Public Workshop: Challenges and Opportunities
for Pumped Storage Hydropower in the U.S.
April 27, 2016
State of the Industry and
Research Efforts in PSH
Vladimir Koritarov
Center for Energy, Environmental, and Economic Systems Analysis
Energy Systems Division
ARGONNE NATIONAL LABORATORY
9700 South Cass Avenue
Argonne, IL 60439
Tel: 630-252-6711
Email: koritarov@anl.gov
2
Pumped Storage Hydropower (PSH)
 About 130 GW of PSH in the world, of which:
–40 GW in the European Union
–22 GW in the United States
 Many utilities are building new PSH capacity
–1,200 MW Alto Tamega in Portugal,
–760 MW Venda Nova 3 in Portugal,
–852 MW La Muela 2 in Spain, etc.
Seneca PSH in Pennsylvania
Drivers for the Development of PSH – Then …
 Historically, key drivers for the development of PSH capacity were to perform load
shifting (load levelling) and provide backup capacity for large nuclear and coal units
3
PSH Installations in the U.S. by Plant Size
Source: DOE – 2014 Hydropower Market Report
Lake Hodges
in 2012 (40 MW)
Existing PSH Plants in the U.S.
Source: Argonne National Laboratory
…and Now – Growth of Variable Energy Resources (VERs)
Source: AWEA 2014
Wind capacity is now over 65 GW Solar capacity is now over 17.5 GW
Source: SEIA 2015
Key challenges for larger
integration of VERs are their:
• Variability
• Uncertainty
4
U.S. Annual PV Installations
Ancillary Services, such as Operating Reserves are
Needed to Balance Wind
5
Almost 2,000MW
range in a single day
Power Systems will Need Flexible Capacity to
Support Variable Generation
Source: http://www.caiso.com/Documents/Presentation-Mark_Rothleder_CaliforniaISO.pdf
About 13,000 MW
ramping in 3 hours
Advanced Forecasting Helps Reduce Uncertainty,
Energy Storage Helps Manage Variability
7
 Current wind forecasts tools do reasonably well
 Forecasting ramps is still an issue
Value of PSH in Utility Systems
Three main components:
1. Energy/price arbitrage
2. Ancillary services
3. System-wide effects (lower system operating costs,
better integration of VER, reduced cycling of thermal
units, increased system reliability, etc.)
8
PSH Has a Key Role in the Integration of Variable
Generation Resources
 PSH plants are well-suited to provide a number of ancillary and other grid
services
 Characterized by fast, flexible, and reliable operation with quick starts and
excellent ramping capabilities
 Proven technologies, commercially widely available
 New PSH technology designs are focusing on providing even more flexibility
 In the pumping mode, PSH plants create system load which can be used to
store excess generation of VER and reduce their curtailments
 PSH plants can provide ancillary services at lower cost than thermal
generating units
9
PSH Provides FLEXIBILITY to the Grid!
Load shifting from peak to off-peak periods
–Increase efficiency of system operation by:
• Increasing the generation of base load units
• Reduces the operation of expensive peaking units
Contingency reserve (spinning and non-spinning)
–Provide large amount of fast contingency reserve (e.g., for the
outages of large nuclear and coal units)
Regulation reserve
– Help maintain system frequency at a narrow band around nominal
system frequency by balancing supply and demand
Flexibility reserves and load following
– Provide quick-ramping capacity
Energy imbalance reduction
–Balance the variability of wind and solar power and correct the
control area intertie exchanges 10
Vt
PS+jQS
Pr+jQr
Stator
Rotor
Power
Converter
Ptotal+jQtotal
Adjustable Speed PSH Provide Even More Flexibility
 One type of adjustable speed unit is doubly-fed induction machine (DFIM)
 The rotors of DFIM units are equipped with three-phase windings and fed via
frequency converter
 The actual mechanical speed is the result of superposition of both rotor and
stator rotating magnetic fields and is controlled by frequency converter
 The units can vary the speed (typically up to 10% around the synchronous
speed)
 It is possible to adjust the speed to actual water head, which increases turbine
efficiency
 Active and reactive power can be controlled electronically and separately
 The units are able to operate in partial load pumping mode
11
Additional Benefits of Adjustable Speed PSH
(Compared to Fixed Speed PSH)
 More flexible and efficient operation in generation mode
–Minimum unit power output as low as 20%
–Increased efficiency and lifetime of the turbine at partial loads by operating at
optimal speed
 Frequency regulation capabilities also available in the pumping mode
 Decoupled control of active and reactive power (electronically)
–Provides more flexible voltage support
 Improved dynamic behavior and stability of power system
–Improved transient stability in case of grid faults (e.g., short circuit faults in the
transmission system)
–Reduced frequency drops in case of generator outages
 Increased capabilities to balance variable renewables
–More flexible and quicker response in generating (turbine) mode
–Variable power in pumping mode to counterbalance variability of VERs
–Excellent source of frequency regulation during off-peak hours
12
Fixed and Adjustable Speed PSH Technologies
 Adjustable speed PSH use doubly-fed induction machines (DFIM) or
converter-fed synchronous machines (CFSM)
 Adjustable speed PSH can operate in partial load pump mode, which allows
them to provide regulation service also during pumping
13
Source: Koritarov et al., HydroVision 2015
Operating Mode Transition Times
14
Source: Fisher et al. (HydroVision 2012)
Ternary PSH Technology with Hydraulic Bypass
Provides for Extraordinary Flexibility
 Kops 2 (3x150 MW) PSH plant in Austria has implemented ternary pump-
turbine arrangement with hydraulic bypass
 Turbine and pump are connected with a mechanical clutch (pump can be
separated during the generation mode to increase efficiency)
 During the pumping, the power taken from the grid can be supplemented by
the power produced by the hydro turbine (“hydraulic short circuit”)
 This provides for flexibility in regulating the pumping power needs from the
grid
15
Source: Illwerke VKW Group, 2009
DOE Funded a Study on the Modeling and Analysis of Value
of Advanced PSH in the U.S.
 Clean energy goals require reliance on large amount of VER, which makes electric
grid difficult to manage
 PSH enables high penetration of VER:
– Provides large quantities of energy storage and full range of ancillary services necessary for
grid operation
– Provides large amount of flexible dispatchable capacity with no greenhouse gas emissions
– Has none of the limitations of other flexible technologies like gas turbines and demand
response
– Can mitigate over-generation of VER through storing and time-shifting excess generation
– Improves dynamic behavior and stability of power system
16Source: C. Barnhart, Stanford University, 2014
Energy Stored
on Energy
Invested (ESOI)
U.S. Energy Storage Capacity Mix
Source: Grid Energy Storage, DOE 2013
Advanced PSH Project Overview
17
 Argonne-led study funded by the DOE Water Power Program
Project website: http://ceeesa.es.anl.gov/projects/psh/psh.html
Project Team
Main Objectives:
 Improve modeling representation of
advanced PSH plants
 Quantify their capabilities to provide
various grid services
 Analyze the value of these services
under different market conditions and
levels of variable renewable generation
 Provide information on full range of
benefits and value of PSH
Advanced Technology Modeling – Model Development
 Developed vendor-neutral dynamic
models for advanced PSH technologies
(adjustable speed and ternary units)
Review of existing CH and PSH models in
use in the United States
Dynamic simulation models for adjustable
speed PSH
Dynamic simulation models for ternary PSH
units
Model Development
18
Comparison of system
frequency with the FS
and AS PSH units in
response to generation
outage in a test case
FS PSH
AS PSH
Advanced Technology Modeling – Integration and Testing of
Dynamic Models
 Dynamic models for adjustable speed PSH
and ternary units were coded and integrated
into the PSS®E model
 Testing of these models for both generating
and pumping mode of operation was
performed using PSS®E test cases and
dynamic cases for Western Interconnection
(WI)
 Additional AGC studies have been
performed for SMUD balancing authority
 Published a report on frequency regulation
capabilities of advanced PSH technologies
Model Integration and Testing
19
Study Addressed Wide Range of Operational Issues & Timeframes
 Analysis aimed to capture PSH dynamic responses and operational characteristics
across different timescales, from a fraction of a second to days/weeks.
20
Production Cost and Revenue Simulations
 First, the Project Team developed
a matrix of various PSH
contributions and services
provided to the power system
 A suite of computer models
(PLEXOS, FESTIV, and CHEERS)
was utilized to simulate system
operation and analyze various
operational issues occurring at
different timescales
 Production cost and revenue
simulations were performed to
analyze the operation of PSH and
the value of their services and
contributions to the power system
PLEXOS Model with Detailed Representation of PSH
was Used for Production Cost Simulations
 Several levels of geographical scope, including the entire Western
Interconnection, California, and SMUD
 Simulations were conducted for 2022
– Multiple runs at different time resolutions
– Hourly simulations for the entire year to
determine maintenance schedule
of thermal units and annual-level
PSH economics
– Runs at hourly and 5-min time steps
for typical weeks in each season to
analyze PSH operation under conditions
of variability and uncertainty of
renewable resources
 Simulations were based on detailed WI grid representation (3,700 generators,
17,000 transmission buses) and examined impact of different levels of wind
and solar penetration
22
Annual Simulation Results Show that PSH Significantly
Reduces Power System Operating Costs
0
2
4
6
8
10
No PSH With FS PSH With FS&AS
PSH
AnnualSystem
ProductionCost
Savings(%)
Western Interconnection
Base RE Scenario High Wind Scenario
0
2
4
6
8
10
No PSH With FS PSH With FS&AS
PSH
AnnualSystem
ProductionCost
Savings(%)
California
Base RE Scenario High Wind Scenario
Production Cost Savings due to PSH Capacity in 2022
PSH Provisions of System Reserves in 2022
(As % of Total System Requirements)
 Western
Interconnect
24
 California:
Western Interconnection: Impact of PSH on VER
Curtailments in 2022
 Baseline RE scenario:
 High Wind RE scenario:
25
VER curtailments reduced 50%
Annual generation of about
5,000 MW of wind capacity
PSH Impacts on Power System Emissions
26
California: CO2 and
NOx emissions
decrease, SO2
emissions increase
under both scenarios
WI: Emissions
increase under Base
RE scenario, but
decrease under High
Wind RE scenario
SMUD: Emissions
decrease under both
scenarios
Reductions in Thermal Generator Ramping in 2022 due
to PSH Capacity
27
California: Thermal Generator Cycling in 2022
 Baseline RE scenario:
 High Wind RE scenario:
28
FS & AS PSH plants reduce cycling
cost of thermal units by one third
Additional Results, Details, and Information
 A total of 7 reports were published during the project
 Available at: http://ceeesa.es.anl.gov/projects/psh/psh.html
29
 U.S. Congress has also requested a
report on the role a value of PSH in
integrating VERs and on potential
hydropower from conduits
 Detailed benefits of PSH for grid
integration of VERs were documented in
a supporting technical report
Main Project Report
PSH Projects with Preliminary FERC Permits
30
April 1, 2015
January 1, 2013
April 1, 2016
October 1, 2014
Decline in Proposed PSH Projects – Why?
31
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
(MW)
PSH Capacity (MW) with Preliminary FERC Permits
32
Contact:
Vladimir KORITAROV
ARGONNE NATIONAL LABORATORY
9700 South Cass Avenue
Argonne, IL 60439
Tel: 630-252-6711
Koritarov@ANL.gov

More Related Content

What's hot

Natf reference-document-reporting-and-verification-of-generating-unit-reactiv...
Natf reference-document-reporting-and-verification-of-generating-unit-reactiv...Natf reference-document-reporting-and-verification-of-generating-unit-reactiv...
Natf reference-document-reporting-and-verification-of-generating-unit-reactiv...
Insanul Aziz
 
Maximizing Gas Turbine and Combined Cycle Capacity and Ratings
Maximizing Gas Turbine and Combined Cycle Capacity and RatingsMaximizing Gas Turbine and Combined Cycle Capacity and Ratings
Maximizing Gas Turbine and Combined Cycle Capacity and Ratings
Cary Campbell
 
Multi-Utility Scheduling Optimization (MUSO) Industrial Modeling Framework (M...
Multi-Utility Scheduling Optimization (MUSO) Industrial Modeling Framework (M...Multi-Utility Scheduling Optimization (MUSO) Industrial Modeling Framework (M...
Multi-Utility Scheduling Optimization (MUSO) Industrial Modeling Framework (M...
Alkis Vazacopoulos
 
(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS
Aiman Ali
 
EcoMarine Propulsion Systems - An Overview
EcoMarine Propulsion Systems - An OverviewEcoMarine Propulsion Systems - An Overview
EcoMarine Propulsion Systems - An Overview
quonseteer
 
Harvesting in electric vehicles: Combining multiple power tracking and fuel-c...
Harvesting in electric vehicles: Combining multiple power tracking and fuel-c...Harvesting in electric vehicles: Combining multiple power tracking and fuel-c...
Harvesting in electric vehicles: Combining multiple power tracking and fuel-c...
IJECEIAES
 
Grid Integration of Large PV Power Systems Using HVDC Link
Grid Integration of Large PV Power Systems Using HVDC LinkGrid Integration of Large PV Power Systems Using HVDC Link
Grid Integration of Large PV Power Systems Using HVDC Link
IJERA Editor
 
IRJET- A Review on Designing of 100KV Grid Power using Hybrid Parameters
IRJET-  	  A Review on Designing of 100KV Grid Power using Hybrid ParametersIRJET-  	  A Review on Designing of 100KV Grid Power using Hybrid Parameters
IRJET- A Review on Designing of 100KV Grid Power using Hybrid Parameters
IRJET Journal
 
G011115473
G011115473G011115473
G011115473
IOSR Journals
 
42x36NCUR_Poster_Final
42x36NCUR_Poster_Final42x36NCUR_Poster_Final
42x36NCUR_Poster_Final
Miguel Zepeda
 
A MIP Approach to the Yearly Scheduling Problem of a Mixed Hydrothermal Syste...
A MIP Approach to the Yearly Scheduling Problem of a Mixed Hydrothermal Syste...A MIP Approach to the Yearly Scheduling Problem of a Mixed Hydrothermal Syste...
A MIP Approach to the Yearly Scheduling Problem of a Mixed Hydrothermal Syste...
Costas Baslis
 
IRJET- Power Management System for Electric Vehicle Charging Stations using F...
IRJET- Power Management System for Electric Vehicle Charging Stations using F...IRJET- Power Management System for Electric Vehicle Charging Stations using F...
IRJET- Power Management System for Electric Vehicle Charging Stations using F...
IRJET Journal
 
Electric and hybrid_marine_world_expo_patrick_baan_062014
Electric and hybrid_marine_world_expo_patrick_baan_062014Electric and hybrid_marine_world_expo_patrick_baan_062014
Electric and hybrid_marine_world_expo_patrick_baan_062014
Wärtsilä Corporation
 
Maulin Trivedi1_Presentation
Maulin Trivedi1_PresentationMaulin Trivedi1_Presentation
Maulin Trivedi1_Presentation
Maulin Trivedi
 
Scarabeus Project
Scarabeus ProjectScarabeus Project
Scarabeus Project
Abengoa
 
A039101011
A039101011A039101011
A039101011
inventionjournals
 
A photovoltaic integrated unified power quality conditioner with a 27-level i...
A photovoltaic integrated unified power quality conditioner with a 27-level i...A photovoltaic integrated unified power quality conditioner with a 27-level i...
A photovoltaic integrated unified power quality conditioner with a 27-level i...
TELKOMNIKA JOURNAL
 
20140218 cisec-emc-in-aeronautics
20140218 cisec-emc-in-aeronautics20140218 cisec-emc-in-aeronautics
20140218 cisec-emc-in-aeronautics
CISEC
 
Load types, estimation, grwoth, forecasting and duration curves
Load types, estimation, grwoth, forecasting and duration curvesLoad types, estimation, grwoth, forecasting and duration curves
Load types, estimation, grwoth, forecasting and duration curves
Azfar Rasool
 
Analysis of a High Efficiency Boost-Inverter with Back-up Battery Storage in ...
Analysis of a High Efficiency Boost-Inverter with Back-up Battery Storage in ...Analysis of a High Efficiency Boost-Inverter with Back-up Battery Storage in ...
Analysis of a High Efficiency Boost-Inverter with Back-up Battery Storage in ...
irjes
 

What's hot (20)

Natf reference-document-reporting-and-verification-of-generating-unit-reactiv...
Natf reference-document-reporting-and-verification-of-generating-unit-reactiv...Natf reference-document-reporting-and-verification-of-generating-unit-reactiv...
Natf reference-document-reporting-and-verification-of-generating-unit-reactiv...
 
Maximizing Gas Turbine and Combined Cycle Capacity and Ratings
Maximizing Gas Turbine and Combined Cycle Capacity and RatingsMaximizing Gas Turbine and Combined Cycle Capacity and Ratings
Maximizing Gas Turbine and Combined Cycle Capacity and Ratings
 
Multi-Utility Scheduling Optimization (MUSO) Industrial Modeling Framework (M...
Multi-Utility Scheduling Optimization (MUSO) Industrial Modeling Framework (M...Multi-Utility Scheduling Optimization (MUSO) Industrial Modeling Framework (M...
Multi-Utility Scheduling Optimization (MUSO) Industrial Modeling Framework (M...
 
(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS
 
EcoMarine Propulsion Systems - An Overview
EcoMarine Propulsion Systems - An OverviewEcoMarine Propulsion Systems - An Overview
EcoMarine Propulsion Systems - An Overview
 
Harvesting in electric vehicles: Combining multiple power tracking and fuel-c...
Harvesting in electric vehicles: Combining multiple power tracking and fuel-c...Harvesting in electric vehicles: Combining multiple power tracking and fuel-c...
Harvesting in electric vehicles: Combining multiple power tracking and fuel-c...
 
Grid Integration of Large PV Power Systems Using HVDC Link
Grid Integration of Large PV Power Systems Using HVDC LinkGrid Integration of Large PV Power Systems Using HVDC Link
Grid Integration of Large PV Power Systems Using HVDC Link
 
IRJET- A Review on Designing of 100KV Grid Power using Hybrid Parameters
IRJET-  	  A Review on Designing of 100KV Grid Power using Hybrid ParametersIRJET-  	  A Review on Designing of 100KV Grid Power using Hybrid Parameters
IRJET- A Review on Designing of 100KV Grid Power using Hybrid Parameters
 
G011115473
G011115473G011115473
G011115473
 
42x36NCUR_Poster_Final
42x36NCUR_Poster_Final42x36NCUR_Poster_Final
42x36NCUR_Poster_Final
 
A MIP Approach to the Yearly Scheduling Problem of a Mixed Hydrothermal Syste...
A MIP Approach to the Yearly Scheduling Problem of a Mixed Hydrothermal Syste...A MIP Approach to the Yearly Scheduling Problem of a Mixed Hydrothermal Syste...
A MIP Approach to the Yearly Scheduling Problem of a Mixed Hydrothermal Syste...
 
IRJET- Power Management System for Electric Vehicle Charging Stations using F...
IRJET- Power Management System for Electric Vehicle Charging Stations using F...IRJET- Power Management System for Electric Vehicle Charging Stations using F...
IRJET- Power Management System for Electric Vehicle Charging Stations using F...
 
Electric and hybrid_marine_world_expo_patrick_baan_062014
Electric and hybrid_marine_world_expo_patrick_baan_062014Electric and hybrid_marine_world_expo_patrick_baan_062014
Electric and hybrid_marine_world_expo_patrick_baan_062014
 
Maulin Trivedi1_Presentation
Maulin Trivedi1_PresentationMaulin Trivedi1_Presentation
Maulin Trivedi1_Presentation
 
Scarabeus Project
Scarabeus ProjectScarabeus Project
Scarabeus Project
 
A039101011
A039101011A039101011
A039101011
 
A photovoltaic integrated unified power quality conditioner with a 27-level i...
A photovoltaic integrated unified power quality conditioner with a 27-level i...A photovoltaic integrated unified power quality conditioner with a 27-level i...
A photovoltaic integrated unified power quality conditioner with a 27-level i...
 
20140218 cisec-emc-in-aeronautics
20140218 cisec-emc-in-aeronautics20140218 cisec-emc-in-aeronautics
20140218 cisec-emc-in-aeronautics
 
Load types, estimation, grwoth, forecasting and duration curves
Load types, estimation, grwoth, forecasting and duration curvesLoad types, estimation, grwoth, forecasting and duration curves
Load types, estimation, grwoth, forecasting and duration curves
 
Analysis of a High Efficiency Boost-Inverter with Back-up Battery Storage in ...
Analysis of a High Efficiency Boost-Inverter with Back-up Battery Storage in ...Analysis of a High Efficiency Boost-Inverter with Back-up Battery Storage in ...
Analysis of a High Efficiency Boost-Inverter with Back-up Battery Storage in ...
 

Viewers also liked

Medco e-catalogue
Medco e-catalogueMedco e-catalogue
Medco e-catalogue
Kenny Luang
 
Отзыв о работе с фирмой Concept Stal
Отзыв о работе с фирмой Concept StalОтзыв о работе с фирмой Concept Stal
Отзыв о работе с фирмой Concept Stal
Vasily Borodihin
 
Schizandra sinensis
Schizandra sinensisSchizandra sinensis
Schizandra sinensis
La Senda natural
 
Assignment 1
Assignment 1Assignment 1
Assignment 1
Vernice Nalani
 
8. salvador espriu
8. salvador espriu8. salvador espriu
8. salvador espriu
Pacomarti
 
2015 MEMBER Advisory Group SCRIPT_July24
2015 MEMBER Advisory Group SCRIPT_July242015 MEMBER Advisory Group SCRIPT_July24
2015 MEMBER Advisory Group SCRIPT_July24
Tania Mayorga
 
Diabetes
DiabetesDiabetes
presentation
presentationpresentation
presentation
Shivam Upadhyay
 
Investigacion tecnologica
Investigacion tecnologicaInvestigacion tecnologica
Investigacion tecnologica
frandako
 
(Inv. Mercados) Tema 9 - Diseño de cuestionarios
(Inv. Mercados) Tema 9 - Diseño de cuestionarios(Inv. Mercados) Tema 9 - Diseño de cuestionarios
(Inv. Mercados) Tema 9 - Diseño de cuestionarios
mdelriomejia
 
(Inv. Mercados) Tema 5 - Diseño de la investigación exploratoria
(Inv. Mercados) Tema 5 - Diseño de la investigación exploratoria(Inv. Mercados) Tema 5 - Diseño de la investigación exploratoria
(Inv. Mercados) Tema 5 - Diseño de la investigación exploratoria
mdelriomejia
 
Curriculum Powerpoint (1)
Curriculum Powerpoint (1)Curriculum Powerpoint (1)
Curriculum Powerpoint (1)
Karl DONVIL
 
Announcements, 8/28/16
Announcements, 8/28/16Announcements, 8/28/16
Announcements, 8/28/16
CLADSM
 

Viewers also liked (14)

Medco e-catalogue
Medco e-catalogueMedco e-catalogue
Medco e-catalogue
 
Отзыв о работе с фирмой Concept Stal
Отзыв о работе с фирмой Concept StalОтзыв о работе с фирмой Concept Stal
Отзыв о работе с фирмой Concept Stal
 
пре
препре
пре
 
Schizandra sinensis
Schizandra sinensisSchizandra sinensis
Schizandra sinensis
 
Assignment 1
Assignment 1Assignment 1
Assignment 1
 
8. salvador espriu
8. salvador espriu8. salvador espriu
8. salvador espriu
 
2015 MEMBER Advisory Group SCRIPT_July24
2015 MEMBER Advisory Group SCRIPT_July242015 MEMBER Advisory Group SCRIPT_July24
2015 MEMBER Advisory Group SCRIPT_July24
 
Diabetes
DiabetesDiabetes
Diabetes
 
presentation
presentationpresentation
presentation
 
Investigacion tecnologica
Investigacion tecnologicaInvestigacion tecnologica
Investigacion tecnologica
 
(Inv. Mercados) Tema 9 - Diseño de cuestionarios
(Inv. Mercados) Tema 9 - Diseño de cuestionarios(Inv. Mercados) Tema 9 - Diseño de cuestionarios
(Inv. Mercados) Tema 9 - Diseño de cuestionarios
 
(Inv. Mercados) Tema 5 - Diseño de la investigación exploratoria
(Inv. Mercados) Tema 5 - Diseño de la investigación exploratoria(Inv. Mercados) Tema 5 - Diseño de la investigación exploratoria
(Inv. Mercados) Tema 5 - Diseño de la investigación exploratoria
 
Curriculum Powerpoint (1)
Curriculum Powerpoint (1)Curriculum Powerpoint (1)
Curriculum Powerpoint (1)
 
Announcements, 8/28/16
Announcements, 8/28/16Announcements, 8/28/16
Announcements, 8/28/16
 

Similar to State of the Industry and Research Efforts in PSH

Smart Solar Plants
Smart Solar PlantsSmart Solar Plants
Smart Solar Plants
Abengoa
 
NMRESGI_Optimized Integration of PV with Battery Storage_Hawkins
NMRESGI_Optimized Integration of PV with Battery Storage_HawkinsNMRESGI_Optimized Integration of PV with Battery Storage_Hawkins
NMRESGI_Optimized Integration of PV with Battery Storage_Hawkins
Sandia National Laboratories: Energy & Climate: Renewables
 
Flexibility needs in the future power system
Flexibility needs in the future power systemFlexibility needs in the future power system
Flexibility needs in the future power system
Leonardo ENERGY
 
Can the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
Can the dream of 100% renewable energy be a reality? - Mr. Ken DragoonCan the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
Can the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
IPPAI
 
S 8 final-report-april-2003
S 8 final-report-april-2003S 8 final-report-april-2003
S 8 final-report-april-2003
Vara Prasad
 
520planning
520planning520planning
520planning
Shubham Sachan
 
Paperbus12
Paperbus12Paperbus12
Pumped hydro storage
Pumped hydro storagePumped hydro storage
Pumped hydro storage
Soumyadeep Nag
 
A Hydraulic Wind Power Transfer System Operation And Modeling
A Hydraulic Wind Power Transfer System  Operation And ModelingA Hydraulic Wind Power Transfer System  Operation And Modeling
A Hydraulic Wind Power Transfer System Operation And Modeling
Sara Perez
 
An Intelligent Power Management Investigation for Stand-alone Hybrid System U...
An Intelligent Power Management Investigation for Stand-alone Hybrid System U...An Intelligent Power Management Investigation for Stand-alone Hybrid System U...
An Intelligent Power Management Investigation for Stand-alone Hybrid System U...
International Journal of Power Electronics and Drive Systems
 
Development of Power System Stabilizer Using Modern Optimization Approach
Development of Power System Stabilizer Using Modern Optimization ApproachDevelopment of Power System Stabilizer Using Modern Optimization Approach
Development of Power System Stabilizer Using Modern Optimization Approach
ijtsrd
 
Integrated Renewable H2 Utility Systems
Integrated Renewable H2 Utility SystemsIntegrated Renewable H2 Utility Systems
Integrated Renewable H2 Utility Systems
Glenn Rambach
 
Smart Grid for US-China Green Energy Council
Smart Grid for US-China Green Energy CouncilSmart Grid for US-China Green Energy Council
Smart Grid for US-China Green Energy Council
Stephen Lee
 
Energy storage system
Energy storage systemEnergy storage system
188-2486-2-PB.pdf
188-2486-2-PB.pdf188-2486-2-PB.pdf
188-2486-2-PB.pdf
DNTPOWER
 
Variable speed operation of hydraulic turbines
Variable speed operation of hydraulic turbinesVariable speed operation of hydraulic turbines
Variable speed operation of hydraulic turbines
Mads Grahl-Madsen
 
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
kevinfok
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
CHAPTER1_EnergyStorage_Pea3450.pptx
CHAPTER1_EnergyStorage_Pea3450.pptxCHAPTER1_EnergyStorage_Pea3450.pptx
CHAPTER1_EnergyStorage_Pea3450.pptx
MohamedHassanain8
 
Show and Tell - Flexibility & Hydrogen Integration.pdf
Show and Tell - Flexibility & Hydrogen Integration.pdfShow and Tell - Flexibility & Hydrogen Integration.pdf
Show and Tell - Flexibility & Hydrogen Integration.pdf
SIFOfgem
 

Similar to State of the Industry and Research Efforts in PSH (20)

Smart Solar Plants
Smart Solar PlantsSmart Solar Plants
Smart Solar Plants
 
NMRESGI_Optimized Integration of PV with Battery Storage_Hawkins
NMRESGI_Optimized Integration of PV with Battery Storage_HawkinsNMRESGI_Optimized Integration of PV with Battery Storage_Hawkins
NMRESGI_Optimized Integration of PV with Battery Storage_Hawkins
 
Flexibility needs in the future power system
Flexibility needs in the future power systemFlexibility needs in the future power system
Flexibility needs in the future power system
 
Can the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
Can the dream of 100% renewable energy be a reality? - Mr. Ken DragoonCan the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
Can the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
 
S 8 final-report-april-2003
S 8 final-report-april-2003S 8 final-report-april-2003
S 8 final-report-april-2003
 
520planning
520planning520planning
520planning
 
Paperbus12
Paperbus12Paperbus12
Paperbus12
 
Pumped hydro storage
Pumped hydro storagePumped hydro storage
Pumped hydro storage
 
A Hydraulic Wind Power Transfer System Operation And Modeling
A Hydraulic Wind Power Transfer System  Operation And ModelingA Hydraulic Wind Power Transfer System  Operation And Modeling
A Hydraulic Wind Power Transfer System Operation And Modeling
 
An Intelligent Power Management Investigation for Stand-alone Hybrid System U...
An Intelligent Power Management Investigation for Stand-alone Hybrid System U...An Intelligent Power Management Investigation for Stand-alone Hybrid System U...
An Intelligent Power Management Investigation for Stand-alone Hybrid System U...
 
Development of Power System Stabilizer Using Modern Optimization Approach
Development of Power System Stabilizer Using Modern Optimization ApproachDevelopment of Power System Stabilizer Using Modern Optimization Approach
Development of Power System Stabilizer Using Modern Optimization Approach
 
Integrated Renewable H2 Utility Systems
Integrated Renewable H2 Utility SystemsIntegrated Renewable H2 Utility Systems
Integrated Renewable H2 Utility Systems
 
Smart Grid for US-China Green Energy Council
Smart Grid for US-China Green Energy CouncilSmart Grid for US-China Green Energy Council
Smart Grid for US-China Green Energy Council
 
Energy storage system
Energy storage systemEnergy storage system
Energy storage system
 
188-2486-2-PB.pdf
188-2486-2-PB.pdf188-2486-2-PB.pdf
188-2486-2-PB.pdf
 
Variable speed operation of hydraulic turbines
Variable speed operation of hydraulic turbinesVariable speed operation of hydraulic turbines
Variable speed operation of hydraulic turbines
 
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
Energy Storage: New Capabilities for the Electric Grid – The Tehachapi Energy...
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
CHAPTER1_EnergyStorage_Pea3450.pptx
CHAPTER1_EnergyStorage_Pea3450.pptxCHAPTER1_EnergyStorage_Pea3450.pptx
CHAPTER1_EnergyStorage_Pea3450.pptx
 
Show and Tell - Flexibility & Hydrogen Integration.pdf
Show and Tell - Flexibility & Hydrogen Integration.pdfShow and Tell - Flexibility & Hydrogen Integration.pdf
Show and Tell - Flexibility & Hydrogen Integration.pdf
 

More from Nate Sandvig

Public Webinar: Challenges and Opportunities for Pumped Storage Hydropower in...
Public Webinar: Challenges and Opportunities for Pumped Storage Hydropower in...Public Webinar: Challenges and Opportunities for Pumped Storage Hydropower in...
Public Webinar: Challenges and Opportunities for Pumped Storage Hydropower in...
Nate Sandvig
 
DOE PSH RFI Reponses
DOE PSH RFI ReponsesDOE PSH RFI Reponses
DOE PSH RFI Reponses
Nate Sandvig
 
Veteran urges support of SB1547
Veteran urges support of SB1547Veteran urges support of SB1547
Veteran urges support of SB1547
Nate Sandvig
 
Columbia Gorge Pumped Storage FERC Permit
Columbia Gorge Pumped Storage FERC PermitColumbia Gorge Pumped Storage FERC Permit
Columbia Gorge Pumped Storage FERC Permit
Nate Sandvig
 
SAME Portland Postscripts
SAME Portland PostscriptsSAME Portland Postscripts
SAME Portland Postscripts
Nate Sandvig
 
Veteran Urges Support of HB 4036
Veteran Urges Support of HB 4036Veteran Urges Support of HB 4036
Veteran Urges Support of HB 4036
Nate Sandvig
 
Preliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia GorgePreliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia Gorge
Nate Sandvig
 
Is pumped storage on the ropes in the US?
Is pumped storage on the ropes in the US?Is pumped storage on the ropes in the US?
Is pumped storage on the ropes in the US?
Nate Sandvig
 
Roles of Dams & Hydro as Renewable Energy in China
Roles of Dams & Hydro as Renewable Energy in ChinaRoles of Dams & Hydro as Renewable Energy in China
Roles of Dams & Hydro as Renewable Energy in China
Nate Sandvig
 
Hydro's long history, and bright future, bode well for american energy indepe...
Hydro's long history, and bright future, bode well for american energy indepe...Hydro's long history, and bright future, bode well for american energy indepe...
Hydro's long history, and bright future, bode well for american energy indepe...
Nate Sandvig
 
What's Pumped Storage got to do with it?
What's Pumped Storage got to do with it?What's Pumped Storage got to do with it?
What's Pumped Storage got to do with it?
Nate Sandvig
 
Hydroelectric Pumped Storage Potential & Renewable Northwest Integration
Hydroelectric Pumped Storage Potential & Renewable Northwest IntegrationHydroelectric Pumped Storage Potential & Renewable Northwest Integration
Hydroelectric Pumped Storage Potential & Renewable Northwest Integration
Nate Sandvig
 

More from Nate Sandvig (12)

Public Webinar: Challenges and Opportunities for Pumped Storage Hydropower in...
Public Webinar: Challenges and Opportunities for Pumped Storage Hydropower in...Public Webinar: Challenges and Opportunities for Pumped Storage Hydropower in...
Public Webinar: Challenges and Opportunities for Pumped Storage Hydropower in...
 
DOE PSH RFI Reponses
DOE PSH RFI ReponsesDOE PSH RFI Reponses
DOE PSH RFI Reponses
 
Veteran urges support of SB1547
Veteran urges support of SB1547Veteran urges support of SB1547
Veteran urges support of SB1547
 
Columbia Gorge Pumped Storage FERC Permit
Columbia Gorge Pumped Storage FERC PermitColumbia Gorge Pumped Storage FERC Permit
Columbia Gorge Pumped Storage FERC Permit
 
SAME Portland Postscripts
SAME Portland PostscriptsSAME Portland Postscripts
SAME Portland Postscripts
 
Veteran Urges Support of HB 4036
Veteran Urges Support of HB 4036Veteran Urges Support of HB 4036
Veteran Urges Support of HB 4036
 
Preliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia GorgePreliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia Gorge
 
Is pumped storage on the ropes in the US?
Is pumped storage on the ropes in the US?Is pumped storage on the ropes in the US?
Is pumped storage on the ropes in the US?
 
Roles of Dams & Hydro as Renewable Energy in China
Roles of Dams & Hydro as Renewable Energy in ChinaRoles of Dams & Hydro as Renewable Energy in China
Roles of Dams & Hydro as Renewable Energy in China
 
Hydro's long history, and bright future, bode well for american energy indepe...
Hydro's long history, and bright future, bode well for american energy indepe...Hydro's long history, and bright future, bode well for american energy indepe...
Hydro's long history, and bright future, bode well for american energy indepe...
 
What's Pumped Storage got to do with it?
What's Pumped Storage got to do with it?What's Pumped Storage got to do with it?
What's Pumped Storage got to do with it?
 
Hydroelectric Pumped Storage Potential & Renewable Northwest Integration
Hydroelectric Pumped Storage Potential & Renewable Northwest IntegrationHydroelectric Pumped Storage Potential & Renewable Northwest Integration
Hydroelectric Pumped Storage Potential & Renewable Northwest Integration
 

Recently uploaded

4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
AI for Legal Research with applications, tools
AI for Legal Research with applications, toolsAI for Legal Research with applications, tools
AI for Legal Research with applications, tools
mahaffeycheryld
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
PIMR BHOPAL
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
harshapolam10
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
ijaia
 
morris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdfmorris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdf
ycwu0509
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...
Prakhyath Rai
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 

Recently uploaded (20)

4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
AI for Legal Research with applications, tools
AI for Legal Research with applications, toolsAI for Legal Research with applications, tools
AI for Legal Research with applications, tools
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
morris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdfmorris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdf
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 

State of the Industry and Research Efforts in PSH

  • 1. Public Workshop: Challenges and Opportunities for Pumped Storage Hydropower in the U.S. April 27, 2016 State of the Industry and Research Efforts in PSH Vladimir Koritarov Center for Energy, Environmental, and Economic Systems Analysis Energy Systems Division ARGONNE NATIONAL LABORATORY 9700 South Cass Avenue Argonne, IL 60439 Tel: 630-252-6711 Email: koritarov@anl.gov
  • 2. 2 Pumped Storage Hydropower (PSH)  About 130 GW of PSH in the world, of which: –40 GW in the European Union –22 GW in the United States  Many utilities are building new PSH capacity –1,200 MW Alto Tamega in Portugal, –760 MW Venda Nova 3 in Portugal, –852 MW La Muela 2 in Spain, etc. Seneca PSH in Pennsylvania
  • 3. Drivers for the Development of PSH – Then …  Historically, key drivers for the development of PSH capacity were to perform load shifting (load levelling) and provide backup capacity for large nuclear and coal units 3 PSH Installations in the U.S. by Plant Size Source: DOE – 2014 Hydropower Market Report Lake Hodges in 2012 (40 MW) Existing PSH Plants in the U.S. Source: Argonne National Laboratory
  • 4. …and Now – Growth of Variable Energy Resources (VERs) Source: AWEA 2014 Wind capacity is now over 65 GW Solar capacity is now over 17.5 GW Source: SEIA 2015 Key challenges for larger integration of VERs are their: • Variability • Uncertainty 4 U.S. Annual PV Installations
  • 5. Ancillary Services, such as Operating Reserves are Needed to Balance Wind 5 Almost 2,000MW range in a single day
  • 6. Power Systems will Need Flexible Capacity to Support Variable Generation Source: http://www.caiso.com/Documents/Presentation-Mark_Rothleder_CaliforniaISO.pdf About 13,000 MW ramping in 3 hours
  • 7. Advanced Forecasting Helps Reduce Uncertainty, Energy Storage Helps Manage Variability 7  Current wind forecasts tools do reasonably well  Forecasting ramps is still an issue
  • 8. Value of PSH in Utility Systems Three main components: 1. Energy/price arbitrage 2. Ancillary services 3. System-wide effects (lower system operating costs, better integration of VER, reduced cycling of thermal units, increased system reliability, etc.) 8
  • 9. PSH Has a Key Role in the Integration of Variable Generation Resources  PSH plants are well-suited to provide a number of ancillary and other grid services  Characterized by fast, flexible, and reliable operation with quick starts and excellent ramping capabilities  Proven technologies, commercially widely available  New PSH technology designs are focusing on providing even more flexibility  In the pumping mode, PSH plants create system load which can be used to store excess generation of VER and reduce their curtailments  PSH plants can provide ancillary services at lower cost than thermal generating units 9
  • 10. PSH Provides FLEXIBILITY to the Grid! Load shifting from peak to off-peak periods –Increase efficiency of system operation by: • Increasing the generation of base load units • Reduces the operation of expensive peaking units Contingency reserve (spinning and non-spinning) –Provide large amount of fast contingency reserve (e.g., for the outages of large nuclear and coal units) Regulation reserve – Help maintain system frequency at a narrow band around nominal system frequency by balancing supply and demand Flexibility reserves and load following – Provide quick-ramping capacity Energy imbalance reduction –Balance the variability of wind and solar power and correct the control area intertie exchanges 10
  • 11. Vt PS+jQS Pr+jQr Stator Rotor Power Converter Ptotal+jQtotal Adjustable Speed PSH Provide Even More Flexibility  One type of adjustable speed unit is doubly-fed induction machine (DFIM)  The rotors of DFIM units are equipped with three-phase windings and fed via frequency converter  The actual mechanical speed is the result of superposition of both rotor and stator rotating magnetic fields and is controlled by frequency converter  The units can vary the speed (typically up to 10% around the synchronous speed)  It is possible to adjust the speed to actual water head, which increases turbine efficiency  Active and reactive power can be controlled electronically and separately  The units are able to operate in partial load pumping mode 11
  • 12. Additional Benefits of Adjustable Speed PSH (Compared to Fixed Speed PSH)  More flexible and efficient operation in generation mode –Minimum unit power output as low as 20% –Increased efficiency and lifetime of the turbine at partial loads by operating at optimal speed  Frequency regulation capabilities also available in the pumping mode  Decoupled control of active and reactive power (electronically) –Provides more flexible voltage support  Improved dynamic behavior and stability of power system –Improved transient stability in case of grid faults (e.g., short circuit faults in the transmission system) –Reduced frequency drops in case of generator outages  Increased capabilities to balance variable renewables –More flexible and quicker response in generating (turbine) mode –Variable power in pumping mode to counterbalance variability of VERs –Excellent source of frequency regulation during off-peak hours 12
  • 13. Fixed and Adjustable Speed PSH Technologies  Adjustable speed PSH use doubly-fed induction machines (DFIM) or converter-fed synchronous machines (CFSM)  Adjustable speed PSH can operate in partial load pump mode, which allows them to provide regulation service also during pumping 13 Source: Koritarov et al., HydroVision 2015
  • 14. Operating Mode Transition Times 14 Source: Fisher et al. (HydroVision 2012)
  • 15. Ternary PSH Technology with Hydraulic Bypass Provides for Extraordinary Flexibility  Kops 2 (3x150 MW) PSH plant in Austria has implemented ternary pump- turbine arrangement with hydraulic bypass  Turbine and pump are connected with a mechanical clutch (pump can be separated during the generation mode to increase efficiency)  During the pumping, the power taken from the grid can be supplemented by the power produced by the hydro turbine (“hydraulic short circuit”)  This provides for flexibility in regulating the pumping power needs from the grid 15 Source: Illwerke VKW Group, 2009
  • 16. DOE Funded a Study on the Modeling and Analysis of Value of Advanced PSH in the U.S.  Clean energy goals require reliance on large amount of VER, which makes electric grid difficult to manage  PSH enables high penetration of VER: – Provides large quantities of energy storage and full range of ancillary services necessary for grid operation – Provides large amount of flexible dispatchable capacity with no greenhouse gas emissions – Has none of the limitations of other flexible technologies like gas turbines and demand response – Can mitigate over-generation of VER through storing and time-shifting excess generation – Improves dynamic behavior and stability of power system 16Source: C. Barnhart, Stanford University, 2014 Energy Stored on Energy Invested (ESOI) U.S. Energy Storage Capacity Mix Source: Grid Energy Storage, DOE 2013
  • 17. Advanced PSH Project Overview 17  Argonne-led study funded by the DOE Water Power Program Project website: http://ceeesa.es.anl.gov/projects/psh/psh.html Project Team Main Objectives:  Improve modeling representation of advanced PSH plants  Quantify their capabilities to provide various grid services  Analyze the value of these services under different market conditions and levels of variable renewable generation  Provide information on full range of benefits and value of PSH
  • 18. Advanced Technology Modeling – Model Development  Developed vendor-neutral dynamic models for advanced PSH technologies (adjustable speed and ternary units) Review of existing CH and PSH models in use in the United States Dynamic simulation models for adjustable speed PSH Dynamic simulation models for ternary PSH units Model Development 18 Comparison of system frequency with the FS and AS PSH units in response to generation outage in a test case FS PSH AS PSH
  • 19. Advanced Technology Modeling – Integration and Testing of Dynamic Models  Dynamic models for adjustable speed PSH and ternary units were coded and integrated into the PSS®E model  Testing of these models for both generating and pumping mode of operation was performed using PSS®E test cases and dynamic cases for Western Interconnection (WI)  Additional AGC studies have been performed for SMUD balancing authority  Published a report on frequency regulation capabilities of advanced PSH technologies Model Integration and Testing 19
  • 20. Study Addressed Wide Range of Operational Issues & Timeframes  Analysis aimed to capture PSH dynamic responses and operational characteristics across different timescales, from a fraction of a second to days/weeks. 20
  • 21. Production Cost and Revenue Simulations  First, the Project Team developed a matrix of various PSH contributions and services provided to the power system  A suite of computer models (PLEXOS, FESTIV, and CHEERS) was utilized to simulate system operation and analyze various operational issues occurring at different timescales  Production cost and revenue simulations were performed to analyze the operation of PSH and the value of their services and contributions to the power system
  • 22. PLEXOS Model with Detailed Representation of PSH was Used for Production Cost Simulations  Several levels of geographical scope, including the entire Western Interconnection, California, and SMUD  Simulations were conducted for 2022 – Multiple runs at different time resolutions – Hourly simulations for the entire year to determine maintenance schedule of thermal units and annual-level PSH economics – Runs at hourly and 5-min time steps for typical weeks in each season to analyze PSH operation under conditions of variability and uncertainty of renewable resources  Simulations were based on detailed WI grid representation (3,700 generators, 17,000 transmission buses) and examined impact of different levels of wind and solar penetration 22
  • 23. Annual Simulation Results Show that PSH Significantly Reduces Power System Operating Costs 0 2 4 6 8 10 No PSH With FS PSH With FS&AS PSH AnnualSystem ProductionCost Savings(%) Western Interconnection Base RE Scenario High Wind Scenario 0 2 4 6 8 10 No PSH With FS PSH With FS&AS PSH AnnualSystem ProductionCost Savings(%) California Base RE Scenario High Wind Scenario Production Cost Savings due to PSH Capacity in 2022
  • 24. PSH Provisions of System Reserves in 2022 (As % of Total System Requirements)  Western Interconnect 24  California:
  • 25. Western Interconnection: Impact of PSH on VER Curtailments in 2022  Baseline RE scenario:  High Wind RE scenario: 25 VER curtailments reduced 50% Annual generation of about 5,000 MW of wind capacity
  • 26. PSH Impacts on Power System Emissions 26 California: CO2 and NOx emissions decrease, SO2 emissions increase under both scenarios WI: Emissions increase under Base RE scenario, but decrease under High Wind RE scenario SMUD: Emissions decrease under both scenarios
  • 27. Reductions in Thermal Generator Ramping in 2022 due to PSH Capacity 27
  • 28. California: Thermal Generator Cycling in 2022  Baseline RE scenario:  High Wind RE scenario: 28 FS & AS PSH plants reduce cycling cost of thermal units by one third
  • 29. Additional Results, Details, and Information  A total of 7 reports were published during the project  Available at: http://ceeesa.es.anl.gov/projects/psh/psh.html 29  U.S. Congress has also requested a report on the role a value of PSH in integrating VERs and on potential hydropower from conduits  Detailed benefits of PSH for grid integration of VERs were documented in a supporting technical report Main Project Report
  • 30. PSH Projects with Preliminary FERC Permits 30 April 1, 2015 January 1, 2013 April 1, 2016 October 1, 2014
  • 31. Decline in Proposed PSH Projects – Why? 31 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 (MW) PSH Capacity (MW) with Preliminary FERC Permits
  • 32. 32 Contact: Vladimir KORITAROV ARGONNE NATIONAL LABORATORY 9700 South Cass Avenue Argonne, IL 60439 Tel: 630-252-6711 Koritarov@ANL.gov