SITE INDUCTION
WELCOME 
Site Induction For Your Safety 
Introduction 
This induction is given to all operatives before they work on site. 
It provides you with specific information about the project, the team 
undertaking the work and how you can actively participate in the safe 
completion of the works. 
The company expects employees to put Safety First before anything else
The Project 
 Installation of a 16.2 MW Photovoltaic Plant. 
 Erecting security fencing; 
 Driving the framework into the ground; 
 Affixing the panels to the mounting frames; 
 Trenching for the cable runs to depth of approximately 1m, and laying cables; 
 Installation of the inverter, transformer cabinets, control room and substation;
Key Personnel 
 Client Sun Edison 
 CDMC HSEF 
 Principal Contractor Sun Edison 
 Project Manager Carlos Rodriguez 
 Site Manager Jorge Arce 
Contractors 
 Eiffage Energia 
 Axial Solar
Responsibilities and Duty of Care 
 You have a legal duty to take care of your own Health & 
Safety as well as people around you. 
 You must inspect your own workplace before starting work 
and during work regularly. 
 You have a legal responsibility regarding the Health & 
Safety of members the public.(NB unauthorised entry) 
 It is the responsibility of all personnel to improve Health & 
Safety standards.
PPE (Personal Protective Equipment) 
Minimum PPE requirements (to be worn at all times): 
 Hard hat 
 Safety boots 
 High visibility vest 
 Gloves 
 Light eye protection (task specific) 
Other items will be worn as operations dictate i.e. goggles/dust masks/ear 
defenders/harnesses etc. 
Your supervisor will be responsible for instructing you on when and where 
these should be worn.
Site Rules 
 Wear correct fitting PPE appropriate to the operation and which is in good 
condition, at all times; 
 Anyone considered to have taken alcohol or be under the influence of drugs 
will be permanently removed from site; 
 Permits are required for the following operations: excavations, lifting 
operation, hot works, confined space entry; 
 Obey all safety notices and signs; 
 Do not indulge in horseplay; 
 Do not intentionally misuse anything which is provided in the interest of 
H&S or welfare facilities.
Site Rules 
 Maintain the workplace in a tidy condition free from avoidable hazards; 
 Report any concerns, near misses or incidents to site management immediately; 
 All vehicles/plant must be kept securely locked when left unattended; 
 A banksman shall be utilised for all plant movements; 
 No keys to be left in unattended vehicles; 
 Temporary fencing must be maintained at all times; 
 Mobile phones can only be used from a position of safety when person is not 
directly involved in an ongoing operation.
Welfare Arrangements 
 Toilets are located in the site compound area; 
 A canteen is provided in the site compound area; 
 A drying room is provided in the site compound area. 
Please ensure that welfare facilities are kept clean & tidy
Emergency Procedures 
 In the event of an emergency or fire, the alarm shall be 
raised by shouting or using the horn located in the project 
office. 
 Operatives shall follow the designated trakway route from 
their working area to the site assembly point behind the 
security cabin (near the entrance to site)
Accident & Near Miss Reporting Procedures 
 If you suffer an injury, how ever small please inform one of our first 
aiders immediately and report it to the site manager as soon as 
possible. The health & safety advisor will then enter your details into 
the Accident Book located in the project office. 
 If you are involved in a near miss or are witness to one please help 
us to prevent reoccurrence by reporting it using one of the following 
ways: 
• Telling a member of staff. 
• Completing a near miss form located in the project office 
• Telephoning the site offices
Hazards on Site 
Overhead Power Lines 
 High voltage lines 8 meters above the ground level 
 Goalpost system must be adhered to when passing or 
working under
Vehicles and Heavy Machinery
Environmental Protection 
In the event of a spill 
STOP WORK – PREVENT anymore material spilling. 
Eliminate all sources of ignition if it’s flammable. 
Contain the spill using bunds, absorbent pads or sand, check spills 
have not reached any ditches or water courses. 
Notify your supervisor of the material spilt, quantity, location of 
spill, and any action taken. 
Ensure that you dispose of your waste in the correct skip. 
All waste must be segregated to satisfy our Duty of care to eliminate, 
reduce, reuse and recycle waste bound for landfill.

More Related Content

What's hot

Workplace hazards
Workplace hazardsWorkplace hazards
Workplace hazards
Navneet Maan
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at work
Paul Smith
 
Office safety awareness training
Office safety awareness trainingOffice safety awareness training
Office safety awareness training
Muhammad Basharat
 
Work At Height
Work At HeightWork At Height
Work At Height
James McCann
 
LOTO
LOTO LOTO
Work at height. The basic needs.
Work at height. The basic needs.Work at height. The basic needs.
Work at height. The basic needs.
Sivasubramaniam Subramanian
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at height
sankarnagar
 
RedPixel OHS Presentation
RedPixel OHS PresentationRedPixel OHS Presentation
RedPixel OHS Presentation
HelenYOH
 
Ses safety induction
Ses safety inductionSes safety induction
Ses safety induction
adam-de
 
Safe operating of forklift
Safe operating of forkliftSafe operating of forklift
Safe operating of forklift
Muthurv Venkatachalam
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
IrfanAwan25
 
Worker safety hand book
Worker    safety hand bookWorker    safety hand book
Worker safety hand book
Mumtaz A. Khan CMIOSH, IDipNEBOSH
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
ssuser0ebdc3
 
Safe work-at-heights-presentation
Safe work-at-heights-presentationSafe work-at-heights-presentation
Safe work-at-heights-presentation
JulianElbu
 
General Industry Fall Protection
General Industry Fall ProtectionGeneral Industry Fall Protection
General Industry Fall Protection
sepinon
 
Working at heights
Working at heightsWorking at heights
Working at heights
Chitra Mohanty
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Work
lifecombo
 
Ladder Safety- Safety First!
Ladder Safety- Safety First!Ladder Safety- Safety First!
Ladder Safety- Safety First!
davidhongwei
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety Induction
James McCann
 
Health safety induction_overview
Health safety induction_overviewHealth safety induction_overview
Health safety induction_overview
zz_bedee
 

What's hot (20)

Workplace hazards
Workplace hazardsWorkplace hazards
Workplace hazards
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at work
 
Office safety awareness training
Office safety awareness trainingOffice safety awareness training
Office safety awareness training
 
Work At Height
Work At HeightWork At Height
Work At Height
 
LOTO
LOTO LOTO
LOTO
 
Work at height. The basic needs.
Work at height. The basic needs.Work at height. The basic needs.
Work at height. The basic needs.
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at height
 
RedPixel OHS Presentation
RedPixel OHS PresentationRedPixel OHS Presentation
RedPixel OHS Presentation
 
Ses safety induction
Ses safety inductionSes safety induction
Ses safety induction
 
Safe operating of forklift
Safe operating of forkliftSafe operating of forklift
Safe operating of forklift
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
 
Worker safety hand book
Worker    safety hand bookWorker    safety hand book
Worker safety hand book
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
Safe work-at-heights-presentation
Safe work-at-heights-presentationSafe work-at-heights-presentation
Safe work-at-heights-presentation
 
General Industry Fall Protection
General Industry Fall ProtectionGeneral Industry Fall Protection
General Industry Fall Protection
 
Working at heights
Working at heightsWorking at heights
Working at heights
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Work
 
Ladder Safety- Safety First!
Ladder Safety- Safety First!Ladder Safety- Safety First!
Ladder Safety- Safety First!
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety Induction
 
Health safety induction_overview
Health safety induction_overviewHealth safety induction_overview
Health safety induction_overview
 

Similar to SITE INDUCTION Version 2

DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
AamirAbbas75
 
Iipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bpIipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bp
KJP Consulting
 
Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4
Garry Pepper
 
Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4
Garry Pepper
 
AMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdfAMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdf
IbukunOwolabi4
 
General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1
debandleigh
 
General Safety Presentation
General Safety PresentationGeneral Safety Presentation
General Safety Presentation
gtwaddell
 
general-safety-presentationupdated-gt-1233624442182954-1.pptx
general-safety-presentationupdated-gt-1233624442182954-1.pptxgeneral-safety-presentationupdated-gt-1233624442182954-1.pptx
general-safety-presentationupdated-gt-1233624442182954-1.pptx
syedatifullahhadi
 
Turn Key Group Services - OHS Toolkit
Turn Key Group Services - OHS ToolkitTurn Key Group Services - OHS Toolkit
Turn Key Group Services - OHS Toolkit
turnkeygroupservices
 
Operator Training
Operator TrainingOperator Training
Operator Training
DariusDelon
 
Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan generic
firstpick
 
ACT Environment Induction
ACT Environment InductionACT Environment Induction
ACT Environment Induction
Dotjo Dev
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentation
Lucy Reimer
 
SITE SAFETY INDUCTION ENGINEERING TRAINING
SITE SAFETY INDUCTION ENGINEERING TRAININGSITE SAFETY INDUCTION ENGINEERING TRAINING
SITE SAFETY INDUCTION ENGINEERING TRAINING
satheesh843134
 
Home Builders Training Program | Chris Collins Dacula ga
Home Builders Training Program | Chris Collins Dacula gaHome Builders Training Program | Chris Collins Dacula ga
Home Builders Training Program | Chris Collins Dacula ga
Chris Collins Dacula ga
 
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
fahadansari131
 
117921179 saudi-aramco-safety-handbook
117921179 saudi-aramco-safety-handbook117921179 saudi-aramco-safety-handbook
117921179 saudi-aramco-safety-handbook
khalil maroun
 
Infraworks plumbing induction feb 19 v1.0
Infraworks plumbing induction feb 19 v1.0Infraworks plumbing induction feb 19 v1.0
Infraworks plumbing induction feb 19 v1.0
Garry Pepper
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
FESTUS RICHARD SIAME
 

Similar to SITE INDUCTION Version 2 (20)

DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
 
Iipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bpIipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bp
 
Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4
 
Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4
 
AMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdfAMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdf
 
General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1
 
General Safety Presentation
General Safety PresentationGeneral Safety Presentation
General Safety Presentation
 
general-safety-presentationupdated-gt-1233624442182954-1.pptx
general-safety-presentationupdated-gt-1233624442182954-1.pptxgeneral-safety-presentationupdated-gt-1233624442182954-1.pptx
general-safety-presentationupdated-gt-1233624442182954-1.pptx
 
Turn Key Group Services - OHS Toolkit
Turn Key Group Services - OHS ToolkitTurn Key Group Services - OHS Toolkit
Turn Key Group Services - OHS Toolkit
 
Safety.pdf
Safety.pdfSafety.pdf
Safety.pdf
 
Operator Training
Operator TrainingOperator Training
Operator Training
 
Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan generic
 
ACT Environment Induction
ACT Environment InductionACT Environment Induction
ACT Environment Induction
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentation
 
SITE SAFETY INDUCTION ENGINEERING TRAINING
SITE SAFETY INDUCTION ENGINEERING TRAININGSITE SAFETY INDUCTION ENGINEERING TRAINING
SITE SAFETY INDUCTION ENGINEERING TRAINING
 
Home Builders Training Program | Chris Collins Dacula ga
Home Builders Training Program | Chris Collins Dacula gaHome Builders Training Program | Chris Collins Dacula ga
Home Builders Training Program | Chris Collins Dacula ga
 
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
 
117921179 saudi-aramco-safety-handbook
117921179 saudi-aramco-safety-handbook117921179 saudi-aramco-safety-handbook
117921179 saudi-aramco-safety-handbook
 
Infraworks plumbing induction feb 19 v1.0
Infraworks plumbing induction feb 19 v1.0Infraworks plumbing induction feb 19 v1.0
Infraworks plumbing induction feb 19 v1.0
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
 

SITE INDUCTION Version 2

  • 2. WELCOME Site Induction For Your Safety Introduction This induction is given to all operatives before they work on site. It provides you with specific information about the project, the team undertaking the work and how you can actively participate in the safe completion of the works. The company expects employees to put Safety First before anything else
  • 3. The Project  Installation of a 16.2 MW Photovoltaic Plant.  Erecting security fencing;  Driving the framework into the ground;  Affixing the panels to the mounting frames;  Trenching for the cable runs to depth of approximately 1m, and laying cables;  Installation of the inverter, transformer cabinets, control room and substation;
  • 4. Key Personnel  Client Sun Edison  CDMC HSEF  Principal Contractor Sun Edison  Project Manager Carlos Rodriguez  Site Manager Jorge Arce Contractors  Eiffage Energia  Axial Solar
  • 5. Responsibilities and Duty of Care  You have a legal duty to take care of your own Health & Safety as well as people around you.  You must inspect your own workplace before starting work and during work regularly.  You have a legal responsibility regarding the Health & Safety of members the public.(NB unauthorised entry)  It is the responsibility of all personnel to improve Health & Safety standards.
  • 6. PPE (Personal Protective Equipment) Minimum PPE requirements (to be worn at all times):  Hard hat  Safety boots  High visibility vest  Gloves  Light eye protection (task specific) Other items will be worn as operations dictate i.e. goggles/dust masks/ear defenders/harnesses etc. Your supervisor will be responsible for instructing you on when and where these should be worn.
  • 7. Site Rules  Wear correct fitting PPE appropriate to the operation and which is in good condition, at all times;  Anyone considered to have taken alcohol or be under the influence of drugs will be permanently removed from site;  Permits are required for the following operations: excavations, lifting operation, hot works, confined space entry;  Obey all safety notices and signs;  Do not indulge in horseplay;  Do not intentionally misuse anything which is provided in the interest of H&S or welfare facilities.
  • 8. Site Rules  Maintain the workplace in a tidy condition free from avoidable hazards;  Report any concerns, near misses or incidents to site management immediately;  All vehicles/plant must be kept securely locked when left unattended;  A banksman shall be utilised for all plant movements;  No keys to be left in unattended vehicles;  Temporary fencing must be maintained at all times;  Mobile phones can only be used from a position of safety when person is not directly involved in an ongoing operation.
  • 9. Welfare Arrangements  Toilets are located in the site compound area;  A canteen is provided in the site compound area;  A drying room is provided in the site compound area. Please ensure that welfare facilities are kept clean & tidy
  • 10. Emergency Procedures  In the event of an emergency or fire, the alarm shall be raised by shouting or using the horn located in the project office.  Operatives shall follow the designated trakway route from their working area to the site assembly point behind the security cabin (near the entrance to site)
  • 11. Accident & Near Miss Reporting Procedures  If you suffer an injury, how ever small please inform one of our first aiders immediately and report it to the site manager as soon as possible. The health & safety advisor will then enter your details into the Accident Book located in the project office.  If you are involved in a near miss or are witness to one please help us to prevent reoccurrence by reporting it using one of the following ways: • Telling a member of staff. • Completing a near miss form located in the project office • Telephoning the site offices
  • 12. Hazards on Site Overhead Power Lines  High voltage lines 8 meters above the ground level  Goalpost system must be adhered to when passing or working under
  • 13. Vehicles and Heavy Machinery
  • 14. Environmental Protection In the event of a spill STOP WORK – PREVENT anymore material spilling. Eliminate all sources of ignition if it’s flammable. Contain the spill using bunds, absorbent pads or sand, check spills have not reached any ditches or water courses. Notify your supervisor of the material spilt, quantity, location of spill, and any action taken. Ensure that you dispose of your waste in the correct skip. All waste must be segregated to satisfy our Duty of care to eliminate, reduce, reuse and recycle waste bound for landfill.