SlideShare a Scribd company logo
CONSTRUCTION OF
SIGNATURE BRIDGE OVER
YAMUNA RIVER
SUBMITTED BY -
SANDEEP KUMAR (08515603414)
INTRODUCTION
India’s first “Signature Bridge” being constructed across the Yamuna at Wazirabad
promised to be a great attraction of Delhi.
 An ambitious project of the Delhi tourism the cable stayed bridge will link National
Highway Number 1 near exiting T-point at wazirabad on Western bank and Marginal
bund road at khajuri khas on eastern bank of river Yamuna , thus connecting north Delhi
with east Delhi .
The Proposed Signature Bridge would have a Bow Shaped Pylon in the middle. Two
high tower will be there to provide double cable support in the inner periphery of the
carriageway.
The Signature Bridge would be length of about 675 meter and height 154 meter with
8 lanes.
The deck will be composite ( steel and concrete) while pylon will be in steel.
Signature bridge is cable stayed bridge.
WHY WE NEED TO BUILD THE
SIGNATURE BRIDGE ?
 Signature bridge will eventually improve access between North and West Delhi.
 To prevent the heavy traffic jam in the peak hours.
 To facilitate the movement of vehicular traffic new express lanes will be
constructed to Connect Ring Road with the Bridge.
OVERVIEW OF PROJECT
 PROJECT NAME – SIGNATURE BRIDGE (YAMUNA BRIDGE AT WAZIRABAD)
 CLINET – DELHI TOURISM & TRANSPORTATION DEVELOPMENT CORPORATION
LTD.
 AGENCY – J.V. OF M/S GAMMON INDIA & CONSTRUTORA CIDADE,TENSACCIAI
 EARTHQUAKE ANALYSIS – IIT ROORKEE & STRUCTURE ENGG. RESEARCH
CENTER,CHENNAI
 PERIOD OF CONSTRUCTION – 20/03/2013 TO 19/12/2016 (ESTIMATED)
 COST OF PROJECT – 1591 CRORE (REVISED)
 TOTAL LENGTH – 675 METER (8 LANES)
 PYLON HEIGHT – 154 METER (5400 TON)
 FOUNDATIONS – 6 OPEN & 18 WELL FOUNDATION
WHY WE CONSTRUCT CABLE STAYED BRIDGE
IN SIGNATURE BRIDGE PROJECT ?
SKETCH OF SIGNATURE BRIDGE
MATERIAL USED IN CONSTRUCTION
• For kerb M35 & M50 For deck
• M35 in well & M30 in pile
Concrete
• Fe415 & Fe500 reinforcement
• TMT and CRS Bars
Steel Bars
• Coarse aggregate
• Fine aggregate
Aggregate
Steel and Concrete (Composite Section)
• River gravels
& crushed
stones
• Start from 6
mm dia &
range 8 to
20mm dia
• which pass
through 4.75
IS Sieve no.
• OPC(OF
GRADE
33,43,53)
Cement Fine aggregate
Coarse
aggregate
Reinforcement(s
teel)
BATCHING PLANT
 The signature bridge site at wazirabad had a batching plant of capacity 60
cubic meter/hr. The plant can deliver the 60 cubic meter/hr output as each
and every operation of the plant has been sequenced to achieve this
output.
 The batching mixers mixes the following-
1. Cement
2. Sand
3. Aggregate
4. Admixture
5. Fly ash
6. water
FOUNDATION
SHALLOW FOUNDATION
• FOUNDATION ARE USED FOR
SHALLOW(SMALL) DEPTH
DEEP FOUNDATION
• FOUNDATION ARE USED UPTO 20
METER(GREATER DEPTH)
o WELL FOUNDATION – Well foundation are the most common
type foundation used in India.
PILEFOUNDATION
BEARING PILE
FRICTION PILE
FRICTION CUM
BEARING PILE
CASING IN PILE
 20mm dia bars are used.
 Pitch of helical striupps are 200mm.
 4 master ring, 3 pair square rings,
16 long bars
 Dia of helical bar 10mm
 Length of cage-1050mm
 Lap length – 72* dia of bar
cartaise www.slideshare.com
TESTS ON SITE
Sieve analysis of all
aggregates
• Silt content
• Moisture content
Impact value test
• Crushing value test
• Water testing
Cement physical
• TMT Bars rusting
inspection
• Specific gravity &
density test
cartaise www.slideshare.com
STATUS OF CONSTRUCTION WORK
CHART OF WORK COMPLETE
0%
20%
40%
60%
80%
100%
PROJECT BRIDGE
82
45
12
55
SIGNATURE BRIDGE PROJECT (TILL JANUARY 2016)
COMPLETE UNCOMPLETE
THANK YOU

More Related Content

What's hot

Worldhighestrailwaybridge
Worldhighestrailwaybridge Worldhighestrailwaybridge
Worldhighestrailwaybridge Hakkim Shajahan
 
Bandra worli sea link case study
Bandra worli sea link  case studyBandra worli sea link  case study
Bandra worli sea link case study
AKSHAY CHATURVEDI
 
report
reportreport
report
Ravi Panchal
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealink
Desireddy Manasa
 
Bandra worli sea link
Bandra worli sea linkBandra worli sea link
Bandra worli sea link
anjusha muttanthottil
 
Kpr resume tunnel engineer
Kpr resume tunnel engineerKpr resume tunnel engineer
Kpr resume tunnel engineer
KRISHNA PRASAD RAO
 
Flyover construction
Flyover constructionFlyover construction
Flyover construction
Akhilesh Kumar
 
Bandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,IndiaBandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,India
oyepuneeta
 
Case study bridge construction upto pier and road construction
Case study   bridge construction upto pier and road constructionCase study   bridge construction upto pier and road construction
Case study bridge construction upto pier and road construction
Satish Kambaliya
 
1.PILE FOUNDATION (ACE) 2160601 GTU
1.PILE FOUNDATION (ACE) 2160601 GTU1.PILE FOUNDATION (ACE) 2160601 GTU
1.PILE FOUNDATION (ACE) 2160601 GTU
VATSAL PATEL
 
my project on chenab bridge
my project on chenab bridge my project on chenab bridge
my project on chenab bridge
Taseem mir
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge Construction
Sukhdeep Jat
 
Presentation On Bandra Worli Sealink
Presentation On Bandra Worli SealinkPresentation On Bandra Worli Sealink
Presentation On Bandra Worli Sealinkpriyank123
 
Bandra+worli+sea+link
Bandra+worli+sea+linkBandra+worli+sea+link
Bandra+worli+sea+link
ASHOK KUMAR
 
Bandra worli sealink pdf
Bandra worli sealink pdfBandra worli sealink pdf
Bandra worli sealink pdf
Desireddy Manasa
 
building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)
rahul jangid
 
Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening
Yash Patel
 

What's hot (20)

Worldhighestrailwaybridge
Worldhighestrailwaybridge Worldhighestrailwaybridge
Worldhighestrailwaybridge
 
Bandra worli sea link case study
Bandra worli sea link  case studyBandra worli sea link  case study
Bandra worli sea link case study
 
report
reportreport
report
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealink
 
Bandra worli sea link
Bandra worli sea linkBandra worli sea link
Bandra worli sea link
 
CHENAB BRIDGE
CHENAB BRIDGECHENAB BRIDGE
CHENAB BRIDGE
 
Kpr resume tunnel engineer
Kpr resume tunnel engineerKpr resume tunnel engineer
Kpr resume tunnel engineer
 
Flyover construction
Flyover constructionFlyover construction
Flyover construction
 
Bandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,IndiaBandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,India
 
Case study bridge construction upto pier and road construction
Case study   bridge construction upto pier and road constructionCase study   bridge construction upto pier and road construction
Case study bridge construction upto pier and road construction
 
1.PILE FOUNDATION (ACE) 2160601 GTU
1.PILE FOUNDATION (ACE) 2160601 GTU1.PILE FOUNDATION (ACE) 2160601 GTU
1.PILE FOUNDATION (ACE) 2160601 GTU
 
my project on chenab bridge
my project on chenab bridge my project on chenab bridge
my project on chenab bridge
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge Construction
 
Presentation On Bandra Worli Sealink
Presentation On Bandra Worli SealinkPresentation On Bandra Worli Sealink
Presentation On Bandra Worli Sealink
 
Bandra+worli+sea+link
Bandra+worli+sea+linkBandra+worli+sea+link
Bandra+worli+sea+link
 
Bridge report
Bridge reportBridge report
Bridge report
 
Final Project
Final ProjectFinal Project
Final Project
 
Bandra worli sealink pdf
Bandra worli sealink pdfBandra worli sealink pdf
Bandra worli sealink pdf
 
building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)
 
Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening
 

Similar to Signature bridge

lmrc presentation
lmrc presentationlmrc presentation
lmrc presentation
ATUL SHUKLA
 
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
Akanksha Priya
 
Report CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdfReport CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdf
GarimaSharma754550
 
Saurabhk601
Saurabhk601Saurabhk601
Saurabhk601
Saurabh601
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
ShuBham RaNa
 
Munger rail cum road bridge
Munger rail cum road bridgeMunger rail cum road bridge
Munger rail cum road bridge
jaiveer singh
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
Rajesh Prasad
 
Bhupen hazarika setu
Bhupen hazarika setuBhupen hazarika setu
Bhupen hazarika setu
RatulDas36
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
KAVYA H
 
Bridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuBridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara Setu
Vishweshwar Rao Narla
 
B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.
B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.
B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.
Anirudh Singhar
 
BOGIBEEL BRIDGE
BOGIBEEL BRIDGEBOGIBEEL BRIDGE
BOGIBEEL BRIDGE
mukul srivastava
 
Chenab bridge ppt
Chenab bridge pptChenab bridge ppt
Chenab bridge ppt
Ravi Panchal
 
Howrah bridge ppt
Howrah bridge pptHowrah bridge ppt
Howrah bridge ppt
Sourav Roy
 
Persentation on "ELEVATED ROAD"
 Persentation on "ELEVATED ROAD" Persentation on "ELEVATED ROAD"
Application of plate girders in steel construction
Application of plate girders in steel constructionApplication of plate girders in steel construction
Application of plate girders in steel construction
Haider Jafferi
 
Chenab Bridge.pdf
Chenab Bridge.pdfChenab Bridge.pdf
Chenab Bridge.pdf
Ppt Creater
 

Similar to Signature bridge (20)

lmrc presentation
lmrc presentationlmrc presentation
lmrc presentation
 
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
 
Report CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdfReport CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdf
 
Saurabhk601
Saurabhk601Saurabhk601
Saurabhk601
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
 
Munger rail cum road bridge
Munger rail cum road bridgeMunger rail cum road bridge
Munger rail cum road bridge
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
Bhupen hazarika setu
Bhupen hazarika setuBhupen hazarika setu
Bhupen hazarika setu
 
Training
TrainingTraining
Training
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
 
Bridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuBridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara Setu
 
B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.
B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.
B.S.P VOCATIONAL TRAINING PRESENTATION by Anirudh.
 
BOGIBEEL BRIDGE
BOGIBEEL BRIDGEBOGIBEEL BRIDGE
BOGIBEEL BRIDGE
 
Chenab bridge ppt
Chenab bridge pptChenab bridge ppt
Chenab bridge ppt
 
Howrah bridge ppt
Howrah bridge pptHowrah bridge ppt
Howrah bridge ppt
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
 
Millau viaduct
Millau viaductMillau viaduct
Millau viaduct
 
Persentation on "ELEVATED ROAD"
 Persentation on "ELEVATED ROAD" Persentation on "ELEVATED ROAD"
Persentation on "ELEVATED ROAD"
 
Application of plate girders in steel construction
Application of plate girders in steel constructionApplication of plate girders in steel construction
Application of plate girders in steel construction
 
Chenab Bridge.pdf
Chenab Bridge.pdfChenab Bridge.pdf
Chenab Bridge.pdf
 

Recently uploaded

Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
AkolbilaEmmanuel1
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 

Recently uploaded (20)

Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 

Signature bridge

  • 1. CONSTRUCTION OF SIGNATURE BRIDGE OVER YAMUNA RIVER SUBMITTED BY - SANDEEP KUMAR (08515603414)
  • 2. INTRODUCTION India’s first “Signature Bridge” being constructed across the Yamuna at Wazirabad promised to be a great attraction of Delhi.  An ambitious project of the Delhi tourism the cable stayed bridge will link National Highway Number 1 near exiting T-point at wazirabad on Western bank and Marginal bund road at khajuri khas on eastern bank of river Yamuna , thus connecting north Delhi with east Delhi . The Proposed Signature Bridge would have a Bow Shaped Pylon in the middle. Two high tower will be there to provide double cable support in the inner periphery of the carriageway. The Signature Bridge would be length of about 675 meter and height 154 meter with 8 lanes. The deck will be composite ( steel and concrete) while pylon will be in steel.
  • 3. Signature bridge is cable stayed bridge.
  • 4. WHY WE NEED TO BUILD THE SIGNATURE BRIDGE ?  Signature bridge will eventually improve access between North and West Delhi.  To prevent the heavy traffic jam in the peak hours.  To facilitate the movement of vehicular traffic new express lanes will be constructed to Connect Ring Road with the Bridge.
  • 5. OVERVIEW OF PROJECT  PROJECT NAME – SIGNATURE BRIDGE (YAMUNA BRIDGE AT WAZIRABAD)  CLINET – DELHI TOURISM & TRANSPORTATION DEVELOPMENT CORPORATION LTD.  AGENCY – J.V. OF M/S GAMMON INDIA & CONSTRUTORA CIDADE,TENSACCIAI  EARTHQUAKE ANALYSIS – IIT ROORKEE & STRUCTURE ENGG. RESEARCH CENTER,CHENNAI  PERIOD OF CONSTRUCTION – 20/03/2013 TO 19/12/2016 (ESTIMATED)  COST OF PROJECT – 1591 CRORE (REVISED)  TOTAL LENGTH – 675 METER (8 LANES)  PYLON HEIGHT – 154 METER (5400 TON)  FOUNDATIONS – 6 OPEN & 18 WELL FOUNDATION
  • 6.
  • 7. WHY WE CONSTRUCT CABLE STAYED BRIDGE IN SIGNATURE BRIDGE PROJECT ?
  • 9. MATERIAL USED IN CONSTRUCTION • For kerb M35 & M50 For deck • M35 in well & M30 in pile Concrete • Fe415 & Fe500 reinforcement • TMT and CRS Bars Steel Bars • Coarse aggregate • Fine aggregate Aggregate
  • 10. Steel and Concrete (Composite Section)
  • 11. • River gravels & crushed stones • Start from 6 mm dia & range 8 to 20mm dia • which pass through 4.75 IS Sieve no. • OPC(OF GRADE 33,43,53) Cement Fine aggregate Coarse aggregate Reinforcement(s teel)
  • 12. BATCHING PLANT  The signature bridge site at wazirabad had a batching plant of capacity 60 cubic meter/hr. The plant can deliver the 60 cubic meter/hr output as each and every operation of the plant has been sequenced to achieve this output.  The batching mixers mixes the following- 1. Cement 2. Sand 3. Aggregate 4. Admixture 5. Fly ash 6. water
  • 13. FOUNDATION SHALLOW FOUNDATION • FOUNDATION ARE USED FOR SHALLOW(SMALL) DEPTH DEEP FOUNDATION • FOUNDATION ARE USED UPTO 20 METER(GREATER DEPTH)
  • 14. o WELL FOUNDATION – Well foundation are the most common type foundation used in India.
  • 16.
  • 17. CASING IN PILE  20mm dia bars are used.  Pitch of helical striupps are 200mm.  4 master ring, 3 pair square rings, 16 long bars  Dia of helical bar 10mm  Length of cage-1050mm  Lap length – 72* dia of bar cartaise www.slideshare.com
  • 18. TESTS ON SITE Sieve analysis of all aggregates • Silt content • Moisture content Impact value test • Crushing value test • Water testing Cement physical • TMT Bars rusting inspection • Specific gravity & density test
  • 21. CHART OF WORK COMPLETE 0% 20% 40% 60% 80% 100% PROJECT BRIDGE 82 45 12 55 SIGNATURE BRIDGE PROJECT (TILL JANUARY 2016) COMPLETE UNCOMPLETE
  • 22.