surge systemTwin Anti surge system
Twin Anti surge system
 
J valves 2008
J valves 2008J valves 2008
J valves 2008
 
Gas Condensate Separation Stages – Design & Optimization
Gas Condensate Separation Stages – Design & OptimizationGas Condensate Separation Stages – Design & Optimization
Gas Condensate Separation Stages – Design & Optimization
 
Safe-Drive™ Process Refractometer PR-23-SD Generation 2.1 Best Practices
Safe-Drive™ Process Refractometer PR-23-SD Generation 2.1 Best PracticesSafe-Drive™ Process Refractometer PR-23-SD Generation 2.1 Best Practices
Safe-Drive™ Process Refractometer PR-23-SD Generation 2.1 Best Practices
 
exp.9 flow meter demonstration
exp.9 flow meter demonstrationexp.9 flow meter demonstration
exp.9 flow meter demonstration
 
Tube burst tester p10 d 2018
Tube burst tester p10 d   2018Tube burst tester p10 d   2018
Tube burst tester p10 d 2018
 
Emerson Rosemount™ 708 Wireless Acoustic Transmitter, the most reliable, effe...
Emerson Rosemount™ 708 Wireless Acoustic Transmitter, the most reliable, effe...Emerson Rosemount™ 708 Wireless Acoustic Transmitter, the most reliable, effe...
Emerson Rosemount™ 708 Wireless Acoustic Transmitter, the most reliable, effe...
 
Ai Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection TrainingAi Ch E Overpressure Protection Training
Ai Ch E Overpressure Protection Training
 

Recently uploaded

electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
benjamincojr
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
rahulmanepalli02
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
IJECEIAES
 

Recently uploaded (20)

UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptx
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 

TechTips-Mini-Frac-DFIT. Mini-frac’ or Diagnostic Fracture Injection Tests (DFIT)

  • 1. Welltest Specialists : Welltest Excellence TechTips Mini-Frac’ DFIT Doubles for Initial Test... Mini-frac’ or Diagnostic Fracture Injection Tests (DFIT) help double your testing efficiency if pressure recorders are installed on bottom. First, a successful DFIT helps estimate hydraulic fracture closure pressure and reservoir flow properties—valuable information for stimulation programs. Second, the pressure fall-off can be analyzed to comply with AER Initial Pressure Oil or Gas requirements. Keep Test Simple & Quick Program pressure recorders for rapid data sampling (1 sec). Leak-off Test (LOT) for ≈60 min to confirm wellbore integrity. Acid spearhead if necessary. Start mini-frac’ at 0.5–1.0 m3 /minute, establish breakdown, hold injection rate constant, maximum 5–10 m3 of Newtonian fluid (N2, oil, water). Hard shut-down, close all wellhead valves. Wait ≈60 min before rigging out pump. Minimum Shut-in 8 h Required for the transient gauge PAS file (TRG.pas) flagged as test purpose “Initial.” If the final pressure passes the Board’s 2 kPa Rule (pressure changing <2 kPa/h/6 h) then you are done. If not pressure transient analysis (PTA) will be required to provide the extrapolated p* to satisfy Initial Pressure requirements for new Oil or Gas wells. Shut-in Time vs. p* As operational logistics allow, longer shut-in times are better. However, the pressure fall-off does not have to pass the 2 kPa Rule, nor does the well have to be shut-in >14 days. The AER will accept PAS files flagged as analyzed, with input extrapolated pressure (p*). Micro-permeability systems probably will never reveal pseudo-radial flow. Step-Rate Tests Changing injection rate, either step-up or step-down, is not recommended as the critical closure pressure signature can be masked by the rate change. Static Gradient Survey A final reverse static gradient survey should be conducted, when recovering subsurface pressure recorders, to end the mini-frac’ fall-off test. G-Function Analysis Estimate closure stress, pore pressure, leak-off, and possibly a permeability for use in fracture stimulation design. Pressure Transient Analysis What isn’t specifically clear in AER D40 is that pressure transient analysis (PTA) is acceptable for estimating both Initial Pressure Oil and Initial Pressure Gas conditions (p*). Analytically the DFIT is similar to a closed chamber drill stem test (DST) where an impulse (opening valve) generates a pressure response. This also corresponds to the positive impulse generated by under-balanced perforating, both resulting in a pressure build-up. The mini-frac’ is opposite: a negative impulse causing the pressure to fall-off. www.welltestspecialists.com