SlideShare a Scribd company logo
TG701 Field
Instruments
Overhaul
TA - 2015
Field Maintenance Team: Usama Tariq Khan/Haris Muhammad/Muhammad Asad Ullah
Prepared by: Muhammad Asad Ullah
Reviewed by: Raja Naveed Lehrasab
 TG701 Field Instruments Overhaul
 Page 1
Introduction
Gas turbine overhaul is always a complex and exciting task. Plant start-up after TA is always linked to the
availability of gas turbine after its overhaul, which makes the job critical and challenging.
The job in TA-2015 was special as a number of critical jobs were being carried out in parallel. The control
system was being replaced with Mark-VIe, turbine rotor was being replaced and the generator rotor had
to be removed for inspection. These activities necessitated better planning, improved coordination with
other teams and perfect execution of the job.
An elaborate plan was prepared before TA in view of the importance of field devices’ proper
overhauling/calibration to ensure that all the above mentioned modifications/replacements achieve
desired results in terms of machine performance and avoid unnecessary delays.
Planning
A thorough planning process was executed to create a detailed job plan. Various discussion sessions for
information and experience sharing were held with engineers and staff. Field visits were also carried out.
Following major activities were concluded:
 Creation of work procedures for overhauling of each category of instruments
 Creation of checklists to record all the parameters of removal, calibration and re-installation.
 Fabrication of new thermowells for proper calibration of Temperature switches.
 Arrangement of special tools for working on gas turbine.
 Management of TG inventory to ensure the availability of critical spares
 Arrangement of consumable spares.
 Arrangement of proper storage location for instruments handling during TA.
Racks placed inside a specially arranged container for storage of removed instruments
 TG701 Field Instruments Overhaul
 Page 2
TA Activities
During the Turnaround, the sequence of working was such that initially the instruments were removed
according to the machine dismantling process and placed in workshop where they were checked and
calibrated. Later, they were re-installed along with turbine reassembly. Some of the instruments were
checked on-site.
A total of 171 instruments were checked amongst which some were removed for the first time. A summary
of the instruments is given below.
Sr. No. Instrument Type Checked / Calibrated
1 Pressure Switch 16
2 Temperature Switch 16
3 Level Switch 02
4 Limit Switch 15
5 Transmitters 05
5 SOV 19
7 Thermocouples 42
8 Analog IO/Misc. 06
9 Seismic probes & vibration switches 07
10 Bentley Nevada Probes 08
11 Magnetic Pickups 03
12 Control Valves 07
13 Gauges 25
Besides the normal jobs, there were some activities which required special preparation. A brief summary
of these activities is give below.
1) Modification at Bearing No. 1
The radial and thrust vibration measurement of turbine rotor is done by 2 VTs and 1 XT installed at the
bearing No. 1. Replacement of turbine rotor was planned in this Turnaround. However, the new rotor
design had a keyphasor notch at the position where the VTs were installed originally. Due to this reason,
GE changed the location and type of VTs and shifted the XT to the active side of the thrust bearing. The
installation mechanism for all three was changed as well.
This arrangement required special VTs which were not available with us. To cope with this situation,
arrangements were made with the help of Machinery department to ensure correct installation, probe
safety and oil sealing.
 TG701 Field Instruments Overhaul
 Page 3
After dismantling, the bearing cover was brought to the machine shop and a mandrel was placed inside it
to simulate the turbine rotor. The new probes’ adapter assembly was installed according to this
arrangement.
In the field, new JBs were installed and the extension cables were routed through tubing up to the main
JB.
Probe Adjustment Job in Workshop
2) New Transmitters Installation
With the up-grade of control system from Mark-II to Mark-VIe, the existing 4-wire transmitters were
replaced by 2-wire transmitters. Three new transmitters were added to the system as well.
- 20CD: Compressor Discharge pressure transmitter (Replaced)
- 20FG: Gas Fuel Pressure Transmitter (Replaced)
- 96HFD-1: Hydraulic Oil Filter DP transmitter (New Transmitter)
- 96HQ: Hydraulic Supply Pressure (New Transmitter)
- 96QA: Lube Oil header pressure transmitter (New Transmitter)
3) 20CB installation:
There are two anti-surge valves installed on the gas turbine which bleed compressor air up to 95% speed
of the turbine. 20CB is the SOV which supplies air to these valves.
The SOV’s ports are located in the turbine compartment while its solenoid assembly is installed through a
metal plate in the wall adjoining accessory compartment. The SOV is installed in one corner under the
turbine and its access is blocked by 20AA, 20PL, VA-17 and some other piping and instrument power
connections tubing.
 TG701 Field Instruments Overhaul
 Page 4
The SOV’s working was tested automatically during TG shutdown, when it opened the bleed valves below
95% speed. During the Turnaround, the coil health of the SOV and other field checks were performed and
were found ok. During the test startup checking, however, the SOV developed fault and started passing
which would result in bleed valves closure before the desired speed.
It was decided to replace the SOV with a new one. Keeping in view the intricate location, time constraint
and ease of future maintenance, the new SOV was installed outside the turbine compartment.
New 20CB
4) Wheelspace & Exhaust TCs:
There are eight wheelspace thermocouples in the gas turbine. Most of them were found stuck and were
removed with difficulty. Three wheelspace thermocouples were replaced as they were found damaged.
Tagging of the wheelspace TCs was corrected as well.
 TG701 Field Instruments Overhaul
 Page 5
Exhaust thermocouples were also removed and checked in the workshop. Alternate TCs were replaced
with the new ones preventively.
Wheelspace TCs Exhaust TCs
5) Boiler and Bypass damper limit switches:
New cables were laid for both boiler and bypass damper limit switches. Support for the Boiler damper
limit switches was reinforced to avoid vibration resulting in nuisance tripping. Contact area of bypass
damper lever was increased with the help of Equipment-UTY to ensure engagement with limit switch.
6) GCV LVDT replacement:
One LVDT of GCV was found malfunctioning during turbine start-up. It was replaced with a new spare.
7) GCV & SRV servos replacement:
Servos of GCV & SRV were replaced preventively.
 TG701 Field Instruments Overhaul
 Page 6
8) 06-LLS-102 level switch replacement:
06-LLS-102 is a side mounted float type level switch at steam drum of B-601. The switch was found in rusty
condition, so it was replaced with a new one.
06-LLS-102
Future Actions:
In light of our experience in this Turnaround, following are the recommended actions for improvement.
1) Spares present in the warehouse since commissioning should be checked for physical health.
2) Test setups should be developed for checking SOVs in field and/or workshop.
3) Externally adjustable GE vibration probes (identical to the ones installed in FFBL) should be procured
for installation at bearing # 1, as per original GE design for the new rotor.

More Related Content

What's hot

Bfwp
BfwpBfwp
Project #3 - A Class Treatment Plant - AMIAD Micro-Strainers
Project #3 - A Class Treatment Plant - AMIAD Micro-StrainersProject #3 - A Class Treatment Plant - AMIAD Micro-Strainers
Project #3 - A Class Treatment Plant - AMIAD Micro-Strainers
David List
 
Presentazione Navim VRCS Cruise 2015- Rev.1
Presentazione Navim VRCS Cruise 2015- Rev.1Presentazione Navim VRCS Cruise 2015- Rev.1
Presentazione Navim VRCS Cruise 2015- Rev.1Luca Testa
 
relevant experience
relevant experiencerelevant experience
relevant experienceRaja Ram
 
Handling of turbine side emergencies
Handling of turbine side emergenciesHandling of turbine side emergencies
Handling of turbine side emergencies
Manohar Tatwawadi
 
Turbo Phase overview
Turbo Phase overviewTurbo Phase overview
Turbo Phase overview
Kenny Linn
 
Fire pump controllers
Fire pump controllersFire pump controllers
Fire pump controllers
michaeljmack
 
Gas Turbine PGT25 DLE Single Gas With Centrifugal Compressor PCL 603PS
Gas Turbine PGT25 DLE Single Gas With Centrifugal Compressor PCL 603PSGas Turbine PGT25 DLE Single Gas With Centrifugal Compressor PCL 603PS
Gas Turbine PGT25 DLE Single Gas With Centrifugal Compressor PCL 603PSJamie Boyd
 
Debris / Junk Catcher Manifold - Worldwide Oilfield Machine
Debris / Junk Catcher Manifold - Worldwide Oilfield MachineDebris / Junk Catcher Manifold - Worldwide Oilfield Machine
Debris / Junk Catcher Manifold - Worldwide Oilfield Machine
womgroup
 
SFCXX1 - SFCXX2 Air Flow Testing Report
SFCXX1 - SFCXX2 Air Flow Testing ReportSFCXX1 - SFCXX2 Air Flow Testing Report
SFCXX1 - SFCXX2 Air Flow Testing Report
David List
 
Hvac Solution Hospital 1
Hvac Solution Hospital 1Hvac Solution Hospital 1
Hvac Solution Hospital 1kiakaha
 
Prvs 2. asme section i fired vessel rev4
Prvs   2. asme section i fired vessel rev4Prvs   2. asme section i fired vessel rev4
Prvs 2. asme section i fired vessel rev4
David Alexandre
 
engine specification
engine specification engine specification
engine specification
Arul Kumar
 
Competency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator AnswersCompetency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator Answersmark robertson
 
Liebherr A 914 C Litronic EDC Hydraulic Excavator Service Repair Manual SN:35...
Liebherr A 914 C Litronic EDC Hydraulic Excavator Service Repair Manual SN:35...Liebherr A 914 C Litronic EDC Hydraulic Excavator Service Repair Manual SN:35...
Liebherr A 914 C Litronic EDC Hydraulic Excavator Service Repair Manual SN:35...
hsemmd uksjemd
 

What's hot (17)

Bfwp
BfwpBfwp
Bfwp
 
Project #3 - A Class Treatment Plant - AMIAD Micro-Strainers
Project #3 - A Class Treatment Plant - AMIAD Micro-StrainersProject #3 - A Class Treatment Plant - AMIAD Micro-Strainers
Project #3 - A Class Treatment Plant - AMIAD Micro-Strainers
 
Presentazione Navim VRCS Cruise 2015- Rev.1
Presentazione Navim VRCS Cruise 2015- Rev.1Presentazione Navim VRCS Cruise 2015- Rev.1
Presentazione Navim VRCS Cruise 2015- Rev.1
 
relevant experience
relevant experiencerelevant experience
relevant experience
 
Handling of turbine side emergencies
Handling of turbine side emergenciesHandling of turbine side emergencies
Handling of turbine side emergencies
 
Turbo Phase overview
Turbo Phase overviewTurbo Phase overview
Turbo Phase overview
 
Fire pump controllers
Fire pump controllersFire pump controllers
Fire pump controllers
 
Gas Turbine PGT25 DLE Single Gas With Centrifugal Compressor PCL 603PS
Gas Turbine PGT25 DLE Single Gas With Centrifugal Compressor PCL 603PSGas Turbine PGT25 DLE Single Gas With Centrifugal Compressor PCL 603PS
Gas Turbine PGT25 DLE Single Gas With Centrifugal Compressor PCL 603PS
 
jayakumarcv
jayakumarcvjayakumarcv
jayakumarcv
 
Debris / Junk Catcher Manifold - Worldwide Oilfield Machine
Debris / Junk Catcher Manifold - Worldwide Oilfield MachineDebris / Junk Catcher Manifold - Worldwide Oilfield Machine
Debris / Junk Catcher Manifold - Worldwide Oilfield Machine
 
SFCXX1 - SFCXX2 Air Flow Testing Report
SFCXX1 - SFCXX2 Air Flow Testing ReportSFCXX1 - SFCXX2 Air Flow Testing Report
SFCXX1 - SFCXX2 Air Flow Testing Report
 
Hvac Solution Hospital 1
Hvac Solution Hospital 1Hvac Solution Hospital 1
Hvac Solution Hospital 1
 
Prvs 2. asme section i fired vessel rev4
Prvs   2. asme section i fired vessel rev4Prvs   2. asme section i fired vessel rev4
Prvs 2. asme section i fired vessel rev4
 
engine specification
engine specification engine specification
engine specification
 
DEEP INJECTION MACHINE
DEEP INJECTION MACHINEDEEP INJECTION MACHINE
DEEP INJECTION MACHINE
 
Competency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator AnswersCompetency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator Answers
 
Liebherr A 914 C Litronic EDC Hydraulic Excavator Service Repair Manual SN:35...
Liebherr A 914 C Litronic EDC Hydraulic Excavator Service Repair Manual SN:35...Liebherr A 914 C Litronic EDC Hydraulic Excavator Service Repair Manual SN:35...
Liebherr A 914 C Litronic EDC Hydraulic Excavator Service Repair Manual SN:35...
 

Viewers also liked

Business case application
Business case applicationBusiness case application
Business case application
Adam Thomas Vinter
 
System and Instrumentation for Practising Effective CSR
System and Instrumentation for Practising Effective CSRSystem and Instrumentation for Practising Effective CSR
System and Instrumentation for Practising Effective CSR
F W
 
A.introduction tech.
A.introduction   tech.A.introduction   tech.
A.introduction tech.girlie22
 
Medical Technology Innovation Techniques & Funding
Medical Technology Innovation Techniques & FundingMedical Technology Innovation Techniques & Funding
Medical Technology Innovation Techniques & Funding
Hacking Medicine, Massachusetts Institute of Technology
 
Why Team work is important?
Why Team work is important?Why Team work is important?
Why Team work is important?
Grape5
 
Team Building PowerPoint PPT Content Modern Sample
Team Building PowerPoint PPT Content Modern SampleTeam Building PowerPoint PPT Content Modern Sample
Team Building PowerPoint PPT Content Modern Sample
Andrew Schwartz
 
TEAM BUILDING POWERPOINT
TEAM BUILDING POWERPOINTTEAM BUILDING POWERPOINT
TEAM BUILDING POWERPOINT
Andrew Schwartz
 

Viewers also liked (7)

Business case application
Business case applicationBusiness case application
Business case application
 
System and Instrumentation for Practising Effective CSR
System and Instrumentation for Practising Effective CSRSystem and Instrumentation for Practising Effective CSR
System and Instrumentation for Practising Effective CSR
 
A.introduction tech.
A.introduction   tech.A.introduction   tech.
A.introduction tech.
 
Medical Technology Innovation Techniques & Funding
Medical Technology Innovation Techniques & FundingMedical Technology Innovation Techniques & Funding
Medical Technology Innovation Techniques & Funding
 
Why Team work is important?
Why Team work is important?Why Team work is important?
Why Team work is important?
 
Team Building PowerPoint PPT Content Modern Sample
Team Building PowerPoint PPT Content Modern SampleTeam Building PowerPoint PPT Content Modern Sample
Team Building PowerPoint PPT Content Modern Sample
 
TEAM BUILDING POWERPOINT
TEAM BUILDING POWERPOINTTEAM BUILDING POWERPOINT
TEAM BUILDING POWERPOINT
 

Similar to TA-2015 GE Frame-V Field Instrumentation Overhaul

Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)
Ashutosh Sachan
 
116805771-Gas-Turbine.ppt
116805771-Gas-Turbine.ppt116805771-Gas-Turbine.ppt
116805771-Gas-Turbine.ppt
SreekanthMylavarapu1
 
Report steffones
Report steffonesReport steffones
Report steffones
Steffones K
 
Mpc implementation for cdu (2002 nprc gcc)
Mpc implementation for cdu (2002 nprc gcc)Mpc implementation for cdu (2002 nprc gcc)
Mpc implementation for cdu (2002 nprc gcc)Yang Lee
 
2020011_106HZ-10118VO.pdf
2020011_106HZ-10118VO.pdf2020011_106HZ-10118VO.pdf
2020011_106HZ-10118VO.pdf
ArunKumar618206
 
Maintenance plan
Maintenance planMaintenance plan
Maintenance planNauman khan
 
Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009
Shaun West
 
Final Presentation Talha (1).pptx
Final Presentation Talha (1).pptxFinal Presentation Talha (1).pptx
Final Presentation Talha (1).pptx
TalhaAbdulRehman2
 
Gabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentationGabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentationAmeya Margaj
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdf
chintanraval24
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performa
Udhayakumar Venkataraman
 
"Electrical Overhaul: Powering Efficiency in Refinery Turnarounds"
"Electrical Overhaul: Powering Efficiency in Refinery Turnarounds""Electrical Overhaul: Powering Efficiency in Refinery Turnarounds"
"Electrical Overhaul: Powering Efficiency in Refinery Turnarounds"
Attock refinery Limited
 
Areva "Manufacturing of transformer, uses & it’s accessories"
Areva "Manufacturing of transformer, uses & it’s accessories"Areva "Manufacturing of transformer, uses & it’s accessories"
Areva "Manufacturing of transformer, uses & it’s accessories"
Harshit Srivastava
 
AIChE Spring Conference 2015_Distillation Troubleshooting_Article
AIChE Spring Conference 2015_Distillation Troubleshooting_ArticleAIChE Spring Conference 2015_Distillation Troubleshooting_Article
AIChE Spring Conference 2015_Distillation Troubleshooting_ArticleHendri Barnard
 
Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Standard erection manual (pressure parts)
Standard erection manual (pressure parts)
Ashutosh Sachan
 
Volvo L70G Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L70G Wheel Loader Service Repair Manual Instant Download.pdfVolvo L70G Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L70G Wheel Loader Service Repair Manual Instant Download.pdf
rou774513po
 

Similar to TA-2015 GE Frame-V Field Instrumentation Overhaul (20)

Presentation-MB-1
Presentation-MB-1Presentation-MB-1
Presentation-MB-1
 
11-IAGT-202_paper
11-IAGT-202_paper11-IAGT-202_paper
11-IAGT-202_paper
 
Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)
 
116805771-Gas-Turbine.ppt
116805771-Gas-Turbine.ppt116805771-Gas-Turbine.ppt
116805771-Gas-Turbine.ppt
 
Report steffones
Report steffonesReport steffones
Report steffones
 
Mpc implementation for cdu (2002 nprc gcc)
Mpc implementation for cdu (2002 nprc gcc)Mpc implementation for cdu (2002 nprc gcc)
Mpc implementation for cdu (2002 nprc gcc)
 
2020011_106HZ-10118VO.pdf
2020011_106HZ-10118VO.pdf2020011_106HZ-10118VO.pdf
2020011_106HZ-10118VO.pdf
 
Maintenance plan
Maintenance planMaintenance plan
Maintenance plan
 
Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009Improved power plant performance, Sulzer Technical Review, 2009
Improved power plant performance, Sulzer Technical Review, 2009
 
Final Presentation Talha (1).pptx
Final Presentation Talha (1).pptxFinal Presentation Talha (1).pptx
Final Presentation Talha (1).pptx
 
TCL Site Services
TCL Site ServicesTCL Site Services
TCL Site Services
 
Gabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentationGabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentation
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdf
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performa
 
LAWSON RESUME
LAWSON RESUMELAWSON RESUME
LAWSON RESUME
 
"Electrical Overhaul: Powering Efficiency in Refinery Turnarounds"
"Electrical Overhaul: Powering Efficiency in Refinery Turnarounds""Electrical Overhaul: Powering Efficiency in Refinery Turnarounds"
"Electrical Overhaul: Powering Efficiency in Refinery Turnarounds"
 
Areva "Manufacturing of transformer, uses & it’s accessories"
Areva "Manufacturing of transformer, uses & it’s accessories"Areva "Manufacturing of transformer, uses & it’s accessories"
Areva "Manufacturing of transformer, uses & it’s accessories"
 
AIChE Spring Conference 2015_Distillation Troubleshooting_Article
AIChE Spring Conference 2015_Distillation Troubleshooting_ArticleAIChE Spring Conference 2015_Distillation Troubleshooting_Article
AIChE Spring Conference 2015_Distillation Troubleshooting_Article
 
Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Standard erection manual (pressure parts)
Standard erection manual (pressure parts)
 
Volvo L70G Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L70G Wheel Loader Service Repair Manual Instant Download.pdfVolvo L70G Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L70G Wheel Loader Service Repair Manual Instant Download.pdf
 

TA-2015 GE Frame-V Field Instrumentation Overhaul

  • 1. TG701 Field Instruments Overhaul TA - 2015 Field Maintenance Team: Usama Tariq Khan/Haris Muhammad/Muhammad Asad Ullah Prepared by: Muhammad Asad Ullah Reviewed by: Raja Naveed Lehrasab
  • 2.  TG701 Field Instruments Overhaul  Page 1 Introduction Gas turbine overhaul is always a complex and exciting task. Plant start-up after TA is always linked to the availability of gas turbine after its overhaul, which makes the job critical and challenging. The job in TA-2015 was special as a number of critical jobs were being carried out in parallel. The control system was being replaced with Mark-VIe, turbine rotor was being replaced and the generator rotor had to be removed for inspection. These activities necessitated better planning, improved coordination with other teams and perfect execution of the job. An elaborate plan was prepared before TA in view of the importance of field devices’ proper overhauling/calibration to ensure that all the above mentioned modifications/replacements achieve desired results in terms of machine performance and avoid unnecessary delays. Planning A thorough planning process was executed to create a detailed job plan. Various discussion sessions for information and experience sharing were held with engineers and staff. Field visits were also carried out. Following major activities were concluded:  Creation of work procedures for overhauling of each category of instruments  Creation of checklists to record all the parameters of removal, calibration and re-installation.  Fabrication of new thermowells for proper calibration of Temperature switches.  Arrangement of special tools for working on gas turbine.  Management of TG inventory to ensure the availability of critical spares  Arrangement of consumable spares.  Arrangement of proper storage location for instruments handling during TA. Racks placed inside a specially arranged container for storage of removed instruments
  • 3.  TG701 Field Instruments Overhaul  Page 2 TA Activities During the Turnaround, the sequence of working was such that initially the instruments were removed according to the machine dismantling process and placed in workshop where they were checked and calibrated. Later, they were re-installed along with turbine reassembly. Some of the instruments were checked on-site. A total of 171 instruments were checked amongst which some were removed for the first time. A summary of the instruments is given below. Sr. No. Instrument Type Checked / Calibrated 1 Pressure Switch 16 2 Temperature Switch 16 3 Level Switch 02 4 Limit Switch 15 5 Transmitters 05 5 SOV 19 7 Thermocouples 42 8 Analog IO/Misc. 06 9 Seismic probes & vibration switches 07 10 Bentley Nevada Probes 08 11 Magnetic Pickups 03 12 Control Valves 07 13 Gauges 25 Besides the normal jobs, there were some activities which required special preparation. A brief summary of these activities is give below. 1) Modification at Bearing No. 1 The radial and thrust vibration measurement of turbine rotor is done by 2 VTs and 1 XT installed at the bearing No. 1. Replacement of turbine rotor was planned in this Turnaround. However, the new rotor design had a keyphasor notch at the position where the VTs were installed originally. Due to this reason, GE changed the location and type of VTs and shifted the XT to the active side of the thrust bearing. The installation mechanism for all three was changed as well. This arrangement required special VTs which were not available with us. To cope with this situation, arrangements were made with the help of Machinery department to ensure correct installation, probe safety and oil sealing.
  • 4.  TG701 Field Instruments Overhaul  Page 3 After dismantling, the bearing cover was brought to the machine shop and a mandrel was placed inside it to simulate the turbine rotor. The new probes’ adapter assembly was installed according to this arrangement. In the field, new JBs were installed and the extension cables were routed through tubing up to the main JB. Probe Adjustment Job in Workshop 2) New Transmitters Installation With the up-grade of control system from Mark-II to Mark-VIe, the existing 4-wire transmitters were replaced by 2-wire transmitters. Three new transmitters were added to the system as well. - 20CD: Compressor Discharge pressure transmitter (Replaced) - 20FG: Gas Fuel Pressure Transmitter (Replaced) - 96HFD-1: Hydraulic Oil Filter DP transmitter (New Transmitter) - 96HQ: Hydraulic Supply Pressure (New Transmitter) - 96QA: Lube Oil header pressure transmitter (New Transmitter) 3) 20CB installation: There are two anti-surge valves installed on the gas turbine which bleed compressor air up to 95% speed of the turbine. 20CB is the SOV which supplies air to these valves. The SOV’s ports are located in the turbine compartment while its solenoid assembly is installed through a metal plate in the wall adjoining accessory compartment. The SOV is installed in one corner under the turbine and its access is blocked by 20AA, 20PL, VA-17 and some other piping and instrument power connections tubing.
  • 5.  TG701 Field Instruments Overhaul  Page 4 The SOV’s working was tested automatically during TG shutdown, when it opened the bleed valves below 95% speed. During the Turnaround, the coil health of the SOV and other field checks were performed and were found ok. During the test startup checking, however, the SOV developed fault and started passing which would result in bleed valves closure before the desired speed. It was decided to replace the SOV with a new one. Keeping in view the intricate location, time constraint and ease of future maintenance, the new SOV was installed outside the turbine compartment. New 20CB 4) Wheelspace & Exhaust TCs: There are eight wheelspace thermocouples in the gas turbine. Most of them were found stuck and were removed with difficulty. Three wheelspace thermocouples were replaced as they were found damaged. Tagging of the wheelspace TCs was corrected as well.
  • 6.  TG701 Field Instruments Overhaul  Page 5 Exhaust thermocouples were also removed and checked in the workshop. Alternate TCs were replaced with the new ones preventively. Wheelspace TCs Exhaust TCs 5) Boiler and Bypass damper limit switches: New cables were laid for both boiler and bypass damper limit switches. Support for the Boiler damper limit switches was reinforced to avoid vibration resulting in nuisance tripping. Contact area of bypass damper lever was increased with the help of Equipment-UTY to ensure engagement with limit switch. 6) GCV LVDT replacement: One LVDT of GCV was found malfunctioning during turbine start-up. It was replaced with a new spare. 7) GCV & SRV servos replacement: Servos of GCV & SRV were replaced preventively.
  • 7.  TG701 Field Instruments Overhaul  Page 6 8) 06-LLS-102 level switch replacement: 06-LLS-102 is a side mounted float type level switch at steam drum of B-601. The switch was found in rusty condition, so it was replaced with a new one. 06-LLS-102 Future Actions: In light of our experience in this Turnaround, following are the recommended actions for improvement. 1) Spares present in the warehouse since commissioning should be checked for physical health. 2) Test setups should be developed for checking SOVs in field and/or workshop. 3) Externally adjustable GE vibration probes (identical to the ones installed in FFBL) should be procured for installation at bearing # 1, as per original GE design for the new rotor.