City Council
July 21st, 2012
Stormwater Regulatory Framework
                                   Clean Water Act, Section 402(p)
  National
                 EPA Nation Pollution Discharge Elimination System (NPDES),
                                         40 CFR 122
                                                               Unauthorized
                        Authorized States
                                                                  States


                  State Laws & Regulations
                     (45 States and PR)                   EPA NPDES Permits
State by State
                  Texas Pollution Discharge          (5 states, most territories and
                 Elimination System (TPDES)              Indian country lands)
                           Permit



  Cities,
Counties, etc
                         MS4s, Construction Sites, Industrial Activities
Stormwater Permit “Phases”
ď‚— Phase I Permit
   ď‚— Medium & large MS4s (pop. >100,000)
   ď‚— Construction activity (ac > 5 acres)


ď‚— Phase II Permit
    Smaller MS4s in “Urbanized Areas” with pop. <100,000
     (College Station)
    Construction sites (1 ≤ ac < 5)
TPDES Phase II MS4 Permit TXR04000
1.   Submit Notice of Intent (NOI) to (TCEQ)
        5 year permit (2008 – 2012)


2. Develop stormwater management program (SWMP)
   ď‚— Reduce discharge of pollutants to maximum extent
     practicable
   ď‚— Protect water quality
   ď‚— Satisfy other state and federal requirements


3. Recordkeeping and reporting
   ď‚— Submit five (5) annual progress reports to TCEQ
SWMP- Minimum Control Measures
1.       Public Education & Outreach (10 BMPs)
2.       Public Involvement & Participation (6 BMPs)
3.       Illicit Discharge Detection and Elimination (12 BMPs)
4.       Construction Site Runoff Control (7 BMPs)
5.       Post-Construction Stormwater Management (5 BMPs)
6.       Best Management Practices (12 BMPs)
MCM 1 Public Education & Outreach

BMP                        Measurable Goal                                                                    Target Date

                           Develop a list of topics to be included in the Utility Bill Inserts.                  Year 1

1-1 Utility Bill Inserts   Design and print utility bill inserts for each of the selected topics.               Year 2

                           Distribute inserts in accordance with the utility bill distribution schedule         Year 3

                           Develop a list of subjects for inclusion and discussion in storm water flyers.        Year 1

1-2 Flyers                 Design and print flyers for each of the selected subjects                            Year 2

                           Post flyers at selected locations in accordance with the flyer posting schedule.     Year 3
SWMP Achievements to Date
ď‚— Public Education, Involvement & Participation
   ď‚— Distributed stormwater literature (UBIs)
   ď‚— Classroom presentations
   ď‚— Broadcast public service announcements (PSAs)
   ď‚— Published city stormwater quality website
   ď‚— Est. Brazos Basin Stormwater Education Committee
     (BBSEC)
   ď‚— Est. www.brazoscleanwater.org
   ď‚— Creek Clean Up/Adopt-A-Street Volunteering
   ď‚— Storm drain stenciling
SWMP Achievements to Date Cont.
ď‚— Illicit Discharge Detection & Elimination (IDDE)
   ď‚— Est. illicit discharge hotline
   ď‚— GIS mapping system of storm drain inlets/outfalls
   ď‚— Developed outfall screening procedures
   ď‚— Key personnel training

ď‚— Municipal Best Management Practices
  ď‚— City landscaping and trimming
  ď‚— Regular fleet maintenance
  ď‚— City employee training
  ď‚— Identified city-owned industrial facilities

ď‚— Construction/Post Construction
   ď‚— Inspector training
   ď‚— Draft stormwater ordinance
   ď‚— Sought input from construction community
   ď‚— Implement stormwater ordinance
Stormwater Ordinance – Ch 7
ď‚— Provision in Health and Sanitation (General)
   ď‚— Stormwater Protection


ď‚— Regulate contributions of pollutants to the MS4 by any
  person or entity
  ď‚— Includes reasonable exceptions (i.e. agriculture, lawn
    care, etc.)

ď‚— Prohibit illicit discharges and illegal connections into
  MS4

ď‚— Control and Containment Requirements
   ď‚— Spill prevention, dumping or disposal in MS4
Stormwater Ordinance – Ch 12
ď‚— Provision in Unified Development Ordinance
 (Development)
  ď‚— Drainage & Stormwater Management


ď‚— Prohibit stormwater discharge associated with
 construction or industrial activity without TPDES
 permit

ď‚— Prevent operations of facilities discharging stormwater
 with out NOI or Site Notice

ď‚— Prevent entrance of sediment, concrete, construction
 debris etc., into MS4 from construction activity
Stormwater Protection

Stormwater Protection

  • 1.
  • 2.
    Stormwater Regulatory Framework Clean Water Act, Section 402(p) National EPA Nation Pollution Discharge Elimination System (NPDES), 40 CFR 122 Unauthorized Authorized States States State Laws & Regulations (45 States and PR) EPA NPDES Permits State by State Texas Pollution Discharge (5 states, most territories and Elimination System (TPDES) Indian country lands) Permit Cities, Counties, etc MS4s, Construction Sites, Industrial Activities
  • 3.
    Stormwater Permit “Phases” Phase I Permit  Medium & large MS4s (pop. >100,000)  Construction activity (ac > 5 acres)  Phase II Permit  Smaller MS4s in “Urbanized Areas” with pop. <100,000 (College Station)  Construction sites (1 ≤ ac < 5)
  • 4.
    TPDES Phase IIMS4 Permit TXR04000 1. Submit Notice of Intent (NOI) to (TCEQ)  5 year permit (2008 – 2012) 2. Develop stormwater management program (SWMP)  Reduce discharge of pollutants to maximum extent practicable  Protect water quality  Satisfy other state and federal requirements 3. Recordkeeping and reporting  Submit five (5) annual progress reports to TCEQ
  • 5.
    SWMP- Minimum ControlMeasures 1. Public Education & Outreach (10 BMPs) 2. Public Involvement & Participation (6 BMPs) 3. Illicit Discharge Detection and Elimination (12 BMPs) 4. Construction Site Runoff Control (7 BMPs) 5. Post-Construction Stormwater Management (5 BMPs) 6. Best Management Practices (12 BMPs) MCM 1 Public Education & Outreach BMP Measurable Goal Target Date Develop a list of topics to be included in the Utility Bill Inserts. Year 1 1-1 Utility Bill Inserts Design and print utility bill inserts for each of the selected topics. Year 2 Distribute inserts in accordance with the utility bill distribution schedule Year 3 Develop a list of subjects for inclusion and discussion in storm water flyers. Year 1 1-2 Flyers Design and print flyers for each of the selected subjects Year 2 Post flyers at selected locations in accordance with the flyer posting schedule. Year 3
  • 6.
    SWMP Achievements toDate ď‚— Public Education, Involvement & Participation ď‚— Distributed stormwater literature (UBIs) ď‚— Classroom presentations ď‚— Broadcast public service announcements (PSAs) ď‚— Published city stormwater quality website ď‚— Est. Brazos Basin Stormwater Education Committee (BBSEC) ď‚— Est. www.brazoscleanwater.org ď‚— Creek Clean Up/Adopt-A-Street Volunteering ď‚— Storm drain stenciling
  • 7.
    SWMP Achievements toDate Cont. ď‚— Illicit Discharge Detection & Elimination (IDDE) ď‚— Est. illicit discharge hotline ď‚— GIS mapping system of storm drain inlets/outfalls ď‚— Developed outfall screening procedures ď‚— Key personnel training ď‚— Municipal Best Management Practices ď‚— City landscaping and trimming ď‚— Regular fleet maintenance ď‚— City employee training ď‚— Identified city-owned industrial facilities ď‚— Construction/Post Construction ď‚— Inspector training ď‚— Draft stormwater ordinance ď‚— Sought input from construction community ď‚— Implement stormwater ordinance
  • 8.
    Stormwater Ordinance –Ch 7  Provision in Health and Sanitation (General)  Stormwater Protection  Regulate contributions of pollutants to the MS4 by any person or entity  Includes reasonable exceptions (i.e. agriculture, lawn care, etc.)  Prohibit illicit discharges and illegal connections into MS4  Control and Containment Requirements  Spill prevention, dumping or disposal in MS4
  • 9.
    Stormwater Ordinance –Ch 12  Provision in Unified Development Ordinance (Development)  Drainage & Stormwater Management  Prohibit stormwater discharge associated with construction or industrial activity without TPDES permit  Prevent operations of facilities discharging stormwater with out NOI or Site Notice  Prevent entrance of sediment, concrete, construction debris etc., into MS4 from construction activity