 Description
 Location
 Construction Details
 Cause of Delay
 Features
 Benefits
 Lifespan
 References
Description :-
• Tarbela dam is the largest Earth Rock filled dam in the world.
• It is the fifth largest dam by structural volume .
• It is also the second largest dam in terms of reservoir capacity in the
world .
• It is also the highest dam in Pakistan .
Location :-
• The dam is built on one of the worlds largest river : The Indus
known as the “Abbasin” or “ The father of Rivers” .
• Located in the “Swabi” ( Khyber Pakhtunkhwa ) mainly and in some
area of “Haripur District” of the province .
• Coordinates of Dam are 34.0875° N & 72.6990° E .
Construction :-
• Construction of Dam began in 1968 and has to be completed in the year 1976 .
• The dam was operational in 1976 but its completion occur in 1984 .
• The dam has to be completed in the duration of 8 years but it take 16 years to
completed .
• Construction is undertaken by Italian firm “Salini Impregilo” .
Cause of delay :-
• Around 70 sinkholes in the reservoir bed appeared which they tried to covering
between 1975 and 1978 by dumping thousands of tonnes of Earth .
• One sinkhole that appeared in 1984 was still there till 1991 .
Features :-
• The total height of dam is 143.26 m ( 470 ft. ) from the river level and length is
2743.2 m ( 9000 ft. ) .
• The Width of Tarbela dam at its base is 600m .
• The Reservoir Capacity is 13.69 cubic Km ( 3.28 cu mi ) .
• Its catchment area is 168000 km2 ( 6500 sq. mi ) .
• Estimated cost of project was $800 million .
• Total cost of project was $1.697 billion .
Benefits :-
• The primary Objective of Dam was to supply water for irrigation by storing flows during
the monsoon and subsequently releasing stored water during low flows in winters .
• The purpose was to compensate for the loss of Water supplies of eastern rivers
( Ravi,Sutlej,Beas ) .
• Tarbela has generated 341.139 billion kwh cheap hydro-electricity energy since
commissioning .
• Project recover its total cost of construction in 10 years and now the project gives the
benefit to the economy of Pakistan .
Lifespan :-
• Because the source of Indus River is glacial melt water from the Himalayas, the
river carries huge amount of sediments with the annual suspended sediments load
of 200 million tons.
• Live storage capacity of Tarbela reservoir had declined more than 33.5% to 6.434
million acre feet (MAF) against its original capacity 9.69 MAF because of
sedimentation over 38 years .
• The useful life of the dam and reservoir was estimated to be approximately 50
Years . However , sedimentation has been much lower than predicted , and it is
now estimated that the useful lifespan of the dam will be 85 years , to about 2060
References :-
• https://en.wikipedia.org/wiki/Tarbela_Dam (Wikipedia )
• https://www.water-technology.net/projects/tarbela-dam-project/
(Google)
THANK- YOU

More Related Content

What's hot

DAMS & HYDROPOWER PROJECTS OF PAKISTAN
DAMS & HYDROPOWER PROJECTS OF PAKISTANDAMS & HYDROPOWER PROJECTS OF PAKISTAN
DAMS & HYDROPOWER PROJECTS OF PAKISTANRizwan Sarwar Awan
 
Renewable energy prospects in Bangladesh
Renewable energy prospects in BangladeshRenewable energy prospects in Bangladesh
Renewable energy prospects in BangladeshHasib Hossen
 
Hydropowerplant 160313180104
Hydropowerplant 160313180104Hydropowerplant 160313180104
Hydropowerplant 160313180104Mohammad Asif
 
Tarbela Hydro Power Plant
Tarbela Hydro Power PlantTarbela Hydro Power Plant
Tarbela Hydro Power PlantSaQib MuGhal
 
121 MW Allai Khwar Hydel Power Station Presentation
121 MW Allai Khwar Hydel Power Station Presentation121 MW Allai Khwar Hydel Power Station Presentation
121 MW Allai Khwar Hydel Power Station PresentationEngrAsimRaza2
 
Ghazi Barotha Hydropower project Internship Report
Ghazi Barotha Hydropower project Internship ReportGhazi Barotha Hydropower project Internship Report
Ghazi Barotha Hydropower project Internship ReportIhtisham Saeed
 
Renewable Energy & Overview in Bangladesh
Renewable Energy & Overview in BangladeshRenewable Energy & Overview in Bangladesh
Renewable Energy & Overview in BangladeshShadrul Alam
 
Hydropower Generation in Pakistan
Hydropower Generation in PakistanHydropower Generation in Pakistan
Hydropower Generation in Pakistanimakshani
 
PADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goals
PADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goalsPADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goals
PADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goalsSajal Eahsan
 
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMPMaster Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMPEkonnect Knowledge Foundation
 
Irrigation system of pakistan
Irrigation system of pakistanIrrigation system of pakistan
Irrigation system of pakistanRanaShaneer
 
Hydropower projects in Nepal_Country Report
Hydropower projects in Nepal_Country ReportHydropower projects in Nepal_Country Report
Hydropower projects in Nepal_Country ReportHari Shrestha
 
Renewable energy-in-bangladesh
Renewable energy-in-bangladeshRenewable energy-in-bangladesh
Renewable energy-in-bangladeshFahim Rafi
 
Water Risk and Crisis of Pakistan
Water Risk and Crisis of PakistanWater Risk and Crisis of Pakistan
Water Risk and Crisis of PakistanMuhammad Awais
 

What's hot (20)

DAMS & HYDROPOWER PROJECTS OF PAKISTAN
DAMS & HYDROPOWER PROJECTS OF PAKISTANDAMS & HYDROPOWER PROJECTS OF PAKISTAN
DAMS & HYDROPOWER PROJECTS OF PAKISTAN
 
NHPC Training Report
NHPC Training ReportNHPC Training Report
NHPC Training Report
 
THE THREE GORGES ppt
THE THREE GORGES pptTHE THREE GORGES ppt
THE THREE GORGES ppt
 
Renewable energy prospects in Bangladesh
Renewable energy prospects in BangladeshRenewable energy prospects in Bangladesh
Renewable energy prospects in Bangladesh
 
Hydropowerplant 160313180104
Hydropowerplant 160313180104Hydropowerplant 160313180104
Hydropowerplant 160313180104
 
Tarbela Hydro Power Plant
Tarbela Hydro Power PlantTarbela Hydro Power Plant
Tarbela Hydro Power Plant
 
Mangla Dam
Mangla Dam Mangla Dam
Mangla Dam
 
121 MW Allai Khwar Hydel Power Station Presentation
121 MW Allai Khwar Hydel Power Station Presentation121 MW Allai Khwar Hydel Power Station Presentation
121 MW Allai Khwar Hydel Power Station Presentation
 
Narmada bachao andolan
Narmada bachao andolanNarmada bachao andolan
Narmada bachao andolan
 
Ghazi Barotha Hydropower project Internship Report
Ghazi Barotha Hydropower project Internship ReportGhazi Barotha Hydropower project Internship Report
Ghazi Barotha Hydropower project Internship Report
 
Renewable Energy & Overview in Bangladesh
Renewable Energy & Overview in BangladeshRenewable Energy & Overview in Bangladesh
Renewable Energy & Overview in Bangladesh
 
Rampal power station
Rampal power stationRampal power station
Rampal power station
 
Hydropower Generation in Pakistan
Hydropower Generation in PakistanHydropower Generation in Pakistan
Hydropower Generation in Pakistan
 
PADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goals
PADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goalsPADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goals
PADMA MULTIPURPOSE BRIDGE – Mission, Vision, Objective and goals
 
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMPMaster Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
 
mangla dam
mangla dammangla dam
mangla dam
 
Irrigation system of pakistan
Irrigation system of pakistanIrrigation system of pakistan
Irrigation system of pakistan
 
Hydropower projects in Nepal_Country Report
Hydropower projects in Nepal_Country ReportHydropower projects in Nepal_Country Report
Hydropower projects in Nepal_Country Report
 
Renewable energy-in-bangladesh
Renewable energy-in-bangladeshRenewable energy-in-bangladesh
Renewable energy-in-bangladesh
 
Water Risk and Crisis of Pakistan
Water Risk and Crisis of PakistanWater Risk and Crisis of Pakistan
Water Risk and Crisis of Pakistan
 

Similar to Tarbela Dam Presentation Summary

Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800PRIYANSHU KUMAR
 
Kala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmanKala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmansabir rehman
 
Neelum jehlum hydropower project
Neelum jehlum hydropower projectNeelum jehlum hydropower project
Neelum jehlum hydropower projectMuhammad Aqeel
 
Hydropower projects in Jammu and Kashmir
Hydropower projects in Jammu and KashmirHydropower projects in Jammu and Kashmir
Hydropower projects in Jammu and KashmirAaquib Firdous
 
Subansiri Lower Hydroelectric Project.pptx
Subansiri Lower Hydroelectric Project.pptxSubansiri Lower Hydroelectric Project.pptx
Subansiri Lower Hydroelectric Project.pptxMadhavGorane
 
Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891usman ijaz
 
Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project Deshan Arachchige
 
pakistan indus basin irrigation system
pakistan indus basin irrigation system pakistan indus basin irrigation system
pakistan indus basin irrigation system Usman Khawaja
 
Potential & experience of dams in ethiopia
Potential & experience of dams in ethiopiaPotential & experience of dams in ethiopia
Potential & experience of dams in ethiopiaFeteneBefekadu
 
Development works on Major river basins of nepal
Development works on Major river basins of nepalDevelopment works on Major river basins of nepal
Development works on Major river basins of nepalAnilKoirala
 
Water resource management and role of dams
Water resource management and role of damsWater resource management and role of dams
Water resource management and role of damsnibeditachakraborty
 
Mangla Dam by Zain Ramzan
Mangla Dam by Zain RamzanMangla Dam by Zain Ramzan
Mangla Dam by Zain RamzanZain Ramzan
 
Libya great man made river project
Libya   great man made river projectLibya   great man made river project
Libya great man made river projectissa ibrahim
 

Similar to Tarbela Dam Presentation Summary (20)

Srisailam project final
Srisailam project finalSrisailam project final
Srisailam project final
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800
 
Kala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmanKala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehman
 
Neelum jehlum hydropower project
Neelum jehlum hydropower projectNeelum jehlum hydropower project
Neelum jehlum hydropower project
 
Presention ppt
Presention pptPresention ppt
Presention ppt
 
Hydropower projects in Jammu and Kashmir
Hydropower projects in Jammu and KashmirHydropower projects in Jammu and Kashmir
Hydropower projects in Jammu and Kashmir
 
Subansiri Lower Hydroelectric Project.pptx
Subansiri Lower Hydroelectric Project.pptxSubansiri Lower Hydroelectric Project.pptx
Subansiri Lower Hydroelectric Project.pptx
 
Ataturk dam
Ataturk damAtaturk dam
Ataturk dam
 
Dams%20report
Dams%20reportDams%20report
Dams%20report
 
Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891
 
Pakistan dams
Pakistan damsPakistan dams
Pakistan dams
 
Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project
 
Tidal energy
Tidal energyTidal energy
Tidal energy
 
pakistan indus basin irrigation system
pakistan indus basin irrigation system pakistan indus basin irrigation system
pakistan indus basin irrigation system
 
Potential & experience of dams in ethiopia
Potential & experience of dams in ethiopiaPotential & experience of dams in ethiopia
Potential & experience of dams in ethiopia
 
Development works on Major river basins of nepal
Development works on Major river basins of nepalDevelopment works on Major river basins of nepal
Development works on Major river basins of nepal
 
Water resource management and role of dams
Water resource management and role of damsWater resource management and role of dams
Water resource management and role of dams
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
 
Mangla Dam by Zain Ramzan
Mangla Dam by Zain RamzanMangla Dam by Zain Ramzan
Mangla Dam by Zain Ramzan
 
Libya great man made river project
Libya   great man made river projectLibya   great man made river project
Libya great man made river project
 

Recently uploaded

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 

Recently uploaded (20)

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 

Tarbela Dam Presentation Summary

  • 1. Visvesvaraya National Institute of Technology (VNIT Nagpur) Topic Of Presentation :- TARBELA DAM Submitted To : Presented By : Dr. Ashwini Mirajkar Gaurav Gautam ( Assistant Prof. ) ( MT21WRE012 )
  • 2. Outline Of Presentation :-  Description  Location  Construction Details  Cause of Delay  Features  Benefits  Lifespan  References
  • 3. Description :- • Tarbela dam is the largest Earth Rock filled dam in the world. • It is the fifth largest dam by structural volume . • It is also the second largest dam in terms of reservoir capacity in the world . • It is also the highest dam in Pakistan .
  • 4.
  • 5. Location :- • The dam is built on one of the worlds largest river : The Indus known as the “Abbasin” or “ The father of Rivers” . • Located in the “Swabi” ( Khyber Pakhtunkhwa ) mainly and in some area of “Haripur District” of the province . • Coordinates of Dam are 34.0875° N & 72.6990° E .
  • 6. Construction :- • Construction of Dam began in 1968 and has to be completed in the year 1976 . • The dam was operational in 1976 but its completion occur in 1984 . • The dam has to be completed in the duration of 8 years but it take 16 years to completed . • Construction is undertaken by Italian firm “Salini Impregilo” .
  • 7. Cause of delay :- • Around 70 sinkholes in the reservoir bed appeared which they tried to covering between 1975 and 1978 by dumping thousands of tonnes of Earth . • One sinkhole that appeared in 1984 was still there till 1991 .
  • 8. Features :- • The total height of dam is 143.26 m ( 470 ft. ) from the river level and length is 2743.2 m ( 9000 ft. ) . • The Width of Tarbela dam at its base is 600m . • The Reservoir Capacity is 13.69 cubic Km ( 3.28 cu mi ) . • Its catchment area is 168000 km2 ( 6500 sq. mi ) . • Estimated cost of project was $800 million . • Total cost of project was $1.697 billion .
  • 9. Benefits :- • The primary Objective of Dam was to supply water for irrigation by storing flows during the monsoon and subsequently releasing stored water during low flows in winters . • The purpose was to compensate for the loss of Water supplies of eastern rivers ( Ravi,Sutlej,Beas ) . • Tarbela has generated 341.139 billion kwh cheap hydro-electricity energy since commissioning . • Project recover its total cost of construction in 10 years and now the project gives the benefit to the economy of Pakistan .
  • 10. Lifespan :- • Because the source of Indus River is glacial melt water from the Himalayas, the river carries huge amount of sediments with the annual suspended sediments load of 200 million tons. • Live storage capacity of Tarbela reservoir had declined more than 33.5% to 6.434 million acre feet (MAF) against its original capacity 9.69 MAF because of sedimentation over 38 years . • The useful life of the dam and reservoir was estimated to be approximately 50 Years . However , sedimentation has been much lower than predicted , and it is now estimated that the useful lifespan of the dam will be 85 years , to about 2060
  • 11. References :- • https://en.wikipedia.org/wiki/Tarbela_Dam (Wikipedia ) • https://www.water-technology.net/projects/tarbela-dam-project/ (Google)