www.novatek-electro.com
RN-111M
RN-111M:
 Multifunctional digital display,
 Direct power load connection
up to 3.5kW (16A), any load
through contactor;
 Operation mode Selection by
Dip-switch;
 Maximum and Minimum
voltage protection;
 Separate setting of Min. and
Max. thresholds,
 Protection from neutral Break
Condition (440V protection);
 Auto reset timer settings;
 Umin.= 160-220V
 Umax. = 230-280V
RN-113
RN-113:
 Multifunctional digital display;
 Direct power load connection
up to 7.0kW (32A), any load
through contactor;
 Operation mode Selection by
Dip-switch;
 Maximum and Minimum
voltage protection;
 Separate setting of Min. and
Max. thresholds;
 Auto reset timer settings;
 Protection from neutral Break
Condition (440V protection);
 Umin. = 160-220V
 Umax. = 230-280V
RN-101M
RN-101M:
 Direct power load connection up
to 3.5KW (16A);
 Short circuits & current overload
protection;
 Over & Under voltage protection;
 Protection from the neutral Break
Condition (440V protection);
 Spike Busting;
 Auto reset timer settings;
 Multifunction digital display;
 Umin. = 160-220V
 Umax. = 230-280V
RN-102
RN-102:
 Multifunctional digital display;
 Direct power load connection
up to 7.0 kW (32A), any load
through contactor;
 Maximum and Minimum
voltage protection;
 Separate setting of Min. and
Max. thresholds;
 Board mounting;
 Auto reset timer settings;
 Protection from neutral Break
Condition (440V protection);
 Umin. = 160-220V
 Umax. = 230-280V
RNPP-301
RNPP-301:
 Multiple protection - from Over &
Under voltage, Single phasing,
Reverse phase sequence, Phase
voltage imbalance;
 Independent adjustable setting
for the basic parameters;
 Capacity of operation within
isolated (3 wire) & solidly earthed
neutral (4 wire) electrical circuits;
 Adjustable trip delay and auto-
reset timers;
 Urated = 240/415V
 Umin. = 5-25%
 Umax. = 5-25%
 Pimbal. = 1-20%
RNPP-311M
RNPP-311M:
 Multifunctional protection from
Over & Under voltage, Single
phasing, Reverse phase
sequence, Voltage imbalance;
 Adjustable trip delay and auto-
reset timer;
 Dip-switches allow to select
the type of monitored circuit
voltage (400 or 415V) and
protection;
 Capacity of operation within
isolated (3 wire) & solidly
earthed neutral (4wire)
electrical circuits.
 Urated = 240/415V
 Umin/Umax = 5-50%
RNPP-302
RNPP-302:
Multiple protection from Over &
Under voltage, Single phasing,
Reverse phase sequence,
Voltage imbalance;
 Multifunction Digital display;
 Programmable password
protected settings;
 Capacity of operation within
isolated (3wire) & solidly
earthed neutral (4wire) circuits;
 Control over the full phase
switching of the contactor;
 Seperate trip & reset delay for
each parameter;
 Urated.=220/380 – 240/415V
 Umin. = 0-60% / exact value
 Umax. = 0-30% / exact value
TK-415
Operation Modes:
15 channel timer device;
Selectable Sequential &
Combination modes in same
device;
 Indicator of selected channels;
 7 segments LED indications;
 Cascade connection of several
devices for extended total
number of channels;
 Memorization of device mode
after switching off & program
operation restart from stopage;
 Programming through software;
 Inputs for timer start & pause
control, copy of settings;
 Program can be executed only
one time or cyclic operation
possible.
NEW
REV-302
Operation Modes:
 Programmable up to one year;
 Perpetual real time clock with location
parameters (Astro function)
 Voltage protection relay;
 Photo sensors input;
 2 independent channels with 4 programs per
channel (8 programs)
 Non-volatile memory can store up to 5000
events;
 Free programming software with USB
communication;
 LCD display on front panel;
 Modes: Yearly, Monthly, Weekly, Daily, Time
delay relay, Pulse relay.
RN-16TM
Perform protection in the following
cases:
 Max. no. of programmable events in the
timer mode upto 420.
 Energizing/deenergizing load acc. with
the user-required time schedule.
 Integrated Photo Relay.
 Load de-energizing acc. to reaching
certain illumination levels.
 Load de-energizing in case of
inadmissible voltage variations.
RMT-101
RMT-101 :
 Max. current relay;
 Priority load selection relay;
 Digital ammeter;
 Measure & control over the
load current;
 Dip-switches available to
select the measure-ment
range;
 Useful for load limiting in case
of generator back-up or mains.
 Imax.=0-100A
OM-110
OM-110 :
 Power limiting relay to cut-off
an excessive power load
 Continuous control over active
& total power capacity;
 Threshold & Setting of rated
power, tripping time by Dip-
switches or potentio-meter
knobs
 Power management range = 0-
20kW or 0-20kVA;
PEF-301
PEF-301 :
 Control over voltage on each of
available lines;
 Select any of the lines with
required proper voltage
parameters;
 Compact automatic fallback
panel;
 Operation load up to 3.5 kw
directly
 Wrong voltage fault indication
 Protection from inter-phase
switching
 Operation with generators
 Built-in autoreclosing timer
UBZ-301
Perform complete motor
protection in the following
cases:
 When main voltage is of poor
quality.
 Mechanical Overloads.
 Dry stroke and absence of the
load on the motor.
 Earth leakage protection.
 Protection and Operation with
the motors from 2.5 to 315
KW.
 Data transmission to the upper
level on rs-485 protocol.
UBZ-302
UBZ-3 0 2:
 Delta/Star switching
operation
 Cascade motor start (delayed
starting of motor one by one)
 Built-in current transformers
and pts earth leakage
protection.
 Protection and Operation with
the motors from 2.5 to 315
KW.
 Data transmission to the upper
level on rs-485 protocol.
UBZ-304
UBZ-3 0 4:
 Delta/Star switching
operation
 Cascade motor start (delayed
starting of motor one by one)
 Built-in current transformers
and pts earth leakage
protection.
 Protection and Operation with
the motors from 2.5 to 315
KW.
 Data transmission to the upper
level on RS-485 protocol.
NEW
UBZ-115
UBZ-115:
 Unique solution for
submersible pumps;
 External input for remote Start
& stop the engine
 Soft start the engine up to
5sec.
 When main voltage is of poor
quality;
 Delayed start or rotor lock-up;
 When mechanical torque is
lost;
 Provides protection to single-
phase induction electric
motors with power up to 5.5
kW (25А).
NEW
OM-310
OM-310 :
 Total Power load cut OFF in
case of active power basis;
 Partial power load cut OFF in
case of reactive power basis;
 Protection equipment &
machinery from faults
 Measurement & indication of 3
phase power supply
parameters;
 Protection and Operation with
the motors from 2.5 to 450
KW.
 Data transmission to the upper
level on RS-485 protocol or
RS-232 interface.
RPM-16-4-3
RPM-16-4-3 :
 16-channel data recorder;
 4 channels for voltage
recording;
 3 for current recording;
 2 for temp. recording;
 2 input channels from standard
signal transducers
 5 discreate input(digital)
channels.
 Present all active information
on LCD screen;
 Save it to an external USB Flash
memory of up to 2GB capacity
with user-specified sampling
frequency of 1-36000 sec.
TR-100
TR-100 provide:
 Protection of Motor, Generator,
Dry-type High voltage
transformer;
 Temperature measurement on
4 input channels;
 4 relay output for Alarm,
tripping, Fault,co-oling
 LED digital display Indication of
parameters
 Power supply=24-260V
AC/DC;
 To provide for communication
RS-485 MODBUS RTU interface
 Measured temp. range=-40 to
+240*c
TR-101
TR-101 provide:
 Controlling temperature
according to PID principle;
 Temperature measurement on
4 input channels
 LED digital display Indication of
parameters
 Power supply=24-260V
AC/DC;
 To provide for communication
RS-485 MODBUS RTU standard
protocol;
 Detect a break or a short-
circuit in the connected
sensors;
 Measured temp. range=-40 to
+240*c
MCK-301-83
MCK-301:
 Control both 1-phase or 3-
phase equipment.
 Built in all possible voltage
protections
 Control appliances inside
satellite communication base
station & telecommunication
base
Two version are provided:
1) MCK-301-85:-control unit for
middle & low temperature
refrigerating machines with
automatic defrost.
2) MCK-301-61:-control unit for
chiller & HVAC application.
LEGAT series
LEGAT Series:
 Unique Transformerless
scheme of voltage stabilization
;
 Output voltage smooth & step-
less regulation;
 1% output voltage accuracy;
 Built-in protection from all
faults ;
 Galvanized insulated from
circuit;
 100% output power throughout
all the operation voltage range;
 Compact & light due to
absence of power transformer
inside.
Microcontroller Based Devices By Novatek Electro (India) Pvt. Ltd, Delhi

Microcontroller Based Devices By Novatek Electro (India) Pvt. Ltd, Delhi

  • 1.
  • 2.
    RN-111M RN-111M:  Multifunctional digitaldisplay,  Direct power load connection up to 3.5kW (16A), any load through contactor;  Operation mode Selection by Dip-switch;  Maximum and Minimum voltage protection;  Separate setting of Min. and Max. thresholds,  Protection from neutral Break Condition (440V protection);  Auto reset timer settings;  Umin.= 160-220V  Umax. = 230-280V
  • 3.
    RN-113 RN-113:  Multifunctional digitaldisplay;  Direct power load connection up to 7.0kW (32A), any load through contactor;  Operation mode Selection by Dip-switch;  Maximum and Minimum voltage protection;  Separate setting of Min. and Max. thresholds;  Auto reset timer settings;  Protection from neutral Break Condition (440V protection);  Umin. = 160-220V  Umax. = 230-280V
  • 4.
    RN-101M RN-101M:  Direct powerload connection up to 3.5KW (16A);  Short circuits & current overload protection;  Over & Under voltage protection;  Protection from the neutral Break Condition (440V protection);  Spike Busting;  Auto reset timer settings;  Multifunction digital display;  Umin. = 160-220V  Umax. = 230-280V
  • 5.
    RN-102 RN-102:  Multifunctional digitaldisplay;  Direct power load connection up to 7.0 kW (32A), any load through contactor;  Maximum and Minimum voltage protection;  Separate setting of Min. and Max. thresholds;  Board mounting;  Auto reset timer settings;  Protection from neutral Break Condition (440V protection);  Umin. = 160-220V  Umax. = 230-280V
  • 6.
    RNPP-301 RNPP-301:  Multiple protection- from Over & Under voltage, Single phasing, Reverse phase sequence, Phase voltage imbalance;  Independent adjustable setting for the basic parameters;  Capacity of operation within isolated (3 wire) & solidly earthed neutral (4 wire) electrical circuits;  Adjustable trip delay and auto- reset timers;  Urated = 240/415V  Umin. = 5-25%  Umax. = 5-25%  Pimbal. = 1-20%
  • 7.
    RNPP-311M RNPP-311M:  Multifunctional protectionfrom Over & Under voltage, Single phasing, Reverse phase sequence, Voltage imbalance;  Adjustable trip delay and auto- reset timer;  Dip-switches allow to select the type of monitored circuit voltage (400 or 415V) and protection;  Capacity of operation within isolated (3 wire) & solidly earthed neutral (4wire) electrical circuits.  Urated = 240/415V  Umin/Umax = 5-50%
  • 8.
    RNPP-302 RNPP-302: Multiple protection fromOver & Under voltage, Single phasing, Reverse phase sequence, Voltage imbalance;  Multifunction Digital display;  Programmable password protected settings;  Capacity of operation within isolated (3wire) & solidly earthed neutral (4wire) circuits;  Control over the full phase switching of the contactor;  Seperate trip & reset delay for each parameter;  Urated.=220/380 – 240/415V  Umin. = 0-60% / exact value  Umax. = 0-30% / exact value
  • 9.
    TK-415 Operation Modes: 15 channeltimer device; Selectable Sequential & Combination modes in same device;  Indicator of selected channels;  7 segments LED indications;  Cascade connection of several devices for extended total number of channels;  Memorization of device mode after switching off & program operation restart from stopage;  Programming through software;  Inputs for timer start & pause control, copy of settings;  Program can be executed only one time or cyclic operation possible. NEW
  • 10.
    REV-302 Operation Modes:  Programmableup to one year;  Perpetual real time clock with location parameters (Astro function)  Voltage protection relay;  Photo sensors input;  2 independent channels with 4 programs per channel (8 programs)  Non-volatile memory can store up to 5000 events;  Free programming software with USB communication;  LCD display on front panel;  Modes: Yearly, Monthly, Weekly, Daily, Time delay relay, Pulse relay.
  • 11.
    RN-16TM Perform protection inthe following cases:  Max. no. of programmable events in the timer mode upto 420.  Energizing/deenergizing load acc. with the user-required time schedule.  Integrated Photo Relay.  Load de-energizing acc. to reaching certain illumination levels.  Load de-energizing in case of inadmissible voltage variations.
  • 12.
    RMT-101 RMT-101 :  Max.current relay;  Priority load selection relay;  Digital ammeter;  Measure & control over the load current;  Dip-switches available to select the measure-ment range;  Useful for load limiting in case of generator back-up or mains.  Imax.=0-100A
  • 13.
    OM-110 OM-110 :  Powerlimiting relay to cut-off an excessive power load  Continuous control over active & total power capacity;  Threshold & Setting of rated power, tripping time by Dip- switches or potentio-meter knobs  Power management range = 0- 20kW or 0-20kVA;
  • 14.
    PEF-301 PEF-301 :  Controlover voltage on each of available lines;  Select any of the lines with required proper voltage parameters;  Compact automatic fallback panel;  Operation load up to 3.5 kw directly  Wrong voltage fault indication  Protection from inter-phase switching  Operation with generators  Built-in autoreclosing timer
  • 15.
    UBZ-301 Perform complete motor protectionin the following cases:  When main voltage is of poor quality.  Mechanical Overloads.  Dry stroke and absence of the load on the motor.  Earth leakage protection.  Protection and Operation with the motors from 2.5 to 315 KW.  Data transmission to the upper level on rs-485 protocol.
  • 16.
    UBZ-302 UBZ-3 0 2: Delta/Star switching operation  Cascade motor start (delayed starting of motor one by one)  Built-in current transformers and pts earth leakage protection.  Protection and Operation with the motors from 2.5 to 315 KW.  Data transmission to the upper level on rs-485 protocol.
  • 17.
    UBZ-304 UBZ-3 0 4: Delta/Star switching operation  Cascade motor start (delayed starting of motor one by one)  Built-in current transformers and pts earth leakage protection.  Protection and Operation with the motors from 2.5 to 315 KW.  Data transmission to the upper level on RS-485 protocol. NEW
  • 18.
    UBZ-115 UBZ-115:  Unique solutionfor submersible pumps;  External input for remote Start & stop the engine  Soft start the engine up to 5sec.  When main voltage is of poor quality;  Delayed start or rotor lock-up;  When mechanical torque is lost;  Provides protection to single- phase induction electric motors with power up to 5.5 kW (25А). NEW
  • 19.
    OM-310 OM-310 :  TotalPower load cut OFF in case of active power basis;  Partial power load cut OFF in case of reactive power basis;  Protection equipment & machinery from faults  Measurement & indication of 3 phase power supply parameters;  Protection and Operation with the motors from 2.5 to 450 KW.  Data transmission to the upper level on RS-485 protocol or RS-232 interface.
  • 20.
    RPM-16-4-3 RPM-16-4-3 :  16-channeldata recorder;  4 channels for voltage recording;  3 for current recording;  2 for temp. recording;  2 input channels from standard signal transducers  5 discreate input(digital) channels.  Present all active information on LCD screen;  Save it to an external USB Flash memory of up to 2GB capacity with user-specified sampling frequency of 1-36000 sec.
  • 21.
    TR-100 TR-100 provide:  Protectionof Motor, Generator, Dry-type High voltage transformer;  Temperature measurement on 4 input channels;  4 relay output for Alarm, tripping, Fault,co-oling  LED digital display Indication of parameters  Power supply=24-260V AC/DC;  To provide for communication RS-485 MODBUS RTU interface  Measured temp. range=-40 to +240*c
  • 22.
    TR-101 TR-101 provide:  Controllingtemperature according to PID principle;  Temperature measurement on 4 input channels  LED digital display Indication of parameters  Power supply=24-260V AC/DC;  To provide for communication RS-485 MODBUS RTU standard protocol;  Detect a break or a short- circuit in the connected sensors;  Measured temp. range=-40 to +240*c
  • 23.
    MCK-301-83 MCK-301:  Control both1-phase or 3- phase equipment.  Built in all possible voltage protections  Control appliances inside satellite communication base station & telecommunication base Two version are provided: 1) MCK-301-85:-control unit for middle & low temperature refrigerating machines with automatic defrost. 2) MCK-301-61:-control unit for chiller & HVAC application.
  • 24.
    LEGAT series LEGAT Series: Unique Transformerless scheme of voltage stabilization ;  Output voltage smooth & step- less regulation;  1% output voltage accuracy;  Built-in protection from all faults ;  Galvanized insulated from circuit;  100% output power throughout all the operation voltage range;  Compact & light due to absence of power transformer inside.