SPM-UNIT III
RISK MANAGEMENT
MONITORING & CONTROL
Prof. Kanchana Devi
Introduction
 After scheduling , project will start and then
attention must be focused on progress.
 Progress needs monitoring
 What is happening
 Comparison of actual achievement against the schedule
 Revision of plans and schedules (wherever necessary)
2
Prof. Kanchana Devi
Creating Framework
Prof. Kanchana Devi
3
 Exercising control over a project and ensuring
that targets are met is a matter of regular
monitoring.
 Finding out what is happening and comparing
it with targets
 Re-planning also sometimes required
Project control cycle
Prof. Kanchana Devi
4
Responsibility
Prof. Kanchana Devi
5
 The overall responsibility
 Ensuring satisfactory progress on a project
 It is the role of “Steering Committee”, project
management board or Project Board.
Project Reporting Structure
Prof. Kanchana Devi
6
Reporting
Prof. Kanchana Devi
7
 Reporting may be
 Oral/Written
 Formal/Informal
 Regular/Ad-hoc
Assessing Progress
Prof. Kanchana Devi
8
 Information should be collected routinely
 Information should be objective and tangible
 Whether or not a particular report has been delivered
 Sometimes the assessment depends on
estimates of proportion of current activity that
has been completed
Setting Checkpoints
Prof. Kanchana Devi
9
 Necessary to set a series of check points in
the initial activity plan.
 Checkpoints may be:
 Regular(Monthly)
 Tied to specific events (production of report)
Collecting the Data
Prof. Kanchana Devi
10
 Rule: Manager will breakdown the long
activities into more controllable tasks of one or
two weeks.
 It is necessary to gather information about
partially completed activities, forecasts of how
much work is left to be completed.
Example of partial completion reporting
Prof. Kanchana Devi
11
Risk Reporting
Prof. Kanchana Devi
12
 One way to overcome the objections of partial
completion report is to avoid asking for
completion dates. (instead ask for likelihood of meeting the
target)
 Called “Traffic Light Method”.
Consists of following steps
Prof. Kanchana Devi
13
 Identify the key elements for assessment in a piece of
work
 Break these key elements into constituent element
 Assess each of the second level element on the scale
 Green for target,
 Amber for ‘not on target but recoverable’
 Red for ‘not on target and recoverable only with
difficulty’
 Review second level assessment to arrive at first level
 Review first level assessment to produce an overall
assessment
Example
Prof. Kanchana Devi
14
Visualizing Progress
Prof. Kanchana Devi
15
 Gantt Chart
 Slip Chart
 Ball Chart
 Timeline Chart
Cost Monitoring
Prof. Kanchana Devi
16
 Expenditure monitoring is an important
component of project control
 A project might be on time but only because
more money has been spent on activities than
originally budgeted
Tracking cumulative expenditure
Prof. Kanchana Devi
17
Cumulative Expenditure Chart
Prof. Kanchana Devi
18
Earned Value
Prof. Kanchana Devi
19
 Analysis is based on assigning a ‘value’ to each
task or work package based on expenditure
forecasts.
 The assigned value is the original budgeted cost
for the item and is known as the ‘baseline budget’
or ‘budgeted cost of work scheduled’(BCWS)
 The total value credited to a project at any point is
known as the ‘earned value’ or ‘budgeted cost of
the work performed’(BCWP)
Actual Cost
Prof. Kanchana Devi
20
 By recording the “Earned Value”, the actual
cost of each task can be collected as “Actual
Cost” or ACWP-Actual Cost of Work
Performed.
 There are three types of Variance:
 Schedule Variance(SV)
 Time Variance(TV)
 Cost Variance(CV)
Schedule Variance(SV)
Prof. Kanchana Devi
21
 The Schedule Variance is measured in
cost terms as EV-PV
 It indicates the degree to which the value
of the completed work differs from the
planned work.
Example:
Prof. Kanchana Devi
22
 A work with a PV of $40,000 should have
been completed by now. In fact, some of that
work has not been done so that the EV is only
$35,000. Calculate SV.
 SV=EV-PV
 35000-40000= - 5000
 A negative SV means the project is behind
schedule
Time Variance (TV)
Prof. Kanchana Devi
23
 Difference between the time when the
achievement of the current earned value was
planned to occur and the time now.
 Eg:
 The current EV should have been achieved in the
early part of month 9 and as the time now is end
of month 11, the TV is about -1.75 months from
graph.
Cost Variance (CV)
Prof. Kanchana Devi
24
 This is calculated as EV-AC.
 It indicates the difference between the earned
value or budgeted cost and the actual cost of the
completed work.
 Let Actual Cost for previous example is $ 55,000
 CV=35000-55000
 = -20000
 A negative CV means that the project is over cost
Prioritizing Monitoring
Prof. Kanchana Devi
25
 List of priorities
 Critical Path Activities
 Activities with no free float
 Activities with less than a specified float
 High Risk Activities
 Activities using critical resources

More Related Content

What's hot

Spm unit iii-risk-pert
Spm unit iii-risk-pertSpm unit iii-risk-pert
Spm unit iii-risk-pertKanchana Devi
 
Information Technology Project Management
Information Technology Project ManagementInformation Technology Project Management
Information Technology Project ManagementGoutama Bachtiar
 
Information Technology Project Management - part 08
Information Technology Project Management - part  08Information Technology Project Management - part  08
Information Technology Project Management - part 08Rizwan Khurram
 
Project planning and scheduling
Project planning and schedulingProject planning and scheduling
Project planning and schedulingadeel hamid
 
Spm software effort estimation
Spm software effort estimationSpm software effort estimation
Spm software effort estimationKanchana Devi
 
Chapter 3: The Project Management Process Groups: A Case Study
Chapter 3:The Project Management Process Groups: A Case StudyChapter 3:The Project Management Process Groups: A Case Study
Chapter 3: The Project Management Process Groups: A Case StudyShahid Riaz
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTKathirvel Ayyaswamy
 
Project human resources management
Project human resources managementProject human resources management
Project human resources managementFirmansyah Ashari
 
Develop Project Management Plan Data Flow Diagram
Develop Project Management Plan Data Flow DiagramDevelop Project Management Plan Data Flow Diagram
Develop Project Management Plan Data Flow Diagramriosabel
 
Unit 1.2 Stepwise Project Planning.pdf
Unit 1.2 Stepwise Project Planning.pdfUnit 1.2 Stepwise Project Planning.pdf
Unit 1.2 Stepwise Project Planning.pdfAkshayDwivedi31
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTKathirvel Ayyaswamy
 
Chapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.pptChapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.pptAhmadTawfigAlRadaide
 
Information Technology Project Management - part 05
Information Technology Project Management - part 05Information Technology Project Management - part 05
Information Technology Project Management - part 05Rizwan Khurram
 

What's hot (20)

Spm unit iii-risk-pert
Spm unit iii-risk-pertSpm unit iii-risk-pert
Spm unit iii-risk-pert
 
Information Technology Project Management
Information Technology Project ManagementInformation Technology Project Management
Information Technology Project Management
 
SPM Evaluation
SPM EvaluationSPM Evaluation
SPM Evaluation
 
Stepwise planning
Stepwise planningStepwise planning
Stepwise planning
 
Information Technology Project Management - part 08
Information Technology Project Management - part  08Information Technology Project Management - part  08
Information Technology Project Management - part 08
 
Spm unit 5
Spm unit 5Spm unit 5
Spm unit 5
 
Spm unit 1
Spm unit 1Spm unit 1
Spm unit 1
 
Project planning and scheduling
Project planning and schedulingProject planning and scheduling
Project planning and scheduling
 
Spm software effort estimation
Spm software effort estimationSpm software effort estimation
Spm software effort estimation
 
Chapter 3: The Project Management Process Groups: A Case Study
Chapter 3:The Project Management Process Groups: A Case StudyChapter 3:The Project Management Process Groups: A Case Study
Chapter 3: The Project Management Process Groups: A Case Study
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 
Project human resources management
Project human resources managementProject human resources management
Project human resources management
 
Develop Project Management Plan Data Flow Diagram
Develop Project Management Plan Data Flow DiagramDevelop Project Management Plan Data Flow Diagram
Develop Project Management Plan Data Flow Diagram
 
Spm unit 3
Spm unit 3Spm unit 3
Spm unit 3
 
Final Project Closing
Final Project ClosingFinal Project Closing
Final Project Closing
 
Project Scheduling, Planning and Risk Management
Project Scheduling, Planning and Risk ManagementProject Scheduling, Planning and Risk Management
Project Scheduling, Planning and Risk Management
 
Unit 1.2 Stepwise Project Planning.pdf
Unit 1.2 Stepwise Project Planning.pdfUnit 1.2 Stepwise Project Planning.pdf
Unit 1.2 Stepwise Project Planning.pdf
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 
Chapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.pptChapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.ppt
 
Information Technology Project Management - part 05
Information Technology Project Management - part 05Information Technology Project Management - part 05
Information Technology Project Management - part 05
 

Viewers also liked

Spm unit iii-risk-resource allocation
Spm unit iii-risk-resource allocationSpm unit iii-risk-resource allocation
Spm unit iii-risk-resource allocationKanchana Devi
 
Risk Management
Risk ManagementRisk Management
Risk Managementcgeorgeo
 
Spm unit iii-risk-working in teams
Spm unit iii-risk-working in teamsSpm unit iii-risk-working in teams
Spm unit iii-risk-working in teamsKanchana Devi
 
List of 10 Sales Performance Management (SPM) Vendors
List of 10 Sales Performance Management (SPM) VendorsList of 10 Sales Performance Management (SPM) Vendors
List of 10 Sales Performance Management (SPM) VendorsTriCorps Technologies
 
Spm project planning
Spm project planning Spm project planning
Spm project planning Kanchana Devi
 
160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-controleidalin95
 
Ch 9 project monitoring & control updated
Ch 9 project monitoring & control updatedCh 9 project monitoring & control updated
Ch 9 project monitoring & control updatedFarhana Rehman
 
How to monitor your project progress
How to monitor your project progressHow to monitor your project progress
How to monitor your project progressAsif A. Kabani
 
Bank risk management
Bank risk managementBank risk management
Bank risk managementAshima Thakur
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Controlguy_davis
 
Risk management in banks
Risk management in banksRisk management in banks
Risk management in bankseduCBA
 
Leadership In Project Management
Leadership In Project ManagementLeadership In Project Management
Leadership In Project Managementguest484a666
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoringharoldtaylor1113
 
Risk management in banking
Risk management in bankingRisk management in banking
Risk management in banking7939790a
 
Report - Risk Management in Banks
Report - Risk Management in BanksReport - Risk Management in Banks
Report - Risk Management in BanksSharad Srivastava
 

Viewers also liked (20)

Spm unit iii-risk-resource allocation
Spm unit iii-risk-resource allocationSpm unit iii-risk-resource allocation
Spm unit iii-risk-resource allocation
 
Risk management
Risk managementRisk management
Risk management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Spm chapter 8
Spm chapter 8Spm chapter 8
Spm chapter 8
 
Spm unit iii-risk-working in teams
Spm unit iii-risk-working in teamsSpm unit iii-risk-working in teams
Spm unit iii-risk-working in teams
 
List of 10 Sales Performance Management (SPM) Vendors
List of 10 Sales Performance Management (SPM) VendorsList of 10 Sales Performance Management (SPM) Vendors
List of 10 Sales Performance Management (SPM) Vendors
 
Spm project planning
Spm project planning Spm project planning
Spm project planning
 
Monitoring the control
Monitoring the control Monitoring the control
Monitoring the control
 
160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-control
 
Ch 9 project monitoring & control updated
Ch 9 project monitoring & control updatedCh 9 project monitoring & control updated
Ch 9 project monitoring & control updated
 
How to monitor your project progress
How to monitor your project progressHow to monitor your project progress
How to monitor your project progress
 
Bank risk management
Bank risk managementBank risk management
Bank risk management
 
Effective Risk Mgmt Kylucas (C) 2009 All Rights Reserved
Effective Risk Mgmt Kylucas (C) 2009 All Rights ReservedEffective Risk Mgmt Kylucas (C) 2009 All Rights Reserved
Effective Risk Mgmt Kylucas (C) 2009 All Rights Reserved
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Control
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Control
 
Risk management in banks
Risk management in banksRisk management in banks
Risk management in banks
 
Leadership In Project Management
Leadership In Project ManagementLeadership In Project Management
Leadership In Project Management
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoring
 
Risk management in banking
Risk management in bankingRisk management in banking
Risk management in banking
 
Report - Risk Management in Banks
Report - Risk Management in BanksReport - Risk Management in Banks
Report - Risk Management in Banks
 

Similar to Spm unit iii-risk-monitoring & control1

Project monitoring & Earned Value Analysis
Project monitoring & Earned Value AnalysisProject monitoring & Earned Value Analysis
Project monitoring & Earned Value AnalysisBECM, RUET, Bangladesh
 
Project Planning and Excution chapter 4.ppt
Project Planning and Excution chapter 4.pptProject Planning and Excution chapter 4.ppt
Project Planning and Excution chapter 4.pptadabotor7
 
Projects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part OneProjects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part OneWaleed Hamdy Albana
 
project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 waleed hamdy
 
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.pptProfDrAnbalaganChinn
 
Earned value analysis (1)
Earned value analysis (1)Earned value analysis (1)
Earned value analysis (1)Harshit Mahajan
 
Primavera Calender and Earned Value.pdf..
Primavera Calender and Earned Value.pdf..Primavera Calender and Earned Value.pdf..
Primavera Calender and Earned Value.pdf..EngrMuhammadJavidNaw
 
The Project Management Process - Week 9 Performance Management
The Project Management Process - Week 9   Performance ManagementThe Project Management Process - Week 9   Performance Management
The Project Management Process - Week 9 Performance ManagementCraig Brown
 
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...Mohammad Lemar ZALMAİ
 
Earned value Project Management (evpm)
Earned value Project Management (evpm)Earned value Project Management (evpm)
Earned value Project Management (evpm)Ejaz Bhatti
 
Summer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javedSummer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javedWaqar Ahmed
 
Earned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlEarned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlM Maged Hegazy, LLM, MBA, CCP, P3O
 
Earned value management
Earned value managementEarned value management
Earned value managementGautam Kumar
 

Similar to Spm unit iii-risk-monitoring & control1 (20)

Project monitoring & Earned Value Analysis
Project monitoring & Earned Value AnalysisProject monitoring & Earned Value Analysis
Project monitoring & Earned Value Analysis
 
Project monitoring lecture 1
Project monitoring lecture 1Project monitoring lecture 1
Project monitoring lecture 1
 
Project Planning and Excution chapter 4.ppt
Project Planning and Excution chapter 4.pptProject Planning and Excution chapter 4.ppt
Project Planning and Excution chapter 4.ppt
 
Projects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part OneProjects Control Using Earned Value Techniques - Part One
Projects Control Using Earned Value Techniques - Part One
 
project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 project control using earned value analysis - Part 01
project control using earned value analysis - Part 01
 
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
 
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSISPROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
 
Earned value analysis
Earned value analysisEarned value analysis
Earned value analysis
 
An introduction to project accounting
An introduction to project accountingAn introduction to project accounting
An introduction to project accounting
 
Earned value analysis (1)
Earned value analysis (1)Earned value analysis (1)
Earned value analysis (1)
 
Primavera Calender and Earned Value.pdf..
Primavera Calender and Earned Value.pdf..Primavera Calender and Earned Value.pdf..
Primavera Calender and Earned Value.pdf..
 
The Project Management Process - Week 9 Performance Management
The Project Management Process - Week 9   Performance ManagementThe Project Management Process - Week 9   Performance Management
The Project Management Process - Week 9 Performance Management
 
EVA - Metrics.ppt
EVA - Metrics.pptEVA - Metrics.ppt
EVA - Metrics.ppt
 
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
 
Project managment 6 (a)
Project managment 6 (a)Project managment 6 (a)
Project managment 6 (a)
 
Earned value Project Management (evpm)
Earned value Project Management (evpm)Earned value Project Management (evpm)
Earned value Project Management (evpm)
 
Summer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javedSummer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javed
 
Earned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlEarned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project Control
 
Performing against the wall - SPI after completion
Performing against the wall - SPI after completionPerforming against the wall - SPI after completion
Performing against the wall - SPI after completion
 
Earned value management
Earned value managementEarned value management
Earned value management
 

More from Kanchana Devi

Spm unit v-software reliability-
Spm unit v-software reliability-Spm unit v-software reliability-
Spm unit v-software reliability-Kanchana Devi
 
Spm unit v-software maintenance-intro
Spm unit v-software maintenance-introSpm unit v-software maintenance-intro
Spm unit v-software maintenance-introKanchana Devi
 
Spm unit iii-configuration mgmt-responsibilities
Spm unit iii-configuration mgmt-responsibilitiesSpm unit iii-configuration mgmt-responsibilities
Spm unit iii-configuration mgmt-responsibilitiesKanchana Devi
 
Spm unit iii-configuration mgmt-intro
Spm unit iii-configuration mgmt-introSpm unit iii-configuration mgmt-intro
Spm unit iii-configuration mgmt-introKanchana Devi
 
Spm unit iii-risk-intro
Spm unit iii-risk-introSpm unit iii-risk-intro
Spm unit iii-risk-introKanchana Devi
 
Open source spm tools
Open source spm toolsOpen source spm tools
Open source spm toolsKanchana Devi
 

More from Kanchana Devi (6)

Spm unit v-software reliability-
Spm unit v-software reliability-Spm unit v-software reliability-
Spm unit v-software reliability-
 
Spm unit v-software maintenance-intro
Spm unit v-software maintenance-introSpm unit v-software maintenance-intro
Spm unit v-software maintenance-intro
 
Spm unit iii-configuration mgmt-responsibilities
Spm unit iii-configuration mgmt-responsibilitiesSpm unit iii-configuration mgmt-responsibilities
Spm unit iii-configuration mgmt-responsibilities
 
Spm unit iii-configuration mgmt-intro
Spm unit iii-configuration mgmt-introSpm unit iii-configuration mgmt-intro
Spm unit iii-configuration mgmt-intro
 
Spm unit iii-risk-intro
Spm unit iii-risk-introSpm unit iii-risk-intro
Spm unit iii-risk-intro
 
Open source spm tools
Open source spm toolsOpen source spm tools
Open source spm tools
 

Recently uploaded

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 

Recently uploaded (20)

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 

Spm unit iii-risk-monitoring & control1

  • 1. SPM-UNIT III RISK MANAGEMENT MONITORING & CONTROL Prof. Kanchana Devi
  • 2. Introduction  After scheduling , project will start and then attention must be focused on progress.  Progress needs monitoring  What is happening  Comparison of actual achievement against the schedule  Revision of plans and schedules (wherever necessary) 2 Prof. Kanchana Devi
  • 3. Creating Framework Prof. Kanchana Devi 3  Exercising control over a project and ensuring that targets are met is a matter of regular monitoring.  Finding out what is happening and comparing it with targets  Re-planning also sometimes required
  • 4. Project control cycle Prof. Kanchana Devi 4
  • 5. Responsibility Prof. Kanchana Devi 5  The overall responsibility  Ensuring satisfactory progress on a project  It is the role of “Steering Committee”, project management board or Project Board.
  • 7. Reporting Prof. Kanchana Devi 7  Reporting may be  Oral/Written  Formal/Informal  Regular/Ad-hoc
  • 8. Assessing Progress Prof. Kanchana Devi 8  Information should be collected routinely  Information should be objective and tangible  Whether or not a particular report has been delivered  Sometimes the assessment depends on estimates of proportion of current activity that has been completed
  • 9. Setting Checkpoints Prof. Kanchana Devi 9  Necessary to set a series of check points in the initial activity plan.  Checkpoints may be:  Regular(Monthly)  Tied to specific events (production of report)
  • 10. Collecting the Data Prof. Kanchana Devi 10  Rule: Manager will breakdown the long activities into more controllable tasks of one or two weeks.  It is necessary to gather information about partially completed activities, forecasts of how much work is left to be completed.
  • 11. Example of partial completion reporting Prof. Kanchana Devi 11
  • 12. Risk Reporting Prof. Kanchana Devi 12  One way to overcome the objections of partial completion report is to avoid asking for completion dates. (instead ask for likelihood of meeting the target)  Called “Traffic Light Method”.
  • 13. Consists of following steps Prof. Kanchana Devi 13  Identify the key elements for assessment in a piece of work  Break these key elements into constituent element  Assess each of the second level element on the scale  Green for target,  Amber for ‘not on target but recoverable’  Red for ‘not on target and recoverable only with difficulty’  Review second level assessment to arrive at first level  Review first level assessment to produce an overall assessment
  • 15. Visualizing Progress Prof. Kanchana Devi 15  Gantt Chart  Slip Chart  Ball Chart  Timeline Chart
  • 16. Cost Monitoring Prof. Kanchana Devi 16  Expenditure monitoring is an important component of project control  A project might be on time but only because more money has been spent on activities than originally budgeted
  • 19. Earned Value Prof. Kanchana Devi 19  Analysis is based on assigning a ‘value’ to each task or work package based on expenditure forecasts.  The assigned value is the original budgeted cost for the item and is known as the ‘baseline budget’ or ‘budgeted cost of work scheduled’(BCWS)  The total value credited to a project at any point is known as the ‘earned value’ or ‘budgeted cost of the work performed’(BCWP)
  • 20. Actual Cost Prof. Kanchana Devi 20  By recording the “Earned Value”, the actual cost of each task can be collected as “Actual Cost” or ACWP-Actual Cost of Work Performed.  There are three types of Variance:  Schedule Variance(SV)  Time Variance(TV)  Cost Variance(CV)
  • 21. Schedule Variance(SV) Prof. Kanchana Devi 21  The Schedule Variance is measured in cost terms as EV-PV  It indicates the degree to which the value of the completed work differs from the planned work.
  • 22. Example: Prof. Kanchana Devi 22  A work with a PV of $40,000 should have been completed by now. In fact, some of that work has not been done so that the EV is only $35,000. Calculate SV.  SV=EV-PV  35000-40000= - 5000  A negative SV means the project is behind schedule
  • 23. Time Variance (TV) Prof. Kanchana Devi 23  Difference between the time when the achievement of the current earned value was planned to occur and the time now.  Eg:  The current EV should have been achieved in the early part of month 9 and as the time now is end of month 11, the TV is about -1.75 months from graph.
  • 24. Cost Variance (CV) Prof. Kanchana Devi 24  This is calculated as EV-AC.  It indicates the difference between the earned value or budgeted cost and the actual cost of the completed work.  Let Actual Cost for previous example is $ 55,000  CV=35000-55000  = -20000  A negative CV means that the project is over cost
  • 25. Prioritizing Monitoring Prof. Kanchana Devi 25  List of priorities  Critical Path Activities  Activities with no free float  Activities with less than a specified float  High Risk Activities  Activities using critical resources