Computer based Supply
Chain Management
(SCM) and Information
Systems Integration
Outline
• Introduction
• Supply Chain Components
• Types of Supply Chain
• Problems along Supply chain
• System Integration
• Integrated Value Chain
• How information system facilitative Supply chain
• Enterprise Resource Planning (ERP)
• E-commerce and Supply Chain
• Supply Chain Intelligence
• Case
• Summary
Supply Chain Management
(SCM)
•Close linkage and coordination of activities
involved in buying, making, and moving a product
•Integrates supplier, manufacturer, distributor, and
customer logistics time
•Reduces time, redundant effort, and inventory
costs
Supply Chain Management
(SCM)
•Network of organizations and business
processes
•Helps in procurement of materials,
transformation of raw materials into intermediate
and finished products
• Helps in distribution of the finished products to
customers
Supply Chain Management
(SCM)
Supply Chain Components
Supply chain may involves three segments
• Upstream SC segment: includes organization’s
first tier suppliers and their suppliers.
• Internal SC segment: includes all the processes
used by an organization in transforming the inputs
into outputs, from the time materials enter the
organization to the time finished product goes to
distribution outside the organization
Supply Chain Components
• Downstream SC segment: includes all the
processes involved in distributing and delivering
the products to final customers.
• Includes reverse logistics - returned items flow
in the reverse direction from the buyer back to the
seller.
Supply Chain Management
(SCM)
Supply chain planning system: Enables firm to
generate forecasts for a product and to develop
sourcing and a manufacturing plan for the product
Supply chain execution system: Manages flow of
products through distribution centers and
warehouses
Types of Supply Chains
• Integrated make to stock
- model focuses on tracking the customer
demand in real time.
- Integration is achieved through an
information system that is fully integrated.
- information is integrated further down the
supply chain to the procurement function.
Types of Supply Chains
Continuous replenishment
- Constantly replenish the inventory by
working closely with suppliers and intermediaries.
–Very tight integration is required between the
order fulfillment process and the production
process.
– Real time information about demand changes
is required.
Types of Supply Chains
• Built to order
- Dell computer is best known for this model.
- Assembly of customer’s order starts
immediately on the receipt of the order.
- Careful management of component
inventories is required.
- For this, many common components across
several production lines is maintained
Global Supply Chains
• Supply chains that involve customers and
suppliers in other countries.
• Usually longer than the domestic ones and can be
complex.
• Why companies go global?
- lower prices of materials, services and labor
- availability of products/ technology
- high quality of products in global market
Problems along the Supply Chain
• Uncertainties and the need to coordinate several
activities, internal units, and business partners.
• Demand forecast causes uncertainties.
- May be influenced by many factors such as
competition, prices, weather conditions,
technological developments, etc.
• Coordination problems may occur if company’s
departments are not well connected; messages to
business partners are misunderstood; parties are
misinformed.
Problems along the Supply Chain
• Bullwhip Effect: Information about the
demand for the product gets distorted as it
passes from one entity to next.
• This effect initially observed for Procter &
Gamble in connection with its disposable
diapers product (Pampers)
•Though the actual sales in stores was fairly
stable, orders from wholesalers and
distributors were unexpectedly high.
Problems along the Supply Chain
Phantom stock outs:
• Such a problem occurs when the
customers are told that the product they
want is not available (though the product
is available/ misplaced)
System Integration
Tangible benefits
• Inventory reduction
• Personnel reduction
• Productivity improvement
• IT cost reduction
• Procurement cost reduction
• Revenue/profit increase
System Integration
Intangible benefits
• Information visibility
• New/improved processes
• Customer responsiveness
• Flexibility
• Standardization
Integrated Value Chain
• Value chain describes the primary activities
along with supporting activities.
• Value system- when value chain is extended
to include suppliers, customers etc.
• Process by which multiple enterprises within
a shared market channel collaboratively plan,
implement and manage flow of goods,
services and information along their entire joint
chain.
Integrated Value Chain
Supply chain transformed into IVC when
• Extends the chain from sub suppliers to
customers
• Integrate back office operations with
those of front office.
•Becomes highly customer centric
• Seeks to optimize value addition by
information services.
How Information Systems Facilitate
Supply Chain Management
•Decide when, what to produce, store, move
• Rapidly communicate orders
• Communicate orders, track order status
• Check inventory availability, monitor levels
•Track shipments
• Plan production based on actual demand
• Rapidly communicate product design change
• Provide product specifications
• Share information about defect rates, returns
Enterprise Resource Planning
(ERP)
• Process of managing all resources and their
use in the entire enterprise in a coordinated
manner.
• Objective is to integrate all departments and
functions across a company onto a single
information system that can serve all of the
enterprise needs.
• implementation of ERP done through the
commercial software available from SAP,
Oracle, PeapleSoft.
E-commerce and SCM
• E-procurement
• Internal SCM activities ranging from entering
orders of materials, stream lining production,
recording sales, tracking shipments etc.
• Online selling on downstream activities
• Large companies like Cisco, IBM etc. sell on
their web site. Buyers review electronic
catalogue of these company’s website.
• Electronic auctions can shorten the cycle
time and save on logistics and administrative
expenses.
Supply Chain Intelligence
• Inclusion of business intelligence in supply
chain software solutions.
• Enable strategic decision making by
analyzing the data along the entire supply
chain.
Case#1: Warner-Lambert
• Major product is Listerine antiseptic
mouthwash (now a division of Pfizer)
• Material for making Listerine comes from
eucalyptus trees in Australia and are
shipped to W-L manufacturing plant at New
Jersey.
• Problem is to forecast overall demand in
order to determine how much listerine to
produce.
• Wrong forecast can lead to high
inventories or shortages.
Case#1: Warner-Lambert
• For this, W-L forecasts demand using
Manugistics Inc’s Demand Planning
Information System.
• Manugistics- vendor of IT software for SCM.
• System analyzes manufacturing,
distribution, and sales data against expected
demand and business climate information.
• Helps W-L to decide how much Listerine to
make and distribute, how much raw
ingredient needed and when.
Supply Chain Problems and their IT
solutions
Problems
• Slow delivery of paper
documents.
• Linear sequence of
processing too slow.
• Lack of information.
• Poor coordination and
cooperation.
• Delays in shipments
Solutions
• Electronic documents e.g.
EDI
• Parallel processing, using
workflow S/W.
• Internet/Intranet etc.
• Groupware products, other
collaboration tools
• Use of robots in
warehouses, use
warehouse management
software.
Summary
• Supply chains connect suppliers to
manufacturing company, departments
inside the company and to its customers.
• Difficult to mange the supply chain due to
uncertainties in demand and supply and the
need to coordinate several business
partner's activities.
Summary
• EC can provide new solutions to problems
along the supply chain by automating the
processes and integrating company’s major
business activities.
• ERP software is designed to improve
standard business transactions and is
equipped with decision support capabilities
and web interfaces.
Artificial
Intelligence
Outline
• Introduction
• Attributes of Intelligent Behavior
• Domains of Artificial Intelligence
- Cognitive Science
- Robotics
- Natural interfaces
• Case
• Summary
Knowledge
• A field of science and technology based
on disciplines such as computer science,
biology,psychology,linguistics,
mathematics, and engineering
• Goal is to develop computers that can
simulate the ability to think, as well as see,
hear, walk, talk, and feel
Knowledg
• A field of science and technology based
on disciplines such as computer science,
biology,psychology,linguistics,
mathematics, and engineering
• Goal is to develop computers that can
simulate the ability to think, as well as see,
hear, walk, talk, and feel
Artificial Intelligence (AI)
• A field of science and technology based
on disciplines such as computer science,
biology,psychology,linguistics,
mathematics, and engineering
• Goal is to develop computers that can
simulate the ability to think, as well as see,
hear, walk, talk, and feel
Attributes of Intelligent Behavior
• Think and reason
• Use reason to solve problems
• Learn or understand from experience
• Acquire and apply knowledge
• Exhibit creativity and imagination
• Deal with complex or perplexing situations
• Respond quickly and successfully to new
situations
• Recognize the relative importance of elements
in a situation
• Handle ambiguous, incomplete, or erroneous
information
Domains of Artificial Intelligence
Cognitive Science
• Focuses on researching how the human brain
works and how humans think and learn.
• Applications in this area of AI includes:
- Expert systems
- Fuzzy logic
- Neural networks
Robotics
• Robot machines with computer
intelligence and computer controlled,
humanlike physical capabilities.
• Powers of sight or visual perception,
touch, physical ability etc.
Natural Interfaces
• Includes natural language, speech
recognition, and the development of multi-
sensory devices that use a variety of body
movements to operate computers.
• Emerging area of virtual reality
Expert Systems
• A knowledge-based information system
that uses its knowledge about a specific,
complex application to act as an expert
consultant to end users
Expert System Components
Knowledge Base – facts about specific subject
area and heuristics that express the
reasoning procedures of an expert
Software Resources – inference engine and
other programs refining knowledge and
communicating with users
Expert System Components
• Involves interactive computer based
session.
• Users enters the problem facts, system
searches its knowledge base for facts and
rules.
• Users answers the questions as they
appear on the screen with system applying
appropriate rules .
Expert System Benefits
• Faster and more consistent than an expert
• Can have the knowledge of several experts
• Does not get tired or distracted by overwork or
stress
• Helps preserve and reproduce the knowledge of
experts
Expert System Limitations
• Limited focus
• Inability to learn
• Maintenance problems
• Developmental costs
Neural Networks
• Computing systems modeled after the brain’s
mesh-like network of interconnected processing
elements, called neurons
Fuzzy Logic
Method of reasoning that resembles human
reasoning since it allows for approximate values
and inferences and incomplete or ambiguous
data instead of relying only on crisp data
Genetic Algorithms
Software that uses Darwinian, randomizing, and
other mathematical functions to simulate an
evolutionary process that can yield increasingly
better solutions to a problem
Virtual Reality (VR)
Computer-simulated reality that relies on
multisensory input/output devices such as a
tracking headset with video goggles and stereo
earphones, a data glove or jumpsuit with fiber-
optic sensors that track your body movements,
and a walker that monitors the movement of your
feet
Case#1: Wal-Mart
• Huge amounts of data collected and various
data mining tools are used.
• Data mining software includes neural nets,
expert systems etc.
• Sift instantly through the deluge of
information and uncover patterns and
relationships.
• The results unable to predict sales of every
product at each store with accuracy,
translating into huge savings in inventories.
Case#2: HP
• HP has an enterprise group that undertakes
analysis of data and projecting.
• Uses AI techniques to mine its database of
customers to predict churn rate, loyalty and
where to target promotions.
• Also mines its huge store of data from its
call centers, including emails from customers,
and text typed during voice calls.
Summary
• The goal of artificial intelligence is the
development of computer functions normally
associated with human physical and mental
capabilities.
• Expert systems are knowledge-based information
systems that use software and a knowledge base
about a specific, complex application area to act
as expert consultants to users in many business
and technical applications.
Radio Frequency Identification
( RFID)
• RFID is a technology that uses radio-
frequency waves to transfer data between
a reader and a movable item to identify,
track...
• Fast, reliable, and does not require physical
sight or contact between reader/scanner
and the tagged item.
What Constitutes an RFID
System?
• One or more RF tags
• Two or more antennas
• One or more interrogators
• One or more host computers
• Appropriate software
Components of an RFID
System
•
What is RFID? -- The Tags
• Tags can be read-only or read-write.
• Tags can be attached to almost anything:
– Pallets or cases of product
– Vehicles
– Company assets or personnel
– Items such as apparel, luggage,
laundry
– People, livestock, or pets
– High value electronics such as
computers, TVs, camcorders
Are All Tags The Same?
• Basic Types:
 Active
• Tag transmits radio signal
• Battery powered memory, radio & circuitry
• High Read Range (300 feet)
 Passive
• Tag reflects radio signal from reader
• Reader powered
• Shorter Read Range (4 inches - 15 feet)
What is RFID? -- The Readers
• Also called interrogator,
• Reader is a device used to
communicate with RFID tags.
• The reader has antennas, which emit
radio waves.
• These electromagnetic waves are
picked up by the tag, and the tag sends
back signals containing unique
information.
What is RFID? -- The Readers
• Readers (interrogators) can be at a fixed
point such as
– Entrance/exit
– Point of sale
– Warehouse
• Readers can also be mobile -- hand-held or
wireless
RFID Operation
RFID Operation
• The reader emits RF carrier signals, and keeps
observing the received RF signals for data.
• The presence of a tag modulates the RF field,
and is detected by the reader.
RFID Operation
• The passive tag absorbs a small portion of the
energy emitted by the reader, and starts
sending information when sufficient energy is
acquired from the reader.
• The reader demodulates the signals received
from the tag antenna, and decodes the same
for further processing.
RFID Applications
• Employee Identification and Access Control
• Airline baggage Identification
• Wafer Identification during manufacturing
process
• Livestock Identification
• Parts Identification
• Identification and Tracking of Vehicles
• Supply Chain Automation
• Asset Tracking, and others.
RFID Applications
• Retail giant Wal-Mart announced adoption of
RFID for advanced supply chain management.
• Germany's Metro Group is also preparing to
adopt the RFID for supply chain management.

Supply Chain Management.ppt

  • 1.
    Computer based Supply ChainManagement (SCM) and Information Systems Integration
  • 2.
    Outline • Introduction • SupplyChain Components • Types of Supply Chain • Problems along Supply chain • System Integration • Integrated Value Chain • How information system facilitative Supply chain • Enterprise Resource Planning (ERP) • E-commerce and Supply Chain • Supply Chain Intelligence • Case • Summary
  • 3.
    Supply Chain Management (SCM) •Closelinkage and coordination of activities involved in buying, making, and moving a product •Integrates supplier, manufacturer, distributor, and customer logistics time •Reduces time, redundant effort, and inventory costs
  • 4.
    Supply Chain Management (SCM) •Networkof organizations and business processes •Helps in procurement of materials, transformation of raw materials into intermediate and finished products • Helps in distribution of the finished products to customers
  • 5.
  • 6.
    Supply Chain Components Supplychain may involves three segments • Upstream SC segment: includes organization’s first tier suppliers and their suppliers. • Internal SC segment: includes all the processes used by an organization in transforming the inputs into outputs, from the time materials enter the organization to the time finished product goes to distribution outside the organization
  • 7.
    Supply Chain Components •Downstream SC segment: includes all the processes involved in distributing and delivering the products to final customers. • Includes reverse logistics - returned items flow in the reverse direction from the buyer back to the seller.
  • 8.
    Supply Chain Management (SCM) Supplychain planning system: Enables firm to generate forecasts for a product and to develop sourcing and a manufacturing plan for the product Supply chain execution system: Manages flow of products through distribution centers and warehouses
  • 9.
    Types of SupplyChains • Integrated make to stock - model focuses on tracking the customer demand in real time. - Integration is achieved through an information system that is fully integrated. - information is integrated further down the supply chain to the procurement function.
  • 10.
    Types of SupplyChains Continuous replenishment - Constantly replenish the inventory by working closely with suppliers and intermediaries. –Very tight integration is required between the order fulfillment process and the production process. – Real time information about demand changes is required.
  • 11.
    Types of SupplyChains • Built to order - Dell computer is best known for this model. - Assembly of customer’s order starts immediately on the receipt of the order. - Careful management of component inventories is required. - For this, many common components across several production lines is maintained
  • 12.
    Global Supply Chains •Supply chains that involve customers and suppliers in other countries. • Usually longer than the domestic ones and can be complex. • Why companies go global? - lower prices of materials, services and labor - availability of products/ technology - high quality of products in global market
  • 13.
    Problems along theSupply Chain • Uncertainties and the need to coordinate several activities, internal units, and business partners. • Demand forecast causes uncertainties. - May be influenced by many factors such as competition, prices, weather conditions, technological developments, etc. • Coordination problems may occur if company’s departments are not well connected; messages to business partners are misunderstood; parties are misinformed.
  • 14.
    Problems along theSupply Chain • Bullwhip Effect: Information about the demand for the product gets distorted as it passes from one entity to next. • This effect initially observed for Procter & Gamble in connection with its disposable diapers product (Pampers) •Though the actual sales in stores was fairly stable, orders from wholesalers and distributors were unexpectedly high.
  • 15.
    Problems along theSupply Chain Phantom stock outs: • Such a problem occurs when the customers are told that the product they want is not available (though the product is available/ misplaced)
  • 16.
    System Integration Tangible benefits •Inventory reduction • Personnel reduction • Productivity improvement • IT cost reduction • Procurement cost reduction • Revenue/profit increase
  • 17.
    System Integration Intangible benefits •Information visibility • New/improved processes • Customer responsiveness • Flexibility • Standardization
  • 18.
    Integrated Value Chain •Value chain describes the primary activities along with supporting activities. • Value system- when value chain is extended to include suppliers, customers etc. • Process by which multiple enterprises within a shared market channel collaboratively plan, implement and manage flow of goods, services and information along their entire joint chain.
  • 19.
    Integrated Value Chain Supplychain transformed into IVC when • Extends the chain from sub suppliers to customers • Integrate back office operations with those of front office. •Becomes highly customer centric • Seeks to optimize value addition by information services.
  • 20.
    How Information SystemsFacilitate Supply Chain Management •Decide when, what to produce, store, move • Rapidly communicate orders • Communicate orders, track order status • Check inventory availability, monitor levels •Track shipments • Plan production based on actual demand • Rapidly communicate product design change • Provide product specifications • Share information about defect rates, returns
  • 21.
    Enterprise Resource Planning (ERP) •Process of managing all resources and their use in the entire enterprise in a coordinated manner. • Objective is to integrate all departments and functions across a company onto a single information system that can serve all of the enterprise needs. • implementation of ERP done through the commercial software available from SAP, Oracle, PeapleSoft.
  • 22.
    E-commerce and SCM •E-procurement • Internal SCM activities ranging from entering orders of materials, stream lining production, recording sales, tracking shipments etc. • Online selling on downstream activities • Large companies like Cisco, IBM etc. sell on their web site. Buyers review electronic catalogue of these company’s website. • Electronic auctions can shorten the cycle time and save on logistics and administrative expenses.
  • 23.
    Supply Chain Intelligence •Inclusion of business intelligence in supply chain software solutions. • Enable strategic decision making by analyzing the data along the entire supply chain.
  • 24.
    Case#1: Warner-Lambert • Majorproduct is Listerine antiseptic mouthwash (now a division of Pfizer) • Material for making Listerine comes from eucalyptus trees in Australia and are shipped to W-L manufacturing plant at New Jersey. • Problem is to forecast overall demand in order to determine how much listerine to produce. • Wrong forecast can lead to high inventories or shortages.
  • 25.
    Case#1: Warner-Lambert • Forthis, W-L forecasts demand using Manugistics Inc’s Demand Planning Information System. • Manugistics- vendor of IT software for SCM. • System analyzes manufacturing, distribution, and sales data against expected demand and business climate information. • Helps W-L to decide how much Listerine to make and distribute, how much raw ingredient needed and when.
  • 26.
    Supply Chain Problemsand their IT solutions Problems • Slow delivery of paper documents. • Linear sequence of processing too slow. • Lack of information. • Poor coordination and cooperation. • Delays in shipments Solutions • Electronic documents e.g. EDI • Parallel processing, using workflow S/W. • Internet/Intranet etc. • Groupware products, other collaboration tools • Use of robots in warehouses, use warehouse management software.
  • 27.
    Summary • Supply chainsconnect suppliers to manufacturing company, departments inside the company and to its customers. • Difficult to mange the supply chain due to uncertainties in demand and supply and the need to coordinate several business partner's activities.
  • 28.
    Summary • EC canprovide new solutions to problems along the supply chain by automating the processes and integrating company’s major business activities. • ERP software is designed to improve standard business transactions and is equipped with decision support capabilities and web interfaces.
  • 29.
  • 30.
    Outline • Introduction • Attributesof Intelligent Behavior • Domains of Artificial Intelligence - Cognitive Science - Robotics - Natural interfaces • Case • Summary
  • 31.
    Knowledge • A fieldof science and technology based on disciplines such as computer science, biology,psychology,linguistics, mathematics, and engineering • Goal is to develop computers that can simulate the ability to think, as well as see, hear, walk, talk, and feel
  • 32.
    Knowledg • A fieldof science and technology based on disciplines such as computer science, biology,psychology,linguistics, mathematics, and engineering • Goal is to develop computers that can simulate the ability to think, as well as see, hear, walk, talk, and feel
  • 33.
    Artificial Intelligence (AI) •A field of science and technology based on disciplines such as computer science, biology,psychology,linguistics, mathematics, and engineering • Goal is to develop computers that can simulate the ability to think, as well as see, hear, walk, talk, and feel
  • 34.
    Attributes of IntelligentBehavior • Think and reason • Use reason to solve problems • Learn or understand from experience • Acquire and apply knowledge • Exhibit creativity and imagination • Deal with complex or perplexing situations • Respond quickly and successfully to new situations • Recognize the relative importance of elements in a situation • Handle ambiguous, incomplete, or erroneous information
  • 35.
  • 36.
    Cognitive Science • Focuseson researching how the human brain works and how humans think and learn. • Applications in this area of AI includes: - Expert systems - Fuzzy logic - Neural networks
  • 37.
    Robotics • Robot machineswith computer intelligence and computer controlled, humanlike physical capabilities. • Powers of sight or visual perception, touch, physical ability etc.
  • 38.
    Natural Interfaces • Includesnatural language, speech recognition, and the development of multi- sensory devices that use a variety of body movements to operate computers. • Emerging area of virtual reality
  • 39.
    Expert Systems • Aknowledge-based information system that uses its knowledge about a specific, complex application to act as an expert consultant to end users
  • 40.
    Expert System Components KnowledgeBase – facts about specific subject area and heuristics that express the reasoning procedures of an expert Software Resources – inference engine and other programs refining knowledge and communicating with users
  • 41.
    Expert System Components •Involves interactive computer based session. • Users enters the problem facts, system searches its knowledge base for facts and rules. • Users answers the questions as they appear on the screen with system applying appropriate rules .
  • 42.
    Expert System Benefits •Faster and more consistent than an expert • Can have the knowledge of several experts • Does not get tired or distracted by overwork or stress • Helps preserve and reproduce the knowledge of experts
  • 43.
    Expert System Limitations •Limited focus • Inability to learn • Maintenance problems • Developmental costs
  • 44.
    Neural Networks • Computingsystems modeled after the brain’s mesh-like network of interconnected processing elements, called neurons
  • 45.
    Fuzzy Logic Method ofreasoning that resembles human reasoning since it allows for approximate values and inferences and incomplete or ambiguous data instead of relying only on crisp data
  • 46.
    Genetic Algorithms Software thatuses Darwinian, randomizing, and other mathematical functions to simulate an evolutionary process that can yield increasingly better solutions to a problem
  • 47.
    Virtual Reality (VR) Computer-simulatedreality that relies on multisensory input/output devices such as a tracking headset with video goggles and stereo earphones, a data glove or jumpsuit with fiber- optic sensors that track your body movements, and a walker that monitors the movement of your feet
  • 48.
    Case#1: Wal-Mart • Hugeamounts of data collected and various data mining tools are used. • Data mining software includes neural nets, expert systems etc. • Sift instantly through the deluge of information and uncover patterns and relationships. • The results unable to predict sales of every product at each store with accuracy, translating into huge savings in inventories.
  • 49.
    Case#2: HP • HPhas an enterprise group that undertakes analysis of data and projecting. • Uses AI techniques to mine its database of customers to predict churn rate, loyalty and where to target promotions. • Also mines its huge store of data from its call centers, including emails from customers, and text typed during voice calls.
  • 50.
    Summary • The goalof artificial intelligence is the development of computer functions normally associated with human physical and mental capabilities. • Expert systems are knowledge-based information systems that use software and a knowledge base about a specific, complex application area to act as expert consultants to users in many business and technical applications.
  • 51.
    Radio Frequency Identification (RFID) • RFID is a technology that uses radio- frequency waves to transfer data between a reader and a movable item to identify, track... • Fast, reliable, and does not require physical sight or contact between reader/scanner and the tagged item.
  • 52.
    What Constitutes anRFID System? • One or more RF tags • Two or more antennas • One or more interrogators • One or more host computers • Appropriate software
  • 53.
    Components of anRFID System •
  • 54.
    What is RFID?-- The Tags • Tags can be read-only or read-write. • Tags can be attached to almost anything: – Pallets or cases of product – Vehicles – Company assets or personnel – Items such as apparel, luggage, laundry – People, livestock, or pets – High value electronics such as computers, TVs, camcorders
  • 55.
    Are All TagsThe Same? • Basic Types:  Active • Tag transmits radio signal • Battery powered memory, radio & circuitry • High Read Range (300 feet)  Passive • Tag reflects radio signal from reader • Reader powered • Shorter Read Range (4 inches - 15 feet)
  • 56.
    What is RFID?-- The Readers • Also called interrogator, • Reader is a device used to communicate with RFID tags. • The reader has antennas, which emit radio waves. • These electromagnetic waves are picked up by the tag, and the tag sends back signals containing unique information.
  • 57.
    What is RFID?-- The Readers • Readers (interrogators) can be at a fixed point such as – Entrance/exit – Point of sale – Warehouse • Readers can also be mobile -- hand-held or wireless
  • 58.
  • 59.
    RFID Operation • Thereader emits RF carrier signals, and keeps observing the received RF signals for data. • The presence of a tag modulates the RF field, and is detected by the reader.
  • 60.
    RFID Operation • Thepassive tag absorbs a small portion of the energy emitted by the reader, and starts sending information when sufficient energy is acquired from the reader. • The reader demodulates the signals received from the tag antenna, and decodes the same for further processing.
  • 61.
    RFID Applications • EmployeeIdentification and Access Control • Airline baggage Identification • Wafer Identification during manufacturing process • Livestock Identification • Parts Identification • Identification and Tracking of Vehicles • Supply Chain Automation • Asset Tracking, and others.
  • 62.
    RFID Applications • Retailgiant Wal-Mart announced adoption of RFID for advanced supply chain management. • Germany's Metro Group is also preparing to adopt the RFID for supply chain management.