Muhammad Ali
1/19/2015
Pakistan Underground Subway
Proposal
TRANSMITTAL LETTER
The Transport Ministry,
CIIT Lahore.
Jan 10th, 2015
Muhammad Ali
Dear Sir,
I submit my proposal “Pakistan Underground Subway” which would be helpful for
every generation of the societies and mainly for the students who want to accomplish
good grades and want to proceed further in their studies, for abroad and want to
make their own identification. In this project the ideas and the progression is that the
system will support and value in our country. The design and the procedures shows
how it should be obliging.
I will be thankful if my mentors and superintendents will further process this proposal,
it will be an absolute privilege for me.
Muhammad Ali DDP-SP14-BEC-015
Contents
TRANSMITTAL LETTER ..........................................................................................................1
ABSTRACT ...............................................................................................................................3
STATEMENT OF THE PROBLEM ...........................................................................................4
NEED OF THE STUDY..............................................................................................................5
SIGNIFICANCE OF THE STUDY.............................................................................................5
RESEARCH QUESTIONS ........................................................................................................6
INTRODUCTION........................................................................................................................6
CUT AND COVER METHOD....................................................................................................7
DEEP BORE METHOD.............................................................................................................7
DISCUSSION.............................................................................................................................9
INFRASTRUCTURE..................................................................................................................9
DESIGN.................................................................................................................................... 11
CONCLUSION......................................................................................................................... 13
RECOMMENDATION.............................................................................................................. 13
REFERENCES......................................................................................................................... 14
Abstract
The underground subway is an engineering marvel carrying millions of people
daylight and nightlight. The first forever underground train was constructed in London
in 1863. But in 1890, the electrified underground line made London underground the
world’s first ever metro system. With its success to its nation its shows that how we
can bring out the finest mass transit system in our county. Therefore, my proposal
explains the procedures to be considered, in what manner government should
implement it, what kind of services and security should be provided. Furthermore, it
briefs the pros and cons of the underground subway system in Pakistan.
The International Association of
Public Transport (IAPT) outlines
metro as ‘‘inner-city passenger
transport system’’, operated on
their own right of way and
segregated from general road and
pedestrian traffic. The term Heavy
rail is fundamentally identical with the term "metro". But heavy rail system is
specifically defined as an "electric railway".
The separating line between metro and other means of public transport, such as light
rail and commuter rail is by their separation from other traffic. Light rail (tram) share
roads, streets, boulevards, paths or lanes while a metro offers no access for
pedestrians and traffic.
Figure 1 Underground Subw ay Construction 1863
Statement of the Problem
The capacity of the existing transport is being awkward, rude, blundering due to the
increase in the public transport use and urban densification. With the increase in
population the peoples of Pakistan are facing variety of problems and travelling is the
one of them. Moreover, peoples while travelling faces traffic jams which are caused
by the unusual lane violation, accidents, vehicle breakdown, long train at rail
crossing, checkpoints, tollbooth, divergence etc. therefore, in order to increase the
consistency, volume, reliability of public transport network or to increase its growth
could be possible only by introducing mass transit system or metro style service, that
should be inexpensive and directly facilitated by subsidies from the government.
Figure 3 Metro (Present) Figure 2 Light Rail or Tram
Figure 5 Failure of Public Transport
Figure 4 Traffic blocked because of side construction
Need of the Study
The need of the study is that the underground subway or metro would play a vital
role in the economy and it is a great way to travel in cities, agglomerations, and
metropolitan areas providing the facility to transport large amount of peoples at a
high frequency. Moreover, it is the most frequent way of travelling that eradicates the
chaos of the traffic jams, accidents, V.I.P protocols, and certain types of strikes, high
prices of petrol or CNG. Therefore, with is growth it helps peoples of all classes to
travel long distances in a very short time and in a very small expenditures. Due to its
better design and infrastructure which are chatted with architectures and engineers
will provides the safety of the passengers.
Significance of the Study
Growth in exchanges
Increase in tourist interests
Communication in communities
Time saving
Decrease in accidents ratio
Increase in the economy
Research Questions
The questionnaires in this research are the core riggings. The questions asked in
different dimensions like
What are the different methods of the construction?
Will the ‘deep bore’ method would be benefit in cities?
‘Cut and cover’ method would be used?
Introduction
The metro system is a rapid transit system. The word metro is also referred as
subways or U-Bahns. U-Bahns is the name of the underground metro system in
Berlin capital of Germany which is having a track length of about 151.7 km and
serving stations about 173. Moreover, there are 168 metro systems in just 55
countries of the world.
Country City Name Year Opened Track Length Stations
Canada Toronto Toronto Rapid
Transit
1954 63.8 km 69
Argentina Buenos Aires Buenos Aires
Covert
1913 51.6 km 83
Germany Berlin U-Bahns 1902 151.7 km 173
India Delhi Delhi Metro 2002 190.0 km 137
Japan Tokyo Tokyo Metro 1927 195.1 km 179
Table 1 Constructed Underground Subways
As we go deeper we discover that the tube system has helped many countries and is
playing a vital role not in London, not in China, not in India but also in various parts
around the globe.
Therefore, the purpose of this proposal is to bring out the best mass transport
system that should be inexpensive but also directly facilitated by subsidies from the
government. It is convenient as you will not left deserted in the CNG strikes. One of
the main reason for it is that it would be safe and will provide better quality travel in
less time but could have rush hours but no traffic jams which will bring the pollution
assorted.
Cut and Cover Method
In "cut and cover" tunnelling, the roadway of the street is removed, a hole for the
subway and stations is dug, and then the street is restored. The "cut and cover"
method is much cheaper than "deep bore" but the alignment is restricted to the street
grid. "Cut and cover" also results in the stations that are much closer to the surface
as little as twenty feet below the surface, which significantly reduces passenger
access time. On the other hand, "cut and cover" results in serious disruption to traffic
along the street for a significant amount of time. This disruption usually results in
negative effects to especially store landlords along the passageway.
Deep Bore Method
In "deep bore" tunnelling, boring machines are inserted into a hole dug at a
convenient spot along the proposed line, and then proceed through the earth, little by
little, up to eighty feet per day until they have fixed out space along the entire
corridor. These boring machines are huge. The world’s largest is fifty feet in
diameter. Boring machines generally can dig only in one fixed shape, which is
generally circular. "Deep bore" construction costs significantly more than "cut and
cover" and the underground stations alone can cost $150 million. Because of the
large number of variables that make up the cost of subway construction, it is
extremely difficult to quantify the cost differential between the two methods. The
second is access is the passenger access to "deep bore" stations, significantly more
difficult than "cut and cover" stations, making the subway much less useful for
relatively short trips.
Country Location Name Start of
Construction
Planned of
Opening
Qatar Doha Doha
Metro
2013 2019
Iran Qom Qom Metro 2010 2015
Saudi
Arabia
Riyadh Riyadh
Metro
2014 2019
India Chennai Chennai
Metro
2010 2015
Table 2 Projects under Construction
Discussion
The underground subway or metro is expected to provide the shape to future
transport network. Therefore, it is important to under know the infrastructure of the
underground subway or metro system in Pakistan.
Infrastructure
Most metro systems are electrical compound units with lengths from three to over
ten cars. Power is commonly delivered by a third rail or by overhead wires. Most run
on conventional steel railway tracks, although some use rubber tires. Rubber tires
allow sharper inclines and a softer ride, but have higher maintenance expenses and
are less energy efficient. They also lose traction when weather conditions are wet or
ice-cold. Moreover, the infrastructure of the underground tube in Pakistan would be
planned in such a way that the monitoring system must be tailor made to suit
applications and critical parameters such as “Rate of movement, extent of influence
and need of accuracy”. Fibre optics strain measurements and sensors will be used
because it is unresponsive to electromagnetic interference, durable and chemically
inert, low transmission loss, distributed sensing and Low cost.
The above figure will show the method of how the fibre strain measurement would be
calculated and what procedure will be followed and why what and how the fibre
sensor will be used.
 Range (5-10 km)
 Resolution 30 µε (0.003%)
Figure 6 Fibre Strain Measurements
System
The subway system will work in such a way that it will be a zone fare System which
will be planned by its charges. People will use contactless smart card or oyster which
will be embedded with RFID chip, which would be loaded while travelling. Peoples
will touch in before the start of the journey and at the end of the ride. However, the
underground will be patrolled or guarded by both the uniformed and ticket inspector
with hand-held card readers to check passengers, who are travelling with a valid
ticket and those who are travelling with invalid ticket would be fined. The public will
have rights to access to all the information on the subway by visiting the websites,
information reception before travelling which would tell them about the delays,
postpones, interruptions etc.
Figure 8 Smart Card And Oyster
Design
The underground tubes are designed in such a way that it focuses on the safety and
on the sensor deployed in such a way that it could be easy for a communication in
distance, no delays, no postpones, no interruption, and no other criteria.
The following shows the design we focus on sensor deployed for underground
tunnels:
Figure 9 Sensors
Figure 10 Cables and System
The figure here emphases on the cables and the system. This picture shows the final
application of the system.
Figure 11 Final Application
Conclusion
The tube’s greatest strengths are its efficiency and simplicity of navigation. It is used
and preferred for both sensitive and coherent reasons. Therefore, the conclusion is
that as the Subway system is necessary in Pakistan, it is also important that with the
good planning, understanding the strategy and keeping our population in mind we
have to see how it is benefiting the budget, economy of our country.
Recommendation
As per the rules and regulation must be followed it is important for our people to
obey the laws for mass transit system. If the laws are not followed not only it will
create problem but also will affect the economy. With the security cameras are more
I would recommend that a penalty should be charge to those who break rules. It
would then make more people understand with this much population it is significant
that procedures should be followed. My recommendation to the government is that
focusing on this will not just attract more tourist but will also increase its standard.
References
 “Travel-cards make way for oyster ”.BBC News. 30 June 2003. Retrieved 7
March 2012.
 "Where can I buy my ticket?" Transport for London. January 2012. Retrieved 18
June 2014.
 Murray, Dick (23 August 2002).Tube”. London Evening Standard. Retrieved 31
March 2013.
 "Northern line extension". Transport for London. 2013. Archived from the
original on 3 December 2013.
 Smith, Stephen J. (6 January 2014). "New Starts: Shanghai Metro World’s
Longest, Panama Canal Drama, Japan’s Maglev". Next City. Retrieved 2014-09-
21
 Rapid Transit". Encyclopaedia. Retrieved 2014-11-28.

More Related Content

What's hot

Rigid pavement
Rigid pavementRigid pavement
Rigid pavementpjainrahul
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTSatyam Anand
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavementpradip dangar
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studiesAnkit Patel
 
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.Sayed Sajid H.Zidani
 
building material Minor project for final year .
building material Minor project for final year .building material Minor project for final year .
building material Minor project for final year .Sachin gupta
 
Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1GARRE RAVI KUMAR
 
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION Ved Jangid
 
Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Ankit Singh
 
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTssuser5fea8f
 
Dowel bars, tie bars and their design
Dowel bars, tie bars and their designDowel bars, tie bars and their design
Dowel bars, tie bars and their designBhavya Jaiswal
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentationPawan Kumar
 
Analysis and design of pre engineered building using is 800:2007 and Internat...
Analysis and design of pre engineered building using is 800:2007 and Internat...Analysis and design of pre engineered building using is 800:2007 and Internat...
Analysis and design of pre engineered building using is 800:2007 and Internat...Pratik R. Atwal
 

What's hot (20)

Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studies
 
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
SPECIFIC GRAVITY TEST ON BITUMINOUS MATERIALS.
 
building material Minor project for final year .
building material Minor project for final year .building material Minor project for final year .
building material Minor project for final year .
 
Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1
 
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
 
Sight distance
Sight distanceSight distance
Sight distance
 
Flyover bridge
Flyover bridgeFlyover bridge
Flyover bridge
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)
 
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
 
Dowel bars, tie bars and their design
Dowel bars, tie bars and their designDowel bars, tie bars and their design
Dowel bars, tie bars and their design
 
PAVEMENT DESIGN
PAVEMENT DESIGNPAVEMENT DESIGN
PAVEMENT DESIGN
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentation
 
Analysis and design of pre engineered building using is 800:2007 and Internat...
Analysis and design of pre engineered building using is 800:2007 and Internat...Analysis and design of pre engineered building using is 800:2007 and Internat...
Analysis and design of pre engineered building using is 800:2007 and Internat...
 
Chapter 3 junction design
Chapter 3 junction designChapter 3 junction design
Chapter 3 junction design
 
Design of footing as per IS 456-2000
Design of footing as per IS 456-2000Design of footing as per IS 456-2000
Design of footing as per IS 456-2000
 
Unit 1
Unit 1Unit 1
Unit 1
 

Viewers also liked

Islamabad Bus Rapid Transit
Islamabad Bus Rapid TransitIslamabad Bus Rapid Transit
Islamabad Bus Rapid Transityasarfayyaz
 
Cooperative Development Authority
Cooperative Development AuthorityCooperative Development Authority
Cooperative Development AuthorityAJ Briones
 
Highlights of the new BRT Planning Guide
Highlights of the new BRT Planning GuideHighlights of the new BRT Planning Guide
Highlights of the new BRT Planning GuideBRTCoE
 
Personal Rapid Transit System
Personal Rapid Transit SystemPersonal Rapid Transit System
Personal Rapid Transit SystemHimanshu Singh
 
Rail rapid transit system (india)
Rail rapid transit system (india)Rail rapid transit system (india)
Rail rapid transit system (india)Sourabh Jain
 
Built operate transfer case studies in local construction Sector in Pakistan
Built operate transfer case studies in local construction Sector in PakistanBuilt operate transfer case studies in local construction Sector in Pakistan
Built operate transfer case studies in local construction Sector in PakistanMeesum Zaidi
 
Bus Rapid Transit System
Bus Rapid Transit SystemBus Rapid Transit System
Bus Rapid Transit SystemVishal Dedhia
 
Lectures for Basic Seminar on Cooperative Development
Lectures for Basic Seminar on Cooperative DevelopmentLectures for Basic Seminar on Cooperative Development
Lectures for Basic Seminar on Cooperative DevelopmentGaphor Panimbang
 
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Apparao Gandi
 
World Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for BangaloreWorld Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for BangaloreKiran Shaw
 

Viewers also liked (12)

Islamabad Bus Rapid Transit
Islamabad Bus Rapid TransitIslamabad Bus Rapid Transit
Islamabad Bus Rapid Transit
 
Cooperative Development Authority
Cooperative Development AuthorityCooperative Development Authority
Cooperative Development Authority
 
Highlights of the new BRT Planning Guide
Highlights of the new BRT Planning GuideHighlights of the new BRT Planning Guide
Highlights of the new BRT Planning Guide
 
Personal Rapid Transit System
Personal Rapid Transit SystemPersonal Rapid Transit System
Personal Rapid Transit System
 
Rail rapid transit system (india)
Rail rapid transit system (india)Rail rapid transit system (india)
Rail rapid transit system (india)
 
Built operate transfer case studies in local construction Sector in Pakistan
Built operate transfer case studies in local construction Sector in PakistanBuilt operate transfer case studies in local construction Sector in Pakistan
Built operate transfer case studies in local construction Sector in Pakistan
 
Bus Rapid Transit System
Bus Rapid Transit SystemBus Rapid Transit System
Bus Rapid Transit System
 
Rapid transit system
Rapid transit systemRapid transit system
Rapid transit system
 
Lectures for Basic Seminar on Cooperative Development
Lectures for Basic Seminar on Cooperative DevelopmentLectures for Basic Seminar on Cooperative Development
Lectures for Basic Seminar on Cooperative Development
 
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
 
World Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for BangaloreWorld Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for Bangalore
 
BRTS
BRTSBRTS
BRTS
 

Similar to Pakistan's Underground Subway Proposal

Transit-oriented development (TOD): Integrating rail and commercial developme...
Transit-oriented development (TOD): Integrating rail and commercial developme...Transit-oriented development (TOD): Integrating rail and commercial developme...
Transit-oriented development (TOD): Integrating rail and commercial developme...Atkins
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro raillibin paul
 
MRT REPORT TPT 250
MRT REPORT TPT 250MRT REPORT TPT 250
MRT REPORT TPT 250Shadina Shah
 
Running head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docx
Running head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docxRunning head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docx
Running head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docxcowinhelen
 
What is the cut and cover tunnelling method for the underground metro project?
What is the cut and cover tunnelling method for the underground metro project?What is the cut and cover tunnelling method for the underground metro project?
What is the cut and cover tunnelling method for the underground metro project?Joyville Shapoorji Housing Pvt. Ltd
 
Secondary 2 : Geography : Chapter 4 : Transport Summary Notes
Secondary 2 : Geography : Chapter 4 : Transport Summary NotesSecondary 2 : Geography : Chapter 4 : Transport Summary Notes
Secondary 2 : Geography : Chapter 4 : Transport Summary Notespaglinton
 
Possibilities For Bus Lane System
Possibilities For Bus Lane SystemPossibilities For Bus Lane System
Possibilities For Bus Lane SystemNaveen Chandra
 
project ppt.pptx
project ppt.pptxproject ppt.pptx
project ppt.pptxAswin132028
 
Tod mpd-road map-08nov09
Tod mpd-road map-08nov09Tod mpd-road map-08nov09
Tod mpd-road map-08nov09Paromita Roy
 
Possibilities for Bus Lane System
Possibilities for Bus Lane SystemPossibilities for Bus Lane System
Possibilities for Bus Lane Systemguestf2886b
 
IRJET- Appraisal and Design of Foot Over Bridge
IRJET- Appraisal and Design of Foot Over BridgeIRJET- Appraisal and Design of Foot Over Bridge
IRJET- Appraisal and Design of Foot Over BridgeIRJET Journal
 
Mass transit system
Mass transit systemMass transit system
Mass transit systemAsjad Khuram
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081Anush verma
 
Theme 6 BRT vs. LRT moving beyond emotional bias
Theme 6 BRT vs. LRT moving beyond emotional biasTheme 6 BRT vs. LRT moving beyond emotional bias
Theme 6 BRT vs. LRT moving beyond emotional biasBRTCoE
 
What is the cut and cover tunnelling method for the underground metro project?
What is the cut and cover tunnelling method for the underground metro project?What is the cut and cover tunnelling method for the underground metro project?
What is the cut and cover tunnelling method for the underground metro project?Joyville Shapoorji Housing Pvt. Ltd
 
Public Transport For Smart Cities
Public Transport For Smart CitiesPublic Transport For Smart Cities
Public Transport For Smart CitiesIPPAI
 

Similar to Pakistan's Underground Subway Proposal (20)

Transit-oriented development (TOD): Integrating rail and commercial developme...
Transit-oriented development (TOD): Integrating rail and commercial developme...Transit-oriented development (TOD): Integrating rail and commercial developme...
Transit-oriented development (TOD): Integrating rail and commercial developme...
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
MRT REPORT TPT 250
MRT REPORT TPT 250MRT REPORT TPT 250
MRT REPORT TPT 250
 
Bus Rapid Transit (BRT)
Bus Rapid Transit (BRT)Bus Rapid Transit (BRT)
Bus Rapid Transit (BRT)
 
Running head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docx
Running head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docxRunning head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docx
Running head LIGHT RAIL TRANSPORTATION LIGHT RAIL TRANSPO.docx
 
What is the cut and cover tunnelling method for the underground metro project?
What is the cut and cover tunnelling method for the underground metro project?What is the cut and cover tunnelling method for the underground metro project?
What is the cut and cover tunnelling method for the underground metro project?
 
Secondary 2 : Geography : Chapter 4 : Transport Summary Notes
Secondary 2 : Geography : Chapter 4 : Transport Summary NotesSecondary 2 : Geography : Chapter 4 : Transport Summary Notes
Secondary 2 : Geography : Chapter 4 : Transport Summary Notes
 
Possibilities For Bus Lane System
Possibilities For Bus Lane SystemPossibilities For Bus Lane System
Possibilities For Bus Lane System
 
project ppt.pptx
project ppt.pptxproject ppt.pptx
project ppt.pptx
 
Tod mpd-road map-08nov09
Tod mpd-road map-08nov09Tod mpd-road map-08nov09
Tod mpd-road map-08nov09
 
Possibilities for Bus Lane System
Possibilities for Bus Lane SystemPossibilities for Bus Lane System
Possibilities for Bus Lane System
 
IRJET- Appraisal and Design of Foot Over Bridge
IRJET- Appraisal and Design of Foot Over BridgeIRJET- Appraisal and Design of Foot Over Bridge
IRJET- Appraisal and Design of Foot Over Bridge
 
Public Transportation
Public TransportationPublic Transportation
Public Transportation
 
Mass transit system
Mass transit systemMass transit system
Mass transit system
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
 
Theme 6 BRT vs. LRT moving beyond emotional bias
Theme 6 BRT vs. LRT moving beyond emotional biasTheme 6 BRT vs. LRT moving beyond emotional bias
Theme 6 BRT vs. LRT moving beyond emotional bias
 
What is the cut and cover tunnelling method for the underground metro project?
What is the cut and cover tunnelling method for the underground metro project?What is the cut and cover tunnelling method for the underground metro project?
What is the cut and cover tunnelling method for the underground metro project?
 
TramsLightRailMelbourne
TramsLightRailMelbourneTramsLightRailMelbourne
TramsLightRailMelbourne
 
final report
final reportfinal report
final report
 
Public Transport For Smart Cities
Public Transport For Smart CitiesPublic Transport For Smart Cities
Public Transport For Smart Cities
 

More from knowledge1995

More from knowledge1995 (20)

Communicating At Workplace
Communicating At WorkplaceCommunicating At Workplace
Communicating At Workplace
 
Basic Flow Chart
Basic Flow ChartBasic Flow Chart
Basic Flow Chart
 
Glass Manufacturing
Glass Manufacturing Glass Manufacturing
Glass Manufacturing
 
Hardness ppt
Hardness pptHardness ppt
Hardness ppt
 
Fabrication of metals
Fabrication of metalsFabrication of metals
Fabrication of metals
 
Evaporators
EvaporatorsEvaporators
Evaporators
 
Newtons law of viscosity
Newtons law of viscosityNewtons law of viscosity
Newtons law of viscosity
 
Renewable energy
Renewable energyRenewable energy
Renewable energy
 
Fire Triange
Fire TriangeFire Triange
Fire Triange
 
coke and metallurgical coal
coke and metallurgical coalcoke and metallurgical coal
coke and metallurgical coal
 
Animals that are chemical engineers
Animals that are chemical engineersAnimals that are chemical engineers
Animals that are chemical engineers
 
Job interview
Job interviewJob interview
Job interview
 
Letter to editor
Letter to editorLetter to editor
Letter to editor
 
High shear mill
High shear millHigh shear mill
High shear mill
 
Agitaion and mixing
Agitaion and mixingAgitaion and mixing
Agitaion and mixing
 
Sui gas
Sui gasSui gas
Sui gas
 
Principles of effective communication
Principles of effective communicationPrinciples of effective communication
Principles of effective communication
 
sample of critique
sample of critiquesample of critique
sample of critique
 
Types of communication
Types of communicationTypes of communication
Types of communication
 
how to write a paragraph
how to write a paragraphhow to write a paragraph
how to write a paragraph
 

Recently uploaded

Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 

Recently uploaded (20)

Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 

Pakistan's Underground Subway Proposal

  • 2. TRANSMITTAL LETTER The Transport Ministry, CIIT Lahore. Jan 10th, 2015 Muhammad Ali Dear Sir, I submit my proposal “Pakistan Underground Subway” which would be helpful for every generation of the societies and mainly for the students who want to accomplish good grades and want to proceed further in their studies, for abroad and want to make their own identification. In this project the ideas and the progression is that the system will support and value in our country. The design and the procedures shows how it should be obliging. I will be thankful if my mentors and superintendents will further process this proposal, it will be an absolute privilege for me. Muhammad Ali DDP-SP14-BEC-015
  • 3. Contents TRANSMITTAL LETTER ..........................................................................................................1 ABSTRACT ...............................................................................................................................3 STATEMENT OF THE PROBLEM ...........................................................................................4 NEED OF THE STUDY..............................................................................................................5 SIGNIFICANCE OF THE STUDY.............................................................................................5 RESEARCH QUESTIONS ........................................................................................................6 INTRODUCTION........................................................................................................................6 CUT AND COVER METHOD....................................................................................................7 DEEP BORE METHOD.............................................................................................................7 DISCUSSION.............................................................................................................................9 INFRASTRUCTURE..................................................................................................................9 DESIGN.................................................................................................................................... 11 CONCLUSION......................................................................................................................... 13 RECOMMENDATION.............................................................................................................. 13 REFERENCES......................................................................................................................... 14
  • 4. Abstract The underground subway is an engineering marvel carrying millions of people daylight and nightlight. The first forever underground train was constructed in London in 1863. But in 1890, the electrified underground line made London underground the world’s first ever metro system. With its success to its nation its shows that how we can bring out the finest mass transit system in our county. Therefore, my proposal explains the procedures to be considered, in what manner government should implement it, what kind of services and security should be provided. Furthermore, it briefs the pros and cons of the underground subway system in Pakistan. The International Association of Public Transport (IAPT) outlines metro as ‘‘inner-city passenger transport system’’, operated on their own right of way and segregated from general road and pedestrian traffic. The term Heavy rail is fundamentally identical with the term "metro". But heavy rail system is specifically defined as an "electric railway". The separating line between metro and other means of public transport, such as light rail and commuter rail is by their separation from other traffic. Light rail (tram) share roads, streets, boulevards, paths or lanes while a metro offers no access for pedestrians and traffic. Figure 1 Underground Subw ay Construction 1863
  • 5. Statement of the Problem The capacity of the existing transport is being awkward, rude, blundering due to the increase in the public transport use and urban densification. With the increase in population the peoples of Pakistan are facing variety of problems and travelling is the one of them. Moreover, peoples while travelling faces traffic jams which are caused by the unusual lane violation, accidents, vehicle breakdown, long train at rail crossing, checkpoints, tollbooth, divergence etc. therefore, in order to increase the consistency, volume, reliability of public transport network or to increase its growth could be possible only by introducing mass transit system or metro style service, that should be inexpensive and directly facilitated by subsidies from the government. Figure 3 Metro (Present) Figure 2 Light Rail or Tram Figure 5 Failure of Public Transport Figure 4 Traffic blocked because of side construction
  • 6. Need of the Study The need of the study is that the underground subway or metro would play a vital role in the economy and it is a great way to travel in cities, agglomerations, and metropolitan areas providing the facility to transport large amount of peoples at a high frequency. Moreover, it is the most frequent way of travelling that eradicates the chaos of the traffic jams, accidents, V.I.P protocols, and certain types of strikes, high prices of petrol or CNG. Therefore, with is growth it helps peoples of all classes to travel long distances in a very short time and in a very small expenditures. Due to its better design and infrastructure which are chatted with architectures and engineers will provides the safety of the passengers. Significance of the Study Growth in exchanges Increase in tourist interests Communication in communities Time saving Decrease in accidents ratio Increase in the economy
  • 7. Research Questions The questionnaires in this research are the core riggings. The questions asked in different dimensions like What are the different methods of the construction? Will the ‘deep bore’ method would be benefit in cities? ‘Cut and cover’ method would be used? Introduction The metro system is a rapid transit system. The word metro is also referred as subways or U-Bahns. U-Bahns is the name of the underground metro system in Berlin capital of Germany which is having a track length of about 151.7 km and serving stations about 173. Moreover, there are 168 metro systems in just 55 countries of the world. Country City Name Year Opened Track Length Stations Canada Toronto Toronto Rapid Transit 1954 63.8 km 69 Argentina Buenos Aires Buenos Aires Covert 1913 51.6 km 83 Germany Berlin U-Bahns 1902 151.7 km 173 India Delhi Delhi Metro 2002 190.0 km 137 Japan Tokyo Tokyo Metro 1927 195.1 km 179 Table 1 Constructed Underground Subways
  • 8. As we go deeper we discover that the tube system has helped many countries and is playing a vital role not in London, not in China, not in India but also in various parts around the globe. Therefore, the purpose of this proposal is to bring out the best mass transport system that should be inexpensive but also directly facilitated by subsidies from the government. It is convenient as you will not left deserted in the CNG strikes. One of the main reason for it is that it would be safe and will provide better quality travel in less time but could have rush hours but no traffic jams which will bring the pollution assorted. Cut and Cover Method In "cut and cover" tunnelling, the roadway of the street is removed, a hole for the subway and stations is dug, and then the street is restored. The "cut and cover" method is much cheaper than "deep bore" but the alignment is restricted to the street grid. "Cut and cover" also results in the stations that are much closer to the surface as little as twenty feet below the surface, which significantly reduces passenger access time. On the other hand, "cut and cover" results in serious disruption to traffic along the street for a significant amount of time. This disruption usually results in negative effects to especially store landlords along the passageway. Deep Bore Method In "deep bore" tunnelling, boring machines are inserted into a hole dug at a convenient spot along the proposed line, and then proceed through the earth, little by little, up to eighty feet per day until they have fixed out space along the entire corridor. These boring machines are huge. The world’s largest is fifty feet in
  • 9. diameter. Boring machines generally can dig only in one fixed shape, which is generally circular. "Deep bore" construction costs significantly more than "cut and cover" and the underground stations alone can cost $150 million. Because of the large number of variables that make up the cost of subway construction, it is extremely difficult to quantify the cost differential between the two methods. The second is access is the passenger access to "deep bore" stations, significantly more difficult than "cut and cover" stations, making the subway much less useful for relatively short trips. Country Location Name Start of Construction Planned of Opening Qatar Doha Doha Metro 2013 2019 Iran Qom Qom Metro 2010 2015 Saudi Arabia Riyadh Riyadh Metro 2014 2019 India Chennai Chennai Metro 2010 2015 Table 2 Projects under Construction
  • 10. Discussion The underground subway or metro is expected to provide the shape to future transport network. Therefore, it is important to under know the infrastructure of the underground subway or metro system in Pakistan. Infrastructure Most metro systems are electrical compound units with lengths from three to over ten cars. Power is commonly delivered by a third rail or by overhead wires. Most run on conventional steel railway tracks, although some use rubber tires. Rubber tires allow sharper inclines and a softer ride, but have higher maintenance expenses and are less energy efficient. They also lose traction when weather conditions are wet or ice-cold. Moreover, the infrastructure of the underground tube in Pakistan would be planned in such a way that the monitoring system must be tailor made to suit applications and critical parameters such as “Rate of movement, extent of influence and need of accuracy”. Fibre optics strain measurements and sensors will be used because it is unresponsive to electromagnetic interference, durable and chemically inert, low transmission loss, distributed sensing and Low cost. The above figure will show the method of how the fibre strain measurement would be calculated and what procedure will be followed and why what and how the fibre sensor will be used.  Range (5-10 km)  Resolution 30 µε (0.003%) Figure 6 Fibre Strain Measurements
  • 11. System The subway system will work in such a way that it will be a zone fare System which will be planned by its charges. People will use contactless smart card or oyster which will be embedded with RFID chip, which would be loaded while travelling. Peoples will touch in before the start of the journey and at the end of the ride. However, the underground will be patrolled or guarded by both the uniformed and ticket inspector with hand-held card readers to check passengers, who are travelling with a valid ticket and those who are travelling with invalid ticket would be fined. The public will have rights to access to all the information on the subway by visiting the websites, information reception before travelling which would tell them about the delays, postpones, interruptions etc.
  • 12. Figure 8 Smart Card And Oyster Design The underground tubes are designed in such a way that it focuses on the safety and on the sensor deployed in such a way that it could be easy for a communication in distance, no delays, no postpones, no interruption, and no other criteria. The following shows the design we focus on sensor deployed for underground tunnels: Figure 9 Sensors
  • 13. Figure 10 Cables and System The figure here emphases on the cables and the system. This picture shows the final application of the system. Figure 11 Final Application
  • 14. Conclusion The tube’s greatest strengths are its efficiency and simplicity of navigation. It is used and preferred for both sensitive and coherent reasons. Therefore, the conclusion is that as the Subway system is necessary in Pakistan, it is also important that with the good planning, understanding the strategy and keeping our population in mind we have to see how it is benefiting the budget, economy of our country. Recommendation As per the rules and regulation must be followed it is important for our people to obey the laws for mass transit system. If the laws are not followed not only it will create problem but also will affect the economy. With the security cameras are more I would recommend that a penalty should be charge to those who break rules. It would then make more people understand with this much population it is significant that procedures should be followed. My recommendation to the government is that focusing on this will not just attract more tourist but will also increase its standard.
  • 15. References  “Travel-cards make way for oyster ”.BBC News. 30 June 2003. Retrieved 7 March 2012.  "Where can I buy my ticket?" Transport for London. January 2012. Retrieved 18 June 2014.  Murray, Dick (23 August 2002).Tube”. London Evening Standard. Retrieved 31 March 2013.  "Northern line extension". Transport for London. 2013. Archived from the original on 3 December 2013.  Smith, Stephen J. (6 January 2014). "New Starts: Shanghai Metro World’s Longest, Panama Canal Drama, Japan’s Maglev". Next City. Retrieved 2014-09- 21  Rapid Transit". Encyclopaedia. Retrieved 2014-11-28.