Key Assignment 2<br />Problem Definition:<br /> There is a tug pulls the tankers at the port. There is only one tug at the port. The condition for all the tug activities are given as per in the assignment. The condition for the storm is also as given in the assignment and what the tug does in the event of the storm is described. The goal is to find out the time for which the tug is idle, travelling without tankerad engaged in either berthing or deberthing activity.<br />Project Planning:<br />For building the simulation software we have been given the management support from the company for whom the project is been built. It is been given that the company understands that is the project planning is one of the most important steps in building a simulation model. The computer hardware has been provided and the software support also has been provided in the form of WITNESS 2008. Also one of the most important concepts of project planning is the communication channel; also we have to make sure that we provide nice response to the clients.<br />               System Definition:<br />The system boundary for this assignment has been given as the nine trucks and three shovels, eight buffers and a crusher. <br />             Storm<br />40957526797000152400028702000267652526797000436245014414500<br />       <br />Three shipping station<br />4762504381500<br />TUG<br />443865018415003952875184150034290001841500290512518415002390775184150018954751841500139065018415009334501841500184785014090650016954501256665004762503746500TANKERS<br />Conceptual Model Formulation:<br />In order to develop a preliminary model we have represented in a graphical method with the suitable pseudo-code, which determines the components, variables and interactions. With this preliminary model we can develop alternate models. We must make sure that the large system must be broken down into a reduced model complexity. <br />Preliminary Experimental Design:<br />First we must select the performance measure of the system which consists of several varied factors.<br />Since our system is small we needn’t worry about the variations involved in the system. The prime plus point with these steps we can plan the model with desired data more efficiently and effectively.<br />Input data preparation: <br />The input data of the model is analyzed in from the below motioned table.<br />Type  Relative FreqLoading Time,Hours<br />10.2518±2<br />20.2524±3<br />               0.5036±4<br />Model Translation:<br />Verification and Validation:<br />We see that the tug is 27.10% busy and M1, M2, M3 are almost busy for equal amount of time, and also we see that the system is not blocked at any stage of time, so we can say that the system is correct.<br />Final Experimentation Design<br />The design of the experiment determines the analysis that can be applied to the results. We can see that the experiment’s success in answering the questions being asked of the model is a core function of the correct experimental design.<br />Experimentation:<br />    We need to run the model for 480 minutes, so we need to make the experimentation of the model carefully so as to make sure that the data is not lost.<br />Analysis and Interpretation:<br />From the outputs of the simulation in this phase, we have studied various cases. But since the size of the system is small, the chance of making changes to study various cases is also very small.<br />Documentation and Implementation:<br />This project is said to be complete only when the outcomes of the given scenario is well understood and accepted. We need to have proper documentation work to make it more clear and comprehendable.<br />
Simulation Project 2
Simulation Project 2
Simulation Project 2
Simulation Project 2

More Related Content

Viewers also liked

Cnc Offsets
Cnc OffsetsCnc Offsets
Cnc Offsets
shri1984
 
Metal Removal Processes
Metal Removal ProcessesMetal Removal Processes
Metal Removal Processes
shri1984
 
Cnc Manual Operations
Cnc Manual OperationsCnc Manual Operations
Cnc Manual Operations
shri1984
 
Simulation Project
Simulation ProjectSimulation Project
Simulation Project
shri1984
 
Cnc Maching Center
Cnc Maching CenterCnc Maching Center
Cnc Maching Center
shri1984
 
Cnc Coordinates
Cnc CoordinatesCnc Coordinates
Cnc Coordinates
shri1984
 
Cad Cam
Cad CamCad Cam
Cad Cam
shri1984
 
Cnc Turning
Cnc TurningCnc Turning
Cnc Turning
shri1984
 

Viewers also liked (8)

Cnc Offsets
Cnc OffsetsCnc Offsets
Cnc Offsets
 
Metal Removal Processes
Metal Removal ProcessesMetal Removal Processes
Metal Removal Processes
 
Cnc Manual Operations
Cnc Manual OperationsCnc Manual Operations
Cnc Manual Operations
 
Simulation Project
Simulation ProjectSimulation Project
Simulation Project
 
Cnc Maching Center
Cnc Maching CenterCnc Maching Center
Cnc Maching Center
 
Cnc Coordinates
Cnc CoordinatesCnc Coordinates
Cnc Coordinates
 
Cad Cam
Cad CamCad Cam
Cad Cam
 
Cnc Turning
Cnc TurningCnc Turning
Cnc Turning
 

Similar to Simulation Project 2

Week 4 Assignment - Software Development PlanScenario-Your team has be.docx
Week 4 Assignment - Software Development PlanScenario-Your team has be.docxWeek 4 Assignment - Software Development PlanScenario-Your team has be.docx
Week 4 Assignment - Software Development PlanScenario-Your team has be.docx
estefana2345678
 
Unit 1 introduction
Unit 1 introductionUnit 1 introduction
Unit 1 introduction
raksharao
 
Ch14
Ch14Ch14
Ch14
ckiranku
 
Modeling&Simulation_Ch01_part 3.pptx
Modeling&Simulation_Ch01_part 3.pptxModeling&Simulation_Ch01_part 3.pptx
Modeling&Simulation_Ch01_part 3.pptx
MaiGaafar
 
Network Design and Management
Network Design and ManagementNetwork Design and Management
Network Design and Management
tlerell
 
@SIMUL8 Virtual User Group, September: Brian Harrington, Less is More
@SIMUL8 Virtual User Group, September: Brian Harrington, Less is More@SIMUL8 Virtual User Group, September: Brian Harrington, Less is More
@SIMUL8 Virtual User Group, September: Brian Harrington, Less is More
SIMUL8 Corporation
 
Final Year Project Report Example
Final Year Project Report ExampleFinal Year Project Report Example
Final Year Project Report Example
Muhd Mu'izuddin
 
aw_survivalguide_r2opt
aw_survivalguide_r2optaw_survivalguide_r2opt
aw_survivalguide_r2opt
Reza Abed
 
ESTIMATING HANDLING TIME OF SOFTWARE DEFECTS
ESTIMATING HANDLING TIME OF SOFTWARE DEFECTSESTIMATING HANDLING TIME OF SOFTWARE DEFECTS
ESTIMATING HANDLING TIME OF SOFTWARE DEFECTS
csandit
 
Glenn Vanderburg — Real software engineering
Glenn Vanderburg — Real software engineeringGlenn Vanderburg — Real software engineering
Glenn Vanderburg — Real software engineering
atr2006
 
Software Testing and Quality Assurance Assignment 2
Software Testing and Quality Assurance Assignment 2Software Testing and Quality Assurance Assignment 2
Software Testing and Quality Assurance Assignment 2
Gurpreet singh
 
Darius Silingas - From Model-Driven Testing - EuroSTAR 2010
Darius Silingas - From Model-Driven Testing - EuroSTAR 2010Darius Silingas - From Model-Driven Testing - EuroSTAR 2010
Darius Silingas - From Model-Driven Testing - EuroSTAR 2010
TEST Huddle
 
Modeling & simulation in projects
Modeling & simulation in projectsModeling & simulation in projects
Modeling & simulation in projects
anki009
 
Performance Evaluation of a Network Using Simulation Tools or Packet Tracer
Performance Evaluation of a Network Using Simulation Tools or Packet TracerPerformance Evaluation of a Network Using Simulation Tools or Packet Tracer
Performance Evaluation of a Network Using Simulation Tools or Packet Tracer
IOSRjournaljce
 
I07 Simulation
I07 SimulationI07 Simulation
I07 Simulation
Leanleaders.org
 
I07 Simulation
I07 SimulationI07 Simulation
I07 Simulation
Leanleaders.org
 
Mc0084 software project management & quality
Mc0084 software project management & qualityMc0084 software project management & quality
Mc0084 software project management & quality
smumbahelp
 
Report simulation
Report simulationReport simulation
Report simulation
azida md zin
 
Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...
Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...
Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...
IJERA Editor
 
Software Engineering with Objects (M363) Final Revision By Kuwait10
Software Engineering with Objects (M363) Final Revision By Kuwait10Software Engineering with Objects (M363) Final Revision By Kuwait10
Software Engineering with Objects (M363) Final Revision By Kuwait10
Kuwait10
 

Similar to Simulation Project 2 (20)

Week 4 Assignment - Software Development PlanScenario-Your team has be.docx
Week 4 Assignment - Software Development PlanScenario-Your team has be.docxWeek 4 Assignment - Software Development PlanScenario-Your team has be.docx
Week 4 Assignment - Software Development PlanScenario-Your team has be.docx
 
Unit 1 introduction
Unit 1 introductionUnit 1 introduction
Unit 1 introduction
 
Ch14
Ch14Ch14
Ch14
 
Modeling&Simulation_Ch01_part 3.pptx
Modeling&Simulation_Ch01_part 3.pptxModeling&Simulation_Ch01_part 3.pptx
Modeling&Simulation_Ch01_part 3.pptx
 
Network Design and Management
Network Design and ManagementNetwork Design and Management
Network Design and Management
 
@SIMUL8 Virtual User Group, September: Brian Harrington, Less is More
@SIMUL8 Virtual User Group, September: Brian Harrington, Less is More@SIMUL8 Virtual User Group, September: Brian Harrington, Less is More
@SIMUL8 Virtual User Group, September: Brian Harrington, Less is More
 
Final Year Project Report Example
Final Year Project Report ExampleFinal Year Project Report Example
Final Year Project Report Example
 
aw_survivalguide_r2opt
aw_survivalguide_r2optaw_survivalguide_r2opt
aw_survivalguide_r2opt
 
ESTIMATING HANDLING TIME OF SOFTWARE DEFECTS
ESTIMATING HANDLING TIME OF SOFTWARE DEFECTSESTIMATING HANDLING TIME OF SOFTWARE DEFECTS
ESTIMATING HANDLING TIME OF SOFTWARE DEFECTS
 
Glenn Vanderburg — Real software engineering
Glenn Vanderburg — Real software engineeringGlenn Vanderburg — Real software engineering
Glenn Vanderburg — Real software engineering
 
Software Testing and Quality Assurance Assignment 2
Software Testing and Quality Assurance Assignment 2Software Testing and Quality Assurance Assignment 2
Software Testing and Quality Assurance Assignment 2
 
Darius Silingas - From Model-Driven Testing - EuroSTAR 2010
Darius Silingas - From Model-Driven Testing - EuroSTAR 2010Darius Silingas - From Model-Driven Testing - EuroSTAR 2010
Darius Silingas - From Model-Driven Testing - EuroSTAR 2010
 
Modeling & simulation in projects
Modeling & simulation in projectsModeling & simulation in projects
Modeling & simulation in projects
 
Performance Evaluation of a Network Using Simulation Tools or Packet Tracer
Performance Evaluation of a Network Using Simulation Tools or Packet TracerPerformance Evaluation of a Network Using Simulation Tools or Packet Tracer
Performance Evaluation of a Network Using Simulation Tools or Packet Tracer
 
I07 Simulation
I07 SimulationI07 Simulation
I07 Simulation
 
I07 Simulation
I07 SimulationI07 Simulation
I07 Simulation
 
Mc0084 software project management & quality
Mc0084 software project management & qualityMc0084 software project management & quality
Mc0084 software project management & quality
 
Report simulation
Report simulationReport simulation
Report simulation
 
Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...
Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...
Virtual Commissioning of Small to Medium Scale Industry Using the Concepts of...
 
Software Engineering with Objects (M363) Final Revision By Kuwait10
Software Engineering with Objects (M363) Final Revision By Kuwait10Software Engineering with Objects (M363) Final Revision By Kuwait10
Software Engineering with Objects (M363) Final Revision By Kuwait10
 

More from shri1984

Probabilistic decision making
Probabilistic decision makingProbabilistic decision making
Probabilistic decision making
shri1984
 
Multi attribute decision making
Multi attribute decision makingMulti attribute decision making
Multi attribute decision making
shri1984
 
Advanced engineering economy
Advanced  engineering economyAdvanced  engineering economy
Advanced engineering economy
shri1984
 
Statistics project2
Statistics project2Statistics project2
Statistics project2
shri1984
 
Time Study Analysis Metrics
Time Study Analysis MetricsTime Study Analysis Metrics
Time Study Analysis Metrics
shri1984
 
Logistics Transportation
Logistics TransportationLogistics Transportation
Logistics Transportation
shri1984
 
Shriraam Madanagopal Internship Report
Shriraam Madanagopal Internship ReportShriraam Madanagopal Internship Report
Shriraam Madanagopal Internship Report
shri1984
 
Logistics Distribution Systems Design
Logistics Distribution Systems DesignLogistics Distribution Systems Design
Logistics Distribution Systems Design
shri1984
 
Statistics Project1
Statistics Project1Statistics Project1
Statistics Project1
shri1984
 

More from shri1984 (9)

Probabilistic decision making
Probabilistic decision makingProbabilistic decision making
Probabilistic decision making
 
Multi attribute decision making
Multi attribute decision makingMulti attribute decision making
Multi attribute decision making
 
Advanced engineering economy
Advanced  engineering economyAdvanced  engineering economy
Advanced engineering economy
 
Statistics project2
Statistics project2Statistics project2
Statistics project2
 
Time Study Analysis Metrics
Time Study Analysis MetricsTime Study Analysis Metrics
Time Study Analysis Metrics
 
Logistics Transportation
Logistics TransportationLogistics Transportation
Logistics Transportation
 
Shriraam Madanagopal Internship Report
Shriraam Madanagopal Internship ReportShriraam Madanagopal Internship Report
Shriraam Madanagopal Internship Report
 
Logistics Distribution Systems Design
Logistics Distribution Systems DesignLogistics Distribution Systems Design
Logistics Distribution Systems Design
 
Statistics Project1
Statistics Project1Statistics Project1
Statistics Project1
 

Recently uploaded

Enchancing adoption of Open Source Libraries. A case study on Albumentations.AI
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AIEnchancing adoption of Open Source Libraries. A case study on Albumentations.AI
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AI
Vladimir Iglovikov, Ph.D.
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
innovationoecd
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
Neo4j
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
Matthew Sinclair
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
Octavian Nadolu
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
Neo4j
 
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Speck&Tech
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
名前 です男
 
How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
Daiki Mogmet Ito
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems S.M.S.A.
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
Neo4j
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
ControlCase
 
Full-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalizationFull-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalization
Zilliz
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Paige Cruz
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
mikeeftimakis1
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 

Recently uploaded (20)

Enchancing adoption of Open Source Libraries. A case study on Albumentations.AI
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AIEnchancing adoption of Open Source Libraries. A case study on Albumentations.AI
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AI
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
 
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
 
How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
 
Full-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalizationFull-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalization
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 

Simulation Project 2

  • 1. Key Assignment 2<br />Problem Definition:<br /> There is a tug pulls the tankers at the port. There is only one tug at the port. The condition for all the tug activities are given as per in the assignment. The condition for the storm is also as given in the assignment and what the tug does in the event of the storm is described. The goal is to find out the time for which the tug is idle, travelling without tankerad engaged in either berthing or deberthing activity.<br />Project Planning:<br />For building the simulation software we have been given the management support from the company for whom the project is been built. It is been given that the company understands that is the project planning is one of the most important steps in building a simulation model. The computer hardware has been provided and the software support also has been provided in the form of WITNESS 2008. Also one of the most important concepts of project planning is the communication channel; also we have to make sure that we provide nice response to the clients.<br /> System Definition:<br />The system boundary for this assignment has been given as the nine trucks and three shovels, eight buffers and a crusher. <br /> Storm<br />40957526797000152400028702000267652526797000436245014414500<br /> <br />Three shipping station<br />4762504381500<br />TUG<br />443865018415003952875184150034290001841500290512518415002390775184150018954751841500139065018415009334501841500184785014090650016954501256665004762503746500TANKERS<br />Conceptual Model Formulation:<br />In order to develop a preliminary model we have represented in a graphical method with the suitable pseudo-code, which determines the components, variables and interactions. With this preliminary model we can develop alternate models. We must make sure that the large system must be broken down into a reduced model complexity. <br />Preliminary Experimental Design:<br />First we must select the performance measure of the system which consists of several varied factors.<br />Since our system is small we needn’t worry about the variations involved in the system. The prime plus point with these steps we can plan the model with desired data more efficiently and effectively.<br />Input data preparation: <br />The input data of the model is analyzed in from the below motioned table.<br />Type Relative FreqLoading Time,Hours<br />10.2518±2<br />20.2524±3<br /> 0.5036±4<br />Model Translation:<br />Verification and Validation:<br />We see that the tug is 27.10% busy and M1, M2, M3 are almost busy for equal amount of time, and also we see that the system is not blocked at any stage of time, so we can say that the system is correct.<br />Final Experimentation Design<br />The design of the experiment determines the analysis that can be applied to the results. We can see that the experiment’s success in answering the questions being asked of the model is a core function of the correct experimental design.<br />Experimentation:<br /> We need to run the model for 480 minutes, so we need to make the experimentation of the model carefully so as to make sure that the data is not lost.<br />Analysis and Interpretation:<br />From the outputs of the simulation in this phase, we have studied various cases. But since the size of the system is small, the chance of making changes to study various cases is also very small.<br />Documentation and Implementation:<br />This project is said to be complete only when the outcomes of the given scenario is well understood and accepted. We need to have proper documentation work to make it more clear and comprehendable.<br />