This document outlines various construction site safety hazards and procedures. It discusses common accident causes like falls, being struck by objects, and electrocution. Proper safety measures are described for working at heights, using ladders, excavation work, cranes, traffic, electricity, sewage, and using personal protective equipment. The key to safety success is preventing accidents through awareness, safe work practices, training, and making safety a priority at all times.
BSS JV WORKING AT HEIGHT TRAINING - KSAB DIRAB & HQ.pptAdeniranIdris
Remember:
Be thorough and objective in your reporting.
Focus on facts, not assigning blame.
Preserve evidence by securing the scene and not moving anything unnecessarily.
By gathering this information, you'll have a solid foundation for a comprehensive incident report and investigation, which can help prevent similar occurrences in the future.
Safety at Construction site is the matter of someone's life so it has to give top priority, we are truly professional to follow this and its actually increase our efficiency, just check out our safety standard
BSS JV WORKING AT HEIGHT TRAINING - KSAB DIRAB & HQ.pptAdeniranIdris
Remember:
Be thorough and objective in your reporting.
Focus on facts, not assigning blame.
Preserve evidence by securing the scene and not moving anything unnecessarily.
By gathering this information, you'll have a solid foundation for a comprehensive incident report and investigation, which can help prevent similar occurrences in the future.
Safety at Construction site is the matter of someone's life so it has to give top priority, we are truly professional to follow this and its actually increase our efficiency, just check out our safety standard
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
11. SAFE ACCESS ON SITE
Everyone can get to their place of work safely.
Edges from which people could fall are provided
with double guard rails or other suitable edge
protection.
Holes are protected with clearly marked and
fixed covers to prevent falls.
Site is tidy.
Fenced off from public.
12. WORK AT HEIGHT
Never use ladders or scaffold without proper
fixing.
Never use incomplete scaffolding.
Make sure there are hand rails and toe boards at
all edges
Things fall on sites, wear your helmet.
Before starting work at heights check for
clearance from any overhead power lines.
13.
14. LADDERS
KILL A LOT OF PEOPLE , MAKE SURE THE LADDER IS :-
Pick right ladder for the right job.
In good shape.
Secured near the top.
On a stable and firm base.
Rising at least 1 meter / 3 feet beyond the
landing place.
Always check rungs.
Check the stepladder platform.
15.
16. SAFE LADDERS
Never allow more than one person on a ladder.
Use tool belts or hand lines to carry objects.
Do not lean out from the ladder in any direction.
If you have a fear of heights-don’t climb a
ladder.
Do not allow others to work under a ladder in
use.
17. EXCAVAION SAFETY:
•All excavations deeper than 1.25 meters must be shored .
•Excavations deeper than 2 meters must have guard rail or barrier.
•Vehicles working too close to the side of the trench may cause collapse.
•Vehicles tipping into the excavation must use stop blocks.
18. EXCAVATION WORK
If you want to avoid being buried alive
apply these safety rules:_
• Make sure you know where any
underground pipes and cables are
before you hit them.
• Make sure excavation is inspected daily.
• Trench slides can collapse without
warning.
19.
20. CRANE SAFETY
The weight of the load must be carefully
estimated.
The crane must befitted with an automatic safe
load indicator(one that works).
The crane must always work on hard, level base.
The load must be properly fixed and secured.
The banksman must be trained to give clear
signals.
Never, never be carried with a load.
21.
22.
23. TRAFFIC VEHICLES AND PLANT
Vehicles and pedestrian should be kept apart
on-site separate them as much as possible
using barriers.
Adequate clearance around slewing vehicles.
Avoid reversing where possible and one-way
system.
Vehicles should have reversing alarms/sirens.
Passengers only on vehicles designed to carry
them.
24. ELECTRICITY
Good practice with electricity onsite:-
Treat electricity with respect.
Check constantly that cables are not damaged
or worn.
Keep trailing cables off the ground and away
from water.
Never overload or use makeshift plugs and
fuses.
25.
26.
27. WORKING NEAR SEWAGE
o Health risks:- gastroenteritis /hepatitis/
weil’s disease/(leptospirosis)<rats urine> /asthma/skin &
eye
disease/ inflammation of lungs.
o How to become infected:-
hand to mouth contact {eating, drinking,}
Skin contact {cuts , wounds}
breathing {dust or mist}
28.
29. HOW TO PROTECT YOURSELF:
Understand the risks.
Understand how you may be infected.
Wear protective clothing.
Avoid sewage if possible.
Apply good possible hygiene.
Cleanse all wounds and cover.
Change out of contaminated clothing.
Clean equipment and boots etc on site.
If in doubt – see your doctor.
30. PPE ON SITE
Most construction sites require at least:-
Hard hat
Safety boots
Hi-viz jacket
Safety glasses
wear them always for your safety
31.
32. BASIC SAFETY PHILOSOPHY FOR SUCCESS
All accidents are preventable
No job is worth getting hurt for.
Every job will be done safely.
Incidents can be managed.
Safety is every ones responsibility.
Continue improvement.
Safety as a “way of life” for 24 hours / day.
All individuals have the responsibility and accountability to
identify eliminate or manage risks associated with their
workplace.
Legal obligations will be the minimum requirements for our
health and safety standards.
Individual will be trained and equipped to have the skills and
facilities to ensure an accident free workplace.