RELIABILITY AND LIFE CYCLE COST SEMINAR           BY SELVA
INDTRODUCTION : 		LCC is the evaluation came up as a convenient  tool for reducing the production cost of operating plant. 		The short term objective of the LCC analyze the performance of investment into  engg product. 		 The long term objective is optimise profitability and survival of the enterprise.
The important project evaluation technique basically need by management for decision making. First application of LCC was by U.S Department of Defence ”to combat the inability of the low bid method to accommodate and allow for the high operating cost of plant ownership”. The LCC forms a sound base for decision making in case of terotechnological problems.
TOTAL LIFE CYCLE COST Significance of LCC was felt in arriving at decision in regard to plant performance, low cost of product ,high survival rate and reliability based desigens. Indian Standard Institution, has already progressed in its endeavour to identify the basic factor of LCC and establish necessary draft standards for the methodology and procedure involved in LCC.
THE COST OF MAINTENANCE OVER THE LCC   Type of maintenance  Incidents of failure	 Repairable or Non Repairable system
Normally all industrial machinery belong to repairable category, subject to large variation of load . A failure becomes imminent when the working loads applied exceed the strength of components comprising of the total system.
RELIABILITY ANALYSIS AND FAILURE 	 In repairable system,  failure follow exponential distribution. Replacement restores the system into original state.
FAILURE DENSITY, HAZARD RATE The failure density fd(t) : Is a measure of the overall rate at which failure occur. The hazard rate h(t) : Is a measure of the instantaneous rate of failure.
BATH TUB CURVE  Early failure region. Random failure region. 	 Wear out failure region.
EARLY OR INITIAL OR RUNNING IN FAILURE REGION When a batch of new items just produced or assembled is placed in operation, the initial failure rate is generally somewhat higher than that encountered a short time later. This is due to mainly to the initial failure components owing to weaknesses or manufacturing defects like fits and tolerances, Insulation and assembly defects which are not found during inspection.
INCIDENTAL OR RANDOM FAILURE REGION  This is the middle region in which fewer failures take place but it is difficult to determine their cause. In general, they seem to occur when the environmental or operational stresses exceed the design strength of the part. It is difficult to predict either the environmental stress or part strengths meeting  upto them as deterministic function of time.
WEAR OUT FAILURE REGION  AS a part or the equipment reaches old age, there are signs of deterioration and many failure occur.
CONCLUSION Since technoeconomic life indicates the most useful and economic life time of a machine, planning can be done to utilise it efficiently. This help in certain decision making in regard to repair or replace the machine. Reliability effort function to offset the time dependent declining reliability by increase additional cost, apart from scheduled maintenance cost, lead to refinement of the existing model of the life cycle costing.
Hazards rate curve plotted with reference to a real life case, gives useful data in regard to application of diagnostic tool for prediction of failure and use of predictive preventive maintenance in specific zone of hazard rate curve having random failures. Hazards rate in the “random failure region“ ,does  not remain same or steady, in real practice, but has a tendency to rise up.
From the failure data record, it may be worthwhile to operational availability of a machine and its variation with time. Total life time cost requires to be minimised through varies methodologies of terotechnology and tribo analysis.
THANK UBY SELVA.G

More Related Content

What's hot

Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes) Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes)
Priyanshu
 
Tero technology and Tribology - Maintenance Management
Tero technology and Tribology - Maintenance ManagementTero technology and Tribology - Maintenance Management
Tero technology and Tribology - Maintenance Management
Pulkit Sharma
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
jericfreimuth
 
JR Dickens - IWCS 2007
JR Dickens - IWCS 2007JR Dickens - IWCS 2007
JR Dickens - IWCS 2007
jrd9234
 
Reliability Engineering and Terotechnology
Reliability Engineering and TerotechnologyReliability Engineering and Terotechnology
Reliability Engineering and Terotechnology
Christian Enoval
 
Condition based maintenance strategy
Condition based maintenance strategyCondition based maintenance strategy
Condition based maintenance strategy
Priyesh Nair
 
Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and Program
Ricky Smith CMRP
 
7 2prevent main
7 2prevent main7 2prevent main
7 2prevent main
Marcin Marucha
 
CBM Requirements by Carl Byington - PHM Design, LLC
CBM Requirements by Carl Byington - PHM Design, LLCCBM Requirements by Carl Byington - PHM Design, LLC
CBM Requirements by Carl Byington - PHM Design, LLC
Carl Byington
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenanceSHIVAJI CHOUDHURY
 
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLCCBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
Carl Byington
 
Maintenance management in operations management
Maintenance management in operations managementMaintenance management in operations management
Maintenance management in operations management
Shereen Shahana
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teams
Matthew Clemens
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenancePallavi Yadav
 
Reliability Engineering
Reliability EngineeringReliability Engineering
Reliability Engineering
Priyanshu Mishra
 
Preventive and predictive maintainence
Preventive and predictive maintainencePreventive and predictive maintainence
Preventive and predictive maintainence
Ankit Narain
 
Engineering plant facilities 12 mechanics building preventive maintenance and...
Engineering plant facilities 12 mechanics building preventive maintenance and...Engineering plant facilities 12 mechanics building preventive maintenance and...
Engineering plant facilities 12 mechanics building preventive maintenance and...
Luis Cabrera
 
Rcm
RcmRcm

What's hot (20)

Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes) Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes)
 
Om 5
Om 5Om 5
Om 5
 
Tero technology and Tribology - Maintenance Management
Tero technology and Tribology - Maintenance ManagementTero technology and Tribology - Maintenance Management
Tero technology and Tribology - Maintenance Management
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
 
JR Dickens - IWCS 2007
JR Dickens - IWCS 2007JR Dickens - IWCS 2007
JR Dickens - IWCS 2007
 
Reliability Engineering and Terotechnology
Reliability Engineering and TerotechnologyReliability Engineering and Terotechnology
Reliability Engineering and Terotechnology
 
Condition based maintenance strategy
Condition based maintenance strategyCondition based maintenance strategy
Condition based maintenance strategy
 
Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and Program
 
7 2prevent main
7 2prevent main7 2prevent main
7 2prevent main
 
CBM Requirements by Carl Byington - PHM Design, LLC
CBM Requirements by Carl Byington - PHM Design, LLCCBM Requirements by Carl Byington - PHM Design, LLC
CBM Requirements by Carl Byington - PHM Design, LLC
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLCCBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
 
Maintenance management in operations management
Maintenance management in operations managementMaintenance management in operations management
Maintenance management in operations management
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teams
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenance
 
Reliability Engineering
Reliability EngineeringReliability Engineering
Reliability Engineering
 
Preventive and predictive maintainence
Preventive and predictive maintainencePreventive and predictive maintainence
Preventive and predictive maintainence
 
Engineering plant facilities 12 mechanics building preventive maintenance and...
Engineering plant facilities 12 mechanics building preventive maintenance and...Engineering plant facilities 12 mechanics building preventive maintenance and...
Engineering plant facilities 12 mechanics building preventive maintenance and...
 
Rcm
RcmRcm
Rcm
 
Maintenance strategies
Maintenance strategiesMaintenance strategies
Maintenance strategies
 

Viewers also liked

Reliability
ReliabilityReliability
Reliability
Chellamuthu K
 
Mobile Mapping Solutions for the Upgrade and Maintenance of Geospatial Asset ...
Mobile Mapping Solutions for the Upgrade and Maintenance of Geospatial Asset ...Mobile Mapping Solutions for the Upgrade and Maintenance of Geospatial Asset ...
Mobile Mapping Solutions for the Upgrade and Maintenance of Geospatial Asset ...
Esri
 
Cost optimized reliability test planning rev 7
Cost optimized reliability test planning rev 7Cost optimized reliability test planning rev 7
Cost optimized reliability test planning rev 7
ASQ Reliability Division
 
Cost & Reliability
Cost & ReliabilityCost & Reliability
Cost & Reliability
Kailas Sree Chandran
 
Balancing Cost, Performance and Reliability when Choosing Solenoid Valves
Balancing Cost, Performance and Reliability when Choosing Solenoid ValvesBalancing Cost, Performance and Reliability when Choosing Solenoid Valves
Balancing Cost, Performance and Reliability when Choosing Solenoid Valves
Design World
 
Reliability engineering chapter-2 reliability of systems
Reliability engineering chapter-2 reliability of systemsReliability engineering chapter-2 reliability of systems
Reliability engineering chapter-2 reliability of systems
Charlton Inao
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementRajeev Sharan
 
Reliability engineering ppt-Internship
Reliability engineering ppt-InternshipReliability engineering ppt-Internship
Reliability engineering ppt-Internship
Turbo Energy Limited(a unit of TVS group)
 

Viewers also liked (10)

Reliability
ReliabilityReliability
Reliability
 
Mobile Mapping Solutions for the Upgrade and Maintenance of Geospatial Asset ...
Mobile Mapping Solutions for the Upgrade and Maintenance of Geospatial Asset ...Mobile Mapping Solutions for the Upgrade and Maintenance of Geospatial Asset ...
Mobile Mapping Solutions for the Upgrade and Maintenance of Geospatial Asset ...
 
Cost optimized reliability test planning rev 7
Cost optimized reliability test planning rev 7Cost optimized reliability test planning rev 7
Cost optimized reliability test planning rev 7
 
Terotechnology
TerotechnologyTerotechnology
Terotechnology
 
Cost & Reliability
Cost & ReliabilityCost & Reliability
Cost & Reliability
 
Balancing Cost, Performance and Reliability when Choosing Solenoid Valves
Balancing Cost, Performance and Reliability when Choosing Solenoid ValvesBalancing Cost, Performance and Reliability when Choosing Solenoid Valves
Balancing Cost, Performance and Reliability when Choosing Solenoid Valves
 
Reliability engineering chapter-2 reliability of systems
Reliability engineering chapter-2 reliability of systemsReliability engineering chapter-2 reliability of systems
Reliability engineering chapter-2 reliability of systems
 
Advanced Maintenance Management
Advanced Maintenance ManagementAdvanced Maintenance Management
Advanced Maintenance Management
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Reliability engineering ppt-Internship
Reliability engineering ppt-InternshipReliability engineering ppt-Internship
Reliability engineering ppt-Internship
 

Similar to Seminar Reliability

Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
ZeeshanZia13
 
Managing mill maintenance - Maintenance options and challenges
Managing mill maintenance - Maintenance options and challengesManaging mill maintenance - Maintenance options and challenges
Managing mill maintenance - Maintenance options and challenges
Milling and Grain magazine
 
(Modifid)condition m0nitoring of longwall face supportd
(Modifid)condition m0nitoring of longwall face supportd(Modifid)condition m0nitoring of longwall face supportd
(Modifid)condition m0nitoring of longwall face supportd
rockyraj19
 
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)Jonathan Lloyd
 
RTOS_GROUP_activity which is for the 7th sem e
RTOS_GROUP_activity which is for  the 7th sem eRTOS_GROUP_activity which is for  the 7th sem e
RTOS_GROUP_activity which is for the 7th sem e
RajeshKotian11
 
Guidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBFGuidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBF
ijsrd.com
 
Narrative Offshore Europe 2015-LRED-Aberdeen office
Narrative Offshore Europe 2015-LRED-Aberdeen officeNarrative Offshore Europe 2015-LRED-Aberdeen office
Narrative Offshore Europe 2015-LRED-Aberdeen officePieter van Asten
 
SMRP 24th Conf Paper - Vextec -J Carter
SMRP 24th Conf Paper - Vextec -J CarterSMRP 24th Conf Paper - Vextec -J Carter
SMRP 24th Conf Paper - Vextec -J Carterjcarter1972
 
SPE 171517_Estimating Probability of Failure _2014_Final
SPE 171517_Estimating Probability of Failure _2014_FinalSPE 171517_Estimating Probability of Failure _2014_Final
SPE 171517_Estimating Probability of Failure _2014_FinalKatrina Carter-Journet
 
Improving the Availability of Lift Stations through Optimized Redundant / Bac...
Improving the Availability of Lift Stations through Optimized Redundant / Bac...Improving the Availability of Lift Stations through Optimized Redundant / Bac...
Improving the Availability of Lift Stations through Optimized Redundant / Bac...
Vecoin
 
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-32937903 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
Jose Quintero
 
Apres Cobem09
Apres Cobem09Apres Cobem09
Apres Cobem09
Beatriz Juliana
 
reliability.pdf
reliability.pdfreliability.pdf
reliability.pdf
tinymoley
 
Improving Reliability on Mixed Overhead and Underground Distribution Feeders
Improving Reliability on Mixed Overhead and Underground Distribution FeedersImproving Reliability on Mixed Overhead and Underground Distribution Feeders
Improving Reliability on Mixed Overhead and Underground Distribution Feeders
Power System Operation
 
Improving Reliability on Mixed Overhead and Underground Distribution Feeders
Improving Reliability on Mixed Overhead and Underground Distribution FeedersImproving Reliability on Mixed Overhead and Underground Distribution Feeders
Improving Reliability on Mixed Overhead and Underground Distribution Feeders
Power System Operation
 
Enhancing Capacity Utilization of Coal Fired Thermal Power Plant through Bett...
Enhancing Capacity Utilization of Coal Fired Thermal Power Plant through Bett...Enhancing Capacity Utilization of Coal Fired Thermal Power Plant through Bett...
Enhancing Capacity Utilization of Coal Fired Thermal Power Plant through Bett...
Premier Publishers
 
Unit 2
Unit 2Unit 2
Unit 2
DEVARAJMECH
 
Prioritizing waste reduction projects
Prioritizing waste reduction projectsPrioritizing waste reduction projects
Prioritizing waste reduction projects
GBX Summits
 

Similar to Seminar Reliability (20)

Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
Managing mill maintenance - Maintenance options and challenges
Managing mill maintenance - Maintenance options and challengesManaging mill maintenance - Maintenance options and challenges
Managing mill maintenance - Maintenance options and challenges
 
(Modifid)condition m0nitoring of longwall face supportd
(Modifid)condition m0nitoring of longwall face supportd(Modifid)condition m0nitoring of longwall face supportd
(Modifid)condition m0nitoring of longwall face supportd
 
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
 
RTOS_GROUP_activity which is for the 7th sem e
RTOS_GROUP_activity which is for  the 7th sem eRTOS_GROUP_activity which is for  the 7th sem e
RTOS_GROUP_activity which is for the 7th sem e
 
Guidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBFGuidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBF
 
Narrative Offshore Europe 2015-LRED-Aberdeen office
Narrative Offshore Europe 2015-LRED-Aberdeen officeNarrative Offshore Europe 2015-LRED-Aberdeen office
Narrative Offshore Europe 2015-LRED-Aberdeen office
 
Rcm
RcmRcm
Rcm
 
SMRP 24th Conf Paper - Vextec -J Carter
SMRP 24th Conf Paper - Vextec -J CarterSMRP 24th Conf Paper - Vextec -J Carter
SMRP 24th Conf Paper - Vextec -J Carter
 
SPE 171517_Estimating Probability of Failure _2014_Final
SPE 171517_Estimating Probability of Failure _2014_FinalSPE 171517_Estimating Probability of Failure _2014_Final
SPE 171517_Estimating Probability of Failure _2014_Final
 
Improving the Availability of Lift Stations through Optimized Redundant / Bac...
Improving the Availability of Lift Stations through Optimized Redundant / Bac...Improving the Availability of Lift Stations through Optimized Redundant / Bac...
Improving the Availability of Lift Stations through Optimized Redundant / Bac...
 
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-32937903 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
 
Apres Cobem09
Apres Cobem09Apres Cobem09
Apres Cobem09
 
reliability.pdf
reliability.pdfreliability.pdf
reliability.pdf
 
Improving Reliability on Mixed Overhead and Underground Distribution Feeders
Improving Reliability on Mixed Overhead and Underground Distribution FeedersImproving Reliability on Mixed Overhead and Underground Distribution Feeders
Improving Reliability on Mixed Overhead and Underground Distribution Feeders
 
Improving Reliability on Mixed Overhead and Underground Distribution Feeders
Improving Reliability on Mixed Overhead and Underground Distribution FeedersImproving Reliability on Mixed Overhead and Underground Distribution Feeders
Improving Reliability on Mixed Overhead and Underground Distribution Feeders
 
Enhancing Capacity Utilization of Coal Fired Thermal Power Plant through Bett...
Enhancing Capacity Utilization of Coal Fired Thermal Power Plant through Bett...Enhancing Capacity Utilization of Coal Fired Thermal Power Plant through Bett...
Enhancing Capacity Utilization of Coal Fired Thermal Power Plant through Bett...
 
Reliability
ReliabilityReliability
Reliability
 
Unit 2
Unit 2Unit 2
Unit 2
 
Prioritizing waste reduction projects
Prioritizing waste reduction projectsPrioritizing waste reduction projects
Prioritizing waste reduction projects
 

Recently uploaded

Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Product School
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
Elena Simperl
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
Product School
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
UiPathCommunity
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
Elena Simperl
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
Alison B. Lowndes
 

Recently uploaded (20)

Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 

Seminar Reliability

  • 1. RELIABILITY AND LIFE CYCLE COST SEMINAR BY SELVA
  • 2. INDTRODUCTION : LCC is the evaluation came up as a convenient tool for reducing the production cost of operating plant. The short term objective of the LCC analyze the performance of investment into engg product. The long term objective is optimise profitability and survival of the enterprise.
  • 3. The important project evaluation technique basically need by management for decision making. First application of LCC was by U.S Department of Defence ”to combat the inability of the low bid method to accommodate and allow for the high operating cost of plant ownership”. The LCC forms a sound base for decision making in case of terotechnological problems.
  • 4. TOTAL LIFE CYCLE COST Significance of LCC was felt in arriving at decision in regard to plant performance, low cost of product ,high survival rate and reliability based desigens. Indian Standard Institution, has already progressed in its endeavour to identify the basic factor of LCC and establish necessary draft standards for the methodology and procedure involved in LCC.
  • 5. THE COST OF MAINTENANCE OVER THE LCC Type of maintenance Incidents of failure Repairable or Non Repairable system
  • 6. Normally all industrial machinery belong to repairable category, subject to large variation of load . A failure becomes imminent when the working loads applied exceed the strength of components comprising of the total system.
  • 7. RELIABILITY ANALYSIS AND FAILURE In repairable system, failure follow exponential distribution. Replacement restores the system into original state.
  • 8. FAILURE DENSITY, HAZARD RATE The failure density fd(t) : Is a measure of the overall rate at which failure occur. The hazard rate h(t) : Is a measure of the instantaneous rate of failure.
  • 9. BATH TUB CURVE Early failure region. Random failure region. Wear out failure region.
  • 10. EARLY OR INITIAL OR RUNNING IN FAILURE REGION When a batch of new items just produced or assembled is placed in operation, the initial failure rate is generally somewhat higher than that encountered a short time later. This is due to mainly to the initial failure components owing to weaknesses or manufacturing defects like fits and tolerances, Insulation and assembly defects which are not found during inspection.
  • 11. INCIDENTAL OR RANDOM FAILURE REGION This is the middle region in which fewer failures take place but it is difficult to determine their cause. In general, they seem to occur when the environmental or operational stresses exceed the design strength of the part. It is difficult to predict either the environmental stress or part strengths meeting upto them as deterministic function of time.
  • 12. WEAR OUT FAILURE REGION AS a part or the equipment reaches old age, there are signs of deterioration and many failure occur.
  • 13. CONCLUSION Since technoeconomic life indicates the most useful and economic life time of a machine, planning can be done to utilise it efficiently. This help in certain decision making in regard to repair or replace the machine. Reliability effort function to offset the time dependent declining reliability by increase additional cost, apart from scheduled maintenance cost, lead to refinement of the existing model of the life cycle costing.
  • 14. Hazards rate curve plotted with reference to a real life case, gives useful data in regard to application of diagnostic tool for prediction of failure and use of predictive preventive maintenance in specific zone of hazard rate curve having random failures. Hazards rate in the “random failure region“ ,does not remain same or steady, in real practice, but has a tendency to rise up.
  • 15. From the failure data record, it may be worthwhile to operational availability of a machine and its variation with time. Total life time cost requires to be minimised through varies methodologies of terotechnology and tribo analysis.