GGEL
50MW SOLAR THERMAL POWER PLANT
SUMITTED TO: SUBMITTED BY:
Mr. VINAY KUMAR GUPTA BANWARI LAL
Assistant Professor B.Tech (E.E.)
DEPARTMENT OF Electrical Engg. SEMESTER–7th
PRATAP UNIVERSITY JAIPUR. ROLL NO.- EE110006
INTRODUCTION
 GODAWARI GREEN ENERGY LIMITED (GGEL) IS
A FLAGSHIP COMPANY OF THE HIRA GROUP IN
THE RENEWABLE ENERGY SECTOR.
 GGEL’S FOCUS AREA IS POWER GENERATION
USING RENEWABLE SOURCES SUCH AS SOLAR
ENERGY, GEOTHERMAL ENERGY, WIND ENERGY
ETC.
 THE COMPANY WAS INCORPORATED AS A 100%
SUBSIDIARY OF THE GODAWARI POWER & ISPAT
LTD IN THE YEAR 2009.
WORKING PRINCIPLE OF CSP
HTF CYCLE
SUPERHEATER
& REHEATER S
387°C
EVAPORATOR
308°C
ECONOMISER &
REHEATER E
291°C
EXPANSSION
VESSEL
SOLAR FIELD
HTF
PUMP
WATER CYCLE
SUPERHEATER
379°C
REHEATER E &
S
HP
TURBINE
LP
TURBINE
BFP
180°C
WATER SOURCE
DM
PLANT
HP HEATER
284°C
ECONOMISER
295°C
STEAM DRUM
&
EVAPORATOR
295°C
CONDENSOR
HOT WELL
DEAERATOR
REHEATER E
& S
BLOCK DIAGRAM OF TURBINE-ALTERNATOR
CONNECTION
LP
TURBINE
LP STEAM
DIRECT CONNECTION
INDIRECT
CONNECTION HP STEAM
ALTERNA
TOR
GEAR BOX
HP
TURBINE
ABBREVIATIONS
 UAT – UNIT AUXILIARY TRANSFORMER
 SST – STATION SERVICE TRANSFORMER
 BFP – BOILER FEED PUMP
 CCWP – CLOSE COOLING WATER PUMP
 ACWP – AUXILIARY COOLING WATER PUMP
 HTF – HEAT TRANSFER FLUID
 JOP – JACKING OIL PUMP
 GSC – GLAND STEAM CONDENSOR
ABBREVIATIONS
 MOP – MAIN OIL PUMP
 AOP – AUXILIARY OIL PUMP
 EOP – EMERGENCY OIL PUMP
 CEP – CONDENSATE EXTRACTING PUMP
 CT FAN – COOLING TOWER FAN
 CWP – CIRCULATING WATER PUMP
 MOG – MAGNETIC OIL GAUGE
 PRV – PRESSURE RELEAVE VALVE
POWER DISTRIBUTION BLOCK DIAGRAM
GEN.
70.5 MVA
10.5 KV
GSU T/F
75 MVA
10.5/132 KV
UAT
7.5 MVA
10.5/6.6 KV
SST-1
2.5 MVA
10.5/0.440 KV
SST-2
2.5 MVA
10.5/0.440 KV
SST-3
1.5 MVA
6.6/0.440 KV
SST-4
750 KVA
6.6/0.440 KV
HV MOTORS
1.BFP-1/2/3
2.HTF PUMP-1/2/3/4
3.CWP-1/2/3
LV MOTORS
1. CEP 8. VACUUM PUMP 15. SEAL WATER PUMP
2. MOP 9. OIL MIST FAN 16. HTF SEAL PUMP
3. AOP 10. CONTROL OIL PUMP 17. LUBE OIL PURIFIER
4. EOP 11. AIR COMPRESSOR 18. CONTROL
5. JOP 12. CT FAN OFFLINE PUMP
6. CCWP 13. TURBINE GEAR
7. ACWP 14. GSC
GEN. BREAKER
UAT
BREAKER
BREAKER
BREAKER
HTF HEATER PUMP RW SUPPLY PUMP
R
Y
B
SWITCHIN
G YARD
POWER DISTRIBUTION TO THE TRANSFORMERS
UAT
GEN.
SST-1 SST-2
POWER
T/F
1. TURBINE IS NOT RUNNING.(GRID IS AVAILABLE)
2. TURBINE IS RUNNING.(GRID IS NOT AVAILABLE)
SG
SGPOWER
T/F
UAT SST-1 SST-2
GEN.
132KV
132KV
10.5KV
10.5KV
GENERATOR
 IT IS A DEVICE THAT CONVERTS MECHANICAL
ENERGY INTO ELECTRICAL ENERGY.
 IT WORKS ON THE PRINCIPLE OF EMI(ELECTRO-
MAGNETIC INDUCTION) OF FARADAY.
 IT IS CONNECTED TO LP AND HP TURBINE DIRECT
AND INDIRECT RESPECTIVELY.
 HERE THE ELECTRICITY IS GENERATED AT 10.5KV.
RATED
POWER-
70.590MVA
RATED
VOLTAGE –
10500V+/- 10% V
RATED
CURRENT –
3881 A
ACTIVE POWER
-50 MW
SPEED – 3000rpm
GENERATOR SPECIFICATIONS
MACHINE CODE SGEN5-100A-2P
RATED VOLTAGE 10500V +/- 10%
RATED POWER 70590 KVA
PHASES 3
CONNECTION STAR
FREQUENCY 50 Hz
P.F.(COSF) 0.708
RATED CURRENT 3881 A
EXCITATION SELF
RATED SPEED 3000 rpm
INSULATION
CLASS
F
AMBIENT TEMP. 50C
PHASE SEQUENCE U1 V1 W1
IP 54
IM 7216
ACTIVE POWER 50 MW
TOTAL WEIGHT 116.800 Kg
COOLING TYPE AIR
TRANSFORMER – 75 MVA (10.5KV/132KV)
 IT IS AN ELECTRICAL
DEVICE THAT TRANSFER
ELECTRICAL ENERGY
FROM ONE SIDE TO
ANOTHERSIDE WITHOUT
CHANGE IN ITS
FREQUENCY.
 TRANSFORMER IS USED
TO CONVERT 10.5KV INTO
132KV FOR
TRANSMISSION TO
GSS(GRID SUB-STATION).
MARSHAILING
BOX
10.5 KV
INPUT
132KV
OUTPUT
GSU TRANSFORMER
COOLING
FAN
REFERENCE
STANDARD
IS:2026
CORE & WDG MASS 38900Kg
TANK & FITTING
MASS
14900Kg
OIL MASS 17200Kg
TOTAL T/F MASS 71000Kg
TRANSPORT MASS 66000Kg
TOTAL OIL
QUANTITY
20200 Liters
OVERALL
DIMENSIONS
6.754.205.90 m
TRANSPORT
DIMENSIONS
5.302.503.75 m
GSU TRANSFORMER PHYSICAL
SPECIFICATIONS
TEMP. RISE OF
OIL
60C
TEMP. RISE OF
WDG
65C
AMBIENT TEMP. 50C
TYPE OF
COOLING
ONAN/ONAF
TANK PLATE THICKNESS
COVER 12 mm
BOTTOM 16 mm
SIDE 8 mm
SWITCHING YARD
 THE APPLICATION OF SWITCHYARDS IS TO
DELIVER THE GENERATED POWER FROM
POWER PLANT AT DESIRED VOLTAGE LEVEL TO
THE NEAREST GRID OR TRANSMISSION LINE.
 THE SWITCHYARD IS PROVIDED WITH NECESSARY
ISOLATORS, CIRCUIT BREAKERS, CURRENT
TRANSFORMER, POTENTIAL TRANSFORMERS,
SURGE ARRESTORS, WAVE TRAPS, PROTECTIVE
RELAYS, PLCC ETC.
 SWITCHYARD IS CONTROLLED FROM DCS WHICH
WILL BE LOCATED IN POWER BLOCK CONTROL
ROOM.
CONNECTION OF T/F’S
UAT CONNECTION
UAT
7.5 MVA
10.5KV/6.6KV
SST-3
1.5 MVA
6.6KV/0.440KV
SST-4
750KVA
6.6KV/0.440KV
BFP(3)
875 KW
6300V
96A
3071rpm
HTFP(4)
900KW
6300V
101A
2970rpm
CWP(3)
510KW
6300V
58A
986rpm
RAW WATER
PUMP SUPPLY
HTF HEATER
SPARE
MOTOR
FEEDER
LOAD DISTRIBUTION FROM UAT
 THE HV MOTORS(HTF, BFP & CWP) ARE CONNECTED
TO UAT TRANSFORMER.
 THE TOTAL POWER DISTRIBUTED TO HT MOTORS IN
BOTH CASES ARE:
 IN NORMAL CONDITION – 5470 KW
 TOTAL LOAD CONNECTED – 7755 KW
SST-1 CONNECTION TO LOADS
SST-1
2.5 MVA
10.5/0.440 KV
CONDENSAT
E PUMP 1&3
220 KW
415 V
193 A
1488 rpm
JOP 1&2
30 KW
415 V
27.1 A
1455 rpm
CT FAN 1&3
150 KW
415 V
132 A
1482rpm
VACUUM
PUMP-1
55 KW
415 V
96 A
CCWP 1&2
90 KW
415 V
78 A
2955 rpm
AOP 2
45 KW
415 V
78.4 A
1470 rpm
ACWP-1
55 KW
415 V
95.6 A
1475 rpm
AUXILIARY
LOAD
150 KW
AIR
COMPRESSOR
-2
37 KW
400 V
2965 rpm
COP
16 KW
415 V
TOTAL LOAD
= 848 KW
SST-2 CONNECTION TO LOADS
SST-2
2.5 MVA
10.5/0.440 KV
CT FAN-2
75 KW
415 V
132 A
1482 rpm
MOP
45 KW
415 V
78.4 A
1470 rpm
AIR
COMPRESSOR
-1
37 KW
400 V
2965 rpm
VACUUM
PUMP-2
55 KW
415 V
96 A
CONDENSAT
E PUMP-2
110 KW
415 V
193 A
1488 rpm
ACWP-2
55 KW
415 V
95.6 A
1475 rpm
COP
16 KW
AUXILIARY
LOAD
88.6 KW
TOTAL LOAD
= 481.6 KW
SST-4 CONNECTED LOAD
SST-4
750KVA
6.6/0.440KV
RAW WATER
MAKEUP
PUMP (2)
18.5KW
415V
31.5A
2929rpm
WASTE
WATER
PUMP (2)
1.5KW
415V
3.4A
1410rpm
TOTAL
LOAD = 40
KW
LOAD DISTRIBUTION FROM SST
 THE LV MOTORS(CEP, CCWP, ACWP & VACUUM PUMP etc.) ARE
CONNECTED TO SST TRANSFORMERS.
 THERE ARE 4 SST TRANSFORMER - SST-1, SST-2, SST-3, SST-4.
 THE TOTAL LOAD CONNECTED TO EACH OF THE SST IN BOTH
CASE ARE:
 SST-1
 IN NORMAL CONDITION – 545.6 KW
 THE TOTAL LOAD CONNECTED – 848KW
LOAD DISTRIBUTION FROM SST
 SST-2
 IN NORMAL LOAD CONDITION – 364.2 KW
 TOTAL LOAD CONNECTED – 481.6 KW
 SST-4
 IN NORMAL LOAD CONDITION – 20 KW
 TOTAL LOAD CONNECTED – 40 KW
 SST-3 - ISOLATE
TOTAL LOAD DISTRIBUTION FROM ALL
TRANSFORMERS
 TOTAL LOAD AT HV MOTORS –
 IN NORMAL CONDITION – 5470 KW
 TOTAL LOAD CONNECTED – 7755 KW
 TOTAL LOAD AT LV MOTORS –
 IN NORMAL CONDITION – 909.8 KW
 TOTAL LOAD CONNECTED – 1329.6 KW
 TOTAL LOAD –
 IN NORMAL CONDITION – 6399.8 KW
 TOTAL LOAD CONNECTED – 9124.6 KW
 LOAD DURING NON-GENERATING HOURS – 205.5 KW
PPA – POWER PURCHASE AGREEMENT
Short description about GGEL

More Related Content

What's hot

THE FUTURE OF ELECTRIC POWER GENERATION 2.0 - for all generations...
THE FUTURE OF ELECTRIC POWER GENERATION 2.0 - for all generations...THE FUTURE OF ELECTRIC POWER GENERATION 2.0 - for all generations...
THE FUTURE OF ELECTRIC POWER GENERATION 2.0 - for all generations...
Thane Heins Regenerative Acceleration Generator Technology
 
Conservative Party of Canada, NRC, Queen's University Introduction to the ReG...
Conservative Party of Canada, NRC, Queen's University Introduction to the ReG...Conservative Party of Canada, NRC, Queen's University Introduction to the ReG...
Conservative Party of Canada, NRC, Queen's University Introduction to the ReG...
Thane Heins
 
Effects of Reversing Generator Armature Reaction in Electric Power Generation
Effects of Reversing Generator Armature Reaction in Electric Power GenerationEffects of Reversing Generator Armature Reaction in Electric Power Generation
Effects of Reversing Generator Armature Reaction in Electric Power Generation
Thane Heins Regenerative Acceleration Generator Technology
 
OTPC-Palatana 726.6MW combined cycle power generation
OTPC-Palatana 726.6MW combined cycle power generationOTPC-Palatana 726.6MW combined cycle power generation
OTPC-Palatana 726.6MW combined cycle power generation
Joydeep Paul
 
2018 INFINITE EFFICIENCY ReGenX Generator, Bi-Toroid Transformer Tests Report...
2018 INFINITE EFFICIENCY ReGenX Generator, Bi-Toroid Transformer Tests Report...2018 INFINITE EFFICIENCY ReGenX Generator, Bi-Toroid Transformer Tests Report...
2018 INFINITE EFFICIENCY ReGenX Generator, Bi-Toroid Transformer Tests Report...
Thane Heins Regenerative Acceleration Generator Technology
 
Potential Difference Inc. Innovation One Page Summary 9/11 – 2021
Potential Difference Inc. Innovation One Page Summary 9/11 – 2021Potential Difference Inc. Innovation One Page Summary 9/11 – 2021
Potential Difference Inc. Innovation One Page Summary 9/11 – 2021
Thane Heins
 
2 ReGenX Generator Scientific Performance Validation Requirements
2 ReGenX Generator Scientific Performance Validation Requirements2 ReGenX Generator Scientific Performance Validation Requirements
2 ReGenX Generator Scientific Performance Validation Requirements
Thane Heins Regenerative Acceleration Generator Technology
 
Six week Summer training report ppt on power plant.
Six week Summer training report ppt on power plant.Six week Summer training report ppt on power plant.
Six week Summer training report ppt on power plant.
Bikram Prasad
 
Final Version Electric Vehicle Regenerative Acceleration Innovation Presentat...
Final Version Electric Vehicle Regenerative Acceleration Innovation Presentat...Final Version Electric Vehicle Regenerative Acceleration Innovation Presentat...
Final Version Electric Vehicle Regenerative Acceleration Innovation Presentat...
Thane Heins Regenerative Acceleration Generator Technology
 
ReGenX Generator E Core Prototype #1 Performance Test Data
ReGenX Generator E Core Prototype #1 Performance Test DataReGenX Generator E Core Prototype #1 Performance Test Data
ReGenX Generator E Core Prototype #1 Performance Test Data
Thane Heins
 
Law of Creation of Energy and the History of US Patented ReGenX Generator Inn...
Law of Creation of Energy and the History of US Patented ReGenX Generator Inn...Law of Creation of Energy and the History of US Patented ReGenX Generator Inn...
Law of Creation of Energy and the History of US Patented ReGenX Generator Inn...
Thane Heins Regenerative Acceleration Generator Technology
 
HILLCREST PETROLEUM AND DESIGN 1ST ReGenX Generator Innovation History Intern...
HILLCREST PETROLEUM AND DESIGN 1ST ReGenX Generator Innovation History Intern...HILLCREST PETROLEUM AND DESIGN 1ST ReGenX Generator Innovation History Intern...
HILLCREST PETROLEUM AND DESIGN 1ST ReGenX Generator Innovation History Intern...
Thane Heins Regenerative Acceleration Generator Technology
 
Official Invitation Government of Quebec Introduction to a New Law of Physics
Official Invitation Government of Quebec Introduction to a New Law of PhysicsOfficial Invitation Government of Quebec Introduction to a New Law of Physics
Official Invitation Government of Quebec Introduction to a New Law of Physics
Thane Heins Regenerative Acceleration Generator Technology
 
Renault Nissan Electric Vehicle Regenerative Acceleration Innovation Presenta...
Renault Nissan Electric Vehicle Regenerative Acceleration Innovation Presenta...Renault Nissan Electric Vehicle Regenerative Acceleration Innovation Presenta...
Renault Nissan Electric Vehicle Regenerative Acceleration Innovation Presenta...
Thane Heins
 
New Physics for a New Era of Electric Mobility and Clean Power Generation
New Physics for a New Era of Electric Mobility and Clean Power GenerationNew Physics for a New Era of Electric Mobility and Clean Power Generation
New Physics for a New Era of Electric Mobility and Clean Power Generation
Thane Heins Regenerative Acceleration Generator Technology
 
ECE356 -- 20150910 -- Bradt
ECE356 -- 20150910 -- BradtECE356 -- 20150910 -- Bradt
ECE356 -- 20150910 -- Bradt
Mitch Bradt, PE
 
ReGenX Generator Law of Induction
ReGenX Generator Law of InductionReGenX Generator Law of Induction
Siemens Gal Power Systems ReGenX, BiTT and Conventional Generator, Transforme...
Siemens Gal Power Systems ReGenX, BiTT and Conventional Generator, Transforme...Siemens Gal Power Systems ReGenX, BiTT and Conventional Generator, Transforme...
Siemens Gal Power Systems ReGenX, BiTT and Conventional Generator, Transforme...
Thane Heins
 
FINAL Potential Difference inc. Innovations Test Program with 13 Internationa...
FINAL Potential Difference inc. Innovations Test Program with 13 Internationa...FINAL Potential Difference inc. Innovations Test Program with 13 Internationa...
FINAL Potential Difference inc. Innovations Test Program with 13 Internationa...
Thane Heins
 
Electric Vehicle Regenerative Acceleration Innovation Presentation for India ...
Electric Vehicle Regenerative Acceleration Innovation Presentation for India ...Electric Vehicle Regenerative Acceleration Innovation Presentation for India ...
Electric Vehicle Regenerative Acceleration Innovation Presentation for India ...
Thane Heins Regenerative Acceleration Generator Technology
 

What's hot (20)

THE FUTURE OF ELECTRIC POWER GENERATION 2.0 - for all generations...
THE FUTURE OF ELECTRIC POWER GENERATION 2.0 - for all generations...THE FUTURE OF ELECTRIC POWER GENERATION 2.0 - for all generations...
THE FUTURE OF ELECTRIC POWER GENERATION 2.0 - for all generations...
 
Conservative Party of Canada, NRC, Queen's University Introduction to the ReG...
Conservative Party of Canada, NRC, Queen's University Introduction to the ReG...Conservative Party of Canada, NRC, Queen's University Introduction to the ReG...
Conservative Party of Canada, NRC, Queen's University Introduction to the ReG...
 
Effects of Reversing Generator Armature Reaction in Electric Power Generation
Effects of Reversing Generator Armature Reaction in Electric Power GenerationEffects of Reversing Generator Armature Reaction in Electric Power Generation
Effects of Reversing Generator Armature Reaction in Electric Power Generation
 
OTPC-Palatana 726.6MW combined cycle power generation
OTPC-Palatana 726.6MW combined cycle power generationOTPC-Palatana 726.6MW combined cycle power generation
OTPC-Palatana 726.6MW combined cycle power generation
 
2018 INFINITE EFFICIENCY ReGenX Generator, Bi-Toroid Transformer Tests Report...
2018 INFINITE EFFICIENCY ReGenX Generator, Bi-Toroid Transformer Tests Report...2018 INFINITE EFFICIENCY ReGenX Generator, Bi-Toroid Transformer Tests Report...
2018 INFINITE EFFICIENCY ReGenX Generator, Bi-Toroid Transformer Tests Report...
 
Potential Difference Inc. Innovation One Page Summary 9/11 – 2021
Potential Difference Inc. Innovation One Page Summary 9/11 – 2021Potential Difference Inc. Innovation One Page Summary 9/11 – 2021
Potential Difference Inc. Innovation One Page Summary 9/11 – 2021
 
2 ReGenX Generator Scientific Performance Validation Requirements
2 ReGenX Generator Scientific Performance Validation Requirements2 ReGenX Generator Scientific Performance Validation Requirements
2 ReGenX Generator Scientific Performance Validation Requirements
 
Six week Summer training report ppt on power plant.
Six week Summer training report ppt on power plant.Six week Summer training report ppt on power plant.
Six week Summer training report ppt on power plant.
 
Final Version Electric Vehicle Regenerative Acceleration Innovation Presentat...
Final Version Electric Vehicle Regenerative Acceleration Innovation Presentat...Final Version Electric Vehicle Regenerative Acceleration Innovation Presentat...
Final Version Electric Vehicle Regenerative Acceleration Innovation Presentat...
 
ReGenX Generator E Core Prototype #1 Performance Test Data
ReGenX Generator E Core Prototype #1 Performance Test DataReGenX Generator E Core Prototype #1 Performance Test Data
ReGenX Generator E Core Prototype #1 Performance Test Data
 
Law of Creation of Energy and the History of US Patented ReGenX Generator Inn...
Law of Creation of Energy and the History of US Patented ReGenX Generator Inn...Law of Creation of Energy and the History of US Patented ReGenX Generator Inn...
Law of Creation of Energy and the History of US Patented ReGenX Generator Inn...
 
HILLCREST PETROLEUM AND DESIGN 1ST ReGenX Generator Innovation History Intern...
HILLCREST PETROLEUM AND DESIGN 1ST ReGenX Generator Innovation History Intern...HILLCREST PETROLEUM AND DESIGN 1ST ReGenX Generator Innovation History Intern...
HILLCREST PETROLEUM AND DESIGN 1ST ReGenX Generator Innovation History Intern...
 
Official Invitation Government of Quebec Introduction to a New Law of Physics
Official Invitation Government of Quebec Introduction to a New Law of PhysicsOfficial Invitation Government of Quebec Introduction to a New Law of Physics
Official Invitation Government of Quebec Introduction to a New Law of Physics
 
Renault Nissan Electric Vehicle Regenerative Acceleration Innovation Presenta...
Renault Nissan Electric Vehicle Regenerative Acceleration Innovation Presenta...Renault Nissan Electric Vehicle Regenerative Acceleration Innovation Presenta...
Renault Nissan Electric Vehicle Regenerative Acceleration Innovation Presenta...
 
New Physics for a New Era of Electric Mobility and Clean Power Generation
New Physics for a New Era of Electric Mobility and Clean Power GenerationNew Physics for a New Era of Electric Mobility and Clean Power Generation
New Physics for a New Era of Electric Mobility and Clean Power Generation
 
ECE356 -- 20150910 -- Bradt
ECE356 -- 20150910 -- BradtECE356 -- 20150910 -- Bradt
ECE356 -- 20150910 -- Bradt
 
ReGenX Generator Law of Induction
ReGenX Generator Law of InductionReGenX Generator Law of Induction
ReGenX Generator Law of Induction
 
Siemens Gal Power Systems ReGenX, BiTT and Conventional Generator, Transforme...
Siemens Gal Power Systems ReGenX, BiTT and Conventional Generator, Transforme...Siemens Gal Power Systems ReGenX, BiTT and Conventional Generator, Transforme...
Siemens Gal Power Systems ReGenX, BiTT and Conventional Generator, Transforme...
 
FINAL Potential Difference inc. Innovations Test Program with 13 Internationa...
FINAL Potential Difference inc. Innovations Test Program with 13 Internationa...FINAL Potential Difference inc. Innovations Test Program with 13 Internationa...
FINAL Potential Difference inc. Innovations Test Program with 13 Internationa...
 
Electric Vehicle Regenerative Acceleration Innovation Presentation for India ...
Electric Vehicle Regenerative Acceleration Innovation Presentation for India ...Electric Vehicle Regenerative Acceleration Innovation Presentation for India ...
Electric Vehicle Regenerative Acceleration Innovation Presentation for India ...
 

Similar to Short description about GGEL

Industrial summer training
Industrial summer trainingIndustrial summer training
Industrial summer training
Shubham Patel
 
Naps
Naps Naps
Rajghat power house ppt
Rajghat power house pptRajghat power house ppt
Rajghat power house ppt
Er Sagar
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
guru nanak institute of technology
 
V.T ppt
V.T pptV.T ppt
V.T ppt
Aditi Tiwari
 
electrical.ppt
electrical.pptelectrical.ppt
electrical.ppt
AdityanshuBehera
 
Company profile MAPS TG
Company profile MAPS TGCompany profile MAPS TG
Company profile MAPS TG
Reach Our Company
 
Prashant report final NTPC ANTA
Prashant report final NTPC ANTAPrashant report final NTPC ANTA
Prashant report final NTPC ANTA
prashant shukla
 
IRJET- Piezoelectric Effect Based Wind Energy Conversion System
IRJET- Piezoelectric Effect Based Wind Energy Conversion SystemIRJET- Piezoelectric Effect Based Wind Energy Conversion System
IRJET- Piezoelectric Effect Based Wind Energy Conversion System
IRJET Journal
 
Power plant technical overview report
Power plant technical overview reportPower plant technical overview report
Power plant technical overview report
ASHOKKUMARPAL1
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
Tarun Kumar
 
MAPS TG
MAPS TGMAPS TG
MAPS TG
company2014
 
An industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAn industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYA
Atul Kumar Singh
 
Energy Conservation Report
Energy Conservation ReportEnergy Conservation Report
Energy Conservation Report
Syed Ahmer Ali Bukhari
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
Aditya Shekhar
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
Aditya Shekhar
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensation
cijogeorgep
 
Presentation 1 (2).pptx
Presentation 1 (2).pptxPresentation 1 (2).pptx
Presentation 1 (2).pptx
NaveenJarwal1
 
Dev
DevDev
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
Amit Kumar
 

Similar to Short description about GGEL (20)

Industrial summer training
Industrial summer trainingIndustrial summer training
Industrial summer training
 
Naps
Naps Naps
Naps
 
Rajghat power house ppt
Rajghat power house pptRajghat power house ppt
Rajghat power house ppt
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
 
V.T ppt
V.T pptV.T ppt
V.T ppt
 
electrical.ppt
electrical.pptelectrical.ppt
electrical.ppt
 
Company profile MAPS TG
Company profile MAPS TGCompany profile MAPS TG
Company profile MAPS TG
 
Prashant report final NTPC ANTA
Prashant report final NTPC ANTAPrashant report final NTPC ANTA
Prashant report final NTPC ANTA
 
IRJET- Piezoelectric Effect Based Wind Energy Conversion System
IRJET- Piezoelectric Effect Based Wind Energy Conversion SystemIRJET- Piezoelectric Effect Based Wind Energy Conversion System
IRJET- Piezoelectric Effect Based Wind Energy Conversion System
 
Power plant technical overview report
Power plant technical overview reportPower plant technical overview report
Power plant technical overview report
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
MAPS TG
MAPS TGMAPS TG
MAPS TG
 
An industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAn industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYA
 
Energy Conservation Report
Energy Conservation ReportEnergy Conservation Report
Energy Conservation Report
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensation
 
Presentation 1 (2).pptx
Presentation 1 (2).pptxPresentation 1 (2).pptx
Presentation 1 (2).pptx
 
Dev
DevDev
Dev
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
 

Recently uploaded

basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
mamamaam477
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 

Recently uploaded (20)

basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 

Short description about GGEL

  • 1. GGEL 50MW SOLAR THERMAL POWER PLANT SUMITTED TO: SUBMITTED BY: Mr. VINAY KUMAR GUPTA BANWARI LAL Assistant Professor B.Tech (E.E.) DEPARTMENT OF Electrical Engg. SEMESTER–7th PRATAP UNIVERSITY JAIPUR. ROLL NO.- EE110006
  • 2.
  • 3.
  • 4. INTRODUCTION  GODAWARI GREEN ENERGY LIMITED (GGEL) IS A FLAGSHIP COMPANY OF THE HIRA GROUP IN THE RENEWABLE ENERGY SECTOR.  GGEL’S FOCUS AREA IS POWER GENERATION USING RENEWABLE SOURCES SUCH AS SOLAR ENERGY, GEOTHERMAL ENERGY, WIND ENERGY ETC.  THE COMPANY WAS INCORPORATED AS A 100% SUBSIDIARY OF THE GODAWARI POWER & ISPAT LTD IN THE YEAR 2009.
  • 5.
  • 6.
  • 7.
  • 9.
  • 10. HTF CYCLE SUPERHEATER & REHEATER S 387°C EVAPORATOR 308°C ECONOMISER & REHEATER E 291°C EXPANSSION VESSEL SOLAR FIELD HTF PUMP
  • 11. WATER CYCLE SUPERHEATER 379°C REHEATER E & S HP TURBINE LP TURBINE BFP 180°C WATER SOURCE DM PLANT HP HEATER 284°C ECONOMISER 295°C STEAM DRUM & EVAPORATOR 295°C CONDENSOR HOT WELL DEAERATOR REHEATER E & S
  • 12. BLOCK DIAGRAM OF TURBINE-ALTERNATOR CONNECTION LP TURBINE LP STEAM DIRECT CONNECTION INDIRECT CONNECTION HP STEAM ALTERNA TOR GEAR BOX HP TURBINE
  • 13. ABBREVIATIONS  UAT – UNIT AUXILIARY TRANSFORMER  SST – STATION SERVICE TRANSFORMER  BFP – BOILER FEED PUMP  CCWP – CLOSE COOLING WATER PUMP  ACWP – AUXILIARY COOLING WATER PUMP  HTF – HEAT TRANSFER FLUID  JOP – JACKING OIL PUMP  GSC – GLAND STEAM CONDENSOR
  • 14. ABBREVIATIONS  MOP – MAIN OIL PUMP  AOP – AUXILIARY OIL PUMP  EOP – EMERGENCY OIL PUMP  CEP – CONDENSATE EXTRACTING PUMP  CT FAN – COOLING TOWER FAN  CWP – CIRCULATING WATER PUMP  MOG – MAGNETIC OIL GAUGE  PRV – PRESSURE RELEAVE VALVE
  • 15. POWER DISTRIBUTION BLOCK DIAGRAM GEN. 70.5 MVA 10.5 KV GSU T/F 75 MVA 10.5/132 KV UAT 7.5 MVA 10.5/6.6 KV SST-1 2.5 MVA 10.5/0.440 KV SST-2 2.5 MVA 10.5/0.440 KV SST-3 1.5 MVA 6.6/0.440 KV SST-4 750 KVA 6.6/0.440 KV HV MOTORS 1.BFP-1/2/3 2.HTF PUMP-1/2/3/4 3.CWP-1/2/3 LV MOTORS 1. CEP 8. VACUUM PUMP 15. SEAL WATER PUMP 2. MOP 9. OIL MIST FAN 16. HTF SEAL PUMP 3. AOP 10. CONTROL OIL PUMP 17. LUBE OIL PURIFIER 4. EOP 11. AIR COMPRESSOR 18. CONTROL 5. JOP 12. CT FAN OFFLINE PUMP 6. CCWP 13. TURBINE GEAR 7. ACWP 14. GSC GEN. BREAKER UAT BREAKER BREAKER BREAKER HTF HEATER PUMP RW SUPPLY PUMP R Y B SWITCHIN G YARD
  • 16. POWER DISTRIBUTION TO THE TRANSFORMERS UAT GEN. SST-1 SST-2 POWER T/F 1. TURBINE IS NOT RUNNING.(GRID IS AVAILABLE) 2. TURBINE IS RUNNING.(GRID IS NOT AVAILABLE) SG SGPOWER T/F UAT SST-1 SST-2 GEN. 132KV 132KV 10.5KV 10.5KV
  • 17. GENERATOR  IT IS A DEVICE THAT CONVERTS MECHANICAL ENERGY INTO ELECTRICAL ENERGY.  IT WORKS ON THE PRINCIPLE OF EMI(ELECTRO- MAGNETIC INDUCTION) OF FARADAY.  IT IS CONNECTED TO LP AND HP TURBINE DIRECT AND INDIRECT RESPECTIVELY.  HERE THE ELECTRICITY IS GENERATED AT 10.5KV.
  • 18. RATED POWER- 70.590MVA RATED VOLTAGE – 10500V+/- 10% V RATED CURRENT – 3881 A ACTIVE POWER -50 MW SPEED – 3000rpm
  • 19. GENERATOR SPECIFICATIONS MACHINE CODE SGEN5-100A-2P RATED VOLTAGE 10500V +/- 10% RATED POWER 70590 KVA PHASES 3 CONNECTION STAR FREQUENCY 50 Hz P.F.(COSF) 0.708 RATED CURRENT 3881 A EXCITATION SELF RATED SPEED 3000 rpm INSULATION CLASS F AMBIENT TEMP. 50C PHASE SEQUENCE U1 V1 W1 IP 54 IM 7216 ACTIVE POWER 50 MW TOTAL WEIGHT 116.800 Kg COOLING TYPE AIR
  • 20. TRANSFORMER – 75 MVA (10.5KV/132KV)  IT IS AN ELECTRICAL DEVICE THAT TRANSFER ELECTRICAL ENERGY FROM ONE SIDE TO ANOTHERSIDE WITHOUT CHANGE IN ITS FREQUENCY.  TRANSFORMER IS USED TO CONVERT 10.5KV INTO 132KV FOR TRANSMISSION TO GSS(GRID SUB-STATION).
  • 22. REFERENCE STANDARD IS:2026 CORE & WDG MASS 38900Kg TANK & FITTING MASS 14900Kg OIL MASS 17200Kg TOTAL T/F MASS 71000Kg TRANSPORT MASS 66000Kg TOTAL OIL QUANTITY 20200 Liters OVERALL DIMENSIONS 6.754.205.90 m TRANSPORT DIMENSIONS 5.302.503.75 m GSU TRANSFORMER PHYSICAL SPECIFICATIONS TEMP. RISE OF OIL 60C TEMP. RISE OF WDG 65C AMBIENT TEMP. 50C TYPE OF COOLING ONAN/ONAF TANK PLATE THICKNESS COVER 12 mm BOTTOM 16 mm SIDE 8 mm
  • 23. SWITCHING YARD  THE APPLICATION OF SWITCHYARDS IS TO DELIVER THE GENERATED POWER FROM POWER PLANT AT DESIRED VOLTAGE LEVEL TO THE NEAREST GRID OR TRANSMISSION LINE.  THE SWITCHYARD IS PROVIDED WITH NECESSARY ISOLATORS, CIRCUIT BREAKERS, CURRENT TRANSFORMER, POTENTIAL TRANSFORMERS, SURGE ARRESTORS, WAVE TRAPS, PROTECTIVE RELAYS, PLCC ETC.  SWITCHYARD IS CONTROLLED FROM DCS WHICH WILL BE LOCATED IN POWER BLOCK CONTROL ROOM.
  • 24.
  • 26. UAT CONNECTION UAT 7.5 MVA 10.5KV/6.6KV SST-3 1.5 MVA 6.6KV/0.440KV SST-4 750KVA 6.6KV/0.440KV BFP(3) 875 KW 6300V 96A 3071rpm HTFP(4) 900KW 6300V 101A 2970rpm CWP(3) 510KW 6300V 58A 986rpm RAW WATER PUMP SUPPLY HTF HEATER SPARE MOTOR FEEDER
  • 27. LOAD DISTRIBUTION FROM UAT  THE HV MOTORS(HTF, BFP & CWP) ARE CONNECTED TO UAT TRANSFORMER.  THE TOTAL POWER DISTRIBUTED TO HT MOTORS IN BOTH CASES ARE:  IN NORMAL CONDITION – 5470 KW  TOTAL LOAD CONNECTED – 7755 KW
  • 28. SST-1 CONNECTION TO LOADS SST-1 2.5 MVA 10.5/0.440 KV CONDENSAT E PUMP 1&3 220 KW 415 V 193 A 1488 rpm JOP 1&2 30 KW 415 V 27.1 A 1455 rpm CT FAN 1&3 150 KW 415 V 132 A 1482rpm VACUUM PUMP-1 55 KW 415 V 96 A CCWP 1&2 90 KW 415 V 78 A 2955 rpm AOP 2 45 KW 415 V 78.4 A 1470 rpm ACWP-1 55 KW 415 V 95.6 A 1475 rpm AUXILIARY LOAD 150 KW AIR COMPRESSOR -2 37 KW 400 V 2965 rpm COP 16 KW 415 V TOTAL LOAD = 848 KW
  • 29. SST-2 CONNECTION TO LOADS SST-2 2.5 MVA 10.5/0.440 KV CT FAN-2 75 KW 415 V 132 A 1482 rpm MOP 45 KW 415 V 78.4 A 1470 rpm AIR COMPRESSOR -1 37 KW 400 V 2965 rpm VACUUM PUMP-2 55 KW 415 V 96 A CONDENSAT E PUMP-2 110 KW 415 V 193 A 1488 rpm ACWP-2 55 KW 415 V 95.6 A 1475 rpm COP 16 KW AUXILIARY LOAD 88.6 KW TOTAL LOAD = 481.6 KW
  • 30. SST-4 CONNECTED LOAD SST-4 750KVA 6.6/0.440KV RAW WATER MAKEUP PUMP (2) 18.5KW 415V 31.5A 2929rpm WASTE WATER PUMP (2) 1.5KW 415V 3.4A 1410rpm TOTAL LOAD = 40 KW
  • 31. LOAD DISTRIBUTION FROM SST  THE LV MOTORS(CEP, CCWP, ACWP & VACUUM PUMP etc.) ARE CONNECTED TO SST TRANSFORMERS.  THERE ARE 4 SST TRANSFORMER - SST-1, SST-2, SST-3, SST-4.  THE TOTAL LOAD CONNECTED TO EACH OF THE SST IN BOTH CASE ARE:  SST-1  IN NORMAL CONDITION – 545.6 KW  THE TOTAL LOAD CONNECTED – 848KW
  • 32. LOAD DISTRIBUTION FROM SST  SST-2  IN NORMAL LOAD CONDITION – 364.2 KW  TOTAL LOAD CONNECTED – 481.6 KW  SST-4  IN NORMAL LOAD CONDITION – 20 KW  TOTAL LOAD CONNECTED – 40 KW  SST-3 - ISOLATE
  • 33. TOTAL LOAD DISTRIBUTION FROM ALL TRANSFORMERS  TOTAL LOAD AT HV MOTORS –  IN NORMAL CONDITION – 5470 KW  TOTAL LOAD CONNECTED – 7755 KW  TOTAL LOAD AT LV MOTORS –  IN NORMAL CONDITION – 909.8 KW  TOTAL LOAD CONNECTED – 1329.6 KW  TOTAL LOAD –  IN NORMAL CONDITION – 6399.8 KW  TOTAL LOAD CONNECTED – 9124.6 KW  LOAD DURING NON-GENERATING HOURS – 205.5 KW
  • 34.
  • 35. PPA – POWER PURCHASE AGREEMENT