What is a Supply Chain ? All activities associated with the flow and transformation of goods from raw materials to end users. The term supply chain refers to the entire network of companies that work together to design, produce, deliver, and service products. A network of facilities including: Material flow from suppliers and their “ upstream ” suppliers at all levels, Transformation of materials into semi-finished and finished products ( internal process ) Distribution of products to customers and their “ downstream ”customers at all levels .
Components of the Supply Chain
Example of SC 2 nd  Tier Supplier Upstream Internal Downstream 2 nd  Tier Supplier 2 nd  Tier Supplier 1 st  Tier Supplier 1 st  Tier Supplier Assembly/ Manufacturing and Packaging Distribution Centers Retailers Customers Grain Producer Processing Facility Packaging Distributor Store Customers Corrugate Manufacturer Lumber Company Label Manufacturer Grain Cereal Packaged Cereal Labels Word Paperboard
Complex-nonlinear Supply Chain
Three Flows in SC There are three kinds of flows in a supply chain:  material ,  information ,  capital . Downstream Material:  Products, Parts Information:  Capacity, Delivery Schedules Finance:  Invoices, Pricing, Credit Terms Upstream Material:  Returns, Repairs, After-sales Services Information:  Orders, Point-of-sale Data Finance:  Payments
Push vs. Pull in supply chains Push or Building-to-stock(BTS):  Producing stock on the basis of anticipated demand. Demand forecasting can be done via a variety of sophisticated techniques (some from the Operations Research area and some using Data Mining). Pull or Building-to-order(BTO):  Producing stock in response to actual demand (firm orders). The Push-Pull Point:  In many supply chains, upstream units employ BTS, while downstream units employ BTO strategies. The point in the supply chain where the switch-over (from BTS to BTO) occurs is called the  Push-Pull point. Optimally locating the Push-Pull point is a key determinant of supply chain performance. Examples ?
The Push vs. Pull Model
Major Concepts Order fulfillment Deliver right order on time Front office operations: order taking, advertisement, CRM Back office operations: Accounting, finance, inventor, packaging, logistics Logistics: Managing the flow of goods, information and money along the supply chain
The Process of Order Fulfillment
The Steps of Order Fulfillment 7. Purchasing, warehousing 8. Demand forecast 9. Accounting, billing 10. Customer contacts 11. Returns (Reverse logistics) 1. Payment Clearance 2. In-stock availability 3. Packaging, shipment 4. Insuring 5. Production (planning, execution) 6. Plant services
Supply Chain Management (SCM) A set of processes and sub-processes which attempt to implement and optimize the functions, connected entities, and interacting elements of a supply chain. Involves: Organizations, procedures, people. Activities: Purchasing, delivery, packaging, checking, warehousing, etc. Establishment of long-term relationships with suppliers (supply alliances) and distributors Effective flow of information through the supply chain Supply chain optimization
Key Business Areas Enterprise performance Customer service Order management Demand planning Warehouse distribution Partnerships Supplier/supply base management
Benefits of SCM Reduce uncertainty along the chain Proper inventory levels in the chain Minimize delays Eliminate rush (unplanned) activities Provide good customer service
Global Supply Chain Can be very long Possible cross-border problems Need information technology support for: communication and collaboration Possible delays due to: customs, tax, translations, politics
Problems along the Supply Chain Delays in production, distribution etc. Expensive Inventories Lack of partners’ coordination Uncertainties in deliveries Poor demand forecast Interference with production  Poor quality
More  Challenges Complexity of the  supply chain network e.g. large numbers of suppliers and distributors Complexity in product structure and manufacturing process How much product differentiation/ customization/ localization should be supported ? Where do you customize a product (upstream or downstream) ? decentralized control/organizational "silos" increasing pressure for customer service and asset utilization
Variability in the supply chain Demand variability Even the most sophisticated demand forecasting tools often fail to anticipate demand Examples of demand variability problems ? Process variability Production unit downtimes Unexpected staff absences Supply variability e.g., late deliveries from suppliers
The Bullwhip Effect Slight changes in actual demand create problems Babies Distributors Proctor & Gamble 3M Retailers
Common Causes of the Bullwhip Effect Demand forecast mismatches Demand forecasting distributed across units in the supply chain Order Batching Sometimes helps achieve economies of scale Price Fluctuations “ forward buy” inducements through lower prices Others: partners build “just in case” inventories  lack of trust among partners cannot order material from suppliers
Product design  The product has been designed so that localization (or customization or differentiation) can occur as close as possible to the local market. The product is built for a specific market before it is shipped out of the factory Upstream differentiation Downstream differentiation Example: The Hewlett-Packard Deskjet Printer.  How might you localize ?
Technology in the SC The internet and the web can be very effective communication enhancers Software includes  demand forecasting tools  and  planning tools  to allow all SC members to coordinate their activities and adjust their production levels. Software can allow members to:  review past performance monitor current performance   predict future production levels of products .
Web SCM Share information about consumer demand Receive rapid notification of product design changes and adjustments Provides specs and drawings more efficiently. Increase speed of processing transactions. Reduce cost of handling transactions. Reduce errors in entering transaction data  Share information about defect rates and types.
Example 1: Cisco  Making use of the internet in its own supply chain.  Products are manufactured by contract manufacturers (CM) Integrated well with both its CM’s and its component suppliers.  Communicates a single forecast through both levels of suppliers, reducing the bullwhip effect.  Display their product and component requirements to their entire chain.
Example 1: Benefits for Cisco  Eliminated paper purchase orders and invoices Communicate engineering change orders electronically to all partners 90% of sales are made over the internet US$875 million annual internet savings (more than 50% due to SC initiatives) Lead times reduced 75% Low manufacturing manpower requirements despite rapid growth Cost  reductions of 20%-28% every year.
Example 2: Dell Create “Virtual integration” : the entire supply chain acts like a single integrated company. Upstream partners: contract manufacturers (CM) and component suppliers Downstream partners/customers (most are business corporations) Share information with suppliers on inventory levels. Maintain long-term relationships with key suppliers for design collaboration.
Example 2: Benefits for Dell  Dell and Suppliers work together as a “Virtual Enterprise” BTO benefits (low inventory) Dynamic pricing: change prices rapidly in response to demand and availability Strong links to corporate customers
Example 3: Covisint B2B Supply Chain Benefits Automated procurement lower procurement costs  lower inventories Collaboration:  complete visibility less bullwhip Efficient market More profits Sell unused capacity
Supply chain integration: Benefits Tangible benefits Inventory reduction, personnel reduction, productivity improvement, order management improvement, financial cycle improvements. Intangible benefits Information visibility, new / improved processes, customer responsiveness, standardization, flexibility, globalization, and business performance.
Evolution of Software Integration Completely Independent of each other MRP = Material Requirements Planning: Inventory, production MRPII =Manufacturing Requirements Planning more integrated, MRP+Finance+labor ERP =Enterprise Resources Planning All functional areas Extended ERP =Include suppliers, customers
MRP Core Concepts Key questions:  How much of an item is needed to meet demand? When? What parts and components are required? When? When to order parts and components? Dependent demand production (or procurement) of parts and materials is directly linked to demand for the final product. Time-phased scheduling parts and components must be ordered in advance to accommodate  lead times  between order placement and receipt.
Enterprise Resource Planning (ERP) ERP  = Integrating business processes and activities in real time Solves many supply chain problems Necessary for medium to large corporations May be useful for SMEs too Need to interface with EC order taking system Manages all routine transactions in the Enterprise
Post ERP (2nd Generation) 1st generation -  transaction processing orientation 2nd generation  including decision making capabilities EC requires decision support EC requires business intelligence SCM software:  Production Planning, Manpower utilization, Profitability models, market analysis.   Integration of SCM capabilities Other added functionalities: CRM, KM
ASP Leasing information systems application Back to the days of “time sharing” A risk prevention strategy Very popular with ERP (expensive, cumbersome)
Supply chain  optimization Business objective: improve supply chain efficiency (velocity ?), optimize operation of the supply chain Metrics for efficiency - what do we optimize ? Define the problem in terms of  decision variables Define an  objective function  in terms of the decision variables. The goal would be to  maximize  or  minimize  the value of this function, i.e., to find an allocation of values to the decision variables such that the value of this function is either maximized or minimized. Supply chain optimization is the continuous process of seeking optimal allocations of values to decision variables
Common optimization problems: I Long-term planning  (time-frame: several months/years): Questions: How much of each product type should I manufacture ? When ? Where ? (Assumes a network of manufacturing centers with potential duplication of manufacturing capability) How much should I keep in inventory (both for manufacturing inputs and outputs) ? Where ? (Assumes a distributed network of warehouses) Constraints: Capacity constraints (both manufacturing and inventory) Demand profile Process constraints (downtimes, planned outages) Supply variability Objectives: Profit/revenue maximization, maximizing asset utilization, minimization of deviation from demand profile, minimization of deviation from target inventory profile
Common optimization problems: II Medium-term planning/scheduling  (time-frame: a few months/weeks) : Similar to long-term planning, but with scheduling constraints and objectives added Unit scheduling/reactive scheduling: Questions: In what sequence should orders/jobs be manufactured ? Which job should I process on a given production unit at a given point in time ? Should I go into overtime ? Constraints: Capacity constraints Sequencing constraints Orders + deadlines Process constraints (downtimes etc.) Objectives: Minimize makespan (i.e., maximize asset utilization), minimize deviation from order deadlines, maximize profit/revenue
Common optimization problems: III Shipping: How do I allocate orders to trucks ? What routes should trucks travel on ? How do I allocate truck to routes ?
Major classes of optimization techniques: From the field of operations research (OR) Linear programming Integer programming…. From the field of artificial intelligence (AI) Constraint programming Heuristic search techniques
Supply Chain Mgt. Software Includes demand forecasting tools and planning capabilities to allow all supply chain members to coordinate their activities and adjust their production levels Firms offering SCM software:  i2 Technologies RHYTHM Manugistics
Purchasing, Logistics & Support Software Enterprise Resource Planning  (ERP) software is designed to integrate manufacturing, finance, distribution, and other internal business functions into one information system Major ERP vendors include -  Baan  J.D. Edwards Oracle PeopleSoft SAP
B2B E-Commerce Software Designed to help companies build Web sites that host: Catalog Marketplace and  other commercial sales activities Major software packages include: Netscape - SellerXpert & ECXpert,  OpenMarket Transact, IBM’s Websphere. MS Site Server, and Ariba
The end Questions?

More Related Content

What's hot

Supply chain management
Supply chain managementSupply chain management
Supply chain management
Sagar Gadekar
 
Role of information Technology in Supply Chain Manageent
Role of information Technology in Supply Chain ManageentRole of information Technology in Supply Chain Manageent
Role of information Technology in Supply Chain Manageent
Anand Jha
 
A presentation on Supply Chain Management
A presentation on Supply Chain ManagementA presentation on Supply Chain Management
A presentation on Supply Chain Management
Shailesh Topno
 
Logistics and Supply Chain
Logistics and Supply ChainLogistics and Supply Chain
Logistics and Supply Chain
Vikram Dahiya
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
Shubham Bhutada
 
Network design
Network designNetwork design
Network design
Hammaduddin
 
Supply Chain Management PowerPoint Presentation Slides
Supply Chain Management PowerPoint Presentation SlidesSupply Chain Management PowerPoint Presentation Slides
Supply Chain Management PowerPoint Presentation Slides
SlideTeam
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
Aniket Verma
 
Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...
Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...
Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...
Babasab Patil
 
Supply Chain Strategy
Supply Chain StrategySupply Chain Strategy
Supply Chain Strategy
Behzad Behdani
 
Logistics Management
Logistics ManagementLogistics Management
Logistics Management
Anand Subramaniam
 
Basics of Supply Chain Management
Basics of Supply Chain ManagementBasics of Supply Chain Management
Basics of Supply Chain Management
vip1233
 
Process view of scm & value chain analysis
Process view of scm & value chain analysisProcess view of scm & value chain analysis
Process view of scm & value chain analysis
MD SALMAN ANJUM
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
Minhajur Rahman
 
Coordination in a supply chain
Coordination in a supply chainCoordination in a supply chain
Coordination in a supply chain
Chaitrali Gijare
 
Unit 1 Supply Chain management
Unit 1 Supply Chain managementUnit 1 Supply Chain management
Unit 1 Supply Chain management
Ramachandran S
 
Supply chain lecture
Supply chain lectureSupply chain lecture
Supply chain lecture
jillmitchell8778
 
Supply chain management and logistics management
Supply chain management and logistics managementSupply chain management and logistics management
Supply chain management and logistics management
NancyLakhani
 
Supply Chain Management Introduction PowerPoint Presentation Slides
Supply Chain Management Introduction PowerPoint Presentation Slides Supply Chain Management Introduction PowerPoint Presentation Slides
Supply Chain Management Introduction PowerPoint Presentation Slides
SlideTeam
 
Objectives of supply chain management
Objectives of supply chain managementObjectives of supply chain management
Objectives of supply chain management
DENNY OTTARACKAL
 

What's hot (20)

Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Role of information Technology in Supply Chain Manageent
Role of information Technology in Supply Chain ManageentRole of information Technology in Supply Chain Manageent
Role of information Technology in Supply Chain Manageent
 
A presentation on Supply Chain Management
A presentation on Supply Chain ManagementA presentation on Supply Chain Management
A presentation on Supply Chain Management
 
Logistics and Supply Chain
Logistics and Supply ChainLogistics and Supply Chain
Logistics and Supply Chain
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
Network design
Network designNetwork design
Network design
 
Supply Chain Management PowerPoint Presentation Slides
Supply Chain Management PowerPoint Presentation SlidesSupply Chain Management PowerPoint Presentation Slides
Supply Chain Management PowerPoint Presentation Slides
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...
Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...
Supply chain performance achieving strategic fit and scope MBA STRATERGIC MAN...
 
Supply Chain Strategy
Supply Chain StrategySupply Chain Strategy
Supply Chain Strategy
 
Logistics Management
Logistics ManagementLogistics Management
Logistics Management
 
Basics of Supply Chain Management
Basics of Supply Chain ManagementBasics of Supply Chain Management
Basics of Supply Chain Management
 
Process view of scm & value chain analysis
Process view of scm & value chain analysisProcess view of scm & value chain analysis
Process view of scm & value chain analysis
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Coordination in a supply chain
Coordination in a supply chainCoordination in a supply chain
Coordination in a supply chain
 
Unit 1 Supply Chain management
Unit 1 Supply Chain managementUnit 1 Supply Chain management
Unit 1 Supply Chain management
 
Supply chain lecture
Supply chain lectureSupply chain lecture
Supply chain lecture
 
Supply chain management and logistics management
Supply chain management and logistics managementSupply chain management and logistics management
Supply chain management and logistics management
 
Supply Chain Management Introduction PowerPoint Presentation Slides
Supply Chain Management Introduction PowerPoint Presentation Slides Supply Chain Management Introduction PowerPoint Presentation Slides
Supply Chain Management Introduction PowerPoint Presentation Slides
 
Objectives of supply chain management
Objectives of supply chain managementObjectives of supply chain management
Objectives of supply chain management
 

Viewers also liked

Presentation on supply chain management
Presentation on supply chain managementPresentation on supply chain management
Presentation on supply chain management
Ankur Mehta
 
Customer Relationship Management (CRM)
Customer Relationship Management (CRM)Customer Relationship Management (CRM)
Customer Relationship Management (CRM)
Jaiser Abbas
 
Supply chain drivers
Supply chain driversSupply chain drivers
Supply chain drivers
Anupam Basu
 
Supply chain management ppt MBA
Supply chain management ppt MBA  Supply chain management ppt MBA
Supply chain management ppt MBA
Babasab Patil
 
Customer relationship management
Customer relationship managementCustomer relationship management
Customer relationship management
charanreddy589
 
Supply Chain Management-Drivers
Supply Chain Management-DriversSupply Chain Management-Drivers
Supply Chain Management-Drivers
Malaviya National Institute of Technology, Jaipur
 
Supply chain drivers & metrics
Supply chain drivers & metricsSupply chain drivers & metrics
Supply chain drivers & metrics
ujjmishra
 
Chapter 6 Mis And Erp
Chapter 6 Mis And ErpChapter 6 Mis And Erp
Chapter 6 Mis And Erp
management 2
 
Supply Chain Management, Basics
Supply Chain Management, BasicsSupply Chain Management, Basics
Supply Chain Management, Basics
Rajendran Ananda Krishnan
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
Anup Mohan
 
Customer Relationship Management
Customer Relationship ManagementCustomer Relationship Management
Customer Relationship Management
Dr. Praveen Pillai
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
Arunkumar varadharajan
 
Value chain analysis
Value chain analysisValue chain analysis
Value chain analysis
Monish rm
 
Risk Management Framework
Risk Management FrameworkRisk Management Framework
Risk Management Framework
Anand Subramaniam
 
Explication du plan comptable marocaine
Explication du plan comptable marocaine Explication du plan comptable marocaine
Explication du plan comptable marocaine
A.Karim bouknis
 
2014 best life insurance plans in india
2014 best life insurance plans in india2014 best life insurance plans in india
2014 best life insurance plans in india
Steven Wilson
 
Suplay
SuplaySuplay
Kansai Nerolac Paints
Kansai Nerolac PaintsKansai Nerolac Paints
Kansai Nerolac Paints
Nikhil Agarwal
 
SCM- Basics
SCM- BasicsSCM- Basics
SCM- Basics
Badarinath Joshi
 
Scm ppt
Scm pptScm ppt
Scm ppt
abhishek_02
 

Viewers also liked (20)

Presentation on supply chain management
Presentation on supply chain managementPresentation on supply chain management
Presentation on supply chain management
 
Customer Relationship Management (CRM)
Customer Relationship Management (CRM)Customer Relationship Management (CRM)
Customer Relationship Management (CRM)
 
Supply chain drivers
Supply chain driversSupply chain drivers
Supply chain drivers
 
Supply chain management ppt MBA
Supply chain management ppt MBA  Supply chain management ppt MBA
Supply chain management ppt MBA
 
Customer relationship management
Customer relationship managementCustomer relationship management
Customer relationship management
 
Supply Chain Management-Drivers
Supply Chain Management-DriversSupply Chain Management-Drivers
Supply Chain Management-Drivers
 
Supply chain drivers & metrics
Supply chain drivers & metricsSupply chain drivers & metrics
Supply chain drivers & metrics
 
Chapter 6 Mis And Erp
Chapter 6 Mis And ErpChapter 6 Mis And Erp
Chapter 6 Mis And Erp
 
Supply Chain Management, Basics
Supply Chain Management, BasicsSupply Chain Management, Basics
Supply Chain Management, Basics
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Customer Relationship Management
Customer Relationship ManagementCustomer Relationship Management
Customer Relationship Management
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Value chain analysis
Value chain analysisValue chain analysis
Value chain analysis
 
Risk Management Framework
Risk Management FrameworkRisk Management Framework
Risk Management Framework
 
Explication du plan comptable marocaine
Explication du plan comptable marocaine Explication du plan comptable marocaine
Explication du plan comptable marocaine
 
2014 best life insurance plans in india
2014 best life insurance plans in india2014 best life insurance plans in india
2014 best life insurance plans in india
 
Suplay
SuplaySuplay
Suplay
 
Kansai Nerolac Paints
Kansai Nerolac PaintsKansai Nerolac Paints
Kansai Nerolac Paints
 
SCM- Basics
SCM- BasicsSCM- Basics
SCM- Basics
 
Scm ppt
Scm pptScm ppt
Scm ppt
 

Similar to Supply Chain Management

B-Supply Chain Management
B-Supply Chain ManagementB-Supply Chain Management
B-Supply Chain Management
Dr. Abzal Basha H S
 
Supply chain management manbir singh dang
Supply chain management   manbir singh dangSupply chain management   manbir singh dang
Supply chain management manbir singh dang
Manbir Dang
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
Beenu Gulia
 
Supply Chain Enterprise Resources Planning
Supply Chain  Enterprise Resources PlanningSupply Chain  Enterprise Resources Planning
Supply Chain Enterprise Resources Planning
ahmad bassiouny
 
Supply_Chain_Management_san.ppt
Supply_Chain_Management_san.pptSupply_Chain_Management_san.ppt
Supply_Chain_Management_san.ppt
sakshisaxena614088
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
MdSaifAli3
 
Strategy
StrategyStrategy
Strategy
Raghavendra09
 
Ibcs nov2011
Ibcs nov2011Ibcs nov2011
Ibcs nov2011
Meera Das
 
Achieving operational excellence and customer intimacy. enterprise applications
Achieving operational excellence and customer intimacy. enterprise applicationsAchieving operational excellence and customer intimacy. enterprise applications
Achieving operational excellence and customer intimacy. enterprise applications
Sanmugam Marimuthu
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
Ishwar Bulbule
 
Scm
ScmScm
supply chain management
supply chain management supply chain management
supply chain management
Vipul Sharma
 
Introductionto Materials Management
Introductionto Materials ManagementIntroductionto Materials Management
Introductionto Materials Management
Antonio Gonzalez
 
Supplay chain management ppt @ bec doms bagalkot
Supplay chain management ppt @ bec doms bagalkotSupplay chain management ppt @ bec doms bagalkot
Supplay chain management ppt @ bec doms bagalkot
Babasab Patil
 
Supply Sample
Supply SampleSupply Sample
Supply Sample
ahmad bassiouny
 
Supply_sample
Supply_sampleSupply_sample
Supply_sample
ahmad bassiouny
 
SCM_final_contentSCM_final_contentSCM_final_contentSCM_final_content
SCM_final_contentSCM_final_contentSCM_final_contentSCM_final_contentSCM_final_contentSCM_final_contentSCM_final_contentSCM_final_content
SCM_final_contentSCM_final_contentSCM_final_contentSCM_final_content
SanjeevKumar656495
 
SCM CRP ERP Decision Support
SCM CRP ERP Decision SupportSCM CRP ERP Decision Support
SCM CRP ERP Decision Support
ankit_sharma869
 
Tata steel ideation
Tata steel ideationTata steel ideation
Tata steel ideation
Happy Garg
 
Supply Chain Connect Overview
Supply Chain Connect OverviewSupply Chain Connect Overview
Supply Chain Connect Overview
Supply Chain Connect
 

Similar to Supply Chain Management (20)

B-Supply Chain Management
B-Supply Chain ManagementB-Supply Chain Management
B-Supply Chain Management
 
Supply chain management manbir singh dang
Supply chain management   manbir singh dangSupply chain management   manbir singh dang
Supply chain management manbir singh dang
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Supply Chain Enterprise Resources Planning
Supply Chain  Enterprise Resources PlanningSupply Chain  Enterprise Resources Planning
Supply Chain Enterprise Resources Planning
 
Supply_Chain_Management_san.ppt
Supply_Chain_Management_san.pptSupply_Chain_Management_san.ppt
Supply_Chain_Management_san.ppt
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
Strategy
StrategyStrategy
Strategy
 
Ibcs nov2011
Ibcs nov2011Ibcs nov2011
Ibcs nov2011
 
Achieving operational excellence and customer intimacy. enterprise applications
Achieving operational excellence and customer intimacy. enterprise applicationsAchieving operational excellence and customer intimacy. enterprise applications
Achieving operational excellence and customer intimacy. enterprise applications
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
Scm
ScmScm
Scm
 
supply chain management
supply chain management supply chain management
supply chain management
 
Introductionto Materials Management
Introductionto Materials ManagementIntroductionto Materials Management
Introductionto Materials Management
 
Supplay chain management ppt @ bec doms bagalkot
Supplay chain management ppt @ bec doms bagalkotSupplay chain management ppt @ bec doms bagalkot
Supplay chain management ppt @ bec doms bagalkot
 
Supply Sample
Supply SampleSupply Sample
Supply Sample
 
Supply_sample
Supply_sampleSupply_sample
Supply_sample
 
SCM_final_contentSCM_final_contentSCM_final_contentSCM_final_content
SCM_final_contentSCM_final_contentSCM_final_contentSCM_final_contentSCM_final_contentSCM_final_contentSCM_final_contentSCM_final_content
SCM_final_contentSCM_final_contentSCM_final_contentSCM_final_content
 
SCM CRP ERP Decision Support
SCM CRP ERP Decision SupportSCM CRP ERP Decision Support
SCM CRP ERP Decision Support
 
Tata steel ideation
Tata steel ideationTata steel ideation
Tata steel ideation
 
Supply Chain Connect Overview
Supply Chain Connect OverviewSupply Chain Connect Overview
Supply Chain Connect Overview
 

More from Nurhazman Abdul Aziz

iDARE 2021 - 07 - Wheel xplore
iDARE 2021 - 07 - Wheel xploreiDARE 2021 - 07 - Wheel xplore
iDARE 2021 - 07 - Wheel xplore
Nurhazman Abdul Aziz
 
iDARE 2021 - 6 - Smart Trolley
iDARE 2021 - 6 - Smart TrolleyiDARE 2021 - 6 - Smart Trolley
iDARE 2021 - 6 - Smart Trolley
Nurhazman Abdul Aziz
 
iDARE 2021 - 05- Assurance
iDARE 2021 - 05- AssuranceiDARE 2021 - 05- Assurance
iDARE 2021 - 05- Assurance
Nurhazman Abdul Aziz
 
iDARE 2021 - 04 - GoBike!
iDARE 2021 - 04 - GoBike!iDARE 2021 - 04 - GoBike!
iDARE 2021 - 04 - GoBike!
Nurhazman Abdul Aziz
 
iDARE 2021 - 03 - One Door (Footal)
 iDARE 2021 - 03 - One Door (Footal) iDARE 2021 - 03 - One Door (Footal)
iDARE 2021 - 03 - One Door (Footal)
Nurhazman Abdul Aziz
 
iDARE 2021 - 02 - GoFresh!
iDARE 2021 - 02 - GoFresh!iDARE 2021 - 02 - GoFresh!
iDARE 2021 - 02 - GoFresh!
Nurhazman Abdul Aziz
 
Universitas Hasanuddin - Engineering Collections
Universitas Hasanuddin - Engineering CollectionsUniversitas Hasanuddin - Engineering Collections
Universitas Hasanuddin - Engineering Collections
Nurhazman Abdul Aziz
 
Access SpringerProtocols in Universitas Muslim Indonesia
Access SpringerProtocols in Universitas Muslim IndonesiaAccess SpringerProtocols in Universitas Muslim Indonesia
Access SpringerProtocols in Universitas Muslim Indonesia
Nurhazman Abdul Aziz
 
Singapore University of Technology and Design - November 2016 Highlights
Singapore University of Technology and Design - November 2016 HighlightsSingapore University of Technology and Design - November 2016 Highlights
Singapore University of Technology and Design - November 2016 Highlights
Nurhazman Abdul Aziz
 
IEEE Xplore - What can i access
IEEE Xplore  -  What can i accessIEEE Xplore  -  What can i access
IEEE Xplore - What can i access
Nurhazman Abdul Aziz
 
Dsg Portal – Instructor Manual Back View Panel
Dsg Portal – Instructor Manual   Back View PanelDsg Portal – Instructor Manual   Back View Panel
Dsg Portal – Instructor Manual Back View Panel
Nurhazman Abdul Aziz
 
IEEE Xplore - You can now display local contact information on IEEE Xplore
IEEE Xplore - You can now display local contact information on IEEE XploreIEEE Xplore - You can now display local contact information on IEEE Xplore
IEEE Xplore - You can now display local contact information on IEEE Xplore
Nurhazman Abdul Aziz
 
Bibliographic paradigm and the digital information resources
Bibliographic paradigm and the digital information resourcesBibliographic paradigm and the digital information resources
Bibliographic paradigm and the digital information resources
Nurhazman Abdul Aziz
 
Social Media & Marketing Libraries
Social Media & Marketing LibrariesSocial Media & Marketing Libraries
Social Media & Marketing Libraries
Nurhazman Abdul Aziz
 
DSG Webinar Session: Setting up our Search Alerts & Identifying suitable Conf...
DSG Webinar Session: Setting up our Search Alerts & Identifying suitable Conf...DSG Webinar Session: Setting up our Search Alerts & Identifying suitable Conf...
DSG Webinar Session: Setting up our Search Alerts & Identifying suitable Conf...
Nurhazman Abdul Aziz
 
Getting to know IEEE Xplore: PhD students - May 2015
Getting to know IEEE Xplore:  PhD students - May 2015Getting to know IEEE Xplore:  PhD students - May 2015
Getting to know IEEE Xplore: PhD students - May 2015
Nurhazman Abdul Aziz
 
Introduction series to Scholarly Communication (for Doctorate Support Group)
Introduction series to Scholarly Communication (for Doctorate Support Group)Introduction series to Scholarly Communication (for Doctorate Support Group)
Introduction series to Scholarly Communication (for Doctorate Support Group)
Nurhazman Abdul Aziz
 
Altmetrics : The Societal Impact
Altmetrics : The Societal Impact Altmetrics : The Societal Impact
Altmetrics : The Societal Impact
Nurhazman Abdul Aziz
 
Using Mendeley & IEEE Resources: Learn how to cite your research article from...
Using Mendeley & IEEE Resources: Learn how to cite your research article from...Using Mendeley & IEEE Resources: Learn how to cite your research article from...
Using Mendeley & IEEE Resources: Learn how to cite your research article from...
Nurhazman Abdul Aziz
 
Swetswise Linker & Google Scholar
Swetswise Linker & Google ScholarSwetswise Linker & Google Scholar
Swetswise Linker & Google Scholar
Nurhazman Abdul Aziz
 

More from Nurhazman Abdul Aziz (20)

iDARE 2021 - 07 - Wheel xplore
iDARE 2021 - 07 - Wheel xploreiDARE 2021 - 07 - Wheel xplore
iDARE 2021 - 07 - Wheel xplore
 
iDARE 2021 - 6 - Smart Trolley
iDARE 2021 - 6 - Smart TrolleyiDARE 2021 - 6 - Smart Trolley
iDARE 2021 - 6 - Smart Trolley
 
iDARE 2021 - 05- Assurance
iDARE 2021 - 05- AssuranceiDARE 2021 - 05- Assurance
iDARE 2021 - 05- Assurance
 
iDARE 2021 - 04 - GoBike!
iDARE 2021 - 04 - GoBike!iDARE 2021 - 04 - GoBike!
iDARE 2021 - 04 - GoBike!
 
iDARE 2021 - 03 - One Door (Footal)
 iDARE 2021 - 03 - One Door (Footal) iDARE 2021 - 03 - One Door (Footal)
iDARE 2021 - 03 - One Door (Footal)
 
iDARE 2021 - 02 - GoFresh!
iDARE 2021 - 02 - GoFresh!iDARE 2021 - 02 - GoFresh!
iDARE 2021 - 02 - GoFresh!
 
Universitas Hasanuddin - Engineering Collections
Universitas Hasanuddin - Engineering CollectionsUniversitas Hasanuddin - Engineering Collections
Universitas Hasanuddin - Engineering Collections
 
Access SpringerProtocols in Universitas Muslim Indonesia
Access SpringerProtocols in Universitas Muslim IndonesiaAccess SpringerProtocols in Universitas Muslim Indonesia
Access SpringerProtocols in Universitas Muslim Indonesia
 
Singapore University of Technology and Design - November 2016 Highlights
Singapore University of Technology and Design - November 2016 HighlightsSingapore University of Technology and Design - November 2016 Highlights
Singapore University of Technology and Design - November 2016 Highlights
 
IEEE Xplore - What can i access
IEEE Xplore  -  What can i accessIEEE Xplore  -  What can i access
IEEE Xplore - What can i access
 
Dsg Portal – Instructor Manual Back View Panel
Dsg Portal – Instructor Manual   Back View PanelDsg Portal – Instructor Manual   Back View Panel
Dsg Portal – Instructor Manual Back View Panel
 
IEEE Xplore - You can now display local contact information on IEEE Xplore
IEEE Xplore - You can now display local contact information on IEEE XploreIEEE Xplore - You can now display local contact information on IEEE Xplore
IEEE Xplore - You can now display local contact information on IEEE Xplore
 
Bibliographic paradigm and the digital information resources
Bibliographic paradigm and the digital information resourcesBibliographic paradigm and the digital information resources
Bibliographic paradigm and the digital information resources
 
Social Media & Marketing Libraries
Social Media & Marketing LibrariesSocial Media & Marketing Libraries
Social Media & Marketing Libraries
 
DSG Webinar Session: Setting up our Search Alerts & Identifying suitable Conf...
DSG Webinar Session: Setting up our Search Alerts & Identifying suitable Conf...DSG Webinar Session: Setting up our Search Alerts & Identifying suitable Conf...
DSG Webinar Session: Setting up our Search Alerts & Identifying suitable Conf...
 
Getting to know IEEE Xplore: PhD students - May 2015
Getting to know IEEE Xplore:  PhD students - May 2015Getting to know IEEE Xplore:  PhD students - May 2015
Getting to know IEEE Xplore: PhD students - May 2015
 
Introduction series to Scholarly Communication (for Doctorate Support Group)
Introduction series to Scholarly Communication (for Doctorate Support Group)Introduction series to Scholarly Communication (for Doctorate Support Group)
Introduction series to Scholarly Communication (for Doctorate Support Group)
 
Altmetrics : The Societal Impact
Altmetrics : The Societal Impact Altmetrics : The Societal Impact
Altmetrics : The Societal Impact
 
Using Mendeley & IEEE Resources: Learn how to cite your research article from...
Using Mendeley & IEEE Resources: Learn how to cite your research article from...Using Mendeley & IEEE Resources: Learn how to cite your research article from...
Using Mendeley & IEEE Resources: Learn how to cite your research article from...
 
Swetswise Linker & Google Scholar
Swetswise Linker & Google ScholarSwetswise Linker & Google Scholar
Swetswise Linker & Google Scholar
 

Recently uploaded

Test Bank For Principles Of Cost Accounting, 17th Edition Edward J. Vander...
Test Bank For Principles Of Cost Accounting, 	  17th Edition Edward J. Vander...Test Bank For Principles Of Cost Accounting, 	  17th Edition Edward J. Vander...
Test Bank For Principles Of Cost Accounting, 17th Edition Edward J. Vander...
kevinkariuki227
 
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptxSTRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
ImranTabish1
 
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
dimplekumaridk322
 
10 Barriers to Effective Communications.
10 Barriers to Effective Communications.10 Barriers to Effective Communications.
10 Barriers to Effective Communications.
Cora335316
 
Virtual Production Tool Set and Technologies Redefining Cinema.pdf
Virtual Production Tool Set and Technologies Redefining Cinema.pdfVirtual Production Tool Set and Technologies Redefining Cinema.pdf
Virtual Production Tool Set and Technologies Redefining Cinema.pdf
virtualproduction38
 
TALENT ACQUISITION AND MANAGEMENT LECTURE 5
TALENT ACQUISITION AND MANAGEMENT LECTURE 5TALENT ACQUISITION AND MANAGEMENT LECTURE 5
TALENT ACQUISITION AND MANAGEMENT LECTURE 5
projectseasy
 
upGrad_Case_Study_by_Himanshu_Singh.pptx
upGrad_Case_Study_by_Himanshu_Singh.pptxupGrad_Case_Study_by_Himanshu_Singh.pptx
upGrad_Case_Study_by_Himanshu_Singh.pptx
himanshubclubofgsv
 
Data Analytics and AI Strategy Toolkit, Playbook and Templates
Data Analytics and AI Strategy Toolkit, Playbook and TemplatesData Analytics and AI Strategy Toolkit, Playbook and Templates
Data Analytics and AI Strategy Toolkit, Playbook and Templates
Aurelien Domont, MBA
 
Zodiac Signs and Fashion: Dressing to Suit Your Astrological Style
Zodiac Signs and Fashion: Dressing to Suit Your Astrological StyleZodiac Signs and Fashion: Dressing to Suit Your Astrological Style
Zodiac Signs and Fashion: Dressing to Suit Your Astrological Style
my Pandit
 
ShotOniPhone campaign by Vancy macwan.pptx
ShotOniPhone campaign by Vancy macwan.pptxShotOniPhone campaign by Vancy macwan.pptx
ShotOniPhone campaign by Vancy macwan.pptx
macwanvancy
 
Millionaire track government application
Millionaire track government applicationMillionaire track government application
Millionaire track government application
pragyasharma659549
 
You Get Me! Leveraging Communication Styles in Virtual Trainingpptx
You Get Me! Leveraging Communication Styles in Virtual TrainingpptxYou Get Me! Leveraging Communication Styles in Virtual Trainingpptx
You Get Me! Leveraging Communication Styles in Virtual Trainingpptx
Cynthia Clay
 
How to buy a fake Keiser University diploma
How to buy a fake Keiser University diplomaHow to buy a fake Keiser University diploma
How to buy a fake Keiser University diploma
College diploma
 
A Complete Guide of Dubai Freelance Visa and Permit in 2024
A Complete Guide of Dubai Freelance Visa and Permit in 2024A Complete Guide of Dubai Freelance Visa and Permit in 2024
A Complete Guide of Dubai Freelance Visa and Permit in 2024
Dubiz
 
Movers near me in Dubai , Best Packers and Movers In Dubai
Movers near me in Dubai , Best Packers and Movers In DubaiMovers near me in Dubai , Best Packers and Movers In Dubai
Movers near me in Dubai , Best Packers and Movers In Dubai
imranmalik114455
 
How Do Flange Adapters Work and Why Are They Essential?
How Do Flange Adapters Work and Why Are They Essential?How Do Flange Adapters Work and Why Are They Essential?
How Do Flange Adapters Work and Why Are They Essential?
Texas Flange
 
Girls Call Vashi 9910780858 Provide Best And Top Girl Service And No1 in City
Girls Call Vashi 9910780858 Provide Best And Top Girl Service And No1 in CityGirls Call Vashi 9910780858 Provide Best And Top Girl Service And No1 in City
Girls Call Vashi 9910780858 Provide Best And Top Girl Service And No1 in City
77sayre
 
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
Aggregage
 
Corporate Governance for South African Mining Companies
Corporate Governance for South African Mining CompaniesCorporate Governance for South African Mining Companies
Corporate Governance for South African Mining Companies
James AH Campbell
 
Top five predictions today, .
Top five predictions today,            .Top five predictions today,            .
Top five predictions today, .
Rupasingh82
 

Recently uploaded (20)

Test Bank For Principles Of Cost Accounting, 17th Edition Edward J. Vander...
Test Bank For Principles Of Cost Accounting, 	  17th Edition Edward J. Vander...Test Bank For Principles Of Cost Accounting, 	  17th Edition Edward J. Vander...
Test Bank For Principles Of Cost Accounting, 17th Edition Edward J. Vander...
 
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptxSTRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
STRATEGY TO OVERCOME CURRENT PROBLEMS AT MTC.pptx
 
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
High Profile Girls Call Bhubaneswar 🎈🔥000XX00000 🔥💋🎈 Provide Best And Top Gir...
 
10 Barriers to Effective Communications.
10 Barriers to Effective Communications.10 Barriers to Effective Communications.
10 Barriers to Effective Communications.
 
Virtual Production Tool Set and Technologies Redefining Cinema.pdf
Virtual Production Tool Set and Technologies Redefining Cinema.pdfVirtual Production Tool Set and Technologies Redefining Cinema.pdf
Virtual Production Tool Set and Technologies Redefining Cinema.pdf
 
TALENT ACQUISITION AND MANAGEMENT LECTURE 5
TALENT ACQUISITION AND MANAGEMENT LECTURE 5TALENT ACQUISITION AND MANAGEMENT LECTURE 5
TALENT ACQUISITION AND MANAGEMENT LECTURE 5
 
upGrad_Case_Study_by_Himanshu_Singh.pptx
upGrad_Case_Study_by_Himanshu_Singh.pptxupGrad_Case_Study_by_Himanshu_Singh.pptx
upGrad_Case_Study_by_Himanshu_Singh.pptx
 
Data Analytics and AI Strategy Toolkit, Playbook and Templates
Data Analytics and AI Strategy Toolkit, Playbook and TemplatesData Analytics and AI Strategy Toolkit, Playbook and Templates
Data Analytics and AI Strategy Toolkit, Playbook and Templates
 
Zodiac Signs and Fashion: Dressing to Suit Your Astrological Style
Zodiac Signs and Fashion: Dressing to Suit Your Astrological StyleZodiac Signs and Fashion: Dressing to Suit Your Astrological Style
Zodiac Signs and Fashion: Dressing to Suit Your Astrological Style
 
ShotOniPhone campaign by Vancy macwan.pptx
ShotOniPhone campaign by Vancy macwan.pptxShotOniPhone campaign by Vancy macwan.pptx
ShotOniPhone campaign by Vancy macwan.pptx
 
Millionaire track government application
Millionaire track government applicationMillionaire track government application
Millionaire track government application
 
You Get Me! Leveraging Communication Styles in Virtual Trainingpptx
You Get Me! Leveraging Communication Styles in Virtual TrainingpptxYou Get Me! Leveraging Communication Styles in Virtual Trainingpptx
You Get Me! Leveraging Communication Styles in Virtual Trainingpptx
 
How to buy a fake Keiser University diploma
How to buy a fake Keiser University diplomaHow to buy a fake Keiser University diploma
How to buy a fake Keiser University diploma
 
A Complete Guide of Dubai Freelance Visa and Permit in 2024
A Complete Guide of Dubai Freelance Visa and Permit in 2024A Complete Guide of Dubai Freelance Visa and Permit in 2024
A Complete Guide of Dubai Freelance Visa and Permit in 2024
 
Movers near me in Dubai , Best Packers and Movers In Dubai
Movers near me in Dubai , Best Packers and Movers In DubaiMovers near me in Dubai , Best Packers and Movers In Dubai
Movers near me in Dubai , Best Packers and Movers In Dubai
 
How Do Flange Adapters Work and Why Are They Essential?
How Do Flange Adapters Work and Why Are They Essential?How Do Flange Adapters Work and Why Are They Essential?
How Do Flange Adapters Work and Why Are They Essential?
 
Girls Call Vashi 9910780858 Provide Best And Top Girl Service And No1 in City
Girls Call Vashi 9910780858 Provide Best And Top Girl Service And No1 in CityGirls Call Vashi 9910780858 Provide Best And Top Girl Service And No1 in City
Girls Call Vashi 9910780858 Provide Best And Top Girl Service And No1 in City
 
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
Don’t Get Left Behind: Leveraging Modern Product Management Across the Organi...
 
Corporate Governance for South African Mining Companies
Corporate Governance for South African Mining CompaniesCorporate Governance for South African Mining Companies
Corporate Governance for South African Mining Companies
 
Top five predictions today, .
Top five predictions today,            .Top five predictions today,            .
Top five predictions today, .
 

Supply Chain Management

  • 3. What is a Supply Chain ? All activities associated with the flow and transformation of goods from raw materials to end users. The term supply chain refers to the entire network of companies that work together to design, produce, deliver, and service products. A network of facilities including: Material flow from suppliers and their “ upstream ” suppliers at all levels, Transformation of materials into semi-finished and finished products ( internal process ) Distribution of products to customers and their “ downstream ”customers at all levels .
  • 4. Components of the Supply Chain
  • 5. Example of SC 2 nd Tier Supplier Upstream Internal Downstream 2 nd Tier Supplier 2 nd Tier Supplier 1 st Tier Supplier 1 st Tier Supplier Assembly/ Manufacturing and Packaging Distribution Centers Retailers Customers Grain Producer Processing Facility Packaging Distributor Store Customers Corrugate Manufacturer Lumber Company Label Manufacturer Grain Cereal Packaged Cereal Labels Word Paperboard
  • 7. Three Flows in SC There are three kinds of flows in a supply chain: material , information , capital . Downstream Material: Products, Parts Information: Capacity, Delivery Schedules Finance: Invoices, Pricing, Credit Terms Upstream Material: Returns, Repairs, After-sales Services Information: Orders, Point-of-sale Data Finance: Payments
  • 8. Push vs. Pull in supply chains Push or Building-to-stock(BTS): Producing stock on the basis of anticipated demand. Demand forecasting can be done via a variety of sophisticated techniques (some from the Operations Research area and some using Data Mining). Pull or Building-to-order(BTO): Producing stock in response to actual demand (firm orders). The Push-Pull Point: In many supply chains, upstream units employ BTS, while downstream units employ BTO strategies. The point in the supply chain where the switch-over (from BTS to BTO) occurs is called the Push-Pull point. Optimally locating the Push-Pull point is a key determinant of supply chain performance. Examples ?
  • 9. The Push vs. Pull Model
  • 10. Major Concepts Order fulfillment Deliver right order on time Front office operations: order taking, advertisement, CRM Back office operations: Accounting, finance, inventor, packaging, logistics Logistics: Managing the flow of goods, information and money along the supply chain
  • 11. The Process of Order Fulfillment
  • 12. The Steps of Order Fulfillment 7. Purchasing, warehousing 8. Demand forecast 9. Accounting, billing 10. Customer contacts 11. Returns (Reverse logistics) 1. Payment Clearance 2. In-stock availability 3. Packaging, shipment 4. Insuring 5. Production (planning, execution) 6. Plant services
  • 13. Supply Chain Management (SCM) A set of processes and sub-processes which attempt to implement and optimize the functions, connected entities, and interacting elements of a supply chain. Involves: Organizations, procedures, people. Activities: Purchasing, delivery, packaging, checking, warehousing, etc. Establishment of long-term relationships with suppliers (supply alliances) and distributors Effective flow of information through the supply chain Supply chain optimization
  • 14. Key Business Areas Enterprise performance Customer service Order management Demand planning Warehouse distribution Partnerships Supplier/supply base management
  • 15. Benefits of SCM Reduce uncertainty along the chain Proper inventory levels in the chain Minimize delays Eliminate rush (unplanned) activities Provide good customer service
  • 16. Global Supply Chain Can be very long Possible cross-border problems Need information technology support for: communication and collaboration Possible delays due to: customs, tax, translations, politics
  • 17. Problems along the Supply Chain Delays in production, distribution etc. Expensive Inventories Lack of partners’ coordination Uncertainties in deliveries Poor demand forecast Interference with production Poor quality
  • 18. More Challenges Complexity of the supply chain network e.g. large numbers of suppliers and distributors Complexity in product structure and manufacturing process How much product differentiation/ customization/ localization should be supported ? Where do you customize a product (upstream or downstream) ? decentralized control/organizational "silos" increasing pressure for customer service and asset utilization
  • 19. Variability in the supply chain Demand variability Even the most sophisticated demand forecasting tools often fail to anticipate demand Examples of demand variability problems ? Process variability Production unit downtimes Unexpected staff absences Supply variability e.g., late deliveries from suppliers
  • 20. The Bullwhip Effect Slight changes in actual demand create problems Babies Distributors Proctor & Gamble 3M Retailers
  • 21. Common Causes of the Bullwhip Effect Demand forecast mismatches Demand forecasting distributed across units in the supply chain Order Batching Sometimes helps achieve economies of scale Price Fluctuations “ forward buy” inducements through lower prices Others: partners build “just in case” inventories lack of trust among partners cannot order material from suppliers
  • 22. Product design The product has been designed so that localization (or customization or differentiation) can occur as close as possible to the local market. The product is built for a specific market before it is shipped out of the factory Upstream differentiation Downstream differentiation Example: The Hewlett-Packard Deskjet Printer. How might you localize ?
  • 23. Technology in the SC The internet and the web can be very effective communication enhancers Software includes demand forecasting tools and planning tools to allow all SC members to coordinate their activities and adjust their production levels. Software can allow members to: review past performance monitor current performance predict future production levels of products .
  • 24. Web SCM Share information about consumer demand Receive rapid notification of product design changes and adjustments Provides specs and drawings more efficiently. Increase speed of processing transactions. Reduce cost of handling transactions. Reduce errors in entering transaction data Share information about defect rates and types.
  • 25. Example 1: Cisco Making use of the internet in its own supply chain. Products are manufactured by contract manufacturers (CM) Integrated well with both its CM’s and its component suppliers. Communicates a single forecast through both levels of suppliers, reducing the bullwhip effect. Display their product and component requirements to their entire chain.
  • 26. Example 1: Benefits for Cisco Eliminated paper purchase orders and invoices Communicate engineering change orders electronically to all partners 90% of sales are made over the internet US$875 million annual internet savings (more than 50% due to SC initiatives) Lead times reduced 75% Low manufacturing manpower requirements despite rapid growth Cost reductions of 20%-28% every year.
  • 27. Example 2: Dell Create “Virtual integration” : the entire supply chain acts like a single integrated company. Upstream partners: contract manufacturers (CM) and component suppliers Downstream partners/customers (most are business corporations) Share information with suppliers on inventory levels. Maintain long-term relationships with key suppliers for design collaboration.
  • 28. Example 2: Benefits for Dell Dell and Suppliers work together as a “Virtual Enterprise” BTO benefits (low inventory) Dynamic pricing: change prices rapidly in response to demand and availability Strong links to corporate customers
  • 29. Example 3: Covisint B2B Supply Chain Benefits Automated procurement lower procurement costs lower inventories Collaboration: complete visibility less bullwhip Efficient market More profits Sell unused capacity
  • 30. Supply chain integration: Benefits Tangible benefits Inventory reduction, personnel reduction, productivity improvement, order management improvement, financial cycle improvements. Intangible benefits Information visibility, new / improved processes, customer responsiveness, standardization, flexibility, globalization, and business performance.
  • 31. Evolution of Software Integration Completely Independent of each other MRP = Material Requirements Planning: Inventory, production MRPII =Manufacturing Requirements Planning more integrated, MRP+Finance+labor ERP =Enterprise Resources Planning All functional areas Extended ERP =Include suppliers, customers
  • 32. MRP Core Concepts Key questions: How much of an item is needed to meet demand? When? What parts and components are required? When? When to order parts and components? Dependent demand production (or procurement) of parts and materials is directly linked to demand for the final product. Time-phased scheduling parts and components must be ordered in advance to accommodate lead times between order placement and receipt.
  • 33. Enterprise Resource Planning (ERP) ERP = Integrating business processes and activities in real time Solves many supply chain problems Necessary for medium to large corporations May be useful for SMEs too Need to interface with EC order taking system Manages all routine transactions in the Enterprise
  • 34. Post ERP (2nd Generation) 1st generation - transaction processing orientation 2nd generation including decision making capabilities EC requires decision support EC requires business intelligence SCM software: Production Planning, Manpower utilization, Profitability models, market analysis. Integration of SCM capabilities Other added functionalities: CRM, KM
  • 35. ASP Leasing information systems application Back to the days of “time sharing” A risk prevention strategy Very popular with ERP (expensive, cumbersome)
  • 36. Supply chain optimization Business objective: improve supply chain efficiency (velocity ?), optimize operation of the supply chain Metrics for efficiency - what do we optimize ? Define the problem in terms of decision variables Define an objective function in terms of the decision variables. The goal would be to maximize or minimize the value of this function, i.e., to find an allocation of values to the decision variables such that the value of this function is either maximized or minimized. Supply chain optimization is the continuous process of seeking optimal allocations of values to decision variables
  • 37. Common optimization problems: I Long-term planning (time-frame: several months/years): Questions: How much of each product type should I manufacture ? When ? Where ? (Assumes a network of manufacturing centers with potential duplication of manufacturing capability) How much should I keep in inventory (both for manufacturing inputs and outputs) ? Where ? (Assumes a distributed network of warehouses) Constraints: Capacity constraints (both manufacturing and inventory) Demand profile Process constraints (downtimes, planned outages) Supply variability Objectives: Profit/revenue maximization, maximizing asset utilization, minimization of deviation from demand profile, minimization of deviation from target inventory profile
  • 38. Common optimization problems: II Medium-term planning/scheduling (time-frame: a few months/weeks) : Similar to long-term planning, but with scheduling constraints and objectives added Unit scheduling/reactive scheduling: Questions: In what sequence should orders/jobs be manufactured ? Which job should I process on a given production unit at a given point in time ? Should I go into overtime ? Constraints: Capacity constraints Sequencing constraints Orders + deadlines Process constraints (downtimes etc.) Objectives: Minimize makespan (i.e., maximize asset utilization), minimize deviation from order deadlines, maximize profit/revenue
  • 39. Common optimization problems: III Shipping: How do I allocate orders to trucks ? What routes should trucks travel on ? How do I allocate truck to routes ?
  • 40. Major classes of optimization techniques: From the field of operations research (OR) Linear programming Integer programming…. From the field of artificial intelligence (AI) Constraint programming Heuristic search techniques
  • 41. Supply Chain Mgt. Software Includes demand forecasting tools and planning capabilities to allow all supply chain members to coordinate their activities and adjust their production levels Firms offering SCM software: i2 Technologies RHYTHM Manugistics
  • 42. Purchasing, Logistics & Support Software Enterprise Resource Planning (ERP) software is designed to integrate manufacturing, finance, distribution, and other internal business functions into one information system Major ERP vendors include - Baan J.D. Edwards Oracle PeopleSoft SAP
  • 43. B2B E-Commerce Software Designed to help companies build Web sites that host: Catalog Marketplace and other commercial sales activities Major software packages include: Netscape - SellerXpert & ECXpert, OpenMarket Transact, IBM’s Websphere. MS Site Server, and Ariba