Curriculum Vitae
Mobile no.974 74780471
nilo_taghoy@yahoo.com
Name: Nilo Ramos Taghoy Age: 40
Position: Structure Inspector
Nationality: Filipino
Profession: Civil Engineering
Specialization: Quality Assurance/Quality Control & Supervision
Qualifications:
Member:
Bachelor of Science in Civil Engineering
University of Cebu
Philippine Institute of Civil Engineer (PICE
QATAR)
Profile
Summary : More than 15 years and 6 months experience in Construction
including Quality Assurance/Quality Control Inspection and Supervision
from Philippines & Abroad of Buildings, Oil and Gas, Refineries
Petrochemical, Gold Plant, Infrastructures and Railways projects such as :
Drainage, Road works (Concrete/Asphalt Pavement),Bridges, Camel Crossings,
Box Culverts, Tanks Foundation, Substations, Water Retaining Sumps, Retaining
Wall for Slop Protection, Commercial Buildings, Pre-cast Concrete Columns for
Pipe Rack Structure , Hollow Core Slabs for MCC Buildings, Accommodation
buildings of Gold Plant facilities, Sump Pits, Cooling Tower, Rail way
Embankments including ( Ballast and Sub-Ballast),HDPE Installation/Testing
Methods for Water Dam and Sumps ,Earthworks
Activities Selected Experienced
1
(July 5 2015 to date)
WS Atkins & Partners Overseas (Company)
ASHGHAL (Client)
(KBR) Kellogg Brown & Root (PMC)
Structural Inspector/Supervisor
Dukhan Highway a 73 million QR Project (Central Contract)- Doha (State Of
Qatar) : that composed of (1.5 km Tunnel, 4 (Bridges Box Girder), Interchanges
, Retaining walls, Hollow Core Culverts, Camel Underpasses, Utility Building,
Utility Culvert for Drainage Pipe, installation promat board fire proofing of 1.5 km
tunnel and water proofing using integritank coat type,connected to Qatar Mall.
.
RESPONSIBILITIES:
• Supervise or oversee contractor bodies activity such as: water proofing
system of tunnel, using integritank coating system Promat board fixing,
rebar works, formworks and concrete works and cast on site of Box Girder
Bridge/Internal Post Tension (type) of rebar works, formworks, concrete
works, strands pre stressing o, installation of bearing and grouting works.
• Checked documents per site activity provided such as: Method of
Statements, InspectionTest Plan, Formworks Design Calculation, Material
Approval, Drawings, and Calibration Certificates throughout the whole
areas as per above mentioned structures are correct for the plan work and
approved.
• Maintain site monitoring to maintain the site activity base on the project
specification & approved drawings and international standard adopted.
• Gave immediate comment/feed back to Contactor any discrepancy
observed at the site related to construction or Health and Safety issue.
• Reporting a Non Conformance Report to RE/ARE.
• Co-ordinate and cooperate to contractor for corrective action of non
compliance and preventive action during site activity observed.
• Maintain detailed a daily progress report/work acitivities, issues
approved/rejected activities, labor & equipment used etc., to
Resident/Assistant Resident Engineer.
• Maintain the RFI closed, attached with complete relevant documents.
• Attended weekly Health and Safety Meeting.
• Accept approved request for inspection from the RE/ARE to conduct site
witness/testing to ensure compliance the specifications. ]
• Undertake and give comments on contractor request for inspection of
various civil works.
• Maintain/monitor daily logs of RFI closed and pending.
2
Oct. 27, 2014 -July 3, 2015
GUSAN Construction Arabia Ltd.(Company)
MA'ADEN (Client)
AUSENCO Consulting Engineers (Consultant)
AD-DUWAYHI Gravity CIL – GOLD PROJECT (Project)
Hanwa Engineering & Construction (Main Contractor)
Architectural / Civil QA/QC Inspector
AD-DUWAYHI Gravity CIL –Gold Plant (Project) (Al Taef K.S.A)
The Ad Duwayhi project is 1 billion SR CIL (Carbon in Leach)/Gravity
Separation gold plant incorporation of crushing, grinding, screening Flotation,
gold recovery, gold room and related facilities as: 26 Accommodation Building for
operational manpower,5 Main Central Control Building, Warehouse and
Workshop, Maintenance Bay STR. Emergency Building(2no.), (6 no.)Security
Bldg., CIL Tank, Thickener Str.Scats Bank Str. Dust Collector Str.Gold Room
Bldg. ,Sewage Treatment Crusher Str.Emergency Feed Bin Str., Trump Metal
Bin Str. Dust Collector Str.Grizzly Feed Chute Str.,Crusher Rotary Valve Str.
Storm pond10000 sq.ml Tanks, Switch Gear Bldg.,Mill office Lime Silo Str.,Stuck
Pile Tunnel, Sump Pit 6 nos.,Chiller Tank, Carbon Filtration Str.,Transformer
Bldg.,and 82 km.Asphalt Access Road Including the Helipad, Duct Banks and
Pipe racks.
RESPONSIBILITIES:
• Did inspection with the client representative as per RFI submitted such as.
Survey works,formworks,rebar works, earthworks (Soil
Classification,CBR,FDT and other procedure test) block works & interior
architectural of 26 Accommodation,2 MCC Building, Recreational
Buildings and Sewage Treatment,
RCPC lying, for potable water/Fire Water Line and 70 km.Service Road &
Access Road (Asphalt paving), pipe laying (RCPC), Pipe Encasement at
village area.
Culverts for potable and fire water line and roadworks.
• Responsible inspections related the above mentioned structures
foundations such as Pipe Racks, Thickener Structure, Emergency Feed
Bin, Milling Structure Etc. for anchobolts placing, survey location
projection alignment rebars works, formworks and embedded items,
Grouting works of Rotating Equipment Foundations,80 km.Service Road
(Asphalt paving) of entire Process area including the Drainage works.
3
• Responsible for the inspection of 2 Water Dam 1000 sq.m.. and 5 Sump
pits of installation of HDPE (High Density Polyethylene) such as: proper
laying, testing (extrusion weld, hot wedge welding process of jointing,
tensile stressing/ pressure test.
• Gave idea to construction for corrective action of non compliance and
preventive solution during
site activity observed.
• Asssures approved documents per site activity provided such as: Method
of Statements, Inspection, Test Plan, Formworks Design Calculation,
Material Approval, Drawings, Calibration Certificates throughout the whole
areas as per above mentioned structures.
• Checked site modification of structure items has provided with approved
as built drawings.
• Site monitoring to maintain the site activity as per approved methodology
and project specification.
• Undertake give immediate feedback to Construction bodies any
discrepancy observed at with client during to site inspection conducted.
• Issued internal Non Conformance to Construction for preventive action
purpose.
• Hand over the RFI to client and punch listing closing.
June 19, 2012- July 3, 2014
Larsen & Toubro Ltd. (Company) Main Contractor (ATCO Ltd. Sub-
Contractor)
Saudi ARAMCO Dow Arabia Chemical Co. (SADARA) (Client)
JACOBS (Consultants)
Polyethylene (LSPB-1) (Petrochemical Project)
QA/QC Inspector Civil
The Sulfur Refinery project (Plant) Habshan Camp 25 billion $ that composes of
3 Sulphur pits (60x35m 15 meter deep),2 Oil Sump pits (60x25m 15m deep),
/Reinforced Concrete Water Retaining Retaining Wall),interconnecting Pipe Rack
Foundations (East West North and South), Equipment foundations, Vessel
Foundations, Reactor Foundations, Pump Foundations, Blower Foundations, 1
Cooling Pond (1000mx1000m 6m deep), Electrical Duct Banks, Valve Box,
Drainage Manholes,Reactor Foundations, Blower Foundations, Rotating
Equipment Foundations,72 km.service roads (Asphalt paving) and 3 MCC
buildings and 2 Substations.
RESPONSIBILITIES:
• Responsible of the inspection of the above mentioned structures
foundations for survey works, rebar works, formworks, concrete pouring
4
works,cementetious grout/epoxy grout,anchorbolts fixing, field density
Test using sand cone/nuclear gauge method of structural backfill and road
asphalting and duct bank reinforced concrete encasement.
• Liaised with client Representative as per RFI submitted.
• Report immediate feedback to Construction any discrepancy observed
with client during site inspection conducted.
• Inspection of the permanent materials delivered at the site provided with
the approved documents (material approval, vendor certificates, Test
Reports/test Certificate).
• Issued Internal NCR and Surveillance Report to Construction bodies as
per directed QA/QC Manager.
• Keep the daily logged of RFI, provided relevant attachment.
• Monitoring to maintain the site activity as per approved methodology
project Specification and approved drawings.
Aug. 23, 2010 - May 30, 2012
KHARAFI NATIONAL (Company)
Abu Dhabi Gas Industries LTD (GASCO) (Client)
TECNIMONT and JGC (Japan Group of Company) (PMC)
Oil & Gas Refinery (Sulphur) Habshan 5 Process Plant (Project)
The Sulfur Refinery project (Plant) Habshan Camp 25 billion $ that composes of
3 Sulphur pits (60x35m 15 meter deep),2 Oil Sump pits (60x25m 15m deep),
/Reinforced Concrete Water Retaining Retaining Wall),interconnecting Pipe Rack
Foundations (East West North and South), Equipment foundations, Vessel
Foundations, Reactor Foundations, Pump Foundations, Blower Foundations, 1
Cooling Pond (1000mx1000m 6m deep), Electrical Duct Banks, Valve Box,
Drainage Manholes,Reactor Foundations, Blower Foundations, Rotating
Equipment Foundations,72 km.service roads (Asphalt paving) and 3 MCC
buildings and 2 Substations.
RESPONSIBILITIES:
• Responsible of the inspection related civil works such as Survey
checking, soil testing (structure backfilling),re bar works, form works,
concrete pouring works, grouting works (structural columns base plate)
,water proofing system work and epoxy grouting (rotating equipment
foundation.
• Report immediate feedback to Construction any discrepancy observed
with client during site inspection conducted.
5
• Liaised with client Representative of inspection as per RFI received
with the construction bodies.
• Monitoring site activity in daily work basis.
• Ensure the site activity related civil works complies the approved
drawing, methodology, project specification and site testing
equipments has updated calibration certificates.
• Issued internal surveillance/non conformance report as per directed of
QA/QC Manager.
• Keep the daily logged of RFI, provided relevant attachment.
• Daily RFI closed and logged and monitoring.
May 5 2007-July 27 2010
Al Rashid Trading and Contracting Company (RTCC) (Main Contractor)
(Al Jouf K.S.A)
SOMAC Contracting Company (Subcontractor)
Al Rashid & Barclay Mowlem – Mitsui Consortium/Joint Venture
North & South Railway Project (CTW300 km) (Project)
Bridges, Box Culverts, Camel Crossing & Railway
Embankment/ Ballast & Sub Ballast, Grouted Rip-Rap (Project)
/ Slope Protection and Storm Drainage (RCPC)
(ISC) Implementation Supervision and Consultancy (Consultant)
Civil Inspector
RESPONSIBILITIES:
• Responsible of inspection/oversee the site activity of subcontractor that
composed of 8 Girder Bridges (Type), Box Culverts (3 cells 3x3 and 2x2
meter height) (970 nos)., RCPC Culverts with wing walls (1500 nos.),
Riprap works, Fencing works (cyclone wires), Ditches,Embankment works
(structural backfill and Ballast and Sub Ballast), Bearing plate installation,
Excavation works, Soil and Aggregates sampling (wetness), Survey
works, Rebaworks, Formworks, Concrete works, Grouting works, Pipe
laying works and inspection/monitoring of pre cast Girder
Beams at pre cast site area of pre pour and pouring inspection including
installation, Screed works top of bridge girder.
• Liaised with client Representative of inspection as per RFI received with
the sub contractor.
• Coordinate/gave idea or corrective action to Contractor bodies any
discrepancy observed to avoid the delay of the progress.
6
• Daily site inspection for close monitoring of site activity in reference with
approved shop drawings Approved Method of Statements and project
specification.
• Advised to contractor for corrective action of non conformance and
preventive action during site activity observed.
• Issued NCR and Surveillance Report to Contractor bodies as per directed
QA/QC Manager.
• Attended Weekly QA/QC meeting.
• Recorded/monitoring daily log of RFI received/closed.
• Maintaining to site for following the Health and Safety issues to contractor.
• Final RFI hand over to client and punch listing.
January 30 2007- April 28 2007
Integrated Contractor (Company)
Department Store Expansion 2,000 m.sq. (Project)
(3 storey building) Cebu Philippines
Project Supervisor/Site Engineer
RESPONSIBILITIES:
• Responsible for supervision of 2000 manpowers,monthly billing, quantity
surveying, scheduling,
• And preparing monthly progress report.
• Supervised the Excavation works, Survey works, Rebar works,
Formworks, Pipe laying for Sewage/Storm drainage RCPC pipe works.
• Preparing a daily report and two weeks look ahead schedule to Project
Manager.
• Conducted a Safety Tool Box talk prior to start the work.
• Daily site monitoring with reference of Shop drawing and project
specification.
Sep. 10, 2006 to Dec. 20, 2006
Provincial Engineering
Cebu City Philippines (Cebu City Government)
Estimator / Quantity Surveyor
RESPONSIBILITIES:
7
• Estimates or quantify permanent and temporary construction materials
,Excavation/(backfilling)Scaffolding forms, miscellaneous items,
Shuttering, reinforcement bars, Architectural items, Electrical items,
plumbing items, Equipments site monitoring and daily rates, structural
Steel Items, Roofings, concreting items and Equipment manpower billing
monthly, National road works site monitoring.
• Daily site inspection of the project site.
• Preparing Daily site Report submit to Provincial Engineering Manager.
May 16 2001 to August 17 2006 - (6 years)
Davao Cooperative Development Contractor (DACODECO)
Housing & Commercial Building Project
Cebu Philippines
Mason/Assistant Project-In charge
RESPONSIBILITIES:
• Responsible in supervision of 200 manpower and completed 2500
residential houses, 260 5 Storey commercial buildings during my 6 years
in serviced included monthly billing of construction estimating (permanent
and temporary).
• Preparing Two weeks look ahead schedule and daily report to Project
Engineer.
• Supervised the drainage works, rebar works, formworks and concrete
works, road works (backfilling/concrete and asphalt paving) including
earthworks activity.
• Conducted a Safety Tool Box talk prior to start the work.
Employment History
July 201date WS Atkins & Partner’s Overseas,Doha
Oct. 27, 2014 -July 3, 2015 (9 months) GUSAN Construction Arabia Ltd. (K.S.A)
June 19, 2012 to July 3, 2014 (2 years) Larsen & Toubro (Jubial K.S.A)
Aug.23, 2010 to May 30, 2012 - (2 years) KHARAFI NATIONAL (Habshan
Habshan U.E.A),
May 5 2007 to July 27 2010 - (3 years) Al Rashid Trading and Contracting
(RTCC) (Al Jouf K.S.A) Jan.30, )
Jan.30, 2007 to April 28 2007 (4 months) Integrated Contractor (Cebu, Phil.)
Sept. 10, 2006 to Dec. 20, 2006 (5 months) Provincial Engineering Capitol
May 16 2001 to August 17 2006 - (6 years) (DACODECO) (Cebu, Philippines)
Training Seminars/Certificates Received:
8
1. Job safety analysis training (Oil & Gas Project and Petrochemical)
2. Confined Space Training.(SADARA project)
3. Pre Construction Planning (PICE) Qatar
4. Philippines Institute of Civil Engineer Technical Workshop (PICE Qatar)
5. Scaffold Safety Training (SADARA Project)
6. Seminar on Construction & project Management. (PICE) Qatar
7. Auto CAD 2D 3D/MS Office /Word and Excel (TESDA)
8. Approved (SADARA) Saudi ARAMCO DOW Arabia Chemical Company
9
1. Job safety analysis training (Oil & Gas Project and Petrochemical)
2. Confined Space Training.(SADARA project)
3. Pre Construction Planning (PICE) Qatar
4. Philippines Institute of Civil Engineer Technical Workshop (PICE Qatar)
5. Scaffold Safety Training (SADARA Project)
6. Seminar on Construction & project Management. (PICE) Qatar
7. Auto CAD 2D 3D/MS Office /Word and Excel (TESDA)
8. Approved (SADARA) Saudi ARAMCO DOW Arabia Chemical Company
9

More Related Content

What's hot (20)

CV
CVCV
CV
 
Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
 
Riaz Cv
Riaz CvRiaz Cv
Riaz Cv
 
SUNDAR CV.
SUNDAR CV.SUNDAR CV.
SUNDAR CV.
 
Cv english
Cv englishCv english
Cv english
 
HARIDI CV2015
HARIDI CV2015HARIDI CV2015
HARIDI CV2015
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
Michael Keeney--Resume2015-A
Michael Keeney--Resume2015-AMichael Keeney--Resume2015-A
Michael Keeney--Resume2015-A
 
Resume
ResumeResume
Resume
 
Raj kumar betala snr inspection engineer
Raj kumar betala snr inspection engineerRaj kumar betala snr inspection engineer
Raj kumar betala snr inspection engineer
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad Gilbert
 
KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-
 
Saad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC EngineerSaad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC Engineer
 

Similar to wsa (20)

CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
Structural Engineer
Structural EngineerStructural Engineer
Structural Engineer
 
Brief Profile Sanjeev Kadam - 2016
Brief Profile Sanjeev Kadam -    2016Brief Profile Sanjeev Kadam -    2016
Brief Profile Sanjeev Kadam - 2016
 
Resume
ResumeResume
Resume
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
PRINCE CV -
PRINCE CV - PRINCE CV -
PRINCE CV -
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
arun megarme
arun megarmearun megarme
arun megarme
 
Katleho P LETELE CV with picture
Katleho P LETELE CV with pictureKatleho P LETELE CV with picture
Katleho P LETELE CV with picture
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
eng - hazem abdelaziz
eng - hazem abdelazizeng - hazem abdelaziz
eng - hazem abdelaziz
 
R.Krishna Raj Sr. QC_Inspector-19-04-16
R.Krishna Raj Sr. QC_Inspector-19-04-16R.Krishna Raj Sr. QC_Inspector-19-04-16
R.Krishna Raj Sr. QC_Inspector-19-04-16
 
Qa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipelineQa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipeline
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
C.V
C.VC.V
C.V
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
Mithun Banjan CV
Mithun Banjan CVMithun Banjan CV
Mithun Banjan CV
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 

wsa

  • 1. Curriculum Vitae Mobile no.974 74780471 nilo_taghoy@yahoo.com Name: Nilo Ramos Taghoy Age: 40 Position: Structure Inspector Nationality: Filipino Profession: Civil Engineering Specialization: Quality Assurance/Quality Control & Supervision Qualifications: Member: Bachelor of Science in Civil Engineering University of Cebu Philippine Institute of Civil Engineer (PICE QATAR) Profile Summary : More than 15 years and 6 months experience in Construction including Quality Assurance/Quality Control Inspection and Supervision from Philippines & Abroad of Buildings, Oil and Gas, Refineries Petrochemical, Gold Plant, Infrastructures and Railways projects such as : Drainage, Road works (Concrete/Asphalt Pavement),Bridges, Camel Crossings, Box Culverts, Tanks Foundation, Substations, Water Retaining Sumps, Retaining Wall for Slop Protection, Commercial Buildings, Pre-cast Concrete Columns for Pipe Rack Structure , Hollow Core Slabs for MCC Buildings, Accommodation buildings of Gold Plant facilities, Sump Pits, Cooling Tower, Rail way Embankments including ( Ballast and Sub-Ballast),HDPE Installation/Testing Methods for Water Dam and Sumps ,Earthworks Activities Selected Experienced 1
  • 2. (July 5 2015 to date) WS Atkins & Partners Overseas (Company) ASHGHAL (Client) (KBR) Kellogg Brown & Root (PMC) Structural Inspector/Supervisor Dukhan Highway a 73 million QR Project (Central Contract)- Doha (State Of Qatar) : that composed of (1.5 km Tunnel, 4 (Bridges Box Girder), Interchanges , Retaining walls, Hollow Core Culverts, Camel Underpasses, Utility Building, Utility Culvert for Drainage Pipe, installation promat board fire proofing of 1.5 km tunnel and water proofing using integritank coat type,connected to Qatar Mall. . RESPONSIBILITIES: • Supervise or oversee contractor bodies activity such as: water proofing system of tunnel, using integritank coating system Promat board fixing, rebar works, formworks and concrete works and cast on site of Box Girder Bridge/Internal Post Tension (type) of rebar works, formworks, concrete works, strands pre stressing o, installation of bearing and grouting works. • Checked documents per site activity provided such as: Method of Statements, InspectionTest Plan, Formworks Design Calculation, Material Approval, Drawings, and Calibration Certificates throughout the whole areas as per above mentioned structures are correct for the plan work and approved. • Maintain site monitoring to maintain the site activity base on the project specification & approved drawings and international standard adopted. • Gave immediate comment/feed back to Contactor any discrepancy observed at the site related to construction or Health and Safety issue. • Reporting a Non Conformance Report to RE/ARE. • Co-ordinate and cooperate to contractor for corrective action of non compliance and preventive action during site activity observed. • Maintain detailed a daily progress report/work acitivities, issues approved/rejected activities, labor & equipment used etc., to Resident/Assistant Resident Engineer. • Maintain the RFI closed, attached with complete relevant documents. • Attended weekly Health and Safety Meeting. • Accept approved request for inspection from the RE/ARE to conduct site witness/testing to ensure compliance the specifications. ] • Undertake and give comments on contractor request for inspection of various civil works. • Maintain/monitor daily logs of RFI closed and pending. 2
  • 3. Oct. 27, 2014 -July 3, 2015 GUSAN Construction Arabia Ltd.(Company) MA'ADEN (Client) AUSENCO Consulting Engineers (Consultant) AD-DUWAYHI Gravity CIL – GOLD PROJECT (Project) Hanwa Engineering & Construction (Main Contractor) Architectural / Civil QA/QC Inspector AD-DUWAYHI Gravity CIL –Gold Plant (Project) (Al Taef K.S.A) The Ad Duwayhi project is 1 billion SR CIL (Carbon in Leach)/Gravity Separation gold plant incorporation of crushing, grinding, screening Flotation, gold recovery, gold room and related facilities as: 26 Accommodation Building for operational manpower,5 Main Central Control Building, Warehouse and Workshop, Maintenance Bay STR. Emergency Building(2no.), (6 no.)Security Bldg., CIL Tank, Thickener Str.Scats Bank Str. Dust Collector Str.Gold Room Bldg. ,Sewage Treatment Crusher Str.Emergency Feed Bin Str., Trump Metal Bin Str. Dust Collector Str.Grizzly Feed Chute Str.,Crusher Rotary Valve Str. Storm pond10000 sq.ml Tanks, Switch Gear Bldg.,Mill office Lime Silo Str.,Stuck Pile Tunnel, Sump Pit 6 nos.,Chiller Tank, Carbon Filtration Str.,Transformer Bldg.,and 82 km.Asphalt Access Road Including the Helipad, Duct Banks and Pipe racks. RESPONSIBILITIES: • Did inspection with the client representative as per RFI submitted such as. Survey works,formworks,rebar works, earthworks (Soil Classification,CBR,FDT and other procedure test) block works & interior architectural of 26 Accommodation,2 MCC Building, Recreational Buildings and Sewage Treatment, RCPC lying, for potable water/Fire Water Line and 70 km.Service Road & Access Road (Asphalt paving), pipe laying (RCPC), Pipe Encasement at village area. Culverts for potable and fire water line and roadworks. • Responsible inspections related the above mentioned structures foundations such as Pipe Racks, Thickener Structure, Emergency Feed Bin, Milling Structure Etc. for anchobolts placing, survey location projection alignment rebars works, formworks and embedded items, Grouting works of Rotating Equipment Foundations,80 km.Service Road (Asphalt paving) of entire Process area including the Drainage works. 3
  • 4. • Responsible for the inspection of 2 Water Dam 1000 sq.m.. and 5 Sump pits of installation of HDPE (High Density Polyethylene) such as: proper laying, testing (extrusion weld, hot wedge welding process of jointing, tensile stressing/ pressure test. • Gave idea to construction for corrective action of non compliance and preventive solution during site activity observed. • Asssures approved documents per site activity provided such as: Method of Statements, Inspection, Test Plan, Formworks Design Calculation, Material Approval, Drawings, Calibration Certificates throughout the whole areas as per above mentioned structures. • Checked site modification of structure items has provided with approved as built drawings. • Site monitoring to maintain the site activity as per approved methodology and project specification. • Undertake give immediate feedback to Construction bodies any discrepancy observed at with client during to site inspection conducted. • Issued internal Non Conformance to Construction for preventive action purpose. • Hand over the RFI to client and punch listing closing. June 19, 2012- July 3, 2014 Larsen & Toubro Ltd. (Company) Main Contractor (ATCO Ltd. Sub- Contractor) Saudi ARAMCO Dow Arabia Chemical Co. (SADARA) (Client) JACOBS (Consultants) Polyethylene (LSPB-1) (Petrochemical Project) QA/QC Inspector Civil The Sulfur Refinery project (Plant) Habshan Camp 25 billion $ that composes of 3 Sulphur pits (60x35m 15 meter deep),2 Oil Sump pits (60x25m 15m deep), /Reinforced Concrete Water Retaining Retaining Wall),interconnecting Pipe Rack Foundations (East West North and South), Equipment foundations, Vessel Foundations, Reactor Foundations, Pump Foundations, Blower Foundations, 1 Cooling Pond (1000mx1000m 6m deep), Electrical Duct Banks, Valve Box, Drainage Manholes,Reactor Foundations, Blower Foundations, Rotating Equipment Foundations,72 km.service roads (Asphalt paving) and 3 MCC buildings and 2 Substations. RESPONSIBILITIES: • Responsible of the inspection of the above mentioned structures foundations for survey works, rebar works, formworks, concrete pouring 4
  • 5. works,cementetious grout/epoxy grout,anchorbolts fixing, field density Test using sand cone/nuclear gauge method of structural backfill and road asphalting and duct bank reinforced concrete encasement. • Liaised with client Representative as per RFI submitted. • Report immediate feedback to Construction any discrepancy observed with client during site inspection conducted. • Inspection of the permanent materials delivered at the site provided with the approved documents (material approval, vendor certificates, Test Reports/test Certificate). • Issued Internal NCR and Surveillance Report to Construction bodies as per directed QA/QC Manager. • Keep the daily logged of RFI, provided relevant attachment. • Monitoring to maintain the site activity as per approved methodology project Specification and approved drawings. Aug. 23, 2010 - May 30, 2012 KHARAFI NATIONAL (Company) Abu Dhabi Gas Industries LTD (GASCO) (Client) TECNIMONT and JGC (Japan Group of Company) (PMC) Oil & Gas Refinery (Sulphur) Habshan 5 Process Plant (Project) The Sulfur Refinery project (Plant) Habshan Camp 25 billion $ that composes of 3 Sulphur pits (60x35m 15 meter deep),2 Oil Sump pits (60x25m 15m deep), /Reinforced Concrete Water Retaining Retaining Wall),interconnecting Pipe Rack Foundations (East West North and South), Equipment foundations, Vessel Foundations, Reactor Foundations, Pump Foundations, Blower Foundations, 1 Cooling Pond (1000mx1000m 6m deep), Electrical Duct Banks, Valve Box, Drainage Manholes,Reactor Foundations, Blower Foundations, Rotating Equipment Foundations,72 km.service roads (Asphalt paving) and 3 MCC buildings and 2 Substations. RESPONSIBILITIES: • Responsible of the inspection related civil works such as Survey checking, soil testing (structure backfilling),re bar works, form works, concrete pouring works, grouting works (structural columns base plate) ,water proofing system work and epoxy grouting (rotating equipment foundation. • Report immediate feedback to Construction any discrepancy observed with client during site inspection conducted. 5
  • 6. • Liaised with client Representative of inspection as per RFI received with the construction bodies. • Monitoring site activity in daily work basis. • Ensure the site activity related civil works complies the approved drawing, methodology, project specification and site testing equipments has updated calibration certificates. • Issued internal surveillance/non conformance report as per directed of QA/QC Manager. • Keep the daily logged of RFI, provided relevant attachment. • Daily RFI closed and logged and monitoring. May 5 2007-July 27 2010 Al Rashid Trading and Contracting Company (RTCC) (Main Contractor) (Al Jouf K.S.A) SOMAC Contracting Company (Subcontractor) Al Rashid & Barclay Mowlem – Mitsui Consortium/Joint Venture North & South Railway Project (CTW300 km) (Project) Bridges, Box Culverts, Camel Crossing & Railway Embankment/ Ballast & Sub Ballast, Grouted Rip-Rap (Project) / Slope Protection and Storm Drainage (RCPC) (ISC) Implementation Supervision and Consultancy (Consultant) Civil Inspector RESPONSIBILITIES: • Responsible of inspection/oversee the site activity of subcontractor that composed of 8 Girder Bridges (Type), Box Culverts (3 cells 3x3 and 2x2 meter height) (970 nos)., RCPC Culverts with wing walls (1500 nos.), Riprap works, Fencing works (cyclone wires), Ditches,Embankment works (structural backfill and Ballast and Sub Ballast), Bearing plate installation, Excavation works, Soil and Aggregates sampling (wetness), Survey works, Rebaworks, Formworks, Concrete works, Grouting works, Pipe laying works and inspection/monitoring of pre cast Girder Beams at pre cast site area of pre pour and pouring inspection including installation, Screed works top of bridge girder. • Liaised with client Representative of inspection as per RFI received with the sub contractor. • Coordinate/gave idea or corrective action to Contractor bodies any discrepancy observed to avoid the delay of the progress. 6
  • 7. • Daily site inspection for close monitoring of site activity in reference with approved shop drawings Approved Method of Statements and project specification. • Advised to contractor for corrective action of non conformance and preventive action during site activity observed. • Issued NCR and Surveillance Report to Contractor bodies as per directed QA/QC Manager. • Attended Weekly QA/QC meeting. • Recorded/monitoring daily log of RFI received/closed. • Maintaining to site for following the Health and Safety issues to contractor. • Final RFI hand over to client and punch listing. January 30 2007- April 28 2007 Integrated Contractor (Company) Department Store Expansion 2,000 m.sq. (Project) (3 storey building) Cebu Philippines Project Supervisor/Site Engineer RESPONSIBILITIES: • Responsible for supervision of 2000 manpowers,monthly billing, quantity surveying, scheduling, • And preparing monthly progress report. • Supervised the Excavation works, Survey works, Rebar works, Formworks, Pipe laying for Sewage/Storm drainage RCPC pipe works. • Preparing a daily report and two weeks look ahead schedule to Project Manager. • Conducted a Safety Tool Box talk prior to start the work. • Daily site monitoring with reference of Shop drawing and project specification. Sep. 10, 2006 to Dec. 20, 2006 Provincial Engineering Cebu City Philippines (Cebu City Government) Estimator / Quantity Surveyor RESPONSIBILITIES: 7
  • 8. • Estimates or quantify permanent and temporary construction materials ,Excavation/(backfilling)Scaffolding forms, miscellaneous items, Shuttering, reinforcement bars, Architectural items, Electrical items, plumbing items, Equipments site monitoring and daily rates, structural Steel Items, Roofings, concreting items and Equipment manpower billing monthly, National road works site monitoring. • Daily site inspection of the project site. • Preparing Daily site Report submit to Provincial Engineering Manager. May 16 2001 to August 17 2006 - (6 years) Davao Cooperative Development Contractor (DACODECO) Housing & Commercial Building Project Cebu Philippines Mason/Assistant Project-In charge RESPONSIBILITIES: • Responsible in supervision of 200 manpower and completed 2500 residential houses, 260 5 Storey commercial buildings during my 6 years in serviced included monthly billing of construction estimating (permanent and temporary). • Preparing Two weeks look ahead schedule and daily report to Project Engineer. • Supervised the drainage works, rebar works, formworks and concrete works, road works (backfilling/concrete and asphalt paving) including earthworks activity. • Conducted a Safety Tool Box talk prior to start the work. Employment History July 201date WS Atkins & Partner’s Overseas,Doha Oct. 27, 2014 -July 3, 2015 (9 months) GUSAN Construction Arabia Ltd. (K.S.A) June 19, 2012 to July 3, 2014 (2 years) Larsen & Toubro (Jubial K.S.A) Aug.23, 2010 to May 30, 2012 - (2 years) KHARAFI NATIONAL (Habshan Habshan U.E.A), May 5 2007 to July 27 2010 - (3 years) Al Rashid Trading and Contracting (RTCC) (Al Jouf K.S.A) Jan.30, ) Jan.30, 2007 to April 28 2007 (4 months) Integrated Contractor (Cebu, Phil.) Sept. 10, 2006 to Dec. 20, 2006 (5 months) Provincial Engineering Capitol May 16 2001 to August 17 2006 - (6 years) (DACODECO) (Cebu, Philippines) Training Seminars/Certificates Received: 8
  • 9. 1. Job safety analysis training (Oil & Gas Project and Petrochemical) 2. Confined Space Training.(SADARA project) 3. Pre Construction Planning (PICE) Qatar 4. Philippines Institute of Civil Engineer Technical Workshop (PICE Qatar) 5. Scaffold Safety Training (SADARA Project) 6. Seminar on Construction & project Management. (PICE) Qatar 7. Auto CAD 2D 3D/MS Office /Word and Excel (TESDA) 8. Approved (SADARA) Saudi ARAMCO DOW Arabia Chemical Company 9
  • 10. 1. Job safety analysis training (Oil & Gas Project and Petrochemical) 2. Confined Space Training.(SADARA project) 3. Pre Construction Planning (PICE) Qatar 4. Philippines Institute of Civil Engineer Technical Workshop (PICE Qatar) 5. Scaffold Safety Training (SADARA Project) 6. Seminar on Construction & project Management. (PICE) Qatar 7. Auto CAD 2D 3D/MS Office /Word and Excel (TESDA) 8. Approved (SADARA) Saudi ARAMCO DOW Arabia Chemical Company 9