The combination of wood and
stone gives charm to a typical
farmhouse.
Key dates
The farm dates back to before
1900.
Beginning of the plans : 2006
Planning permission secured :
2010.
Works : 2011 to 2012.
In order to preserve the stone farmhouse they inherited from their parents,
Anne and Michel wished to renovate it. They have given it a second life
by creating 5 holiday lets. To give the holiday units a more contemporary
look, they wanted to marry ancient materials taken from the site with
21st century ones, without losing the essence of the location. The Eco-
friendliness of the dwellings is shown through the use of recyclable or
reused materials (stones, beams, doors) as well as natural heating and
sanitation systems.
Introduction
Saint Brieuc
Quimper
Vannes
Rennes
Baden
Les Eco-Logis
Overview - Photo © Servane Guihaire - Constructys Bretagne
www.libnam.eu 2
Context
The owners crated a limited
company (SARL) called   Les Eco
Logis de Lairmarc’h, enabling them
to offer visitors welcoming, easy to
heat and eco-friendly holiday lets.
The project is in a fairly popular
tourist area: Le Golfe du Morbihan,
between the sea and countryside.
The buildings are south facing.
The T – shape enables 3 of the lets
to be south facing while the other 2
are west-facing.
The proximity of the coast means
that the Local Plan Area is restrictive,
and the only possible change of
use for the building was to holiday
accommodation and the only
contractor accepted was a farmer.
These holiday dwellings, covering
an area of 370 sq m (3980 sqft) are
attached to, and in close proximity,
to the farm; privacy was therefore
a requirement put forward by the
architect. Therefore, the layout
was also influenced by the desire
to keep cars away to make the
site wheelchair friendly. One of
the lets is especially converted for
disabled people, as laid out in the
regulation for disabled access (law
of 11/02/2005).
Plan © A’Dao
N
French-British collective Libnam3
Building overview
Two different systems were used
for the renovation ; the existing
buildings are in stone while the
extension is timber-framed.
The stone buildings are on shallow
existing foundations. The internal
solid wall was insulated by blowing
15 cm of cellulose fibre and covered
by gypsum boards (Fermacell).
Where there was a higher risk of
damp, walls have been insulated
with cork.
The timber frame is made of
pinewood beams (45x145 mm) and
laid on a concrete slab, which is
insulated underneath by sheets of
polyurethane 10 cm thick (Sporema
brand). The wall insulation is made
of cellulose fibre, applied between
timber posts, and covered by
chipboard to assure continuity of
the outer-shell.
The distribution of the internal
layout is made of steel frame and
plasterboard (BA13) or gypsum
boards (Fermacell), using wood
wool as an insulator.
The window and door frames were
tailor-made by MC France. They are
made of wood and steel, and double
glazed. They do not come with
rolling blinds as they would look
inappropriate on listed buildings
and would create thermal bridges.
The holiday lets are all equipped
with a wood burner with different
capacity depending on the area to
heat. Electrical heating can be used
when necessary. However, in order
to promote the use of renewable
energy, the wood is provided for
free while electricity is charged on
top of the rental price.
Framing - Photo © Yann Denion - CICS
www.libnam.eu 4
The ventilation is a Hygro B
type (outlet and inlet air hygro
adjustable).
A 10 m3 water tank was installed
to recover rainwater for watering,
toilets and washing machines
(situated in the communal laundry
at the entrance). The water sewage
treatment is done by phyto-
purification ponds.
Structure of the roof, from outside
in : slates - battens - cellulose fibre
- vapour barrier - gypsum boards
(Fermacell).
Structure of the stone walls : Stone
- Whitewash - rain barrier - Douglas
fir frame - 15 cm thick cellulose fibre
- vapour barrier - gypsum boards
(Fermacell).
Structure of the partition walls : 22
mm Douglas fir cladding - battens
(thermal gap) - Wood fibre boards (6
cm Pavatex) - Rain barrier - Bracing
pannels (18 cm OSBracing) - 15 cm
insulated frame - Vapour barrier -
Gypsum boards (Fermacell).
Timber-framed extension - Photo © Servane Guihaire - Constructys Bretagne
French-British collective Libnam5
Technical focus :
Stone and insulation
Cellulose fibre (made of recycled
newspapers) is commonly used
as insulation for timber frame
buildings, but more rarely for stone
buildings.
The cellulose fibre used on site (by
Isocel) is produced by a company
called Celaouate in Morlaix, from
recycled local papers such as Le
Télégramme, which ensures a low
carbon footprint due to its local
production.
As well as cellulose fibre’s insulating
quality, it has greater thermal mass
than mineral wool. This makes it
a useful product to reduce the
temperature difference inside
the building, in particular during
heat waves. Married with stone,
cellulose fibre provides comfort in
the summer time, and the holiday
lets are used mainly during warm
months.
Here, the cellulose fibre was blown
into the wooden frame and sealed
by a vapour barrier. The device
blows the cellulose fibre through an
opening in the vapour barrier which
is then tightly sealed. Moisture
must not reach the insulation. This
requires careful implementation
in respect of the stone, such as
pointing the outside walls and the
protection of the lower parts. For
example, rain barriers have been
applied at the bottom of walls and
loose cork was put in the areas most
exposed to capillary rise.
It is important to note that borax is
integrated into cellulose fibre. This
mineral has fire retardant properties
and enables protection from fungus
and rodents. In 2012 and 2013, in
France, the public health safety of
this additive caused controversy. For
Interior - Photo © Servane Guihaire - Constructys Bretagne
www.libnam.eu 6
Barriers and solutions
On a legal and regulatory level,
several problems were encountered.
For example, the site is situated
in a conservation area, so it was
necessary to communicate with
Architecte des Batiments de France
(French equivalent of English
Heritage), especially for the creation
of West-facing openings and the
modification of the facade.
To put the phytopurification (water
treatement using a reed bed) in
place, it was necessary to explain
to the Syndicat Intercommunal
d’Alimentation en Eau Potable
(Local water board) what the system
was about. The constant evolution
of the techniques can bring
misunderstandings from regulation
bodies which can slow down eco-
construction. This is one of the
reasons why companies have to
keep training to obtain certificates
as well as skills.
For the cellulose fibre, the company
CICS underwent training with
different organisations: Domus
a while, building regulations used
ammonium salts, but finally chose
to reinstate the use of borax; and
for good reasons since ammonium
may degrade into ammonia and this
has potential health risks, whereas
borax has been judged to have a
low impact, below a 5% threshold.
The cellulose fibre industry has
however decided to start research
work to identify substitute to these
salts.
Bedroom - Photo © Servane Guihaire - Constructys Bretagne
French-British collective Libnam7
(supplier), Tyeco2, Ecolusis and
ARFAB (airtight). They also attended
training in Energy-saving in the
building industry.
Monitoring by the main contractor
onsite,discussionswiththearchitect,
and regular site reports allowed
better communication between the
trades, even if it did not avoid all the
problems. For instance, there was a
large turnover of employees in one
company which complicated the
passing down of some instructions.
However, to reach the target thermal
performance, each contractor had
to pay attention to the work of
others.
There are many technical constraints
that guided the homeowners’
choices : lime and hemp concrete is
interesting in terms of insulation but
wouldhaveresultedinwallsthatwere
too thick ; a heat-recovery device
would have been complicated to
install for 5 independent cottages ;
solar panels would have resulted in
a lot of wiring and trouble during a
possible division of dwellings in the
future.
Finally, a few technical problems
occurred on the building site  :
creating weep holes on the cement-
rendered stone walls was very
complicated, the gypsum boards
were heavy and difficult to cut, and
the concrete slab took time to dry
in winter as the building was well
insulated.
Inside - Photo © Servane Guihaire - Constructys Bretagne
8
Stakeholders
Main contractor : SARL Les Eco Logis de
Lairmarc’h (Baden)
Architect : A’Dao (Rennes)
Project manager : Gérard Lucas (Les
Fougerêts)
Masonry : Pelbois (Pluherlin)
Carpentry-Joinery : Burban (Malansac)
Insulation – internal walls : CICS (Saint
Nicolas du Tertre)
Services : SARL Coué Crété (St Martin/Oust)
Plumbing : Lubert (Limerzel)
Electricity : Cornec Pac Elec (Plougoumelen)
Tiling : Roux SARL (Guegon)
Stairs : Potier JP (Rieux)
Decorating : Le Tournel Sarl (La Gacilly)
Wood burners : Nicolas Cheminées
(Lanester)
Landscaping and sewage : Aubat (Landaul)
Phytopurification Conception : Aquatiris
(Landevant)
Link
www.lafermh-baden.fr
Costs
Project management : 8.6% of the global of
the build : £41,167 before tax
Groundwork and connection to services :
£27,526 before tax
Masonry and structural work : £85,315
before tax
Frame : £58,189 before tax
Roofing and waterproofing : £40,644 before
tax
Indoors and outdoors joinery : £54,875
before tax
Electricity and heating : £35,967 before tax
Internal walls and insulation : £71,730
Plumbing : £25,918 before tax
Tiling : £27,430 before tax
Stairs : £9,152 before tax
Decorating : £25,901 before tax
Total : £503,814 before tax, equivalent to
£1,361 per sq m
A partial thermal survey was done
during the study phase in order to
choose the correct materials. The
building did not aim to achieve any
specific eco-labels, the wish being
to make a more energy-efficient
Performance
Perspective © A’Dao
building with environmentally
friendly materials.
Following readings, it was found that
eight people consume twelve euros
worth of hot water and electricity
per week (about 90 kWh).
Contact
Constructys Bretagne
www.constructys-bretagne.fr

More Related Content

What's hot

Cornwall air ambulance trust en
Cornwall air ambulance trust   enCornwall air ambulance trust   en
Cornwall air ambulance trust enlibnam
 
PRESENTATION - Modular Direct
PRESENTATION - Modular DirectPRESENTATION - Modular Direct
PRESENTATION - Modular DirectStephen Fleming
 
Rosemoor (Pilkington Cob Shelter)-en
Rosemoor (Pilkington Cob Shelter)-enRosemoor (Pilkington Cob Shelter)-en
Rosemoor (Pilkington Cob Shelter)-enlibnam
 
R. A. Edwards and Partners Ltd. Company Profile
R. A. Edwards and Partners Ltd.   Company ProfileR. A. Edwards and Partners Ltd.   Company Profile
R. A. Edwards and Partners Ltd. Company Profiledownsy222
 
Marinetek energy efficiency
Marinetek energy efficiencyMarinetek energy efficiency
Marinetek energy efficiencySOLVED
 
Marinetek floating
Marinetek floatingMarinetek floating
Marinetek floatingSOLVED
 
Marinetek floating
Marinetek floatingMarinetek floating
Marinetek floatingSOLVED
 
Literature Study on sports pavilion
Literature Study on sports pavilionLiterature Study on sports pavilion
Literature Study on sports pavilionSakshi Singh
 
Archium stone radio building nepal
Archium stone radio building nepalArchium stone radio building nepal
Archium stone radio building nepalAnjuDaharia
 
UNDERGROUND HOUSES
UNDERGROUND HOUSESUNDERGROUND HOUSES
UNDERGROUND HOUSESalficali
 
Forteco Presentation
Forteco PresentationForteco Presentation
Forteco PresentationJim Jendusa
 
2012 02-11 ibs nahbrc - changing with the times
2012 02-11 ibs nahbrc - changing with the times2012 02-11 ibs nahbrc - changing with the times
2012 02-11 ibs nahbrc - changing with the timesAmber Joan Wood
 
IRJET- Indian Rural Housing Needs to Bridge the Technological Gaps
IRJET-  	  Indian Rural Housing Needs to Bridge the Technological GapsIRJET-  	  Indian Rural Housing Needs to Bridge the Technological Gaps
IRJET- Indian Rural Housing Needs to Bridge the Technological GapsIRJET Journal
 

What's hot (20)

Cornwall air ambulance trust en
Cornwall air ambulance trust   enCornwall air ambulance trust   en
Cornwall air ambulance trust en
 
PRESENTATION - Modular Direct
PRESENTATION - Modular DirectPRESENTATION - Modular Direct
PRESENTATION - Modular Direct
 
Rosemoor (Pilkington Cob Shelter)-en
Rosemoor (Pilkington Cob Shelter)-enRosemoor (Pilkington Cob Shelter)-en
Rosemoor (Pilkington Cob Shelter)-en
 
R. A. Edwards and Partners Ltd. Company Profile
R. A. Edwards and Partners Ltd.   Company ProfileR. A. Edwards and Partners Ltd.   Company Profile
R. A. Edwards and Partners Ltd. Company Profile
 
Marinetek energy efficiency
Marinetek energy efficiencyMarinetek energy efficiency
Marinetek energy efficiency
 
Marinetek floating
Marinetek floatingMarinetek floating
Marinetek floating
 
Marinetek floating
Marinetek floatingMarinetek floating
Marinetek floating
 
5) UBS INTRO 2015 PDF
5) UBS INTRO 2015 PDF5) UBS INTRO 2015 PDF
5) UBS INTRO 2015 PDF
 
Literature Study on sports pavilion
Literature Study on sports pavilionLiterature Study on sports pavilion
Literature Study on sports pavilion
 
Archium stone radio building nepal
Archium stone radio building nepalArchium stone radio building nepal
Archium stone radio building nepal
 
UNDERGROUND HOUSES
UNDERGROUND HOUSESUNDERGROUND HOUSES
UNDERGROUND HOUSES
 
Conservation report
Conservation reportConservation report
Conservation report
 
Forteco Presentation
Forteco PresentationForteco Presentation
Forteco Presentation
 
Simmons Nov 2014
Simmons Nov 2014Simmons Nov 2014
Simmons Nov 2014
 
Possible flood adaptation strategies for Catskill, NY
Possible flood adaptation strategies for Catskill, NYPossible flood adaptation strategies for Catskill, NY
Possible flood adaptation strategies for Catskill, NY
 
Concrete Lego Block Ideas
Concrete Lego Block IdeasConcrete Lego Block Ideas
Concrete Lego Block Ideas
 
2012 02-11 ibs nahbrc - changing with the times
2012 02-11 ibs nahbrc - changing with the times2012 02-11 ibs nahbrc - changing with the times
2012 02-11 ibs nahbrc - changing with the times
 
INKERMAN HOUSE
INKERMAN HOUSEINKERMAN HOUSE
INKERMAN HOUSE
 
Andrew turton 2012
Andrew turton 2012Andrew turton 2012
Andrew turton 2012
 
IRJET- Indian Rural Housing Needs to Bridge the Technological Gaps
IRJET-  	  Indian Rural Housing Needs to Bridge the Technological GapsIRJET-  	  Indian Rural Housing Needs to Bridge the Technological Gaps
IRJET- Indian Rural Housing Needs to Bridge the Technological Gaps
 

Viewers also liked

Enlight constit
Enlight constitEnlight constit
Enlight constitzwbennett
 
JICA Reference_Letter_for_Michael_Boateng
JICA Reference_Letter_for_Michael_BoatengJICA Reference_Letter_for_Michael_Boateng
JICA Reference_Letter_for_Michael_BoatengBoateng Michael
 
3- 3 amending the constitution
3- 3 amending the constitution3- 3 amending the constitution
3- 3 amending the constitutionjpaone76
 
네이버 블로그에 페북위젯 만들기
네이버 블로그에 페북위젯 만들기네이버 블로그에 페북위젯 만들기
네이버 블로그에 페북위젯 만들기Yun-Ho Chang
 
Bootstrap. December 2015 [Brisbane Drupal meetup]
Bootstrap. December 2015 [Brisbane Drupal meetup] Bootstrap. December 2015 [Brisbane Drupal meetup]
Bootstrap. December 2015 [Brisbane Drupal meetup] Vladimir Roudakov
 
Open source software development
Open source software developmentOpen source software development
Open source software developmentSagar Raravi
 
Kids Voting USA Curriculum
Kids Voting USA CurriculumKids Voting USA Curriculum
Kids Voting USA CurriculumGenerationNation
 
Softplace - Une exploration des écosystèmes de lieux hybrides : livret final
Softplace - Une exploration des écosystèmes de lieux hybrides : livret final Softplace - Une exploration des écosystèmes de lieux hybrides : livret final
Softplace - Une exploration des écosystèmes de lieux hybrides : livret final Fing
 
Transformations du travail et conditions d'une amélioration des conditions de...
Transformations du travail et conditions d'une amélioration des conditions de...Transformations du travail et conditions d'une amélioration des conditions de...
Transformations du travail et conditions d'une amélioration des conditions de...Fing
 
Week 3: Responses to terrorism
Week 3: Responses to terrorismWeek 3: Responses to terrorism
Week 3: Responses to terrorismkamila_fraser
 

Viewers also liked (14)

Enlight constit
Enlight constitEnlight constit
Enlight constit
 
JICA Reference_Letter_for_Michael_Boateng
JICA Reference_Letter_for_Michael_BoatengJICA Reference_Letter_for_Michael_Boateng
JICA Reference_Letter_for_Michael_Boateng
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
Website
WebsiteWebsite
Website
 
3- 3 amending the constitution
3- 3 amending the constitution3- 3 amending the constitution
3- 3 amending the constitution
 
네이버 블로그에 페북위젯 만들기
네이버 블로그에 페북위젯 만들기네이버 블로그에 페북위젯 만들기
네이버 블로그에 페북위젯 만들기
 
Bootstrap. December 2015 [Brisbane Drupal meetup]
Bootstrap. December 2015 [Brisbane Drupal meetup] Bootstrap. December 2015 [Brisbane Drupal meetup]
Bootstrap. December 2015 [Brisbane Drupal meetup]
 
El sistema solar
El sistema solarEl sistema solar
El sistema solar
 
Open source software development
Open source software developmentOpen source software development
Open source software development
 
Kids Voting USA Curriculum
Kids Voting USA CurriculumKids Voting USA Curriculum
Kids Voting USA Curriculum
 
PayPal MENA 2016
PayPal MENA 2016PayPal MENA 2016
PayPal MENA 2016
 
Softplace - Une exploration des écosystèmes de lieux hybrides : livret final
Softplace - Une exploration des écosystèmes de lieux hybrides : livret final Softplace - Une exploration des écosystèmes de lieux hybrides : livret final
Softplace - Une exploration des écosystèmes de lieux hybrides : livret final
 
Transformations du travail et conditions d'une amélioration des conditions de...
Transformations du travail et conditions d'une amélioration des conditions de...Transformations du travail et conditions d'une amélioration des conditions de...
Transformations du travail et conditions d'une amélioration des conditions de...
 
Week 3: Responses to terrorism
Week 3: Responses to terrorismWeek 3: Responses to terrorism
Week 3: Responses to terrorism
 

Similar to Les eco logis-en

Coatleven en
Coatleven   enCoatleven   en
Coatleven enlibnam
 
Education center le picaou en
Education center le picaou   enEducation center le picaou   en
Education center le picaou enlibnam
 
Smictom in fougères region-en
Smictom in fougères region-enSmictom in fougères region-en
Smictom in fougères region-enlibnam
 
Saint léry en
Saint léry   enSaint léry   en
Saint léry enlibnam
 
Montès-en
Montès-enMontès-en
Montès-enlibnam
 
Norlands en
Norlands   enNorlands   en
Norlands enlibnam
 
Lightweight insulated floor and wall panelling with heavyweight benefits
Lightweight insulated floor and wall panelling with heavyweight benefitsLightweight insulated floor and wall panelling with heavyweight benefits
Lightweight insulated floor and wall panelling with heavyweight benefitsjohndorian555
 
Malcolm's golf shop-en
Malcolm's golf shop-enMalcolm's golf shop-en
Malcolm's golf shop-enlibnam
 
Building our future-LECA (expanded clay)
Building our future-LECA (expanded clay)Building our future-LECA (expanded clay)
Building our future-LECA (expanded clay)Gary1028841
 
The emerald-en
The emerald-enThe emerald-en
The emerald-enlibnam
 
Civil Engineering Materiel's 2017
Civil Engineering Materiel's 2017   Civil Engineering Materiel's 2017
Civil Engineering Materiel's 2017 ABIR A HAPZU
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systemsLin Hui
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systemsFarah Sham
 
Podpassiv specifications
Podpassiv specificationsPodpassiv specifications
Podpassiv specificationsPODPASSIV
 
Peter Cox - Drywall Thermotek
Peter Cox - Drywall ThermotekPeter Cox - Drywall Thermotek
Peter Cox - Drywall ThermotekKevin Ball
 
Koeschi-en
Koeschi-enKoeschi-en
Koeschi-enlibnam
 

Similar to Les eco logis-en (20)

Coatleven en
Coatleven   enCoatleven   en
Coatleven en
 
Education center le picaou en
Education center le picaou   enEducation center le picaou   en
Education center le picaou en
 
Smictom in fougères region-en
Smictom in fougères region-enSmictom in fougères region-en
Smictom in fougères region-en
 
Saint léry en
Saint léry   enSaint léry   en
Saint léry en
 
Montès-en
Montès-enMontès-en
Montès-en
 
Norlands en
Norlands   enNorlands   en
Norlands en
 
Lightweight insulated floor and wall panelling with heavyweight benefits
Lightweight insulated floor and wall panelling with heavyweight benefitsLightweight insulated floor and wall panelling with heavyweight benefits
Lightweight insulated floor and wall panelling with heavyweight benefits
 
Malcolm's golf shop-en
Malcolm's golf shop-enMalcolm's golf shop-en
Malcolm's golf shop-en
 
Presentation opti water systems
Presentation opti water systemsPresentation opti water systems
Presentation opti water systems
 
Building our future-LECA (expanded clay)
Building our future-LECA (expanded clay)Building our future-LECA (expanded clay)
Building our future-LECA (expanded clay)
 
The emerald-en
The emerald-enThe emerald-en
The emerald-en
 
Ubs building system pdf
Ubs building system pdfUbs building system pdf
Ubs building system pdf
 
Civil Engineering Materiel's 2017
Civil Engineering Materiel's 2017   Civil Engineering Materiel's 2017
Civil Engineering Materiel's 2017
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systems
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systems
 
Floating Technology
Floating TechnologyFloating Technology
Floating Technology
 
The amphibious structure
The amphibious structureThe amphibious structure
The amphibious structure
 
Podpassiv specifications
Podpassiv specificationsPodpassiv specifications
Podpassiv specifications
 
Peter Cox - Drywall Thermotek
Peter Cox - Drywall ThermotekPeter Cox - Drywall Thermotek
Peter Cox - Drywall Thermotek
 
Koeschi-en
Koeschi-enKoeschi-en
Koeschi-en
 

More from libnam

Robinard fr
Robinard   frRobinard   fr
Robinard frlibnam
 
Booklet supporting methods sustainable construction
Booklet supporting methods sustainable constructionBooklet supporting methods sustainable construction
Booklet supporting methods sustainable constructionlibnam
 
Livret méthodologies d'accompagnement construction durable
Livret méthodologies d'accompagnement construction durableLivret méthodologies d'accompagnement construction durable
Livret méthodologies d'accompagnement construction durablelibnam
 
Booklet two integrated building designs
Booklet two integrated building designsBooklet two integrated building designs
Booklet two integrated building designslibnam
 
Livret deux méthodes de conception collaboratives
Livret deux méthodes de conception collaborativesLivret deux méthodes de conception collaboratives
Livret deux méthodes de conception collaborativeslibnam
 
Educational sheet hqe
Educational sheet hqeEducational sheet hqe
Educational sheet hqelibnam
 
educational sheet breeam
 educational sheet breeam educational sheet breeam
educational sheet breeamlibnam
 
Educational sheet rt 2020
Educational sheet rt 2020Educational sheet rt 2020
Educational sheet rt 2020libnam
 
Thermal regulation 2013 in england
Thermal regulation 2013 in englandThermal regulation 2013 in england
Thermal regulation 2013 in englandlibnam
 
En tool 4 educational sheet thermal regulation in england
En tool 4 educational sheet thermal regulation in englandEn tool 4 educational sheet thermal regulation in england
En tool 4 educational sheet thermal regulation in englandlibnam
 
Réglementation thermique 2013 en angleterre
Réglementation thermique 2013 en angleterreRéglementation thermique 2013 en angleterre
Réglementation thermique 2013 en angleterrelibnam
 
Fr outil 1 fiche enquête vierge livret études de cas
Fr outil 1 fiche enquête vierge livret études de casFr outil 1 fiche enquête vierge livret études de cas
Fr outil 1 fiche enquête vierge livret études de caslibnam
 
En tool 1 blank survey data sheet case studies booklet
En tool 1 blank survey data sheet case studies booklet En tool 1 blank survey data sheet case studies booklet
En tool 1 blank survey data sheet case studies booklet libnam
 
Fr outil 7 compte rendu photos tests bottes de paille
Fr outil 7 compte rendu photos tests bottes de pailleFr outil 7 compte rendu photos tests bottes de paille
Fr outil 7 compte rendu photos tests bottes de paillelibnam
 
Fr outil 7 compte rendu photos terre bauge mécanisée btc torchis
Fr outil 7 compte rendu photos terre bauge mécanisée btc torchisFr outil 7 compte rendu photos terre bauge mécanisée btc torchis
Fr outil 7 compte rendu photos terre bauge mécanisée btc torchislibnam
 
Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...
Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...
Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...libnam
 
Fr outil 7 compte rendu photos isolation terre paille
Fr outil 7 compte rendu photos isolation terre pailleFr outil 7 compte rendu photos isolation terre paille
Fr outil 7 compte rendu photos isolation terre paillelibnam
 
Fr outil 7 compte rendu photos chanvre projeté
Fr outil 7 compte rendu photos chanvre projetéFr outil 7 compte rendu photos chanvre projeté
Fr outil 7 compte rendu photos chanvre projetélibnam
 
Fr outil 7 compte rendu photos chanvre dans tous ses états
Fr outil 7 compte rendu photos chanvre dans tous ses étatsFr outil 7 compte rendu photos chanvre dans tous ses états
Fr outil 7 compte rendu photos chanvre dans tous ses étatslibnam
 
Fr outil 7 compte rendu photos chanvre banché
Fr outil 7 compte rendu photos chanvre banchéFr outil 7 compte rendu photos chanvre banché
Fr outil 7 compte rendu photos chanvre banchélibnam
 

More from libnam (20)

Robinard fr
Robinard   frRobinard   fr
Robinard fr
 
Booklet supporting methods sustainable construction
Booklet supporting methods sustainable constructionBooklet supporting methods sustainable construction
Booklet supporting methods sustainable construction
 
Livret méthodologies d'accompagnement construction durable
Livret méthodologies d'accompagnement construction durableLivret méthodologies d'accompagnement construction durable
Livret méthodologies d'accompagnement construction durable
 
Booklet two integrated building designs
Booklet two integrated building designsBooklet two integrated building designs
Booklet two integrated building designs
 
Livret deux méthodes de conception collaboratives
Livret deux méthodes de conception collaborativesLivret deux méthodes de conception collaboratives
Livret deux méthodes de conception collaboratives
 
Educational sheet hqe
Educational sheet hqeEducational sheet hqe
Educational sheet hqe
 
educational sheet breeam
 educational sheet breeam educational sheet breeam
educational sheet breeam
 
Educational sheet rt 2020
Educational sheet rt 2020Educational sheet rt 2020
Educational sheet rt 2020
 
Thermal regulation 2013 in england
Thermal regulation 2013 in englandThermal regulation 2013 in england
Thermal regulation 2013 in england
 
En tool 4 educational sheet thermal regulation in england
En tool 4 educational sheet thermal regulation in englandEn tool 4 educational sheet thermal regulation in england
En tool 4 educational sheet thermal regulation in england
 
Réglementation thermique 2013 en angleterre
Réglementation thermique 2013 en angleterreRéglementation thermique 2013 en angleterre
Réglementation thermique 2013 en angleterre
 
Fr outil 1 fiche enquête vierge livret études de cas
Fr outil 1 fiche enquête vierge livret études de casFr outil 1 fiche enquête vierge livret études de cas
Fr outil 1 fiche enquête vierge livret études de cas
 
En tool 1 blank survey data sheet case studies booklet
En tool 1 blank survey data sheet case studies booklet En tool 1 blank survey data sheet case studies booklet
En tool 1 blank survey data sheet case studies booklet
 
Fr outil 7 compte rendu photos tests bottes de paille
Fr outil 7 compte rendu photos tests bottes de pailleFr outil 7 compte rendu photos tests bottes de paille
Fr outil 7 compte rendu photos tests bottes de paille
 
Fr outil 7 compte rendu photos terre bauge mécanisée btc torchis
Fr outil 7 compte rendu photos terre bauge mécanisée btc torchisFr outil 7 compte rendu photos terre bauge mécanisée btc torchis
Fr outil 7 compte rendu photos terre bauge mécanisée btc torchis
 
Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...
Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...
Fr outil 7 compte rendu photos ossature bois, ouate de cellulose et laine de ...
 
Fr outil 7 compte rendu photos isolation terre paille
Fr outil 7 compte rendu photos isolation terre pailleFr outil 7 compte rendu photos isolation terre paille
Fr outil 7 compte rendu photos isolation terre paille
 
Fr outil 7 compte rendu photos chanvre projeté
Fr outil 7 compte rendu photos chanvre projetéFr outil 7 compte rendu photos chanvre projeté
Fr outil 7 compte rendu photos chanvre projeté
 
Fr outil 7 compte rendu photos chanvre dans tous ses états
Fr outil 7 compte rendu photos chanvre dans tous ses étatsFr outil 7 compte rendu photos chanvre dans tous ses états
Fr outil 7 compte rendu photos chanvre dans tous ses états
 
Fr outil 7 compte rendu photos chanvre banché
Fr outil 7 compte rendu photos chanvre banchéFr outil 7 compte rendu photos chanvre banché
Fr outil 7 compte rendu photos chanvre banché
 

Recently uploaded

call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 

Recently uploaded (20)

call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 

Les eco logis-en

  • 1. 162 The combination of wood and stone gives charm to a typical farmhouse. Key dates The farm dates back to before 1900. Beginning of the plans : 2006 Planning permission secured : 2010. Works : 2011 to 2012. In order to preserve the stone farmhouse they inherited from their parents, Anne and Michel wished to renovate it. They have given it a second life by creating 5 holiday lets. To give the holiday units a more contemporary look, they wanted to marry ancient materials taken from the site with 21st century ones, without losing the essence of the location. The Eco- friendliness of the dwellings is shown through the use of recyclable or reused materials (stones, beams, doors) as well as natural heating and sanitation systems. Introduction Saint Brieuc Quimper Vannes Rennes Baden Les Eco-Logis Overview - Photo © Servane Guihaire - Constructys Bretagne
  • 2. www.libnam.eu 2 Context The owners crated a limited company (SARL) called   Les Eco Logis de Lairmarc’h, enabling them to offer visitors welcoming, easy to heat and eco-friendly holiday lets. The project is in a fairly popular tourist area: Le Golfe du Morbihan, between the sea and countryside. The buildings are south facing. The T – shape enables 3 of the lets to be south facing while the other 2 are west-facing. The proximity of the coast means that the Local Plan Area is restrictive, and the only possible change of use for the building was to holiday accommodation and the only contractor accepted was a farmer. These holiday dwellings, covering an area of 370 sq m (3980 sqft) are attached to, and in close proximity, to the farm; privacy was therefore a requirement put forward by the architect. Therefore, the layout was also influenced by the desire to keep cars away to make the site wheelchair friendly. One of the lets is especially converted for disabled people, as laid out in the regulation for disabled access (law of 11/02/2005). Plan © A’Dao N
  • 3. French-British collective Libnam3 Building overview Two different systems were used for the renovation ; the existing buildings are in stone while the extension is timber-framed. The stone buildings are on shallow existing foundations. The internal solid wall was insulated by blowing 15 cm of cellulose fibre and covered by gypsum boards (Fermacell). Where there was a higher risk of damp, walls have been insulated with cork. The timber frame is made of pinewood beams (45x145 mm) and laid on a concrete slab, which is insulated underneath by sheets of polyurethane 10 cm thick (Sporema brand). The wall insulation is made of cellulose fibre, applied between timber posts, and covered by chipboard to assure continuity of the outer-shell. The distribution of the internal layout is made of steel frame and plasterboard (BA13) or gypsum boards (Fermacell), using wood wool as an insulator. The window and door frames were tailor-made by MC France. They are made of wood and steel, and double glazed. They do not come with rolling blinds as they would look inappropriate on listed buildings and would create thermal bridges. The holiday lets are all equipped with a wood burner with different capacity depending on the area to heat. Electrical heating can be used when necessary. However, in order to promote the use of renewable energy, the wood is provided for free while electricity is charged on top of the rental price. Framing - Photo © Yann Denion - CICS
  • 4. www.libnam.eu 4 The ventilation is a Hygro B type (outlet and inlet air hygro adjustable). A 10 m3 water tank was installed to recover rainwater for watering, toilets and washing machines (situated in the communal laundry at the entrance). The water sewage treatment is done by phyto- purification ponds. Structure of the roof, from outside in : slates - battens - cellulose fibre - vapour barrier - gypsum boards (Fermacell). Structure of the stone walls : Stone - Whitewash - rain barrier - Douglas fir frame - 15 cm thick cellulose fibre - vapour barrier - gypsum boards (Fermacell). Structure of the partition walls : 22 mm Douglas fir cladding - battens (thermal gap) - Wood fibre boards (6 cm Pavatex) - Rain barrier - Bracing pannels (18 cm OSBracing) - 15 cm insulated frame - Vapour barrier - Gypsum boards (Fermacell). Timber-framed extension - Photo © Servane Guihaire - Constructys Bretagne
  • 5. French-British collective Libnam5 Technical focus : Stone and insulation Cellulose fibre (made of recycled newspapers) is commonly used as insulation for timber frame buildings, but more rarely for stone buildings. The cellulose fibre used on site (by Isocel) is produced by a company called Celaouate in Morlaix, from recycled local papers such as Le Télégramme, which ensures a low carbon footprint due to its local production. As well as cellulose fibre’s insulating quality, it has greater thermal mass than mineral wool. This makes it a useful product to reduce the temperature difference inside the building, in particular during heat waves. Married with stone, cellulose fibre provides comfort in the summer time, and the holiday lets are used mainly during warm months. Here, the cellulose fibre was blown into the wooden frame and sealed by a vapour barrier. The device blows the cellulose fibre through an opening in the vapour barrier which is then tightly sealed. Moisture must not reach the insulation. This requires careful implementation in respect of the stone, such as pointing the outside walls and the protection of the lower parts. For example, rain barriers have been applied at the bottom of walls and loose cork was put in the areas most exposed to capillary rise. It is important to note that borax is integrated into cellulose fibre. This mineral has fire retardant properties and enables protection from fungus and rodents. In 2012 and 2013, in France, the public health safety of this additive caused controversy. For Interior - Photo © Servane Guihaire - Constructys Bretagne
  • 6. www.libnam.eu 6 Barriers and solutions On a legal and regulatory level, several problems were encountered. For example, the site is situated in a conservation area, so it was necessary to communicate with Architecte des Batiments de France (French equivalent of English Heritage), especially for the creation of West-facing openings and the modification of the facade. To put the phytopurification (water treatement using a reed bed) in place, it was necessary to explain to the Syndicat Intercommunal d’Alimentation en Eau Potable (Local water board) what the system was about. The constant evolution of the techniques can bring misunderstandings from regulation bodies which can slow down eco- construction. This is one of the reasons why companies have to keep training to obtain certificates as well as skills. For the cellulose fibre, the company CICS underwent training with different organisations: Domus a while, building regulations used ammonium salts, but finally chose to reinstate the use of borax; and for good reasons since ammonium may degrade into ammonia and this has potential health risks, whereas borax has been judged to have a low impact, below a 5% threshold. The cellulose fibre industry has however decided to start research work to identify substitute to these salts. Bedroom - Photo © Servane Guihaire - Constructys Bretagne
  • 7. French-British collective Libnam7 (supplier), Tyeco2, Ecolusis and ARFAB (airtight). They also attended training in Energy-saving in the building industry. Monitoring by the main contractor onsite,discussionswiththearchitect, and regular site reports allowed better communication between the trades, even if it did not avoid all the problems. For instance, there was a large turnover of employees in one company which complicated the passing down of some instructions. However, to reach the target thermal performance, each contractor had to pay attention to the work of others. There are many technical constraints that guided the homeowners’ choices : lime and hemp concrete is interesting in terms of insulation but wouldhaveresultedinwallsthatwere too thick ; a heat-recovery device would have been complicated to install for 5 independent cottages ; solar panels would have resulted in a lot of wiring and trouble during a possible division of dwellings in the future. Finally, a few technical problems occurred on the building site  : creating weep holes on the cement- rendered stone walls was very complicated, the gypsum boards were heavy and difficult to cut, and the concrete slab took time to dry in winter as the building was well insulated. Inside - Photo © Servane Guihaire - Constructys Bretagne
  • 8. 8 Stakeholders Main contractor : SARL Les Eco Logis de Lairmarc’h (Baden) Architect : A’Dao (Rennes) Project manager : Gérard Lucas (Les Fougerêts) Masonry : Pelbois (Pluherlin) Carpentry-Joinery : Burban (Malansac) Insulation – internal walls : CICS (Saint Nicolas du Tertre) Services : SARL Coué Crété (St Martin/Oust) Plumbing : Lubert (Limerzel) Electricity : Cornec Pac Elec (Plougoumelen) Tiling : Roux SARL (Guegon) Stairs : Potier JP (Rieux) Decorating : Le Tournel Sarl (La Gacilly) Wood burners : Nicolas Cheminées (Lanester) Landscaping and sewage : Aubat (Landaul) Phytopurification Conception : Aquatiris (Landevant) Link www.lafermh-baden.fr Costs Project management : 8.6% of the global of the build : £41,167 before tax Groundwork and connection to services : £27,526 before tax Masonry and structural work : £85,315 before tax Frame : £58,189 before tax Roofing and waterproofing : £40,644 before tax Indoors and outdoors joinery : £54,875 before tax Electricity and heating : £35,967 before tax Internal walls and insulation : £71,730 Plumbing : £25,918 before tax Tiling : £27,430 before tax Stairs : £9,152 before tax Decorating : £25,901 before tax Total : £503,814 before tax, equivalent to £1,361 per sq m A partial thermal survey was done during the study phase in order to choose the correct materials. The building did not aim to achieve any specific eco-labels, the wish being to make a more energy-efficient Performance Perspective © A’Dao building with environmentally friendly materials. Following readings, it was found that eight people consume twelve euros worth of hot water and electricity per week (about 90 kWh). Contact Constructys Bretagne www.constructys-bretagne.fr