The first French public building
labelled Minergie®.
Key dates
Design : january 2007 to
september 2008
Construction : september
2008 to january 2010
Smicton handles the waste of 51 neighbouring boroughs having a
combined total of more than 74 000 residents. The project illustrates the
desire of the Trade Union Committee (Comité Syndical) and locally elected
representatives to build an exemplary waste disposal and recycling plant
to cover many issues - technical, environmental, energy, and social.
Introduction
Saint Brieuc
Quimper
Vannes
Rennes
Javené
Smictom du Pays de Fougères
Overview - Photo © Pays de Fougères
www.libnam.eu 2
Context
The capacity of the old waste
disposal plant at Fougères had
reached its limit and there was
an urgent need to move to a
new location to centralise all the
activities of the Smictom region.
The Chair of the union and the local
representatives decided to manage
the project under the High Quality
Environmental standard (HQE).
The construction should, in effect,
be coherent with the message
conveyed to residents (sorting
recyclable waste, waste reduction
etc). The High Quality Environmental
standard (HQE) helped them fix
their design objectives, namely:
• Limit the building’s footprint, while
anticipating a possible extension.
• Provide an efficient building with
greater energy production than
requirements.
• Utilise and collect rainwater.
• Very little environmental impact
during the demolition of the
building through the use of recycled
or recyclable materials.
• Social integration in the operation
of the recycling centre.
• Cost control of construction.
Building overview
It was the first French public building
to receive the Swiss certification
Minergie®.
The building is wooden framed,
clad with local, rough-cut, chestnut.
The southern wall is insulated with
Plan © Architecte Liard & Tanguy
French-British collective Libnam3
wood fibre, the exterior walls and
interior stud walls are insulated
with Metisse® (recycled fibres
from textile collections provided
by the association «Le Relais»), the
foundation beams were insulated
with glass foam (or cellular glass)
a rot proof product available loose,
in granular form, or as rigid panels.
The south walls were covered with
Lucido®; a process to increase
passive solar gain. This choice was
made after a visit to Switzerland
organised by the association
ABIBOIS. The zinc-panelled roof
was covered in solar panels. Finally
thermal collectors were included to
cover some of the hot water needs,
whilst a wood-chip burner with a
back boiler provided the rest of
the hot water needs. A dual flow,
heat recovery system provides very
efficient ventilation. The building
makes full use of water-saving
materials.
Technical Focus :
Lucido®
The solar facade, Lucido®, absorbs
and stores solar energy to create a
warm buffer between the building
and the ambient temperature,
reducing heat loss from walls.
This solar facade is composed of
solar glass (typically 4 mm), a 16 mm
air gap, a 40 mm thick wooden heat
absorber (typically larch or fir) and
an insulating wall. This technology
makes use of the «phase-change»
qualities of wood accumulated by
Timber frame - Photo © SMICTOM
Lucido®
www.libnam.eu 4
the greenhouse effect. «Phase-
change» denotes the time it takes
for heat to travel from the outside
to the inside of a building, passing
through the insulation.
The sun’s rays heat the wooden heat
absorber and travel through the wall
in 4 to 12 hours, according to the
supplier. The heat then penetrates
into the inside of the building.
The procedure allows a reduction
in heat loss on sunny days during
winter, while performing its role as
an efficient insulation on other days.
This system was not problematic
to install. However, it is expensive,
requiring a specialised consulting
firm to «fine tune» the process.
Furthermore, the different
elements of the system are made in
Switzerland. Despite the technical
qualities of the system the architect
has never reused it in any further
projects.
Barriers and solutions
At the organizational and human
level : The building was built
between 2008 and 2009. At that
time, the principle and techniques of
air tightness were little understood,
even misunderstood. Experience
has shown that air tightness tests
and dynamic thermal studies should
be done by people independent to
the actual project.
The project owner and project
supervisor were lucky to work with
a team leader from the company
Volutique (a plasterboard (or
drywall) craftsman) who filled the
role of foreman on a continual
basis. He was very demanding
on his colleagues and equally as
demanding with the other trades.
On the technical side : This
project was in advance of national
Luccido® wall - Photo © Pays de Fougères
French-British collective Libnam5
requirements and it was not
always easy to make technical
choices. Because of the number of
consulting firms involved, advice
differed on the effects and expected
results of technical solutions. This
project remains a forerunner of
“new” technologies and techniques,
as well as the requisite level of air
tightness.
As for water saving, TRIVALOR
(consulting firm) proposed to
recapture the water used as the
2nd wash for lorries and then use
this water as the 1st wash during
the following clean. The idea was
abandoned because of the amount
of organic material in the water and
the high level of chemical impurities.
On the regulatory and insurance
level : The companies signed a
«Green Site» charter «Chantier
Vert». «Green Site» agreements are
principally a means to manage the
environmental impact generated by
the different activities on site (waste
management, noise reduction,
etc.). This charter was hard to
manage alongside a Common
Costs Allocation system «compte
prorata».
Training : Training was provided
by Olivier Clerc, of the company
EVALYS (blower door tests), to raise
awareness among the craftsmen on
site. During the design and planning
stage he focused on sensitive issues.
After the construction phase the
checks put into place allowed errors
and oversights to be corrected.
This method is very effective and
educational.
Mr Liard, the project supervisor,
also came to the site to explain to
the workmen the ideas behind the
working principles of the building,
to heighten their awareness and try
to influence their future behaviour.
Timber cladding - Photo © SMICTOM
www.libnam.eu 6
Energy results of the space
heated in kWh/m2/year
2010 2011 2012
Electricity used 18 19 20
Electricity produced 33 30 29
Heating used (wood) 28 27 20
The results of the building during
the last 3 years, all forms of
energy included, is positive. It
produced 5 kW/m²/year. The solar
energy production was lower than
estimated by the initial studies
(54 kWh/m²/year) and suffers a
slight but steady decline due to
the malfunction of some panels.
Performance
Electricity consumption increased
with the addition of a garage
and an area to dry work clothes.
Initially, the idea was to recuperate
the heat from the boiler room and
the room containing the inverters,
situated beside the laundry room
but fire regulations prevented
the installation of this system. As
a consequence electric tumble
The feedback : The organisation
of the building was designed in the
interests of comfort, ease of use and
energy efficiency. Unfortunately,
the practical and functional side
between different services was not
sufficiently taken into account.
The hot water pipe network is very
long due to technical reasons (the
position of the wood burner at one
extremity of the building), and as a
consequence it is necessary to run
the water for a long time before
getting hot water from the tap.
The distribution manifolds for the
heating system were positioned
within one of the offices, which in
consequence is often overheated.
The lighting is «user friendly»
(motion detectors, brightness
control depending on the ambient
light) but the bulbs used (compact
fluorescent) were not adapted to
short cycles of use, which in turn
increased the budget devoted to
them. The automation of lighting
deprives the user of responsibility.
The linoleum flooring, laid in the
technical / working areas, was not
Energy results
a wise choice because it is not
adapted for trolley use, safety shoes,
and small stones.
In an innovative project of this
type, there is the need of a project
supervisor who is both technically
and politically motivated.
French-British collective Libnam7
Stakeholders
Project owners : SMICTOM du Pays de
Fougères
Project supervisor : Architecte DPLG : LIARD
& TANGUY (Rennes)
Site coordinator : ECC Engineering (Saint
Ave)
Consulting firm (Electricity, plumbing,
heating, and liquids) : ECC Engineering
Consulting firm (Reinforced concrete) :
EDSBAT (Surzur)
Building surveyor : Qualiconsult (Saint
Grégoire)
Consulting firm (Carpentry) : Synergie bois
(Cholet)
Quantity Surveyor : Cabinet BAGOT
(Rennes)
Consulting firm (Roads and utilities) : B31
(Nantes)
Health and Safety : ECIE ( Fougères)
Blower door tests : Evalys ( Brest)
Consulting firm (Thermal + feasibility
studies) : Inddigo (Nantes)
Structural work + interior joinery : Heude
bâtiment (Ernee)
Timber framework : SAS Belliard Frères
(Gorron)
Metalworking – Locksmithing : SMIO
(Fougères)
Wooden cladding : SCOB (Mordelles)
Insulation, plastering, studwork : Volutique
(Melesse)
Roofing (zinc-waterproofing) : Quemard
SAS (Langueux)
Flexible floor coverings : Pinto (Fougères)
Subcontractor (photovoltaic cells) : Facilasol
(Dol de Bretagne)
Glued floor coverings, tiling : Leblois (Saint
James)
Decoration (Painting – Wallcoverings) :
Pinto (Fougères)
Heating, ventilation, hot-water solar
panels : Galle SAS (Romagne)
Furniture - Seats (amphitheater) : Mussidan
sièges (Mussidan)
Electricity (low current) : Lafosse électricité
(Torigni sur vire)
Solar facade : IC Bois (La Gouesnière )
Roads and utilities, landscaping : Sotrav
(Fougères)
Cleaning : Breiz services Fougères
(Fougères)
Plumbing, sanitary equipment : Galle SAS
(Romagne)
Suspended ceilings : Volutique (Melesse)
dryers were put in place. Even so,
the electricity produced remains
significantly higher than the
electricity used.
The comparison between the
thermal studies and the energy bills
is complex to work out because
certain areas cannot be separated
(for example the wood heating
systemalsosupplementsthethermal
collectors during the heating of the
hot water). Nevertheless we can do
the following analysis :
The heating needs estimated, from
the thermodynamic simulations,
were 28 kWh/m²/year. In practical
terms the actual consumption
was less. The decrease in 2012 is
misleading because the silo was still
full at the beginning of the heating
season. This naturally «increases»
the heating needs of 2011 and
«decreases» those of 2012. The year
2010 was mild compared to the
previous 2 years which explains the
notable decrease in heating needs.
Rainwater represents ⅔ of the
total consumption. The biggest use
of this rainwater was during the
washing of the dumper trucks. The
rainwater was collected and stocked
in two underground reservoirs each
22 m³.
8
Costs
Project supervisor : £344,721
Roads and utilities, landscaping : £871,959
Structural work : £419,610
Interior joinery : £144,512
Timber framework : £481,620
Metalworking – Locksmithing : £203,404
Wooden cladding : £312,954
Insulation, plastering, studwork : £264,884
Roofing (zinc-waterproofing),
Subcontractor (photovoltaic cells) :
£888,028
Flexible floor coverings : £27,431
Glued floor coverings, tiling : £29,422
Decoration (Painting – Wallcoverings) :
£42,799
Heating, ventilation, hot-water solar
panels : £158,925
Electricity (low current) : £195,337
Solar façade, Exterior joinery : £221,248
Cleaning : £3,396
Plumbing, sanitary equipment : £95,439
Suspended ceilings : £23,074
Seats (amphitheater) : £12,686
These invoice amounts includes the
construction of the headquarters of
SMICTOM waste disposal and the recycling
plant. Each invoice would need to ensure
the construction of the two facilities.
Surface area : 3026 sq m
Total without charges : £3,879,638
Giving a cost of £1,282 per sq m
Total with charges included : £4741449
Giving a cost of £1,566 per sq m
Landscaping - Photo © Pays de Fougères
Contact
Pays de Fougères
www.pays-fougeres.org

More Related Content

What's hot

Akurana Development Programm
Akurana Development ProgrammAkurana Development Programm
Akurana Development Programmishana shaheed
 
How can designers assess their designs for “circularity?” What tools can be u...
How can designers assess their designs for “circularity?” What tools can be u...How can designers assess their designs for “circularity?” What tools can be u...
How can designers assess their designs for “circularity?” What tools can be u...Circular Economy Thinking
 
Webinar: Future Buildings (Arts Council England programme 2015/16)
Webinar: Future Buildings (Arts Council England programme 2015/16) Webinar: Future Buildings (Arts Council England programme 2015/16)
Webinar: Future Buildings (Arts Council England programme 2015/16) Julie's Bicycle
 
How to Build a Self Sustaining Bio House Technologically Applied
How to Build a Self Sustaining Bio House Technologically AppliedHow to Build a Self Sustaining Bio House Technologically Applied
How to Build a Self Sustaining Bio House Technologically AppliedAbundioTeca
 
Prof Derek Clements-Croome - Intelligent building facades
Prof Derek Clements-Croome - Intelligent building facades Prof Derek Clements-Croome - Intelligent building facades
Prof Derek Clements-Croome - Intelligent building facades Derek Clements-Croome
 
Marinetek energy efficiency
Marinetek energy efficiencyMarinetek energy efficiency
Marinetek energy efficiencySOLVED
 
Minergy SPL processing solution
Minergy SPL processing solutionMinergy SPL processing solution
Minergy SPL processing solutionslideshareminergy
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research PresentationSerra's Art Studio
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016Steve Edgson
 
SUSTAINABLE AND GREEN ARCHITECTURE
SUSTAINABLE AND GREEN ARCHITECTURE SUSTAINABLE AND GREEN ARCHITECTURE
SUSTAINABLE AND GREEN ARCHITECTURE IshaRajpurohit
 
Designing for the circular economy – Land Rover Ben Ainslie Racing Building, ...
Designing for the circular economy – Land Rover Ben Ainslie Racing Building, ...Designing for the circular economy – Land Rover Ben Ainslie Racing Building, ...
Designing for the circular economy – Land Rover Ben Ainslie Racing Building, ...Circular Economy Thinking
 
Hong Kong green building checklist
Hong Kong green building checklistHong Kong green building checklist
Hong Kong green building checklistJohn A Herbert
 
Marinetek floating
Marinetek floatingMarinetek floating
Marinetek floatingSOLVED
 

What's hot (20)

Akurana Development Programm
Akurana Development ProgrammAkurana Development Programm
Akurana Development Programm
 
Env presengfv220109
Env presengfv220109Env presengfv220109
Env presengfv220109
 
Ubs business details pdf
Ubs business details pdfUbs business details pdf
Ubs business details pdf
 
How can designers assess their designs for “circularity?” What tools can be u...
How can designers assess their designs for “circularity?” What tools can be u...How can designers assess their designs for “circularity?” What tools can be u...
How can designers assess their designs for “circularity?” What tools can be u...
 
Webinar: Future Buildings (Arts Council England programme 2015/16)
Webinar: Future Buildings (Arts Council England programme 2015/16) Webinar: Future Buildings (Arts Council England programme 2015/16)
Webinar: Future Buildings (Arts Council England programme 2015/16)
 
How to Build a Self Sustaining Bio House Technologically Applied
How to Build a Self Sustaining Bio House Technologically AppliedHow to Build a Self Sustaining Bio House Technologically Applied
How to Build a Self Sustaining Bio House Technologically Applied
 
Innovative and Intelligent Facades
Innovative and Intelligent FacadesInnovative and Intelligent Facades
Innovative and Intelligent Facades
 
The Process of Building A Green Project
The Process of Building A Green ProjectThe Process of Building A Green Project
The Process of Building A Green Project
 
Prof Derek Clements-Croome - Intelligent building facades
Prof Derek Clements-Croome - Intelligent building facades Prof Derek Clements-Croome - Intelligent building facades
Prof Derek Clements-Croome - Intelligent building facades
 
Marinetek energy efficiency
Marinetek energy efficiencyMarinetek energy efficiency
Marinetek energy efficiency
 
UPLINK - Aceh, Indonesia post-tsunami reconstruction
UPLINK - Aceh, Indonesia post-tsunami reconstructionUPLINK - Aceh, Indonesia post-tsunami reconstruction
UPLINK - Aceh, Indonesia post-tsunami reconstruction
 
Minergy SPL processing solution
Minergy SPL processing solutionMinergy SPL processing solution
Minergy SPL processing solution
 
The Green Roundtable Green Residential Case Studies
The Green Roundtable Green Residential Case StudiesThe Green Roundtable Green Residential Case Studies
The Green Roundtable Green Residential Case Studies
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research Presentation
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016
 
SUSTAINABLE AND GREEN ARCHITECTURE
SUSTAINABLE AND GREEN ARCHITECTURE SUSTAINABLE AND GREEN ARCHITECTURE
SUSTAINABLE AND GREEN ARCHITECTURE
 
Designing for the circular economy – Land Rover Ben Ainslie Racing Building, ...
Designing for the circular economy – Land Rover Ben Ainslie Racing Building, ...Designing for the circular economy – Land Rover Ben Ainslie Racing Building, ...
Designing for the circular economy – Land Rover Ben Ainslie Racing Building, ...
 
Hong Kong green building checklist
Hong Kong green building checklistHong Kong green building checklist
Hong Kong green building checklist
 
Fed lcc-2010-green buildings
Fed lcc-2010-green buildingsFed lcc-2010-green buildings
Fed lcc-2010-green buildings
 
Marinetek floating
Marinetek floatingMarinetek floating
Marinetek floating
 

Viewers also liked

재무 3표(국문)
재무 3표(국문)재무 3표(국문)
재무 3표(국문)Yun-Ho Chang
 
PS 101 Voting and Elections
PS 101 Voting and ElectionsPS 101 Voting and Elections
PS 101 Voting and ElectionsChristopher Rice
 
Unutma ege ing yemekler(
Unutma ege ing yemekler(Unutma ege ing yemekler(
Unutma ege ing yemekler(maverick_72
 
Financiële analyse en ratio
Financiële analyse en ratioFinanciële analyse en ratio
Financiële analyse en ratioLaura De Laender
 
3 -1 structure and principles
3 -1 structure and principles3 -1 structure and principles
3 -1 structure and principlesjpaone76
 
Cartographie de la Musette de l'Actif
Cartographie de la Musette de l'ActifCartographie de la Musette de l'Actif
Cartographie de la Musette de l'ActifFing
 
Transformateur Fing/Anact - description
Transformateur Fing/Anact - descriptionTransformateur Fing/Anact - description
Transformateur Fing/Anact - descriptionFing
 
Week 3: Elections and voting
Week 3: Elections and votingWeek 3: Elections and voting
Week 3: Elections and votingkamila_fraser
 
Sample Report: Apple Pay Profile 2017
Sample Report: Apple Pay Profile 2017Sample Report: Apple Pay Profile 2017
Sample Report: Apple Pay Profile 2017yStats.com
 

Viewers also liked (13)

재무 3표(국문)
재무 3표(국문)재무 3표(국문)
재무 3표(국문)
 
PS 101 Voting and Elections
PS 101 Voting and ElectionsPS 101 Voting and Elections
PS 101 Voting and Elections
 
PS 101 Voting & Elections
PS 101 Voting & ElectionsPS 101 Voting & Elections
PS 101 Voting & Elections
 
Unutma ege ing yemekler(
Unutma ege ing yemekler(Unutma ege ing yemekler(
Unutma ege ing yemekler(
 
Financiële analyse en ratio
Financiële analyse en ratioFinanciële analyse en ratio
Financiële analyse en ratio
 
CV_Ravi_Kumar
CV_Ravi_KumarCV_Ravi_Kumar
CV_Ravi_Kumar
 
3 -1 structure and principles
3 -1 structure and principles3 -1 structure and principles
3 -1 structure and principles
 
El ciclo del agua
El ciclo del aguaEl ciclo del agua
El ciclo del agua
 
Cartographie de la Musette de l'Actif
Cartographie de la Musette de l'ActifCartographie de la Musette de l'Actif
Cartographie de la Musette de l'Actif
 
Transformateur Fing/Anact - description
Transformateur Fing/Anact - descriptionTransformateur Fing/Anact - description
Transformateur Fing/Anact - description
 
Week 3: Elections and voting
Week 3: Elections and votingWeek 3: Elections and voting
Week 3: Elections and voting
 
Sample Report: Apple Pay Profile 2017
Sample Report: Apple Pay Profile 2017Sample Report: Apple Pay Profile 2017
Sample Report: Apple Pay Profile 2017
 
Desarrollo hilario
Desarrollo hilarioDesarrollo hilario
Desarrollo hilario
 

Similar to Smictom in fougères region-en

Coatleven en
Coatleven   enCoatleven   en
Coatleven enlibnam
 
Saint léry en
Saint léry   enSaint léry   en
Saint léry enlibnam
 
Carimalo en
Carimalo   enCarimalo   en
Carimalo enlibnam
 
Education center le picaou en
Education center le picaou   enEducation center le picaou   en
Education center le picaou enlibnam
 
Muël en
Muël   enMuël   en
Muël enlibnam
 
RAINBOW by ECS-3.COM: Eco-district (english version)
RAINBOW by ECS-3.COM:  Eco-district (english version)RAINBOW by ECS-3.COM:  Eco-district (english version)
RAINBOW by ECS-3.COM: Eco-district (english version)RAINBOW by ECS-3.COM
 
Les eco logis-en
Les eco logis-enLes eco logis-en
Les eco logis-enlibnam
 
KOMPROMENT Façade Systems with Integrated Solar System
KOMPROMENT Façade Systems with Integrated Solar SystemKOMPROMENT Façade Systems with Integrated Solar System
KOMPROMENT Façade Systems with Integrated Solar SystemRINNO
 
Graded unit Civil engineering Presentation
Graded unit Civil engineering PresentationGraded unit Civil engineering Presentation
Graded unit Civil engineering PresentationTehmas Saeed
 
Erlenmatt tour Basel, priska sacher
Erlenmatt tour Basel, priska sacherErlenmatt tour Basel, priska sacher
Erlenmatt tour Basel, priska sacherLocal Renewables
 
Bréhan en
Bréhan   enBréhan   en
Bréhan enlibnam
 
Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...
Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...
Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...Ken Dooley
 
"Products / Technologies: Lessons Learnt form Radian Retrofit Project" - Paul...
"Products / Technologies: Lessons Learnt form Radian Retrofit Project" - Paul..."Products / Technologies: Lessons Learnt form Radian Retrofit Project" - Paul...
"Products / Technologies: Lessons Learnt form Radian Retrofit Project" - Paul...Sustainable Business Partnership
 
Sustainability
SustainabilitySustainability
SustainabilityDjCurrie
 
PUR-temadag, 30. maj - Oliver Loebel (PU Europe)
PUR-temadag, 30. maj - Oliver Loebel (PU Europe)PUR-temadag, 30. maj - Oliver Loebel (PU Europe)
PUR-temadag, 30. maj - Oliver Loebel (PU Europe)Plastindustrien
 
Smart Green City Grenoble
Smart Green City GrenobleSmart Green City Grenoble
Smart Green City GrenobleCristian Radu
 
Sustainable building designs
Sustainable building designsSustainable building designs
Sustainable building designsTantish QS, UTM
 
Experiences in Cologne: Energy-efficient refurbishment in residential buildings
Experiences in Cologne: Energy-efficient refurbishment in residential buildings Experiences in Cologne: Energy-efficient refurbishment in residential buildings
Experiences in Cologne: Energy-efficient refurbishment in residential buildings GrowSmarter
 
H2 & Emerging Technologies for sustainable energy - 20 mai 2020
H2 & Emerging Technologies for sustainable energy - 20 mai 2020H2 & Emerging Technologies for sustainable energy - 20 mai 2020
H2 & Emerging Technologies for sustainable energy - 20 mai 2020Cluster TWEED
 

Similar to Smictom in fougères region-en (20)

Coatleven en
Coatleven   enCoatleven   en
Coatleven en
 
Saint léry en
Saint léry   enSaint léry   en
Saint léry en
 
Carimalo en
Carimalo   enCarimalo   en
Carimalo en
 
Education center le picaou en
Education center le picaou   enEducation center le picaou   en
Education center le picaou en
 
ductal_solutions_15
ductal_solutions_15ductal_solutions_15
ductal_solutions_15
 
Muël en
Muël   enMuël   en
Muël en
 
RAINBOW by ECS-3.COM: Eco-district (english version)
RAINBOW by ECS-3.COM:  Eco-district (english version)RAINBOW by ECS-3.COM:  Eco-district (english version)
RAINBOW by ECS-3.COM: Eco-district (english version)
 
Les eco logis-en
Les eco logis-enLes eco logis-en
Les eco logis-en
 
KOMPROMENT Façade Systems with Integrated Solar System
KOMPROMENT Façade Systems with Integrated Solar SystemKOMPROMENT Façade Systems with Integrated Solar System
KOMPROMENT Façade Systems with Integrated Solar System
 
Graded unit Civil engineering Presentation
Graded unit Civil engineering PresentationGraded unit Civil engineering Presentation
Graded unit Civil engineering Presentation
 
Erlenmatt tour Basel, priska sacher
Erlenmatt tour Basel, priska sacherErlenmatt tour Basel, priska sacher
Erlenmatt tour Basel, priska sacher
 
Bréhan en
Bréhan   enBréhan   en
Bréhan en
 
Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...
Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...
Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...
 
"Products / Technologies: Lessons Learnt form Radian Retrofit Project" - Paul...
"Products / Technologies: Lessons Learnt form Radian Retrofit Project" - Paul..."Products / Technologies: Lessons Learnt form Radian Retrofit Project" - Paul...
"Products / Technologies: Lessons Learnt form Radian Retrofit Project" - Paul...
 
Sustainability
SustainabilitySustainability
Sustainability
 
PUR-temadag, 30. maj - Oliver Loebel (PU Europe)
PUR-temadag, 30. maj - Oliver Loebel (PU Europe)PUR-temadag, 30. maj - Oliver Loebel (PU Europe)
PUR-temadag, 30. maj - Oliver Loebel (PU Europe)
 
Smart Green City Grenoble
Smart Green City GrenobleSmart Green City Grenoble
Smart Green City Grenoble
 
Sustainable building designs
Sustainable building designsSustainable building designs
Sustainable building designs
 
Experiences in Cologne: Energy-efficient refurbishment in residential buildings
Experiences in Cologne: Energy-efficient refurbishment in residential buildings Experiences in Cologne: Energy-efficient refurbishment in residential buildings
Experiences in Cologne: Energy-efficient refurbishment in residential buildings
 
H2 & Emerging Technologies for sustainable energy - 20 mai 2020
H2 & Emerging Technologies for sustainable energy - 20 mai 2020H2 & Emerging Technologies for sustainable energy - 20 mai 2020
H2 & Emerging Technologies for sustainable energy - 20 mai 2020
 

More from libnam

Robinard fr
Robinard   frRobinard   fr
Robinard frlibnam
 
Booklet supporting methods sustainable construction
Booklet supporting methods sustainable constructionBooklet supporting methods sustainable construction
Booklet supporting methods sustainable constructionlibnam
 
Livret méthodologies d'accompagnement construction durable
Livret méthodologies d'accompagnement construction durableLivret méthodologies d'accompagnement construction durable
Livret méthodologies d'accompagnement construction durablelibnam
 
Booklet two integrated building designs
Booklet two integrated building designsBooklet two integrated building designs
Booklet two integrated building designslibnam
 
Livret deux méthodes de conception collaboratives
Livret deux méthodes de conception collaborativesLivret deux méthodes de conception collaboratives
Livret deux méthodes de conception collaborativeslibnam
 
Educational sheet hqe
Educational sheet hqeEducational sheet hqe
Educational sheet hqelibnam
 
educational sheet breeam
 educational sheet breeam educational sheet breeam
educational sheet breeamlibnam
 
Educational sheet rt 2020
Educational sheet rt 2020Educational sheet rt 2020
Educational sheet rt 2020libnam
 
Thermal regulation 2013 in england
Thermal regulation 2013 in englandThermal regulation 2013 in england
Thermal regulation 2013 in englandlibnam
 
En tool 4 educational sheet thermal regulation in england
En tool 4 educational sheet thermal regulation in englandEn tool 4 educational sheet thermal regulation in england
En tool 4 educational sheet thermal regulation in englandlibnam
 
Réglementation thermique 2013 en angleterre
Réglementation thermique 2013 en angleterreRéglementation thermique 2013 en angleterre
Réglementation thermique 2013 en angleterrelibnam
 
Fr outil 1 fiche enquête vierge livret études de cas
Fr outil 1 fiche enquête vierge livret études de casFr outil 1 fiche enquête vierge livret études de cas
Fr outil 1 fiche enquête vierge livret études de caslibnam
 
En tool 1 blank survey data sheet case studies booklet
En tool 1 blank survey data sheet case studies booklet En tool 1 blank survey data sheet case studies booklet
En tool 1 blank survey data sheet case studies booklet libnam
 
Fr outil 7 compte rendu photos tests bottes de paille
Fr outil 7 compte rendu photos tests bottes de pailleFr outil 7 compte rendu photos tests bottes de paille
Fr outil 7 compte rendu photos tests bottes de paillelibnam
 
Fr outil 7 compte rendu photos terre bauge mécanisée btc torchis
Fr outil 7 compte rendu photos terre bauge mécanisée btc torchisFr outil 7 compte rendu photos terre bauge mécanisée btc torchis
Fr outil 7 compte rendu photos terre bauge mécanisée btc torchislibnam
 
Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...
Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...
Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...libnam
 
Fr outil 7 compte rendu photos isolation terre paille
Fr outil 7 compte rendu photos isolation terre pailleFr outil 7 compte rendu photos isolation terre paille
Fr outil 7 compte rendu photos isolation terre paillelibnam
 
Fr outil 7 compte rendu photos chanvre projeté
Fr outil 7 compte rendu photos chanvre projetéFr outil 7 compte rendu photos chanvre projeté
Fr outil 7 compte rendu photos chanvre projetélibnam
 
Fr outil 7 compte rendu photos chanvre dans tous ses états
Fr outil 7 compte rendu photos chanvre dans tous ses étatsFr outil 7 compte rendu photos chanvre dans tous ses états
Fr outil 7 compte rendu photos chanvre dans tous ses étatslibnam
 
Fr outil 7 compte rendu photos chanvre banché
Fr outil 7 compte rendu photos chanvre banchéFr outil 7 compte rendu photos chanvre banché
Fr outil 7 compte rendu photos chanvre banchélibnam
 

More from libnam (20)

Robinard fr
Robinard   frRobinard   fr
Robinard fr
 
Booklet supporting methods sustainable construction
Booklet supporting methods sustainable constructionBooklet supporting methods sustainable construction
Booklet supporting methods sustainable construction
 
Livret méthodologies d'accompagnement construction durable
Livret méthodologies d'accompagnement construction durableLivret méthodologies d'accompagnement construction durable
Livret méthodologies d'accompagnement construction durable
 
Booklet two integrated building designs
Booklet two integrated building designsBooklet two integrated building designs
Booklet two integrated building designs
 
Livret deux méthodes de conception collaboratives
Livret deux méthodes de conception collaborativesLivret deux méthodes de conception collaboratives
Livret deux méthodes de conception collaboratives
 
Educational sheet hqe
Educational sheet hqeEducational sheet hqe
Educational sheet hqe
 
educational sheet breeam
 educational sheet breeam educational sheet breeam
educational sheet breeam
 
Educational sheet rt 2020
Educational sheet rt 2020Educational sheet rt 2020
Educational sheet rt 2020
 
Thermal regulation 2013 in england
Thermal regulation 2013 in englandThermal regulation 2013 in england
Thermal regulation 2013 in england
 
En tool 4 educational sheet thermal regulation in england
En tool 4 educational sheet thermal regulation in englandEn tool 4 educational sheet thermal regulation in england
En tool 4 educational sheet thermal regulation in england
 
Réglementation thermique 2013 en angleterre
Réglementation thermique 2013 en angleterreRéglementation thermique 2013 en angleterre
Réglementation thermique 2013 en angleterre
 
Fr outil 1 fiche enquête vierge livret études de cas
Fr outil 1 fiche enquête vierge livret études de casFr outil 1 fiche enquête vierge livret études de cas
Fr outil 1 fiche enquête vierge livret études de cas
 
En tool 1 blank survey data sheet case studies booklet
En tool 1 blank survey data sheet case studies booklet En tool 1 blank survey data sheet case studies booklet
En tool 1 blank survey data sheet case studies booklet
 
Fr outil 7 compte rendu photos tests bottes de paille
Fr outil 7 compte rendu photos tests bottes de pailleFr outil 7 compte rendu photos tests bottes de paille
Fr outil 7 compte rendu photos tests bottes de paille
 
Fr outil 7 compte rendu photos terre bauge mécanisée btc torchis
Fr outil 7 compte rendu photos terre bauge mécanisée btc torchisFr outil 7 compte rendu photos terre bauge mécanisée btc torchis
Fr outil 7 compte rendu photos terre bauge mécanisée btc torchis
 
Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...
Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...
Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...
 
Fr outil 7 compte rendu photos isolation terre paille
Fr outil 7 compte rendu photos isolation terre pailleFr outil 7 compte rendu photos isolation terre paille
Fr outil 7 compte rendu photos isolation terre paille
 
Fr outil 7 compte rendu photos chanvre projeté
Fr outil 7 compte rendu photos chanvre projetéFr outil 7 compte rendu photos chanvre projeté
Fr outil 7 compte rendu photos chanvre projeté
 
Fr outil 7 compte rendu photos chanvre dans tous ses états
Fr outil 7 compte rendu photos chanvre dans tous ses étatsFr outil 7 compte rendu photos chanvre dans tous ses états
Fr outil 7 compte rendu photos chanvre dans tous ses états
 
Fr outil 7 compte rendu photos chanvre banché
Fr outil 7 compte rendu photos chanvre banchéFr outil 7 compte rendu photos chanvre banché
Fr outil 7 compte rendu photos chanvre banché
 

Recently uploaded

Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxabhijeetpadhi001
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 

Recently uploaded (20)

Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 

Smictom in fougères region-en

  • 1. 84 The first French public building labelled Minergie®. Key dates Design : january 2007 to september 2008 Construction : september 2008 to january 2010 Smicton handles the waste of 51 neighbouring boroughs having a combined total of more than 74 000 residents. The project illustrates the desire of the Trade Union Committee (Comité Syndical) and locally elected representatives to build an exemplary waste disposal and recycling plant to cover many issues - technical, environmental, energy, and social. Introduction Saint Brieuc Quimper Vannes Rennes Javené Smictom du Pays de Fougères Overview - Photo © Pays de Fougères
  • 2. www.libnam.eu 2 Context The capacity of the old waste disposal plant at Fougères had reached its limit and there was an urgent need to move to a new location to centralise all the activities of the Smictom region. The Chair of the union and the local representatives decided to manage the project under the High Quality Environmental standard (HQE). The construction should, in effect, be coherent with the message conveyed to residents (sorting recyclable waste, waste reduction etc). The High Quality Environmental standard (HQE) helped them fix their design objectives, namely: • Limit the building’s footprint, while anticipating a possible extension. • Provide an efficient building with greater energy production than requirements. • Utilise and collect rainwater. • Very little environmental impact during the demolition of the building through the use of recycled or recyclable materials. • Social integration in the operation of the recycling centre. • Cost control of construction. Building overview It was the first French public building to receive the Swiss certification Minergie®. The building is wooden framed, clad with local, rough-cut, chestnut. The southern wall is insulated with Plan © Architecte Liard & Tanguy
  • 3. French-British collective Libnam3 wood fibre, the exterior walls and interior stud walls are insulated with Metisse® (recycled fibres from textile collections provided by the association «Le Relais»), the foundation beams were insulated with glass foam (or cellular glass) a rot proof product available loose, in granular form, or as rigid panels. The south walls were covered with Lucido®; a process to increase passive solar gain. This choice was made after a visit to Switzerland organised by the association ABIBOIS. The zinc-panelled roof was covered in solar panels. Finally thermal collectors were included to cover some of the hot water needs, whilst a wood-chip burner with a back boiler provided the rest of the hot water needs. A dual flow, heat recovery system provides very efficient ventilation. The building makes full use of water-saving materials. Technical Focus : Lucido® The solar facade, Lucido®, absorbs and stores solar energy to create a warm buffer between the building and the ambient temperature, reducing heat loss from walls. This solar facade is composed of solar glass (typically 4 mm), a 16 mm air gap, a 40 mm thick wooden heat absorber (typically larch or fir) and an insulating wall. This technology makes use of the «phase-change» qualities of wood accumulated by Timber frame - Photo © SMICTOM Lucido®
  • 4. www.libnam.eu 4 the greenhouse effect. «Phase- change» denotes the time it takes for heat to travel from the outside to the inside of a building, passing through the insulation. The sun’s rays heat the wooden heat absorber and travel through the wall in 4 to 12 hours, according to the supplier. The heat then penetrates into the inside of the building. The procedure allows a reduction in heat loss on sunny days during winter, while performing its role as an efficient insulation on other days. This system was not problematic to install. However, it is expensive, requiring a specialised consulting firm to «fine tune» the process. Furthermore, the different elements of the system are made in Switzerland. Despite the technical qualities of the system the architect has never reused it in any further projects. Barriers and solutions At the organizational and human level : The building was built between 2008 and 2009. At that time, the principle and techniques of air tightness were little understood, even misunderstood. Experience has shown that air tightness tests and dynamic thermal studies should be done by people independent to the actual project. The project owner and project supervisor were lucky to work with a team leader from the company Volutique (a plasterboard (or drywall) craftsman) who filled the role of foreman on a continual basis. He was very demanding on his colleagues and equally as demanding with the other trades. On the technical side : This project was in advance of national Luccido® wall - Photo © Pays de Fougères
  • 5. French-British collective Libnam5 requirements and it was not always easy to make technical choices. Because of the number of consulting firms involved, advice differed on the effects and expected results of technical solutions. This project remains a forerunner of “new” technologies and techniques, as well as the requisite level of air tightness. As for water saving, TRIVALOR (consulting firm) proposed to recapture the water used as the 2nd wash for lorries and then use this water as the 1st wash during the following clean. The idea was abandoned because of the amount of organic material in the water and the high level of chemical impurities. On the regulatory and insurance level : The companies signed a «Green Site» charter «Chantier Vert». «Green Site» agreements are principally a means to manage the environmental impact generated by the different activities on site (waste management, noise reduction, etc.). This charter was hard to manage alongside a Common Costs Allocation system «compte prorata». Training : Training was provided by Olivier Clerc, of the company EVALYS (blower door tests), to raise awareness among the craftsmen on site. During the design and planning stage he focused on sensitive issues. After the construction phase the checks put into place allowed errors and oversights to be corrected. This method is very effective and educational. Mr Liard, the project supervisor, also came to the site to explain to the workmen the ideas behind the working principles of the building, to heighten their awareness and try to influence their future behaviour. Timber cladding - Photo © SMICTOM
  • 6. www.libnam.eu 6 Energy results of the space heated in kWh/m2/year 2010 2011 2012 Electricity used 18 19 20 Electricity produced 33 30 29 Heating used (wood) 28 27 20 The results of the building during the last 3 years, all forms of energy included, is positive. It produced 5 kW/m²/year. The solar energy production was lower than estimated by the initial studies (54 kWh/m²/year) and suffers a slight but steady decline due to the malfunction of some panels. Performance Electricity consumption increased with the addition of a garage and an area to dry work clothes. Initially, the idea was to recuperate the heat from the boiler room and the room containing the inverters, situated beside the laundry room but fire regulations prevented the installation of this system. As a consequence electric tumble The feedback : The organisation of the building was designed in the interests of comfort, ease of use and energy efficiency. Unfortunately, the practical and functional side between different services was not sufficiently taken into account. The hot water pipe network is very long due to technical reasons (the position of the wood burner at one extremity of the building), and as a consequence it is necessary to run the water for a long time before getting hot water from the tap. The distribution manifolds for the heating system were positioned within one of the offices, which in consequence is often overheated. The lighting is «user friendly» (motion detectors, brightness control depending on the ambient light) but the bulbs used (compact fluorescent) were not adapted to short cycles of use, which in turn increased the budget devoted to them. The automation of lighting deprives the user of responsibility. The linoleum flooring, laid in the technical / working areas, was not Energy results a wise choice because it is not adapted for trolley use, safety shoes, and small stones. In an innovative project of this type, there is the need of a project supervisor who is both technically and politically motivated.
  • 7. French-British collective Libnam7 Stakeholders Project owners : SMICTOM du Pays de Fougères Project supervisor : Architecte DPLG : LIARD & TANGUY (Rennes) Site coordinator : ECC Engineering (Saint Ave) Consulting firm (Electricity, plumbing, heating, and liquids) : ECC Engineering Consulting firm (Reinforced concrete) : EDSBAT (Surzur) Building surveyor : Qualiconsult (Saint Grégoire) Consulting firm (Carpentry) : Synergie bois (Cholet) Quantity Surveyor : Cabinet BAGOT (Rennes) Consulting firm (Roads and utilities) : B31 (Nantes) Health and Safety : ECIE ( Fougères) Blower door tests : Evalys ( Brest) Consulting firm (Thermal + feasibility studies) : Inddigo (Nantes) Structural work + interior joinery : Heude bâtiment (Ernee) Timber framework : SAS Belliard Frères (Gorron) Metalworking – Locksmithing : SMIO (Fougères) Wooden cladding : SCOB (Mordelles) Insulation, plastering, studwork : Volutique (Melesse) Roofing (zinc-waterproofing) : Quemard SAS (Langueux) Flexible floor coverings : Pinto (Fougères) Subcontractor (photovoltaic cells) : Facilasol (Dol de Bretagne) Glued floor coverings, tiling : Leblois (Saint James) Decoration (Painting – Wallcoverings) : Pinto (Fougères) Heating, ventilation, hot-water solar panels : Galle SAS (Romagne) Furniture - Seats (amphitheater) : Mussidan sièges (Mussidan) Electricity (low current) : Lafosse électricité (Torigni sur vire) Solar facade : IC Bois (La Gouesnière ) Roads and utilities, landscaping : Sotrav (Fougères) Cleaning : Breiz services Fougères (Fougères) Plumbing, sanitary equipment : Galle SAS (Romagne) Suspended ceilings : Volutique (Melesse) dryers were put in place. Even so, the electricity produced remains significantly higher than the electricity used. The comparison between the thermal studies and the energy bills is complex to work out because certain areas cannot be separated (for example the wood heating systemalsosupplementsthethermal collectors during the heating of the hot water). Nevertheless we can do the following analysis : The heating needs estimated, from the thermodynamic simulations, were 28 kWh/m²/year. In practical terms the actual consumption was less. The decrease in 2012 is misleading because the silo was still full at the beginning of the heating season. This naturally «increases» the heating needs of 2011 and «decreases» those of 2012. The year 2010 was mild compared to the previous 2 years which explains the notable decrease in heating needs. Rainwater represents ⅔ of the total consumption. The biggest use of this rainwater was during the washing of the dumper trucks. The rainwater was collected and stocked in two underground reservoirs each 22 m³.
  • 8. 8 Costs Project supervisor : £344,721 Roads and utilities, landscaping : £871,959 Structural work : £419,610 Interior joinery : £144,512 Timber framework : £481,620 Metalworking – Locksmithing : £203,404 Wooden cladding : £312,954 Insulation, plastering, studwork : £264,884 Roofing (zinc-waterproofing), Subcontractor (photovoltaic cells) : £888,028 Flexible floor coverings : £27,431 Glued floor coverings, tiling : £29,422 Decoration (Painting – Wallcoverings) : £42,799 Heating, ventilation, hot-water solar panels : £158,925 Electricity (low current) : £195,337 Solar façade, Exterior joinery : £221,248 Cleaning : £3,396 Plumbing, sanitary equipment : £95,439 Suspended ceilings : £23,074 Seats (amphitheater) : £12,686 These invoice amounts includes the construction of the headquarters of SMICTOM waste disposal and the recycling plant. Each invoice would need to ensure the construction of the two facilities. Surface area : 3026 sq m Total without charges : £3,879,638 Giving a cost of £1,282 per sq m Total with charges included : £4741449 Giving a cost of £1,566 per sq m Landscaping - Photo © Pays de Fougères Contact Pays de Fougères www.pays-fougeres.org