The Smictom du Pays de Fougères built a new waste disposal and recycling plant to replace their old facility. The building was designed to high environmental standards, including a wooden frame, insulation from recycled materials, solar panels, and a solar facade system called Lucido. While pioneering some technologies, the building achieved positive energy production and met most of its goals, though some systems like the solar panels did not perform as estimated. Lessons were learned around technical choices, coordination between trades, and ensuring user needs were met.
6. www.libnam.eu 6
Energy results of the space
heated in kWh/m2/year
2010 2011 2012
Electricity used 18 19 20
Electricity produced 33 30 29
Heating used (wood) 28 27 20
The results of the building during
the last 3 years, all forms of
energy included, is positive. It
produced 5 kW/m²/year. The solar
energy production was lower than
estimated by the initial studies
(54 kWh/m²/year) and suffers a
slight but steady decline due to
the malfunction of some panels.
Performance
Electricity consumption increased
with the addition of a garage
and an area to dry work clothes.
Initially, the idea was to recuperate
the heat from the boiler room and
the room containing the inverters,
situated beside the laundry room
but fire regulations prevented
the installation of this system. As
a consequence electric tumble
The feedback : The organisation
of the building was designed in the
interests of comfort, ease of use and
energy efficiency. Unfortunately,
the practical and functional side
between different services was not
sufficiently taken into account.
The hot water pipe network is very
long due to technical reasons (the
position of the wood burner at one
extremity of the building), and as a
consequence it is necessary to run
the water for a long time before
getting hot water from the tap.
The distribution manifolds for the
heating system were positioned
within one of the offices, which in
consequence is often overheated.
The lighting is «user friendly»
(motion detectors, brightness
control depending on the ambient
light) but the bulbs used (compact
fluorescent) were not adapted to
short cycles of use, which in turn
increased the budget devoted to
them. The automation of lighting
deprives the user of responsibility.
The linoleum flooring, laid in the
technical / working areas, was not
Energy results
a wise choice because it is not
adapted for trolley use, safety shoes,
and small stones.
In an innovative project of this
type, there is the need of a project
supervisor who is both technically
and politically motivated.
7. French-British collective Libnam7
Stakeholders
Project owners : SMICTOM du Pays de
Fougères
Project supervisor : Architecte DPLG : LIARD
& TANGUY (Rennes)
Site coordinator : ECC Engineering (Saint
Ave)
Consulting firm (Electricity, plumbing,
heating, and liquids) : ECC Engineering
Consulting firm (Reinforced concrete) :
EDSBAT (Surzur)
Building surveyor : Qualiconsult (Saint
Grégoire)
Consulting firm (Carpentry) : Synergie bois
(Cholet)
Quantity Surveyor : Cabinet BAGOT
(Rennes)
Consulting firm (Roads and utilities) : B31
(Nantes)
Health and Safety : ECIE ( Fougères)
Blower door tests : Evalys ( Brest)
Consulting firm (Thermal + feasibility
studies) : Inddigo (Nantes)
Structural work + interior joinery : Heude
bâtiment (Ernee)
Timber framework : SAS Belliard Frères
(Gorron)
Metalworking – Locksmithing : SMIO
(Fougères)
Wooden cladding : SCOB (Mordelles)
Insulation, plastering, studwork : Volutique
(Melesse)
Roofing (zinc-waterproofing) : Quemard
SAS (Langueux)
Flexible floor coverings : Pinto (Fougères)
Subcontractor (photovoltaic cells) : Facilasol
(Dol de Bretagne)
Glued floor coverings, tiling : Leblois (Saint
James)
Decoration (Painting – Wallcoverings) :
Pinto (Fougères)
Heating, ventilation, hot-water solar
panels : Galle SAS (Romagne)
Furniture - Seats (amphitheater) : Mussidan
sièges (Mussidan)
Electricity (low current) : Lafosse électricité
(Torigni sur vire)
Solar facade : IC Bois (La Gouesnière )
Roads and utilities, landscaping : Sotrav
(Fougères)
Cleaning : Breiz services Fougères
(Fougères)
Plumbing, sanitary equipment : Galle SAS
(Romagne)
Suspended ceilings : Volutique (Melesse)
dryers were put in place. Even so,
the electricity produced remains
significantly higher than the
electricity used.
The comparison between the
thermal studies and the energy bills
is complex to work out because
certain areas cannot be separated
(for example the wood heating
systemalsosupplementsthethermal
collectors during the heating of the
hot water). Nevertheless we can do
the following analysis :
The heating needs estimated, from
the thermodynamic simulations,
were 28 kWh/m²/year. In practical
terms the actual consumption
was less. The decrease in 2012 is
misleading because the silo was still
full at the beginning of the heating
season. This naturally «increases»
the heating needs of 2011 and
«decreases» those of 2012. The year
2010 was mild compared to the
previous 2 years which explains the
notable decrease in heating needs.
Rainwater represents ⅔ of the
total consumption. The biggest use
of this rainwater was during the
washing of the dumper trucks. The
rainwater was collected and stocked
in two underground reservoirs each
22 m³.