The document discusses using Geotube dewatering technology to construct dams at the El Mochito mine in Honduras. There was an unstable landslide area above the mine's tailings lagoon that threatened to release debris into the lagoon. Two Geotube dams were designed as mitigation. The dams were constructed by layering and filling Geotube containers with mine tailings to create solid structures weighing 1,500 and 3,000 metric tons. This stabilized the landslide area and protected the tailings lagoon.