Analysis of Land
Acquisition for Public
Interest for the
Implementation of
Railway Infrastructure
Development in Barru
Regency, South Sulawesi.
Alika Asmir - 20410625
● Railway plan in Sulawesi connecting South Sulawesi - West
Sulawesi - Central Sulawesi - North Sulawesi (started in
June 2014).
● The Trans-Sulawesi railway project is targeted to reach a
length of 2,000 kilometers from Makassar to Manado.
● This railway line uses a track width of 1,435 mm
(international standard track width) and its operations are
delegated to PT Kereta Api in Indonesia.
● Makassar - Parepare railroad crossing (first stage of
development)
Introduction
starting from Barru Regency about 120 km north of
Makassar, with land acquisition about 30 km, and
rail work using APBD and APBN funds of 108 billion
rupiah.
● Arrangement of Public Interest (Law Number 5 of 1960
concerning the Basic Agrarian Law (BAL) article 18)
● Arrangement of land procurement process (Law
number 2 of 2012 concerning Land Procurement for
Development in the Public Interest)
● Arrangement of land acquisition implementation
(Presidential Regulation number 71 of 2012 concerning the
Implementation of Land Procurement for Public Interest)
Regulations
Stages of Land Acquisition for
The Railway Line in
Barru Regency
Planning Preparation
Implementation
Submission of
Result
01
03
02
04
Planning
01
Planning of land acquisition in Barru Regency
At the stage of development planning for the railway in Barru regency,
the government agency that needs land is the government agency that
requires the land, in this case the Director General of Railways of
Indonesia, together with the governor, which is then handed over to the
Barru regional land office. The planning document contains the
following:
1. the purpose and objectives of the railway in Sulawesi
2. conformity with the Regional Spatial Plan and National and
Regional Development Plans
3. land location
4. area of land required, general description of land status
5. estimated time for the implementation of Land Procurement
6. estimated period of development implementation
7. estimated land value
8. budget plan
Preparation
02
Preparation of land acquisition in Barru Regency
● Implement development plan notification
The Land Acquisition Committee makes notification of the
development plan to the community at the location of the
development plan, namely by providing explanations and
counseling through socialization to the community whose
land will be affected by land acquisition for the railway track
construction.
● Initial data collection of the location of the
development plan
There was no official report regarding the initial data
collection on the location of the development plan, but based
on data obtained from sources and respondents,
the Land Acquisition Committee at this stage
carried out an initial data collection of the
location of the development plan, namely
collecting initial data on the entitled party
and the object of the Land Acquisition.
Preparation of land acquisition in Barru Regency
● Public consultation on development plans
Public consultation on development plans in land acquisition
for the construction of railway is carried out by the
Government to former land rights holders by means of
socialization and deliberation. In the public consultation
stage, the former land rights holders agree with the
Government regarding the location of the development plan
Implementation
03
Implementation of land acquisition in Barru Regency
● Determination of development location
Determination of development locations in land acquisition
for the construction of railway lines is carried out in (five) areas
including Makassar City, Maros Regency, Pangkep, Barru and
Pare-Pare City.
Counseling/socialization was carried out more than once, the first
was carried out in general with the presence of people affected by
the construction of the railway track and the second was carried out
only for people whose land, buildings and plants (gardens) were
affected by the construction of the railway track.
In the land acquisition for the railway track, the Land Acquisition
Committee together with the agencies that require land at this stage
make an announcement on the determination of the construction
location for the railway track.
Implementation of land acquisition in Barru Regency
● Determination of compensation value
The determination of the compensation value for land prices is
carried out by the Land Acquisition Committee for the construction of
railway in the Barru is based on the results of the appraisal service of a public
appraiser. The normal land price is Rp. 75,000 per meter and what is
determined as compensation is around Rp. 90,000 per meter to Rp. 95,000
per meter. Determination of the value of compensation to former holders of
land rights or determined by an appraiser service that is higher than the
market price on the sale of land so that it can be profitable for the
holder/owner of land rights.
● Deliberation on determining the form of compensation
Deliberation in the form of compensation for former rights holders in Land
Acquisition for the construction of railway in Barru based on information from
respondents and data obtained from the Land Acquisition Committee and the
community, the Land Acquisition Committee has carried out several times
until a mutual agreement between the Government and the rightful parties
regarding the form of compensation is made and an official report is made.
Implementation of land acquisition in Barru Regency
● Implementation of Compensation
Provision of compensation to parties who are entitled to land acquisition for the
construction of railway in the Barru regency is carried out based on the results
of the agreement in deliberation, namely in the form of money and at the stage
of providing compensation. In the process of providing compensation in the
land acquisition for the railway line in the Barru regency, the files/document
that must be met in land ownership for the process of giving compensation.
Then the compensation file which is considered complete and meets the
requirements by the research officer, an official report of the research file is
made and the land owner will be made a savings book (bank account) to make it
easier for the community to take compensation and former holders of land
rights are also made a receipt compensation.
The implementation of the provision of compensation is followed by the release
of rights by the holders of rights to land, buildings and plants stated in the
Declaration of Rights along with the payment of compensation made between:
1. The role of the owner of land, buildings and plants which is then referred
to as the FIRST PARTY.
2. The Government, hereinafter referred to as the SECOND PARTY.
Table of lists of names of compensation recipients
Name Land Area (M2
) Amount of
Compensation Received
Burhanuddin 920 Rp. 86.269.008
Amiruddin 1.252 Rp. 123.707.922
Fatmawati 721 Rp. 71.240.745
Abu Bakar 842 Rp. 83.196.542
Umar 1.486 Rp. 147.065.019
Caiyyah 2.315 Rp.230.383.120
Anna Iskandar 182 Rp. 13.191.000
Bahra 613 Rp. 57.725.180
Nurjihad 1.230 Rp. 120.756.245
Implementation of land acquisition in Barru Regency
● Release of land acquisition object
In the land acquisition for the construction of railway in
Barru regency, the release of land rights is carried out
simultaneously with the provision of compensation in
accordance with the results of a mutual agreement and
a receipt for compensation for land and buildings and
other objects is made, signed by the agency that
requires the land as well as the budget user, namely the
expenditure treasurer, the holder of land rights and
witnessed by the entire Land Acquisition Committee
From the Chair of the Committee to its members and a
statement of release of rights is made which is signed by
the former right holder.
Submission of
Result
04
After the implementation of the provision of
compensation to the entitled party and the
relinquishment of rights, as well as the provision of
compensation has been deposited in the Barru district
court, the regional land office of Barru Regency
submits the results of land acquisition to the agency
that requires the land, in this case the Indonesian
Railways, PT Kereta Api Indonesia.
Submission of result of land acquisition in Barru Regency
Obstacles Encountered in Land Acquisition
Internal factor (comes from the government or agency)
What is meant by internal factors are negligence committed by the agency that requires land in making planning documents, the
preparation team when conducting public consultations on the determination of the development location and or the land
acquisition committee in inventorying and identifying land so that there are obstacles in the land acquisition process.
External factors (coming from the rightful party or the community)
1. The community refused to accept the construction site for various reasons, ranging from land being a will from parents,
land being a permanent source of income, not in accordance with local land prices, and not agreeing with the form of
compensation.
2. The condition of the land is being disputed in court, namely the land is being contested by two parties who are even
brothers themselves
3. The land owner's whereabouts and where he lives are unknown
4. The economic situation of the people belonging to the lower middle class economy demands the provision of
compensation with a higher value than what has been offered by the land acquisition committee
5. Lack of knowledge or understanding of the community about the purpose of land acquisition for the public interest, also
not knowing the social function of land.
6. The delay in giving compensation by some people because the files they have are not complete. And there are some
respondents (community) who suffered losses due to 1⁄2 rice fields/gardens that were allocated for the purpose of
railway construction, only 1⁄2 were affected by railway construction and the remaining 1⁄2 could no longer be
planted.
Conclusions And Suggestions
Conclusion
● The land acquisition process for the construction of railway tracks in Barru
Regency is in accordance with the procedures contained in Law No. 2 of 2012
concerning Land Procurement for the Implementation of Development in the
Public Interest, which has carried out four stages in the Land Acquisition. And
because the implementation took place in 2014 if it is stated with Presidential
Regulation number 71 of 2012 concerning the Implementation of Land
Procurement for Public Interest, the implementation of land acquisition has
been carried out in accordance with applicable law.
● As for the obstacles encountered in the land acquisition, they are divided into
two factors, first, internal factors, namely factors originating from the
government or agency that held the land acquisition. Second, external
factors, namely factors that come from the rightful party or the community.
Conclusions And Suggestions
Suggestion
● For the Government, the central government and local governments
should be directly involved in supervising and evaluating the overall
implementation of land acquisition for the sake of the construction of
railway in Barru Regency
● For the community, the community should follow their instincts in
acquiring land and understand that the purpose of land acquisition is
The land is for the public interest later, not following greedy and
stubborn passions by taking advantage of the situation by taking
advantage of existing legal loopholes
THANK YOU

More Related Content

Similar to Student Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (10).pdf

Navigating the Complexities in Issuance of KKPR (Suitability of Spatial Utili...
Navigating the Complexities in Issuance of KKPR (Suitability of Spatial Utili...Navigating the Complexities in Issuance of KKPR (Suitability of Spatial Utili...
Navigating the Complexities in Issuance of KKPR (Suitability of Spatial Utili...AHRP Law Firm
 
Land acquisition
Land acquisitionLand acquisition
Land acquisitionAman Verma
 
Pham quang tu s1 monitoring land policy
Pham quang tu s1 monitoring land policyPham quang tu s1 monitoring land policy
Pham quang tu s1 monitoring land policymrlgregion
 
LARR 02.10.2020 Class Lecture.pptx
LARR 02.10.2020 Class Lecture.pptxLARR 02.10.2020 Class Lecture.pptx
LARR 02.10.2020 Class Lecture.pptxBapul1
 
Supriya Jadhav_Land Law report.pdf
Supriya Jadhav_Land Law report.pdfSupriya Jadhav_Land Law report.pdf
Supriya Jadhav_Land Law report.pdfsupriya362981
 
Untold Story of Chandigarh Master Plan
Untold Story of Chandigarh Master PlanUntold Story of Chandigarh Master Plan
Untold Story of Chandigarh Master PlanJIT KUMAR GUPTA
 
Bihar urban planning and development act 2012
Bihar urban planning and development act 2012Bihar urban planning and development act 2012
Bihar urban planning and development act 2012Kumar Shriyanshu
 
Student Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (15).pdf
Student Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (15).pdfStudent Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (15).pdf
Student Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (15).pdf224100501
 
8 Key Highlights of the Amended Land Law.docx
8 Key Highlights of the Amended Land Law.docx8 Key Highlights of the Amended Land Law.docx
8 Key Highlights of the Amended Land Law.docxPrénom Nom de famille
 
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...latrobeuni
 
Can a compensation claim arise under a structure plan?
Can a compensation claim arise under a structure plan?Can a compensation claim arise under a structure plan?
Can a compensation claim arise under a structure plan?Alexandria Bishop
 
Town planning schemes
Town planning schemesTown planning schemes
Town planning schemesSakshiGadakh
 
4.Land Acquisition ppt.pptx
4.Land Acquisition ppt.pptx4.Land Acquisition ppt.pptx
4.Land Acquisition ppt.pptxrajarambharose8
 
Student Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (25).pdf
Student Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (25).pdfStudent Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (25).pdf
Student Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (25).pdf224100501
 
Legal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectLegal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectVR M
 

Similar to Student Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (10).pdf (20)

TDR.pptx
TDR.pptxTDR.pptx
TDR.pptx
 
Navigating the Complexities in Issuance of KKPR (Suitability of Spatial Utili...
Navigating the Complexities in Issuance of KKPR (Suitability of Spatial Utili...Navigating the Complexities in Issuance of KKPR (Suitability of Spatial Utili...
Navigating the Complexities in Issuance of KKPR (Suitability of Spatial Utili...
 
Land acquisition
Land acquisitionLand acquisition
Land acquisition
 
Pham quang tu s1 monitoring land policy
Pham quang tu s1 monitoring land policyPham quang tu s1 monitoring land policy
Pham quang tu s1 monitoring land policy
 
LARR 02.10.2020 Class Lecture.pptx
LARR 02.10.2020 Class Lecture.pptxLARR 02.10.2020 Class Lecture.pptx
LARR 02.10.2020 Class Lecture.pptx
 
Supriya Jadhav_Land Law report.pdf
Supriya Jadhav_Land Law report.pdfSupriya Jadhav_Land Law report.pdf
Supriya Jadhav_Land Law report.pdf
 
9 Land Acquisition.ppt
9 Land Acquisition.ppt9 Land Acquisition.ppt
9 Land Acquisition.ppt
 
Untold Story of Chandigarh Master Plan
Untold Story of Chandigarh Master PlanUntold Story of Chandigarh Master Plan
Untold Story of Chandigarh Master Plan
 
Bihar urban planning and development act 2012
Bihar urban planning and development act 2012Bihar urban planning and development act 2012
Bihar urban planning and development act 2012
 
Student Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (15).pdf
Student Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (15).pdfStudent Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (15).pdf
Student Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (15).pdf
 
URBAN LAND MANAGEMENT 1.pdf
URBAN LAND MANAGEMENT 1.pdfURBAN LAND MANAGEMENT 1.pdf
URBAN LAND MANAGEMENT 1.pdf
 
8 Key Highlights of the Amended Land Law.docx
8 Key Highlights of the Amended Land Law.docx8 Key Highlights of the Amended Land Law.docx
8 Key Highlights of the Amended Land Law.docx
 
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
Williams_P_Governance, property rights and planning in Peri-urban areas: Sydn...
 
Can a compensation claim arise under a structure plan?
Can a compensation claim arise under a structure plan?Can a compensation claim arise under a structure plan?
Can a compensation claim arise under a structure plan?
 
Dpe guidelines 1986
Dpe guidelines 1986Dpe guidelines 1986
Dpe guidelines 1986
 
Town planning schemes
Town planning schemesTown planning schemes
Town planning schemes
 
4.Land Acquisition ppt.pptx
4.Land Acquisition ppt.pptx4.Land Acquisition ppt.pptx
4.Land Acquisition ppt.pptx
 
Overview Of Process
Overview Of ProcessOverview Of Process
Overview Of Process
 
Student Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (25).pdf
Student Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (25).pdfStudent Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (25).pdf
Student Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (25).pdf
 
Legal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectLegal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining project
 

More from 224100501

Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...224100501
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...224100501
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...224100501
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (9...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (9...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (9...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (9...224100501
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (7...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (7...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (7...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (7...224100501
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (6...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (6...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (6...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (6...224100501
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (5...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (5...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (5...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (5...224100501
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (4...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (4...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (4...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (4...224100501
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (3...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (3...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (3...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (3...224100501
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...224100501
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (16).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (16).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (16).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (16).pdf224100501
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (15).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (15).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (15).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (15).pdf224100501
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (14).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (14).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (14).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (14).pdf224100501
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (13).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (13).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (13).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (13).pdf224100501
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (11).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (11).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (11).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (11).pdf224100501
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (9).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (9).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (9).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (9).pdf224100501
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (8).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (8).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (8).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (8).pdf224100501
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (6).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (6).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (6).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (6).pdf224100501
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (5).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (5).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (5).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (5).pdf224100501
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (4).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (4).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (4).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (4).pdf224100501
 

More from 224100501 (20)

Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (9...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (9...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (9...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (9...
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (7...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (7...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (7...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (7...
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (6...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (6...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (6...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (6...
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (5...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (5...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (5...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (5...
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (4...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (4...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (4...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (4...
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (3...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (3...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (3...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (3...
 
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
Makalah Pendaftaran Tanah_PPT FH UII_Dosen Pengampu Ricco Survival Yubaidi (1...
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (16).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (16).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (16).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (16).pdf
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (15).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (15).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (15).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (15).pdf
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (14).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (14).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (14).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (14).pdf
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (13).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (13).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (13).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (13).pdf
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (11).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (11).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (11).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (11).pdf
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (9).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (9).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (9).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (9).pdf
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (8).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (8).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (8).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (8).pdf
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (6).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (6).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (6).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (6).pdf
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (5).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (5).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (5).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (5).pdf
 
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (4).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (4).pdfLand Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (4).pdf
Land Registration_Student Assignment_Lecturer Ricco Survival Yubaidi (4).pdf
 

Recently uploaded

Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsNbelano25
 
Economic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesEconomic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesSHIVANANDaRV
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
What is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxWhat is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxCeline George
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Introduction to TechSoup’s Digital Marketing Services and Use Cases
Introduction to TechSoup’s Digital Marketing  Services and Use CasesIntroduction to TechSoup’s Digital Marketing  Services and Use Cases
Introduction to TechSoup’s Digital Marketing Services and Use CasesTechSoup
 
dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningMarc Dusseiller Dusjagr
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptxJoelynRubio1
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 

Recently uploaded (20)

Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
Economic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesEconomic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food Additives
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
What is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxWhat is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptx
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Introduction to TechSoup’s Digital Marketing Services and Use Cases
Introduction to TechSoup’s Digital Marketing  Services and Use CasesIntroduction to TechSoup’s Digital Marketing  Services and Use Cases
Introduction to TechSoup’s Digital Marketing Services and Use Cases
 
dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learning
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 

Student Assignment Agrarian Law - Lecturer Ricco Survival Yubaidi (10).pdf

  • 1. Analysis of Land Acquisition for Public Interest for the Implementation of Railway Infrastructure Development in Barru Regency, South Sulawesi. Alika Asmir - 20410625
  • 2. ● Railway plan in Sulawesi connecting South Sulawesi - West Sulawesi - Central Sulawesi - North Sulawesi (started in June 2014). ● The Trans-Sulawesi railway project is targeted to reach a length of 2,000 kilometers from Makassar to Manado. ● This railway line uses a track width of 1,435 mm (international standard track width) and its operations are delegated to PT Kereta Api in Indonesia. ● Makassar - Parepare railroad crossing (first stage of development) Introduction starting from Barru Regency about 120 km north of Makassar, with land acquisition about 30 km, and rail work using APBD and APBN funds of 108 billion rupiah.
  • 3. ● Arrangement of Public Interest (Law Number 5 of 1960 concerning the Basic Agrarian Law (BAL) article 18) ● Arrangement of land procurement process (Law number 2 of 2012 concerning Land Procurement for Development in the Public Interest) ● Arrangement of land acquisition implementation (Presidential Regulation number 71 of 2012 concerning the Implementation of Land Procurement for Public Interest) Regulations
  • 4. Stages of Land Acquisition for The Railway Line in Barru Regency Planning Preparation Implementation Submission of Result 01 03 02 04
  • 6. Planning of land acquisition in Barru Regency At the stage of development planning for the railway in Barru regency, the government agency that needs land is the government agency that requires the land, in this case the Director General of Railways of Indonesia, together with the governor, which is then handed over to the Barru regional land office. The planning document contains the following: 1. the purpose and objectives of the railway in Sulawesi 2. conformity with the Regional Spatial Plan and National and Regional Development Plans 3. land location 4. area of land required, general description of land status 5. estimated time for the implementation of Land Procurement 6. estimated period of development implementation 7. estimated land value 8. budget plan
  • 8. Preparation of land acquisition in Barru Regency ● Implement development plan notification The Land Acquisition Committee makes notification of the development plan to the community at the location of the development plan, namely by providing explanations and counseling through socialization to the community whose land will be affected by land acquisition for the railway track construction. ● Initial data collection of the location of the development plan There was no official report regarding the initial data collection on the location of the development plan, but based on data obtained from sources and respondents, the Land Acquisition Committee at this stage carried out an initial data collection of the location of the development plan, namely collecting initial data on the entitled party and the object of the Land Acquisition.
  • 9. Preparation of land acquisition in Barru Regency ● Public consultation on development plans Public consultation on development plans in land acquisition for the construction of railway is carried out by the Government to former land rights holders by means of socialization and deliberation. In the public consultation stage, the former land rights holders agree with the Government regarding the location of the development plan
  • 11. Implementation of land acquisition in Barru Regency ● Determination of development location Determination of development locations in land acquisition for the construction of railway lines is carried out in (five) areas including Makassar City, Maros Regency, Pangkep, Barru and Pare-Pare City. Counseling/socialization was carried out more than once, the first was carried out in general with the presence of people affected by the construction of the railway track and the second was carried out only for people whose land, buildings and plants (gardens) were affected by the construction of the railway track. In the land acquisition for the railway track, the Land Acquisition Committee together with the agencies that require land at this stage make an announcement on the determination of the construction location for the railway track.
  • 12. Implementation of land acquisition in Barru Regency ● Determination of compensation value The determination of the compensation value for land prices is carried out by the Land Acquisition Committee for the construction of railway in the Barru is based on the results of the appraisal service of a public appraiser. The normal land price is Rp. 75,000 per meter and what is determined as compensation is around Rp. 90,000 per meter to Rp. 95,000 per meter. Determination of the value of compensation to former holders of land rights or determined by an appraiser service that is higher than the market price on the sale of land so that it can be profitable for the holder/owner of land rights. ● Deliberation on determining the form of compensation Deliberation in the form of compensation for former rights holders in Land Acquisition for the construction of railway in Barru based on information from respondents and data obtained from the Land Acquisition Committee and the community, the Land Acquisition Committee has carried out several times until a mutual agreement between the Government and the rightful parties regarding the form of compensation is made and an official report is made.
  • 13. Implementation of land acquisition in Barru Regency ● Implementation of Compensation Provision of compensation to parties who are entitled to land acquisition for the construction of railway in the Barru regency is carried out based on the results of the agreement in deliberation, namely in the form of money and at the stage of providing compensation. In the process of providing compensation in the land acquisition for the railway line in the Barru regency, the files/document that must be met in land ownership for the process of giving compensation. Then the compensation file which is considered complete and meets the requirements by the research officer, an official report of the research file is made and the land owner will be made a savings book (bank account) to make it easier for the community to take compensation and former holders of land rights are also made a receipt compensation. The implementation of the provision of compensation is followed by the release of rights by the holders of rights to land, buildings and plants stated in the Declaration of Rights along with the payment of compensation made between: 1. The role of the owner of land, buildings and plants which is then referred to as the FIRST PARTY. 2. The Government, hereinafter referred to as the SECOND PARTY.
  • 14. Table of lists of names of compensation recipients Name Land Area (M2 ) Amount of Compensation Received Burhanuddin 920 Rp. 86.269.008 Amiruddin 1.252 Rp. 123.707.922 Fatmawati 721 Rp. 71.240.745 Abu Bakar 842 Rp. 83.196.542 Umar 1.486 Rp. 147.065.019 Caiyyah 2.315 Rp.230.383.120 Anna Iskandar 182 Rp. 13.191.000 Bahra 613 Rp. 57.725.180 Nurjihad 1.230 Rp. 120.756.245
  • 15. Implementation of land acquisition in Barru Regency ● Release of land acquisition object In the land acquisition for the construction of railway in Barru regency, the release of land rights is carried out simultaneously with the provision of compensation in accordance with the results of a mutual agreement and a receipt for compensation for land and buildings and other objects is made, signed by the agency that requires the land as well as the budget user, namely the expenditure treasurer, the holder of land rights and witnessed by the entire Land Acquisition Committee From the Chair of the Committee to its members and a statement of release of rights is made which is signed by the former right holder.
  • 17. After the implementation of the provision of compensation to the entitled party and the relinquishment of rights, as well as the provision of compensation has been deposited in the Barru district court, the regional land office of Barru Regency submits the results of land acquisition to the agency that requires the land, in this case the Indonesian Railways, PT Kereta Api Indonesia. Submission of result of land acquisition in Barru Regency
  • 18. Obstacles Encountered in Land Acquisition Internal factor (comes from the government or agency) What is meant by internal factors are negligence committed by the agency that requires land in making planning documents, the preparation team when conducting public consultations on the determination of the development location and or the land acquisition committee in inventorying and identifying land so that there are obstacles in the land acquisition process. External factors (coming from the rightful party or the community) 1. The community refused to accept the construction site for various reasons, ranging from land being a will from parents, land being a permanent source of income, not in accordance with local land prices, and not agreeing with the form of compensation. 2. The condition of the land is being disputed in court, namely the land is being contested by two parties who are even brothers themselves 3. The land owner's whereabouts and where he lives are unknown 4. The economic situation of the people belonging to the lower middle class economy demands the provision of compensation with a higher value than what has been offered by the land acquisition committee 5. Lack of knowledge or understanding of the community about the purpose of land acquisition for the public interest, also not knowing the social function of land. 6. The delay in giving compensation by some people because the files they have are not complete. And there are some respondents (community) who suffered losses due to 1⁄2 rice fields/gardens that were allocated for the purpose of railway construction, only 1⁄2 were affected by railway construction and the remaining 1⁄2 could no longer be planted.
  • 19. Conclusions And Suggestions Conclusion ● The land acquisition process for the construction of railway tracks in Barru Regency is in accordance with the procedures contained in Law No. 2 of 2012 concerning Land Procurement for the Implementation of Development in the Public Interest, which has carried out four stages in the Land Acquisition. And because the implementation took place in 2014 if it is stated with Presidential Regulation number 71 of 2012 concerning the Implementation of Land Procurement for Public Interest, the implementation of land acquisition has been carried out in accordance with applicable law. ● As for the obstacles encountered in the land acquisition, they are divided into two factors, first, internal factors, namely factors originating from the government or agency that held the land acquisition. Second, external factors, namely factors that come from the rightful party or the community.
  • 20. Conclusions And Suggestions Suggestion ● For the Government, the central government and local governments should be directly involved in supervising and evaluating the overall implementation of land acquisition for the sake of the construction of railway in Barru Regency ● For the community, the community should follow their instincts in acquiring land and understand that the purpose of land acquisition is The land is for the public interest later, not following greedy and stubborn passions by taking advantage of the situation by taking advantage of existing legal loopholes