SlideShare a Scribd company logo
1
SUBMITTED
BY
JISHNU.K.P
REG.NO: 15012267
2
∗ A Submerged  Tunnel  is 
a tunnel that  floats  in  water, 
supported by its buoyancy.
∗ The tube is placed underwater, 
deep  enough  to  avoid  water 
traffic and weather.
What is SFT ???What is SFT ???
3
The  big  advantage  of  a  submerged  floating 
tunnel  compared  to  a  bridge  is  the  lightlylightly
loaded constructionloaded construction..
Flexible  submerged  tunnel  has  much  lessless
problems with earthquakesproblems with earthquakes which  can 
happen in this area. 
Floating  tunnel  can  be  built  fast  from  both 
shores  having no problems with wind orno problems with wind or
high seashigh seas.
WHY THIS.??WHY THIS.??
4
Moreover  traffic  can  run  very  fast  through 
this tunnel compared to ferry link.
Due to lesser contact with the sea bed it has 
lesser  possibilities  of  chemical  reaction  with 
the  construction  material  &  the  sea  bed  soil 
strata.
The  downward  ramp  leading  to  a  tunnel 
leaves  a  smaller  footprint  compared  to  the 
upward ramps required by most bridges.
5
STRUCTURAL COMPONENTSSTRUCTURAL COMPONENTS
OF SFTOF SFT
These components should provide strength and
stiffness against the various forces acting under
the watersurface.
6
External shape can be circular , elliptical or
polygonal.
It may be constructed of steel or concrete.
Corrosion protection is the main issue.
 Tube is composed of elements of length
varying from one hundred meters to half a
kilometre.
7
8
9
It is an “underwaterbridge” with
foundations on the
bottom, in principle the columns are in
compression but
they may also be a tension type alternative.
Waterdepth will play an important role in
this case and a
few hundred meters depth is considered a
limit at the
present time.
However, much deeperfoundations
are at present underinvestigation.
10
It is based on tethers being in tension in all future
situations.
No slack in these tethers may be accepted in any
future load cases.
The tethers are vertical or a combination of
vertical and inclined.
11
It is interesting as it has no anchoring at all except
at landfalls and is then independent of depth.
There is obviously a limit to the length but only
further development will answer this.
Perhaps an alternative for light traffic should be
designed, possibly a 100 or 200 meter long.
12
∗ The connections of the tube to the shore
require appropriate interface elements to
couple the flexible water tube with the much
more rigid tunnel bored in the ground.
∗ This joint should be able to restrain tube
movements, without any unsustainable
increase in stresses.
13
1) Precasting
2) Joining of tunnel segments by using rubber gasket.
3) Foundations
4) Anchoring of cables.
14
∗ Huge tunnel sections are constructed on dry dock.
∗ The procedure consists same as that of precast
construction.
∗ Dry dock is flooded and the panels are transported to
their respective places.
∗ Sinking of the panel is controlled by the use of ballast
tank as in case of submarines.
15
∗ After the submersion of different panels in water they are
connected with one another by using a rubber gasket.
∗ Another procedure includes trapping of water between
the joints and then removing it afterwards.
16
∗ The application consists same as that of in caisson
foundation.
∗ A hollow chamber is penetrated down the sea bed as
shown which evacuates the water trapped inside it by a
valve present on its top surface.
∗ Such type of foundations are been used for the offshore
oil rig plants.
17
∗ After the foundation work is completed the cables are
anchored to the floating tunnel which will avoid its
movement and will place it firmly in alignment.
∗ This operation can be carried out by divers.
∗ Finally the tunnel will be in position and ready to use.
18
∗Invisible 
∗Length only from shore to shore
∗Very low gradient
∗Access to underground service-parking 
space at ends
19
Crossing waterways, whether being from main land
    to islands in the sea, perhaps the one we are at now
    will in many cases meet protests both from tourist
    interests and also from the public in general.
Lakes of special beauty or perhaps historical value
    should be preserved for the future, the crossing of
    such areas and lakes with SFT may make this
    possible.
20
∗ The actual SFT structure is only as long as the 
distance between the shores.
∗  If desired the SFT may be connected directly 
to tunnels and then be completely out of sight 
for any desired distance.
21
Crossings with undersea tunnels or
bridges
will frequently mean longer structures
with consequently higher costs
An SFT crossing may have a very gentle
gradient or being nearly horizontal giving
considerable savings in energy used by
traffic.
22
As the SFT may continue in tunnels having crossed
the waterway.
It is possible to arrange parking places or service
areas under ground
Provide access to the surface by lifts directly into
cities or recreational areas.
These possibilities may be one of big advantages in
future, in fact for all types of tunnels.
23
Advantages of SFTAdvantages of SFT
Allow construction of tunnel in extremely
deep water.
Any type of cross sectional area can be
provided since being prefabricated.
No obstruction to navigational routes as
compared to conventional bridges since all
of the tunnel being placed underwater.
Construction activities has less harmful
effects on aquatic life.
24
Disadvantages of SFT
Cost: Due to lots of material and machinery involved in
project, estimated cost is nearly 1.2 Thousand core
dollars.
Fire: It is difficult to rescue people if fire will break out
in train and also to face the problems due to the smoke
of fire.
Collision: If in case of collision of two trains took
place, it is very difficult to rescue the people.
No Stoppage: It is very difficult to stop the train
travelling on such a high speed.
25
The submerged floating tunnel will set up new trends in
transportation engineering.
With this advances in technology that will reduce the
time required for travelling.
Make the transportation more effective by hiding the
traffic under water by which the beauty of landscape is
maintained.
 Benefits can be obtained with respect to less energy
consumption, air pollution and reduced noise emission.
For wide and deep crossings the submerged floating
tunnel may be the only feasible fix link.
26
27
•Christian Ingerslev “Immersed and floating tunnels” Science Direct
VOL. 4 ,2010 PP:51-59.
•Keqian Zhanga, Yiqiang Xianga,*, Yinguang Dub “Research on
tubular segment design of submerged floating tunnel” Science
Direct VOL. 4,2010 .PP:195-205.
•Yiqiang Xiang*, Chengxi Liu, Keqian Zhang, Qiangqiang “Risk
analysis and management of submerged floating tunnel and its
applications” Science Direct VOL. 4,2010,PP:107-116.
•Bernt Jakobsen “Design of the Submerged Floating Tunnel
operating under various conditions” Science Direct VOL. 4 2010
,PP:71-79.
•Fei Ge*, Wei Lu, Xiaodong Wu, Youshi Hong “Fluid-structure
interaction of submerged floating tunnelin wave field” Science
Direct Vol 4 2010 PP:263-271.
28

More Related Content

What's hot

SUBMERGED FLOATING TUNNELS
SUBMERGED FLOATING TUNNELSSUBMERGED FLOATING TUNNELS
SUBMERGED FLOATING TUNNELS
sathish sak
 
Submerged tunnel technical seminar
Submerged tunnel technical seminarSubmerged tunnel technical seminar
Submerged tunnel technical seminar
Prashant Ojha
 
Submerged floating tunnel
Submerged floating tunnel Submerged floating tunnel
Submerged floating tunnel
Aditya Parida
 
PPT
PPTPPT
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater Tunnels
Ishan Parekh
 
Black cotton soil bricks
Black cotton soil bricksBlack cotton soil bricks
Black cotton soil bricks
S.N. Veeresh Kumar
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
Aglaia Connect
 
"Composite Railway Sleepers" - Recent developments, challenges and future pro...
"Composite Railway Sleepers" - Recent developments, challenges and future pro..."Composite Railway Sleepers" - Recent developments, challenges and future pro...
"Composite Railway Sleepers" - Recent developments, challenges and future pro...
Md Saif Ahmed
 
Site selection for a harbour
Site selection for a harbourSite selection for a harbour
Site selection for a harbour
Latif Hyder Wadho
 
Brief introduction to metro systems and its need, type,routing studies, basic...
Brief introduction to metro systems and its need, type,routing studies, basic...Brief introduction to metro systems and its need, type,routing studies, basic...
Brief introduction to metro systems and its need, type,routing studies, basic...
ShubhamSharma775952
 
Bridge
Bridge Bridge
Bridge
illpa
 
Ferrocement ppt
Ferrocement pptFerrocement ppt
Ferrocement ppt
jvaghani
 
Precast segmental construction of bridges
Precast segmental construction of bridgesPrecast segmental construction of bridges
Precast segmental construction of bridges
mukul srivastava
 
Underwater concrete
Underwater concreteUnderwater concrete
Underwater concrete
santhinishanthu
 
Silica fume concrete
Silica fume concreteSilica fume concrete
Silica fume concrete
selva ganesh
 
FLOATING CONCRETE.pptx
FLOATING CONCRETE.pptxFLOATING CONCRETE.pptx
FLOATING CONCRETE.pptx
ssuserbc5970
 
Breakwaters and types
Breakwaters and types Breakwaters and types
Breakwaters and types
M Aamer Raza
 
corrosion and protection of steel reinforced c...
corrosion and protection of  steel                               reinforced c...corrosion and protection of  steel                               reinforced c...
corrosion and protection of steel reinforced c...
Emad Behdad
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
Deven Diran
 
Jacketing
JacketingJacketing
Jacketing
SHAIKH ARSHAD
 

What's hot (20)

SUBMERGED FLOATING TUNNELS
SUBMERGED FLOATING TUNNELSSUBMERGED FLOATING TUNNELS
SUBMERGED FLOATING TUNNELS
 
Submerged tunnel technical seminar
Submerged tunnel technical seminarSubmerged tunnel technical seminar
Submerged tunnel technical seminar
 
Submerged floating tunnel
Submerged floating tunnel Submerged floating tunnel
Submerged floating tunnel
 
PPT
PPTPPT
PPT
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater Tunnels
 
Black cotton soil bricks
Black cotton soil bricksBlack cotton soil bricks
Black cotton soil bricks
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
 
"Composite Railway Sleepers" - Recent developments, challenges and future pro...
"Composite Railway Sleepers" - Recent developments, challenges and future pro..."Composite Railway Sleepers" - Recent developments, challenges and future pro...
"Composite Railway Sleepers" - Recent developments, challenges and future pro...
 
Site selection for a harbour
Site selection for a harbourSite selection for a harbour
Site selection for a harbour
 
Brief introduction to metro systems and its need, type,routing studies, basic...
Brief introduction to metro systems and its need, type,routing studies, basic...Brief introduction to metro systems and its need, type,routing studies, basic...
Brief introduction to metro systems and its need, type,routing studies, basic...
 
Bridge
Bridge Bridge
Bridge
 
Ferrocement ppt
Ferrocement pptFerrocement ppt
Ferrocement ppt
 
Precast segmental construction of bridges
Precast segmental construction of bridgesPrecast segmental construction of bridges
Precast segmental construction of bridges
 
Underwater concrete
Underwater concreteUnderwater concrete
Underwater concrete
 
Silica fume concrete
Silica fume concreteSilica fume concrete
Silica fume concrete
 
FLOATING CONCRETE.pptx
FLOATING CONCRETE.pptxFLOATING CONCRETE.pptx
FLOATING CONCRETE.pptx
 
Breakwaters and types
Breakwaters and types Breakwaters and types
Breakwaters and types
 
corrosion and protection of steel reinforced c...
corrosion and protection of  steel                               reinforced c...corrosion and protection of  steel                               reinforced c...
corrosion and protection of steel reinforced c...
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
 
Jacketing
JacketingJacketing
Jacketing
 

Similar to Submerged floating tunnel ppt

409967709-Submerged-Floating-tunnel.pptx
409967709-Submerged-Floating-tunnel.pptx409967709-Submerged-Floating-tunnel.pptx
409967709-Submerged-Floating-tunnel.pptx
GokulS229289
 
SUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentationSUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentation
unofficialdevil48
 
Floating tunnel
Floating tunnelFloating tunnel
Floating tunnel
Yasir Hashmi
 
1115
11151115
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptxTRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
SoulLoad
 
Tunneling
TunnelingTunneling
Tunneling
jagdish lawadiya
 
Immersed tunnels
Immersed tunnelsImmersed tunnels
Immersed tunnels
arravindsai
 
Nikhil Gopi.doc.pptx
Nikhil Gopi.doc.pptxNikhil Gopi.doc.pptx
Nikhil Gopi.doc.pptx
itech2017
 
Immersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, IndiaImmersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, India
Abhay Ocean India ltd.
 
BHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationBHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentation
Amir Amdani
 
First assignment group (2) presentation.pdf
First assignment group (2) presentation.pdfFirst assignment group (2) presentation.pdf
First assignment group (2) presentation.pdf
SalamudinSadat1
 
101under water conustrution.pptx
101under water conustrution.pptx101under water conustrution.pptx
101under water conustrution.pptx
MEHALAS3
 
20150421031337318
2015042103133731820150421031337318
20150421031337318
James Prs
 
Busan Geoje
Busan GeojeBusan Geoje
Busan Geoje
PrajwalDeshmukh11
 
Under ground railway
Under ground railwayUnder ground railway
Under ground railway
sandipjagdale2008
 
A Review of Previous Work on an Approach to Design and Construction of Low He...
A Review of Previous Work on an Approach to Design and Construction of Low He...A Review of Previous Work on an Approach to Design and Construction of Low He...
A Review of Previous Work on an Approach to Design and Construction of Low He...
IRJET Journal
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
SuryoNegoro3
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
jamali husain
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING
VATSAL PATEL
 
Constructio underwater
Constructio underwaterConstructio underwater
Constructio underwater
AJITA PANDEY
 

Similar to Submerged floating tunnel ppt (20)

409967709-Submerged-Floating-tunnel.pptx
409967709-Submerged-Floating-tunnel.pptx409967709-Submerged-Floating-tunnel.pptx
409967709-Submerged-Floating-tunnel.pptx
 
SUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentationSUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentation
 
Floating tunnel
Floating tunnelFloating tunnel
Floating tunnel
 
1115
11151115
1115
 
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptxTRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
 
Tunneling
TunnelingTunneling
Tunneling
 
Immersed tunnels
Immersed tunnelsImmersed tunnels
Immersed tunnels
 
Nikhil Gopi.doc.pptx
Nikhil Gopi.doc.pptxNikhil Gopi.doc.pptx
Nikhil Gopi.doc.pptx
 
Immersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, IndiaImmersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, India
 
BHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationBHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentation
 
First assignment group (2) presentation.pdf
First assignment group (2) presentation.pdfFirst assignment group (2) presentation.pdf
First assignment group (2) presentation.pdf
 
101under water conustrution.pptx
101under water conustrution.pptx101under water conustrution.pptx
101under water conustrution.pptx
 
20150421031337318
2015042103133731820150421031337318
20150421031337318
 
Busan Geoje
Busan GeojeBusan Geoje
Busan Geoje
 
Under ground railway
Under ground railwayUnder ground railway
Under ground railway
 
A Review of Previous Work on an Approach to Design and Construction of Low He...
A Review of Previous Work on an Approach to Design and Construction of Low He...A Review of Previous Work on an Approach to Design and Construction of Low He...
A Review of Previous Work on an Approach to Design and Construction of Low He...
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING
 
Constructio underwater
Constructio underwaterConstructio underwater
Constructio underwater
 

Recently uploaded

LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...
PsychoTech Services
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
siemaillard
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
TechSoup
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
Nguyen Thanh Tu Collection
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
Himanshu Rai
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
MJDuyan
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
Krassimira Luka
 
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptxChapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Denish Jangid
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
SWOT analysis in the project Keeping the Memory @live.pptx
SWOT analysis in the project Keeping the Memory @live.pptxSWOT analysis in the project Keeping the Memory @live.pptx
SWOT analysis in the project Keeping the Memory @live.pptx
zuzanka
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
MysoreMuleSoftMeetup
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
Stack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 MicroprocessorStack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 Microprocessor
JomonJoseph58
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptxBIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
RidwanHassanYusuf
 

Recently uploaded (20)

LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
 
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptxChapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptx
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
SWOT analysis in the project Keeping the Memory @live.pptx
SWOT analysis in the project Keeping the Memory @live.pptxSWOT analysis in the project Keeping the Memory @live.pptx
SWOT analysis in the project Keeping the Memory @live.pptx
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
Stack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 MicroprocessorStack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 Microprocessor
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptxBIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
 

Submerged floating tunnel ppt

  • 1. 1
  • 3. ∗ A Submerged  Tunnel  is  a tunnel that  floats  in  water,  supported by its buoyancy. ∗ The tube is placed underwater,  deep  enough  to  avoid  water  traffic and weather. What is SFT ???What is SFT ??? 3
  • 4. The  big  advantage  of  a  submerged  floating  tunnel  compared  to  a  bridge  is  the  lightlylightly loaded constructionloaded construction.. Flexible  submerged  tunnel  has  much  lessless problems with earthquakesproblems with earthquakes which  can  happen in this area.  Floating  tunnel  can  be  built  fast  from  both  shores  having no problems with wind orno problems with wind or high seashigh seas. WHY THIS.??WHY THIS.?? 4
  • 5. Moreover  traffic  can  run  very  fast  through  this tunnel compared to ferry link. Due to lesser contact with the sea bed it has  lesser  possibilities  of  chemical  reaction  with  the  construction  material  &  the  sea  bed  soil  strata. The  downward  ramp  leading  to  a  tunnel  leaves  a  smaller  footprint  compared  to  the  upward ramps required by most bridges. 5
  • 6. STRUCTURAL COMPONENTSSTRUCTURAL COMPONENTS OF SFTOF SFT These components should provide strength and stiffness against the various forces acting under the watersurface. 6
  • 7. External shape can be circular , elliptical or polygonal. It may be constructed of steel or concrete. Corrosion protection is the main issue.  Tube is composed of elements of length varying from one hundred meters to half a kilometre. 7
  • 8. 8
  • 9. 9
  • 10. It is an “underwaterbridge” with foundations on the bottom, in principle the columns are in compression but they may also be a tension type alternative. Waterdepth will play an important role in this case and a few hundred meters depth is considered a limit at the present time. However, much deeperfoundations are at present underinvestigation. 10
  • 11. It is based on tethers being in tension in all future situations. No slack in these tethers may be accepted in any future load cases. The tethers are vertical or a combination of vertical and inclined. 11
  • 12. It is interesting as it has no anchoring at all except at landfalls and is then independent of depth. There is obviously a limit to the length but only further development will answer this. Perhaps an alternative for light traffic should be designed, possibly a 100 or 200 meter long. 12
  • 13. ∗ The connections of the tube to the shore require appropriate interface elements to couple the flexible water tube with the much more rigid tunnel bored in the ground. ∗ This joint should be able to restrain tube movements, without any unsustainable increase in stresses. 13
  • 14. 1) Precasting 2) Joining of tunnel segments by using rubber gasket. 3) Foundations 4) Anchoring of cables. 14
  • 15. ∗ Huge tunnel sections are constructed on dry dock. ∗ The procedure consists same as that of precast construction. ∗ Dry dock is flooded and the panels are transported to their respective places. ∗ Sinking of the panel is controlled by the use of ballast tank as in case of submarines. 15
  • 16. ∗ After the submersion of different panels in water they are connected with one another by using a rubber gasket. ∗ Another procedure includes trapping of water between the joints and then removing it afterwards. 16
  • 17. ∗ The application consists same as that of in caisson foundation. ∗ A hollow chamber is penetrated down the sea bed as shown which evacuates the water trapped inside it by a valve present on its top surface. ∗ Such type of foundations are been used for the offshore oil rig plants. 17
  • 18. ∗ After the foundation work is completed the cables are anchored to the floating tunnel which will avoid its movement and will place it firmly in alignment. ∗ This operation can be carried out by divers. ∗ Finally the tunnel will be in position and ready to use. 18
  • 22. Crossings with undersea tunnels or bridges will frequently mean longer structures with consequently higher costs An SFT crossing may have a very gentle gradient or being nearly horizontal giving considerable savings in energy used by traffic. 22
  • 23. As the SFT may continue in tunnels having crossed the waterway. It is possible to arrange parking places or service areas under ground Provide access to the surface by lifts directly into cities or recreational areas. These possibilities may be one of big advantages in future, in fact for all types of tunnels. 23
  • 24. Advantages of SFTAdvantages of SFT Allow construction of tunnel in extremely deep water. Any type of cross sectional area can be provided since being prefabricated. No obstruction to navigational routes as compared to conventional bridges since all of the tunnel being placed underwater. Construction activities has less harmful effects on aquatic life. 24
  • 25. Disadvantages of SFT Cost: Due to lots of material and machinery involved in project, estimated cost is nearly 1.2 Thousand core dollars. Fire: It is difficult to rescue people if fire will break out in train and also to face the problems due to the smoke of fire. Collision: If in case of collision of two trains took place, it is very difficult to rescue the people. No Stoppage: It is very difficult to stop the train travelling on such a high speed. 25
  • 26. The submerged floating tunnel will set up new trends in transportation engineering. With this advances in technology that will reduce the time required for travelling. Make the transportation more effective by hiding the traffic under water by which the beauty of landscape is maintained.  Benefits can be obtained with respect to less energy consumption, air pollution and reduced noise emission. For wide and deep crossings the submerged floating tunnel may be the only feasible fix link. 26
  • 27. 27 •Christian Ingerslev “Immersed and floating tunnels” Science Direct VOL. 4 ,2010 PP:51-59. •Keqian Zhanga, Yiqiang Xianga,*, Yinguang Dub “Research on tubular segment design of submerged floating tunnel” Science Direct VOL. 4,2010 .PP:195-205. •Yiqiang Xiang*, Chengxi Liu, Keqian Zhang, Qiangqiang “Risk analysis and management of submerged floating tunnel and its applications” Science Direct VOL. 4,2010,PP:107-116. •Bernt Jakobsen “Design of the Submerged Floating Tunnel operating under various conditions” Science Direct VOL. 4 2010 ,PP:71-79. •Fei Ge*, Wei Lu, Xiaodong Wu, Youshi Hong “Fluid-structure interaction of submerged floating tunnelin wave field” Science Direct Vol 4 2010 PP:263-271.
  • 28. 28