Selling UCD

!
!

Getting buy-in & measuring the value of UX
by Anna Dahlström | @annadahlstrom

London, 26 Feb 2014

www.flickr.com/photos/jmsmith000/3169546564
Just to be clear… 

this workshop is not about selling
www.flickr.com/photos/triciawang/2776264432/sizes/l/in/photostream/
It’s about communication, collaboration &
tangible ways to demonstrate + measure the
value of UX

Image via Shutterstock
We all know that 

what we do adds value…

www.flickr.com/photos/31878512@N06/4623931527
We recommend 

an approach & what to do

Image via Shutterstock
Convincing others isn’t 

always that easy

www.flickr.com/photos/torbein/5121357362
Not enough budget

Brought in too late

Not included in
meetings

No budget
allocated

No direct contact
with the client

The company
doesn’t prioritise it

Not enough time allocated

Deliverables & timelines are
promised without consulting us
The client doesn’t
prioritise it
I just don’t know how
to make it tangible

The situations we 

may come across
www.flickr.com/photos/ansik/205993142
“ It will create a better user experience and make
customers happier.”
- Said by many UX people lost for words & tools to explain & demonstrate the value of UX


www.flickr.com/photos/jmsmith000/3169546564
Not enough budget

Brought in too late

Not included in
meetings

No budget
allocated

No direct contact
with the client

The company
doesn’t prioritise it

Not enough time allocated

Deliverables & timelines are
promised without consulting us
The client doesn’t
prioritise it
I just don’t know how
to make it tangible

…and we’re back 

where we started
www.flickr.com/photos/ansik/205993142
Tonight’s agenda
1. Getting buy-in & why it matters
2. Approaches for getting buy-in

Exercise

Break

3. How to measure the value & success of UCD

Exercise
4. Defining a UX metrics plan

Exercise
5. Q & A
1. Getting buy-in 

& why it matters
“ Any company that has not yet realised making the
customer successful is the key to profit and survival is
either delusional or on its way out of business.”
- Greg Nudelman,

UXmatters article ‘Experience Partners: Giving Center Stage to Customer Delight’ 


www.flickr.com/photos/jmsmith000/3169546564
But using our lingo 

doesn’t cut it

Created using Wordle
“ You need to understand where your peers in
other disciplines are coming from and communicate
the message of UX to them in terms they can
understand.”
- Pabini Gabriel-Petit, UX Matters

www.flickr.com/photos/jmsmith000/3169546564
Who we work with

The design team

“The suits”

Our closest allies
who we’ll be doing
the work with

In charge of
budgets, timings,
internal & client
relationships

Finance & board

The client

The client’s bosses

The actual
Our closest point The ones who in
decision makers 
 of contact & key the end make the
with the key to
stakeholder
decision & allocate
the budget
the budget
Some typical challenges
The design team

•
•
•

Erhmm…UX what?

•

How does this impact
my role?

•

Isn’t UX just common
sense?

•

Do we really need it?

What do you do?
How does this affect
me?

“The suits”

•

Finance & board

How does this impact
our process?

•

•

How much (more) does
it cost?

•

•

How does it impact
timings?

•

How do we incorporate
it into the project plan?

•
•

That sounds expensive

•

How can we sell it to
clients?

How can we justify the
cost?

The client
What is UX?

How much value will it
bring?

•
•
•

•

Will it be worth the
cost?

•

•

Do we need to pay
extra for it?

How can we measure
it?

•

How can I justify the
additional time?

•

How can I justify the
additional cost?

How do I know this will
add value?

Do we need it?
Isn’t that just common
sense?

The client’s bosses

•

What impact does this
have on the bottom line?

•

How much is it going to
cost me?

•

What return will it bring
compared to our other
initiatives?

•

Is this really a priority?
Challenges
•
•
•
•
•
•
•

Not understanding UX - what it is, how
you work with it and what it brings
Not knowing when to involve UX people
Not knowing where UX fits in the
company process
Seeing UX as an after thought
Not allowing enough time or seeing the
need to allocate time for UX activities
Not seeing the need to spend budget
on UX activities
Not having clear data or reasons behind
decision making

Opportunities
•
•
•
•
•
•
•

Create co-ownership & excitement
around UX
Being invited to & involved in meetings
Integrating UCD into the process and
company
Being involved from the start
Ensuring the time & resources that are
needed are given to you
Ensuring clients approve budgets and
proposed project outlines
Help with prioritisation & design
decisions as well as supporting
ongoing iterations
2. Approaches for 

getting buy-in for UCD
How 


depends on who we work with
In the ideal world UX is embraced
throughout the organisation

www.flickr.com/photos/vpickering/7760186786
In many places

we’re not there yet

www.flickr.com/photos/vpickering/9435527831
We need to assess the UX readiness 

of organisations & individuals

www.flickr.com/photos/lendingmemo/11746255104
9 questions to assess UX readiness
1. How are products designed and developed today? Where can UX integrate?
2. What is the company vision? Does it use the right words that make it receptive to a UX sell?
3. Who is working on design today? Where does it sit in the organization and who owns it?
4. Is there anyone at the strategic level championing UX currently?
5. Is there anyone at the product or project level championing UX currently?
6. What are their high profile products and services? What are they doing well? How could UX
help? What UX learnings are there? How could you use these as stories that tell why UX is a
good thing?
7. How can you help teams work better toward meeting a UX vision?
8. What does the company know about their customers today? How do they know it? How can
you help them learn more? How can you compliment their current understanding?
9. What type of culture exists now? Is the organization engineering-centric, design-centric,
sales-and-marketing-centric, or something else?
- By Paul Sherman, Daniel Szuc, and John Rhodes, UX Matters: Evangelizing UX Across an Entire Organization
Directive 


we take the leadership role & make decisions



vs

Collaborative 


we advise & provide guidance but don’t decide
UX maturity 

affects leadership style

Image via Shutterstock
Directive 


we take the leadership role & make decisions



plus

Collaborative 


we advise & provide guidance but don’t decide
“ You need to understand where your peers in
other disciplines are coming from and communicate
the message of UX to them in terms they can
understand.”
- Pabini Gabriel-Petit, UX Matters


www.flickr.com/photos/jmsmith000/3169546564
Some typical challenges
The design team

•
•
•

Erhmm…UX what?

•

How does this impact
my role?

•

Isn’t UX just common
sense?

•

Do we really need it?

What do you do?
How does this affect
me?

“The suits”

•

Finance & board

How does this impact
our process?

•

•

How much (more) does
it cost?

•

•

How does it impact
timings?

•

How do we incorporate
it into the project plan?

•
•

That sounds expensive

•

How can we sell it to
clients?

How can we justify the
cost?

The client
What is UX?

How much value will it
bring?

•
•
•

•

Will it be worth the
cost?

•

•

Do we need to pay
extra for it?

How can we measure
it?

•

How can I justify the
additional time?

•

How can I justify the
additional cost?

How do I know this will
add value?

Do we need it?
Isn’t that just common
sense?

The client’s bosses

•

What impact does this
have on the bottom line?

•

How much is it going to
cost me?

•

What return will it bring
compared to our other
initiatives?

•

Is this really a priority?
Don’t make it

a personal matter

www.flickr.com/photos/activars/6803363788
Addressing the challenges
The design team

“The suits”

Finance & board

The client

The client’s bosses

•

Make them
understand

•

Educate & make it easy
to explain

•

Educate & demonstrate
the value of UX

•

Explain & educate on
UX & the process

•

Demonstrate the value
of UX to the business

•

Show how you can
help

•

Help with estimates &
project plans

•

Be clear on how UX 

can be measured

•

Make them part of the
UX process

Give them numbers

•
•

Adjust and fit in

•

Equip them with
arguments & tools

•
•

Give them numbers

•

•
•

•

Make UX co-owned

•

Make them excited

Create excitement
around UX

•

Make UX co-owned

Explain limitations &
dependencies

Tie in with business
objectives & goals

•

Help them justify
costs & times

•

Make them look good

Tie in with business
objectives & goals

!
Involve & build shared 

understanding and ownership

IImage via Shutterstock
As well as 

give something tangible

IImage via Shutterstock
Time for the 

first exercise

www.flickr.com/photos/suttonhoo22/2070700035
01 HANDLING
CHALLENGES
Thinking back at your own experiences, discuss in groups the challenges that you
normally face and some ways to address them.
1. What are the challenges you come across the most?
2. How would you handle them (differently) based on what we’ve discussed today?

www.flickr.com/photos/pinkpurse/5355919491
Not enough budget

Brought in too late

Not included in
meetings

No budget
allocated

No direct contact
with the client

The company
doesn’t prioritise it

Not enough time allocated

Deliverables & timelines are
promised without consulting us
The client doesn’t
prioritise it
I just don’t know how
to make it tangible

The situations we 

may come across
www.flickr.com/photos/ansik/205993142
Some typical challenges
The design team

•
•
•

Erhmm…UX what?

•

How does this impact
my role?

•

Isn’t UX just common
sense?

•

Do we really need it?

What do you do?
How does this affect
me?

“The suits”

•

Finance & board

How does this impact
our process?

•

•

How much (more) does
it cost?

•

•

How does it impact
timings?

•

How do we incorporate
it into the project plan?

•
•

That sounds expensive

•

How can we sell it to
clients?

How can we justify the
cost?

The client
What is UX?

How much value will it
bring?

•
•
•

•

Will it be worth the
cost?

•

•

Do we need to pay
extra for it?

How can we measure
it?

•

How can I justify the
additional time?

•

How can I justify the
additional cost?

How do I know this will
add value?

Do we need it?
Isn’t that just common
sense?

The client’s bosses

•

What impact does this
have on the bottom line?

•

How much is it going to
cost me?

•

What return will it bring
compared to our other
initiatives?

•

Is this really a priority?
Addressing the challenges
The design team

“The suits”

Finance & board

The client

The client’s bosses

•

Make them
understand

•

Educate & make it easy
to explain

•

Educate & demonstrate
the value of UX

•

Explain & educate on
UX & the process

•

Demonstrate the value
of UX to the business

•

Show how you can
help

•

Help with estimates &
project plans

•

Be clear on how UX 

can be measured

•

Make them part of the
UX process

Give them numbers

•
•

Adjust and fit in

•

Equip them with
arguments & tools

•
•

Give them numbers

•

•
•

•

Make UX co-owned

•

Make them excited

Create excitement
around UX

•

Make UX co-owned

Explain limitations &
dependencies

Tie in with business
objectives & goals

•

Help them justify
costs & times

•

Make them look good

Tie in with business
objectives & goals

!
10 minutes

01 HANDLING
CHALLENGES

Thinking back at your own experiences, discuss in groups the challenges that you
normally face and some ways to address them.
1. What are the challenges you come across the most?
2. How would you handle them (differently) based on what we’ve discussed today?

www.flickr.com/photos/pinkpurse/5355919491
3. How to measure the
value & success of UCD
“ If you can’t measure it you can’t manage it.”
- Steve Fleming, HFI Connect


www.flickr.com/photos/jmsmith000/3169546564
What we do 

isn’t guess work

IImage via Shutterstock
Understanding 

the broader picture 


From Adaptive Path - The Anatomy of an Experience Map http://www.adaptivepath.com/ideas/the-anatomy-of-an-experience-map/
From Adaptive Path - The Anatomy of an Experience Map http://www.adaptivepath.com/ideas/the-anatomy-of-an-experience-map/
From UX lady - Experience maps, user journeys and more… www.ux-lady.com/experience-maps-user-journey-and-more-exp-map-layou
The site
knows me 

& what I 

want

Hygiene

Feel good

Delight

Identify key points for experience goals

Awareness

Consideration

Purchase

Post purchase
UX Matters ‘Communicating the UX Value Proposition - http://uxmag.com/articles/communicating-the-ux-value-proposition
Knowing if
Understanding why
Demonstrating how
Repeat or iterate
Measuring UX isn’t 

an exact science

IImage via Shutterstock
framework 

for measuring UX initiatives



+

mechanism 


for understanding & guiding where to apply it
Start of a project
During the design process
End of the design process
After the project
…and ongoing
Creating a UX metrics plan:	

1. Define your criteria
2. Define the method
3. Define the tools
Know what 

you can measure

Image via Shutterstock
Money earned
Money saved
Non-monetary results
Metrics we’ll look at

• Conversion rates
• Average revenue per customer
• Support costs
• User performance
• Net promoter score

www.flickr.com/photos/suttonhoo22/2070700035
01

Conversion rate 

What it is about

“ Conversion might measure the number of sales
on an ecommerce Web site in comparison to the
number of visits, the number of product requests
customers submit on a bank Web site, or the number
of new registrations for a paid service.”
- Yury Vetrov, UX Matters

How to Calculate the ROI of UX Using Metrics

www.flickr.com/photos/jmsmith000/3169546564
02

Average revenue per user 

What it is about

“ For both subscription-based applications and
services and those that use a freemium model and rely
on regular user participation, the average revenue per
user (ARPU) metric is highly important.”
- Yury Vetrov, UX Matters

How to Calculate the ROI of UX Using Metrics

www.flickr.com/photos/jmsmith000/3169546564
03

Support costs

What it is about

“ Any commercial product presents post-sales
liabilities to your clients. First among these is the cost
of providing support services.”
- Yury Vetrov, UX Matters

How to Calculate the ROI of UX Using Metrics

www.flickr.com/photos/jmsmith000/3169546564
04

User performance

What it is about

“ When users work with a product on a regular
basis and repeatedly perform the same operations day
after day, optimizing these operations is always
beneficial.”
- Yury Vetrov, UX Matters

How to Calculate the ROI of UX Using Metrics

www.flickr.com/photos/jmsmith000/3169546564
05

Net promoter score

What it is about

“ It is based on the fundamental premise that
customers can be divided into three groups Promoters, Passives, Detractors [and] empirical
research has shown that there is a striking correlation
between the customer grouping and actual behaviour
– repeat purchase and referral patters - over time.”
- Bernard Marr

A Single Measure of Business Success?
www.flickr.com/photos/jmsmith000/3169546564
5 mins break
02 UX VALUE
PROPOSITION
Your company are in discussions about doing a re-design of a big retail
website. The main objectives are to increase conversions (sales), provide a
customised experience, and decrease the number of customer support calls
and emails the company receives.
1. Using UX Matters’ framework, define and map the UX value proposition

www.flickr.com/photos/pinkpurse/5355919491
UX Matters ‘Communicating the UX Value Proposition - http://uxmag.com/articles/communicating-the-ux-value-proposition
From Adaptive Path - The Anatomy of an Experience Map http://www.adaptivepath.com/ideas/the-anatomy-of-an-experience-map/
From UX lady - Experience maps, user journeys and more… www.ux-lady.com/experience-maps-user-journey-and-more-exp-map-layou
The site
knows me 

& what I 

want

Hygiene

Feel good

Delight

Identify key points for experience goals

Awareness

Consideration

Purchase

Post purchase
20 minutes

02 UX VALUE
PROPOSITION

Your company are in discussions about doing a re-design of a big retail
website. The main objectives are to increase conversions (sales), provide a
customised experience, and decrease the number of customer support calls
and emails the company receives.
1. Using UX Matters framework, define and map the UX value proposition

www.flickr.com/photos/pinkpurse/5355919491
4. Defining a 

UX metrics plan
Creating a UX metrics plan:	

1. Define your criteria
2. Define the method
3. Define the tools
Money earned
Money saved
Non-monetary results
Metrics we’ll look at

• Conversion rates
• Average revenue per customer
• Support costs
• User performance
• Net promoter score

www.flickr.com/photos/suttonhoo22/2070700035
What it means
When to use it
How to use it
The good, the bad & how to validate it
Step 1: starting metric

Where you are now & what you’ll be comparing against






Step 2: target metric

What you need, or where you want to/ need get to

Step 3: validating & applying conversion rates

Understanding limitations, dependencies & influencing factors
01

Conversion rate 

What it is about

“ Conversion might measure the number of sales
on an ecommerce Web site in comparison to the
number of visits, the number of product requests
customers submit on a bank Web site, or the number
of new registrations for a paid service..”
- Yury Vetrov, UX Matters

How to Calculate the ROI of UX Using Metrics

www.flickr.com/photos/jmsmith000/3169546564
01

Conversion rate 

The formula

number of people who complete [task] / number of site
visitors * 100% = conversion rate (%)
!
01

Conversion rate 

What it requires

An understanding of:
1. The process you’re trying to measure e.g. the purchase
2. The actions a customer must take
3. Insights from analytics & data
4. Barriers and pain points in current flow
5. How UX initiatives can support or improve it
01

Conversion rate 

What it involves

Step 1: starting conversion rate 

The current conversion rate, or that of competitors







Step 2: target conversion rate

What you need, or where you want to/ need get to

Step 3: validating & applying conversion rates

Realistic & accurate numbers, Comparing against other costs &
ways to drive conversions, Other factors that may impact, Test
viable design options
02

Average revenue per user 

What it is about

“ For both subscription-based applications and
services and those that use a freemium model and rely
on regular user participation, the average revenue per
user (ARPU) metric is highly important.”
- Yury Vetrov, UX Matters

How to Calculate the ROI of UX Using Metrics

www.flickr.com/photos/jmsmith000/3169546564
02

Average revenue per user 

The formula

revenue from paid services / number of subscribing users =
ARPU (£) per month
02

Average revenue per user 

What it requires

An understanding of:
1. How customers are currently using the products
2. Their needs, behaviour, motivations & barriers (quantitative)
3. Analytics insights of current usage
4. Data on registered paying customers & total revenues
5. The business model & what impact changes would have
6. Design & UX changes that would lead to achieving your target
02

Average revenue per user 

What it involves

Step 1: starting ARPU

Define the standard time period e.g. month, average revenue
for that time period & average subscribers







Step 2: target ARPU

What you need, or where you want to get to & by when

Step 3: validating & applying ARPU

Gradual growth, Other business activities & initiatives that
impact ARPU, Customer satisfaction vs. increasing ARPU
02

Average revenue per user 

The formula

revenue from paid services / number of subscribing users =
ARPU (£) per month
!

(ARPU per month #1 * number of registered users in month
#1) + … + (ARPU per month ## * number of registered users
in month ##) = ARPU per year
03

Support costs

What it is about

“ Any commercial product presents post-sales
liabilities to your clients. First among these is the cost
of providing support services.”
- Yury Vetrov, UX Matters

How to Calculate the ROI of UX Using Metrics

www.flickr.com/photos/jmsmith000/3169546564
03

Support costs

The formula

total support expenses / number of registered users =
support cost per user (£)
03

Support costs 

What it requires

An understanding of:
1. Current support costs
2. Barriers or problem areas in the customer experience
3. Qualitative understanding of what lies behind it
4. Data & analytics of current support costs & usage
5. How UX and design initiatives can address these
6. Context of the savings
03

Support costs

What it involves

Step 1: starting support cost

Time frame & what support costs are per user at the moment







Step 2: target support cost

Where you need to get to, or the decrease you estimate UX
initiatives can result in

Step 3: validating & applying support costs

Time it will take (instant vs. gradual), Other parameters that
influence the need for support & support costs, Savings
compared to investments, Total savings over time
03

Support costs

The formula

total support expenses / number of registered users =
support cost per user (£)
!

decrease in support cost per user for activity #1 +
decrease in support cost per user for activity #2 = target
support cost per user (£)
!

(economy per month #1 * number of registered users in
month #1) + … + (economy per month ## * number of
registered users in month ##) = economy per year
04

User performance

What it is about

“ When users work with a product on a regular
basis and repeatedly perform the same operations day
after day, optimizing these operations is always
beneficial.”
- Yury Vetrov, UX Matters

How to Calculate the ROI of UX Using Metrics

www.flickr.com/photos/jmsmith000/3169546564
04

User performance

The formula

time to execute operation #1
!
04

User performance

What it requires

An understanding of:
1. Costs related to an employee
2. Understanding of carrying out the task & its context
3. Usability issues with carrying out the task
4. Technical or legal constraints for current task flow
5. Ripple effect implications
04

User performance

What it involves

Step 1: starting performance rate

Time to execute task, cost per time unit, e.g. minute







Step 2: target performance rate

What you need, or where you want to get to & by when

Step 3: validating & applying performance rate

Accurate average time calculations, Implication of achieving the
target, What’s required to achieve the target, Time frame
(instant vs. gradual ), Comparing against other initiatives
(savings vs. investment), External factors,
04

User performance

The formula
time to execute operation #1
!

employee cost per month / (hours per month * 60 minutes) =
cost (£) per minute of employees work
!

time to execute operation #1 * cost (£) per minute of employees
work = cost to execute task
!

cost of UX initiative / (number of employees * cost (£) per minute
of employees work) = time saving needed per month to cover cost
of UX initiative
05

Net promoter score

What it is about

“ It is based on the fundamental premise that
customers can be divided into three groups Promoters, Passives, Detractors [and] empirical
research has shown that there is a striking correlation
between the customer grouping and actual behaviour
– repeat purchase and referral patters - over time..”
- Bernard Marr

A Single Measure of Business Success?
www.flickr.com/photos/jmsmith000/3169546564
05

Net promoter score

The score

How likely is it that you would recommend [Company X] to
a friend or colleague? (1 - 9)

•
•
•

Promoters (score 9–10) = loyal enthusiasts who will keep buying and refer others,
fuelling growth.
Passives (score 7–8) = satisfied but unenthusiastic customers who are vulnerable to
competitive offerings.
Detractors (score 0–6) = unhappy customers who can damage your brand and impede
growth through negative word-of-mouth.
05

Net promoter score

What it requires

An understanding of:
1. Going beyond the numbers
2. Combining NPS with financials - customer profitability
3. Look further than existing customers
!
05

Net promoter score

What it involves

Step 1: starting NPS

Combining qualitative methods with quantitative







Step 2: target NPS

Based on business objectives or compared to competitors

Step 3: validating & applying NPS

Understanding what lies behind the score, Know what can move
a customer from one group to another, Combine with customer
profitability & other metrics, Look at non-customers
05

Net promoter score

The formula

% of promoters - % of detractors = Net Promoter Score
03 UX METRICS
PLAN
Your company has given a rough cost estimate for the re-design of the retail website
but the client struggles to justify the cost to his manager. Both you and the client
know the redesign is needed but the big boss needs numbers. 

Consider money earned, money saved and non-monetary results and how metrics
can support the objectives of the redesign.
1. How could metrics help justify the cost before the project begins?
2. What UX metrics would you recommend for the project as a whole?

When do you recommend using them and why?
www.flickr.com/photos/pinkpurse/5355919491
Metrics we’ll look at

• Conversion rates
• Average revenue per customer
• Support costs
• User performance
• Net promoter score

www.flickr.com/photos/suttonhoo22/2070700035
Step 1: starting metric

Where you are now & what you’ll be comparing against






Step 2: target metric

What you need, or where you want to/ need get to

Step 3: validating & applying conversion rates

Understanding limitations, dependencies & influencing factors
20 minutes

03 UX METRICS
PLAN

Your company has given a rough cost estimate for the re-design of the retail website
but the client struggles to justify the cost to his manager. Both you and the client
know the redesign is needed but the big boss needs numbers. 

Consider money earned, money saved and non-monetary results and how metrics
can support the objectives of the redesign.
1. How could metrics help justify the cost before the project begins?
2. What UX metrics would you recommend for the project as a whole?

When do you recommend using them and why?
www.flickr.com/photos/pinkpurse/5355919491
04 Conversion
rate

10 minutes

We know the re-design of purchase flow on it own is going to cost £10,000.
- 10 out of 100 customers currently convert

- An average basket size is £40

- There are 10,000 visitors per day

- They want to increase revenues to £10,000 per day
1. Based on a realistic target conversion rate how many new customers would the
client need to make up the cost?
2. How long would it take to reach this goal?

www.flickr.com/photos/pinkpurse/5355919491
Conversion rate 

The formula

number of people who complete [task] / number of site
visitors * 100% = conversion (%)
!
A few

final words...

www.flickr.com/photos/martinteschner/4569495912
Measuring UX isn’t 

an exact science

IImage via Shutterstock
It needs to be seen in
conjunction with insights…

IImage via Shutterstock
…the experience 

& business as a whole 


From Adaptive Path - The Anatomy of an Experience Map http://www.adaptivepath.com/ideas/the-anatomy-of-an-experience-map/
The site
knows me 

& what I 

want

Delight

Identify key points for experience goals

Hygiene

Feel good

…& tied with 

experience goals & business objectives 


Awareness

Consideration

Purchase

Post purchase
Understanding those we work with & 

how we communicate with them go a long way

Image via Shutterstock
If clients (or someone else) don’t get it,

there is generally something to be improved in
how we work with them & present our work

www.flickr.com/photos/martinteschner/4569495912
Any questions?

www.flickr.com/photos/perolofforsberg/6691744587
Thank you
@annadahlstrom | anna.dahlstrom@gmail.com
www.annadahlstrom.com

Selling UCD: Getting buy-in and measuring the value of UX

  • 1.
    Selling UCD ! ! Getting buy-in& measuring the value of UX by Anna Dahlström | @annadahlstrom
 London, 26 Feb 2014 www.flickr.com/photos/jmsmith000/3169546564
  • 2.
    Just to beclear… 
 this workshop is not about selling www.flickr.com/photos/triciawang/2776264432/sizes/l/in/photostream/
  • 3.
    It’s about communication,collaboration & tangible ways to demonstrate + measure the value of UX Image via Shutterstock
  • 4.
    We all knowthat 
 what we do adds value… www.flickr.com/photos/31878512@N06/4623931527
  • 5.
    We recommend 
 anapproach & what to do Image via Shutterstock
  • 6.
    Convincing others isn’t
 always that easy www.flickr.com/photos/torbein/5121357362
  • 7.
    Not enough budget Broughtin too late Not included in meetings No budget allocated No direct contact with the client The company doesn’t prioritise it Not enough time allocated Deliverables & timelines are promised without consulting us The client doesn’t prioritise it I just don’t know how to make it tangible The situations we 
 may come across www.flickr.com/photos/ansik/205993142
  • 8.
    “ It willcreate a better user experience and make customers happier.” - Said by many UX people lost for words & tools to explain & demonstrate the value of UX
 www.flickr.com/photos/jmsmith000/3169546564
  • 9.
    Not enough budget Broughtin too late Not included in meetings No budget allocated No direct contact with the client The company doesn’t prioritise it Not enough time allocated Deliverables & timelines are promised without consulting us The client doesn’t prioritise it I just don’t know how to make it tangible …and we’re back 
 where we started www.flickr.com/photos/ansik/205993142
  • 10.
    Tonight’s agenda 1. Gettingbuy-in & why it matters 2. Approaches for getting buy-in
 Exercise
 Break 3. How to measure the value & success of UCD
 Exercise 4. Defining a UX metrics plan
 Exercise 5. Q & A
  • 11.
    1. Getting buy-in
 & why it matters
  • 12.
    “ Any companythat has not yet realised making the customer successful is the key to profit and survival is either delusional or on its way out of business.” - Greg Nudelman,
 UXmatters article ‘Experience Partners: Giving Center Stage to Customer Delight’ 
 www.flickr.com/photos/jmsmith000/3169546564
  • 13.
    But using ourlingo 
 doesn’t cut it Created using Wordle
  • 14.
    “ You needto understand where your peers in other disciplines are coming from and communicate the message of UX to them in terms they can understand.” - Pabini Gabriel-Petit, UX Matters www.flickr.com/photos/jmsmith000/3169546564
  • 15.
    Who we workwith The design team “The suits” Our closest allies who we’ll be doing the work with In charge of budgets, timings, internal & client relationships Finance & board The client The client’s bosses The actual Our closest point The ones who in decision makers 
 of contact & key the end make the with the key to stakeholder decision & allocate the budget the budget
  • 16.
    Some typical challenges Thedesign team • • • Erhmm…UX what? • How does this impact my role? • Isn’t UX just common sense? • Do we really need it? What do you do? How does this affect me? “The suits” • Finance & board How does this impact our process? • • How much (more) does it cost? • • How does it impact timings? • How do we incorporate it into the project plan? • • That sounds expensive • How can we sell it to clients? How can we justify the cost? The client What is UX? How much value will it bring? • • • • Will it be worth the cost? • • Do we need to pay extra for it? How can we measure it? • How can I justify the additional time? • How can I justify the additional cost? How do I know this will add value? Do we need it? Isn’t that just common sense? The client’s bosses • What impact does this have on the bottom line? • How much is it going to cost me? • What return will it bring compared to our other initiatives? • Is this really a priority?
  • 17.
    Challenges • • • • • • • Not understanding UX- what it is, how you work with it and what it brings Not knowing when to involve UX people Not knowing where UX fits in the company process Seeing UX as an after thought Not allowing enough time or seeing the need to allocate time for UX activities Not seeing the need to spend budget on UX activities Not having clear data or reasons behind decision making Opportunities • • • • • • • Create co-ownership & excitement around UX Being invited to & involved in meetings Integrating UCD into the process and company Being involved from the start Ensuring the time & resources that are needed are given to you Ensuring clients approve budgets and proposed project outlines Help with prioritisation & design decisions as well as supporting ongoing iterations
  • 18.
    2. Approaches for
 getting buy-in for UCD
  • 19.
    How 
 depends onwho we work with
  • 20.
    In the idealworld UX is embraced throughout the organisation www.flickr.com/photos/vpickering/7760186786
  • 21.
    In many places
 we’renot there yet www.flickr.com/photos/vpickering/9435527831
  • 22.
    We need toassess the UX readiness 
 of organisations & individuals www.flickr.com/photos/lendingmemo/11746255104
  • 23.
    9 questions toassess UX readiness 1. How are products designed and developed today? Where can UX integrate? 2. What is the company vision? Does it use the right words that make it receptive to a UX sell? 3. Who is working on design today? Where does it sit in the organization and who owns it? 4. Is there anyone at the strategic level championing UX currently? 5. Is there anyone at the product or project level championing UX currently? 6. What are their high profile products and services? What are they doing well? How could UX help? What UX learnings are there? How could you use these as stories that tell why UX is a good thing? 7. How can you help teams work better toward meeting a UX vision? 8. What does the company know about their customers today? How do they know it? How can you help them learn more? How can you compliment their current understanding? 9. What type of culture exists now? Is the organization engineering-centric, design-centric, sales-and-marketing-centric, or something else? - By Paul Sherman, Daniel Szuc, and John Rhodes, UX Matters: Evangelizing UX Across an Entire Organization
  • 24.
    Directive 
 we takethe leadership role & make decisions
 
 vs Collaborative 
 we advise & provide guidance but don’t decide
  • 25.
    UX maturity 
 affectsleadership style Image via Shutterstock
  • 26.
    Directive 
 we takethe leadership role & make decisions
 
 plus Collaborative 
 we advise & provide guidance but don’t decide
  • 27.
    “ You needto understand where your peers in other disciplines are coming from and communicate the message of UX to them in terms they can understand.” - Pabini Gabriel-Petit, UX Matters
 www.flickr.com/photos/jmsmith000/3169546564
  • 28.
    Some typical challenges Thedesign team • • • Erhmm…UX what? • How does this impact my role? • Isn’t UX just common sense? • Do we really need it? What do you do? How does this affect me? “The suits” • Finance & board How does this impact our process? • • How much (more) does it cost? • • How does it impact timings? • How do we incorporate it into the project plan? • • That sounds expensive • How can we sell it to clients? How can we justify the cost? The client What is UX? How much value will it bring? • • • • Will it be worth the cost? • • Do we need to pay extra for it? How can we measure it? • How can I justify the additional time? • How can I justify the additional cost? How do I know this will add value? Do we need it? Isn’t that just common sense? The client’s bosses • What impact does this have on the bottom line? • How much is it going to cost me? • What return will it bring compared to our other initiatives? • Is this really a priority?
  • 29.
    Don’t make it
 apersonal matter www.flickr.com/photos/activars/6803363788
  • 30.
    Addressing the challenges Thedesign team “The suits” Finance & board The client The client’s bosses • Make them understand • Educate & make it easy to explain • Educate & demonstrate the value of UX • Explain & educate on UX & the process • Demonstrate the value of UX to the business • Show how you can help • Help with estimates & project plans • Be clear on how UX 
 can be measured • Make them part of the UX process Give them numbers • • Adjust and fit in • Equip them with arguments & tools • • Give them numbers • • • • Make UX co-owned • Make them excited Create excitement around UX • Make UX co-owned Explain limitations & dependencies Tie in with business objectives & goals • Help them justify costs & times • Make them look good Tie in with business objectives & goals !
  • 31.
    Involve & buildshared 
 understanding and ownership IImage via Shutterstock
  • 32.
    As well as
 give something tangible IImage via Shutterstock
  • 33.
    Time for the
 first exercise www.flickr.com/photos/suttonhoo22/2070700035
  • 34.
    01 HANDLING CHALLENGES Thinking backat your own experiences, discuss in groups the challenges that you normally face and some ways to address them. 1. What are the challenges you come across the most? 2. How would you handle them (differently) based on what we’ve discussed today? www.flickr.com/photos/pinkpurse/5355919491
  • 35.
    Not enough budget Broughtin too late Not included in meetings No budget allocated No direct contact with the client The company doesn’t prioritise it Not enough time allocated Deliverables & timelines are promised without consulting us The client doesn’t prioritise it I just don’t know how to make it tangible The situations we 
 may come across www.flickr.com/photos/ansik/205993142
  • 36.
    Some typical challenges Thedesign team • • • Erhmm…UX what? • How does this impact my role? • Isn’t UX just common sense? • Do we really need it? What do you do? How does this affect me? “The suits” • Finance & board How does this impact our process? • • How much (more) does it cost? • • How does it impact timings? • How do we incorporate it into the project plan? • • That sounds expensive • How can we sell it to clients? How can we justify the cost? The client What is UX? How much value will it bring? • • • • Will it be worth the cost? • • Do we need to pay extra for it? How can we measure it? • How can I justify the additional time? • How can I justify the additional cost? How do I know this will add value? Do we need it? Isn’t that just common sense? The client’s bosses • What impact does this have on the bottom line? • How much is it going to cost me? • What return will it bring compared to our other initiatives? • Is this really a priority?
  • 37.
    Addressing the challenges Thedesign team “The suits” Finance & board The client The client’s bosses • Make them understand • Educate & make it easy to explain • Educate & demonstrate the value of UX • Explain & educate on UX & the process • Demonstrate the value of UX to the business • Show how you can help • Help with estimates & project plans • Be clear on how UX 
 can be measured • Make them part of the UX process Give them numbers • • Adjust and fit in • Equip them with arguments & tools • • Give them numbers • • • • Make UX co-owned • Make them excited Create excitement around UX • Make UX co-owned Explain limitations & dependencies Tie in with business objectives & goals • Help them justify costs & times • Make them look good Tie in with business objectives & goals !
  • 38.
    10 minutes 01 HANDLING CHALLENGES Thinkingback at your own experiences, discuss in groups the challenges that you normally face and some ways to address them. 1. What are the challenges you come across the most? 2. How would you handle them (differently) based on what we’ve discussed today? www.flickr.com/photos/pinkpurse/5355919491
  • 39.
    3. How tomeasure the value & success of UCD
  • 40.
    “ If youcan’t measure it you can’t manage it.” - Steve Fleming, HFI Connect
 www.flickr.com/photos/jmsmith000/3169546564
  • 41.
    What we do
 isn’t guess work IImage via Shutterstock
  • 42.
    Understanding 
 the broaderpicture 
 From Adaptive Path - The Anatomy of an Experience Map http://www.adaptivepath.com/ideas/the-anatomy-of-an-experience-map/
  • 43.
    From Adaptive Path- The Anatomy of an Experience Map http://www.adaptivepath.com/ideas/the-anatomy-of-an-experience-map/
  • 44.
    From UX lady- Experience maps, user journeys and more… www.ux-lady.com/experience-maps-user-journey-and-more-exp-map-layou
  • 45.
    The site knows me
 & what I 
 want Hygiene Feel good Delight Identify key points for experience goals Awareness Consideration Purchase Post purchase
  • 46.
    UX Matters ‘Communicatingthe UX Value Proposition - http://uxmag.com/articles/communicating-the-ux-value-proposition
  • 47.
  • 48.
    Measuring UX isn’t
 an exact science IImage via Shutterstock
  • 49.
    framework 
 for measuringUX initiatives
 
 + mechanism 
 for understanding & guiding where to apply it
  • 50.
    Start of aproject During the design process End of the design process After the project …and ongoing
  • 51.
    Creating a UXmetrics plan: 1. Define your criteria 2. Define the method 3. Define the tools
  • 52.
    Know what 
 youcan measure Image via Shutterstock
  • 53.
  • 54.
    Metrics we’ll lookat • Conversion rates • Average revenue per customer • Support costs • User performance • Net promoter score www.flickr.com/photos/suttonhoo22/2070700035
  • 55.
    01 Conversion rate 
 Whatit is about “ Conversion might measure the number of sales on an ecommerce Web site in comparison to the number of visits, the number of product requests customers submit on a bank Web site, or the number of new registrations for a paid service.” - Yury Vetrov, UX Matters
 How to Calculate the ROI of UX Using Metrics www.flickr.com/photos/jmsmith000/3169546564
  • 56.
    02 Average revenue peruser 
 What it is about “ For both subscription-based applications and services and those that use a freemium model and rely on regular user participation, the average revenue per user (ARPU) metric is highly important.” - Yury Vetrov, UX Matters
 How to Calculate the ROI of UX Using Metrics www.flickr.com/photos/jmsmith000/3169546564
  • 57.
    03 Support costs
 What itis about “ Any commercial product presents post-sales liabilities to your clients. First among these is the cost of providing support services.” - Yury Vetrov, UX Matters
 How to Calculate the ROI of UX Using Metrics www.flickr.com/photos/jmsmith000/3169546564
  • 58.
    04 User performance
 What itis about “ When users work with a product on a regular basis and repeatedly perform the same operations day after day, optimizing these operations is always beneficial.” - Yury Vetrov, UX Matters
 How to Calculate the ROI of UX Using Metrics www.flickr.com/photos/jmsmith000/3169546564
  • 59.
    05 Net promoter score
 Whatit is about “ It is based on the fundamental premise that customers can be divided into three groups Promoters, Passives, Detractors [and] empirical research has shown that there is a striking correlation between the customer grouping and actual behaviour – repeat purchase and referral patters - over time.” - Bernard Marr
 A Single Measure of Business Success? www.flickr.com/photos/jmsmith000/3169546564
  • 60.
  • 61.
    02 UX VALUE PROPOSITION Yourcompany are in discussions about doing a re-design of a big retail website. The main objectives are to increase conversions (sales), provide a customised experience, and decrease the number of customer support calls and emails the company receives. 1. Using UX Matters’ framework, define and map the UX value proposition www.flickr.com/photos/pinkpurse/5355919491
  • 62.
    UX Matters ‘Communicatingthe UX Value Proposition - http://uxmag.com/articles/communicating-the-ux-value-proposition
  • 63.
    From Adaptive Path- The Anatomy of an Experience Map http://www.adaptivepath.com/ideas/the-anatomy-of-an-experience-map/
  • 64.
    From UX lady- Experience maps, user journeys and more… www.ux-lady.com/experience-maps-user-journey-and-more-exp-map-layou
  • 65.
    The site knows me
 & what I 
 want Hygiene Feel good Delight Identify key points for experience goals Awareness Consideration Purchase Post purchase
  • 66.
    20 minutes 02 UXVALUE PROPOSITION Your company are in discussions about doing a re-design of a big retail website. The main objectives are to increase conversions (sales), provide a customised experience, and decrease the number of customer support calls and emails the company receives. 1. Using UX Matters framework, define and map the UX value proposition www.flickr.com/photos/pinkpurse/5355919491
  • 67.
    4. Defining a
 UX metrics plan
  • 68.
    Creating a UXmetrics plan: 1. Define your criteria 2. Define the method 3. Define the tools
  • 69.
  • 70.
    Metrics we’ll lookat • Conversion rates • Average revenue per customer • Support costs • User performance • Net promoter score www.flickr.com/photos/suttonhoo22/2070700035
  • 71.
    What it means Whento use it How to use it The good, the bad & how to validate it
  • 72.
    Step 1: startingmetric
 Where you are now & what you’ll be comparing against
 
 
 Step 2: target metric
 What you need, or where you want to/ need get to
 Step 3: validating & applying conversion rates
 Understanding limitations, dependencies & influencing factors
  • 73.
    01 Conversion rate 
 Whatit is about “ Conversion might measure the number of sales on an ecommerce Web site in comparison to the number of visits, the number of product requests customers submit on a bank Web site, or the number of new registrations for a paid service..” - Yury Vetrov, UX Matters
 How to Calculate the ROI of UX Using Metrics www.flickr.com/photos/jmsmith000/3169546564
  • 74.
    01 Conversion rate 
 Theformula number of people who complete [task] / number of site visitors * 100% = conversion rate (%) !
  • 75.
    01 Conversion rate 
 Whatit requires An understanding of: 1. The process you’re trying to measure e.g. the purchase 2. The actions a customer must take 3. Insights from analytics & data 4. Barriers and pain points in current flow 5. How UX initiatives can support or improve it
  • 76.
    01 Conversion rate 
 Whatit involves Step 1: starting conversion rate 
 The current conversion rate, or that of competitors
 
 
 Step 2: target conversion rate
 What you need, or where you want to/ need get to
 Step 3: validating & applying conversion rates
 Realistic & accurate numbers, Comparing against other costs & ways to drive conversions, Other factors that may impact, Test viable design options
  • 77.
    02 Average revenue peruser 
 What it is about “ For both subscription-based applications and services and those that use a freemium model and rely on regular user participation, the average revenue per user (ARPU) metric is highly important.” - Yury Vetrov, UX Matters
 How to Calculate the ROI of UX Using Metrics www.flickr.com/photos/jmsmith000/3169546564
  • 78.
    02 Average revenue peruser 
 The formula revenue from paid services / number of subscribing users = ARPU (£) per month
  • 79.
    02 Average revenue peruser 
 What it requires An understanding of: 1. How customers are currently using the products 2. Their needs, behaviour, motivations & barriers (quantitative) 3. Analytics insights of current usage 4. Data on registered paying customers & total revenues 5. The business model & what impact changes would have 6. Design & UX changes that would lead to achieving your target
  • 80.
    02 Average revenue peruser 
 What it involves Step 1: starting ARPU
 Define the standard time period e.g. month, average revenue for that time period & average subscribers
 
 
 Step 2: target ARPU
 What you need, or where you want to get to & by when
 Step 3: validating & applying ARPU
 Gradual growth, Other business activities & initiatives that impact ARPU, Customer satisfaction vs. increasing ARPU
  • 81.
    02 Average revenue peruser 
 The formula revenue from paid services / number of subscribing users = ARPU (£) per month ! (ARPU per month #1 * number of registered users in month #1) + … + (ARPU per month ## * number of registered users in month ##) = ARPU per year
  • 82.
    03 Support costs
 What itis about “ Any commercial product presents post-sales liabilities to your clients. First among these is the cost of providing support services.” - Yury Vetrov, UX Matters
 How to Calculate the ROI of UX Using Metrics www.flickr.com/photos/jmsmith000/3169546564
  • 83.
    03 Support costs
 The formula totalsupport expenses / number of registered users = support cost per user (£)
  • 84.
    03 Support costs 
 Whatit requires An understanding of: 1. Current support costs 2. Barriers or problem areas in the customer experience 3. Qualitative understanding of what lies behind it 4. Data & analytics of current support costs & usage 5. How UX and design initiatives can address these 6. Context of the savings
  • 85.
    03 Support costs
 What itinvolves Step 1: starting support cost
 Time frame & what support costs are per user at the moment
 
 
 Step 2: target support cost
 Where you need to get to, or the decrease you estimate UX initiatives can result in
 Step 3: validating & applying support costs
 Time it will take (instant vs. gradual), Other parameters that influence the need for support & support costs, Savings compared to investments, Total savings over time
  • 86.
    03 Support costs
 The formula totalsupport expenses / number of registered users = support cost per user (£) ! decrease in support cost per user for activity #1 + decrease in support cost per user for activity #2 = target support cost per user (£) ! (economy per month #1 * number of registered users in month #1) + … + (economy per month ## * number of registered users in month ##) = economy per year
  • 87.
    04 User performance
 What itis about “ When users work with a product on a regular basis and repeatedly perform the same operations day after day, optimizing these operations is always beneficial.” - Yury Vetrov, UX Matters
 How to Calculate the ROI of UX Using Metrics www.flickr.com/photos/jmsmith000/3169546564
  • 88.
    04 User performance
 The formula timeto execute operation #1 !
  • 89.
    04 User performance
 What itrequires An understanding of: 1. Costs related to an employee 2. Understanding of carrying out the task & its context 3. Usability issues with carrying out the task 4. Technical or legal constraints for current task flow 5. Ripple effect implications
  • 90.
    04 User performance
 What itinvolves Step 1: starting performance rate
 Time to execute task, cost per time unit, e.g. minute
 
 
 Step 2: target performance rate
 What you need, or where you want to get to & by when
 Step 3: validating & applying performance rate
 Accurate average time calculations, Implication of achieving the target, What’s required to achieve the target, Time frame (instant vs. gradual ), Comparing against other initiatives (savings vs. investment), External factors,
  • 91.
    04 User performance
 The formula timeto execute operation #1 ! employee cost per month / (hours per month * 60 minutes) = cost (£) per minute of employees work ! time to execute operation #1 * cost (£) per minute of employees work = cost to execute task ! cost of UX initiative / (number of employees * cost (£) per minute of employees work) = time saving needed per month to cover cost of UX initiative
  • 92.
    05 Net promoter score
 Whatit is about “ It is based on the fundamental premise that customers can be divided into three groups Promoters, Passives, Detractors [and] empirical research has shown that there is a striking correlation between the customer grouping and actual behaviour – repeat purchase and referral patters - over time..” - Bernard Marr
 A Single Measure of Business Success? www.flickr.com/photos/jmsmith000/3169546564
  • 93.
    05 Net promoter score
 Thescore How likely is it that you would recommend [Company X] to a friend or colleague? (1 - 9) • • • Promoters (score 9–10) = loyal enthusiasts who will keep buying and refer others, fuelling growth. Passives (score 7–8) = satisfied but unenthusiastic customers who are vulnerable to competitive offerings. Detractors (score 0–6) = unhappy customers who can damage your brand and impede growth through negative word-of-mouth.
  • 94.
    05 Net promoter score
 Whatit requires An understanding of: 1. Going beyond the numbers 2. Combining NPS with financials - customer profitability 3. Look further than existing customers !
  • 95.
    05 Net promoter score
 Whatit involves Step 1: starting NPS
 Combining qualitative methods with quantitative
 
 
 Step 2: target NPS
 Based on business objectives or compared to competitors
 Step 3: validating & applying NPS
 Understanding what lies behind the score, Know what can move a customer from one group to another, Combine with customer profitability & other metrics, Look at non-customers
  • 96.
    05 Net promoter score
 Theformula % of promoters - % of detractors = Net Promoter Score
  • 97.
    03 UX METRICS PLAN Yourcompany has given a rough cost estimate for the re-design of the retail website but the client struggles to justify the cost to his manager. Both you and the client know the redesign is needed but the big boss needs numbers. 
 Consider money earned, money saved and non-monetary results and how metrics can support the objectives of the redesign. 1. How could metrics help justify the cost before the project begins? 2. What UX metrics would you recommend for the project as a whole?
 When do you recommend using them and why? www.flickr.com/photos/pinkpurse/5355919491
  • 98.
    Metrics we’ll lookat • Conversion rates • Average revenue per customer • Support costs • User performance • Net promoter score www.flickr.com/photos/suttonhoo22/2070700035
  • 99.
    Step 1: startingmetric
 Where you are now & what you’ll be comparing against
 
 
 Step 2: target metric
 What you need, or where you want to/ need get to
 Step 3: validating & applying conversion rates
 Understanding limitations, dependencies & influencing factors
  • 100.
    20 minutes 03 UXMETRICS PLAN Your company has given a rough cost estimate for the re-design of the retail website but the client struggles to justify the cost to his manager. Both you and the client know the redesign is needed but the big boss needs numbers. 
 Consider money earned, money saved and non-monetary results and how metrics can support the objectives of the redesign. 1. How could metrics help justify the cost before the project begins? 2. What UX metrics would you recommend for the project as a whole?
 When do you recommend using them and why? www.flickr.com/photos/pinkpurse/5355919491
  • 101.
    04 Conversion rate 10 minutes Weknow the re-design of purchase flow on it own is going to cost £10,000. - 10 out of 100 customers currently convert
 - An average basket size is £40
 - There are 10,000 visitors per day
 - They want to increase revenues to £10,000 per day 1. Based on a realistic target conversion rate how many new customers would the client need to make up the cost? 2. How long would it take to reach this goal? www.flickr.com/photos/pinkpurse/5355919491
  • 102.
    Conversion rate 
 Theformula number of people who complete [task] / number of site visitors * 100% = conversion (%) !
  • 103.
  • 104.
    Measuring UX isn’t
 an exact science IImage via Shutterstock
  • 105.
    It needs tobe seen in conjunction with insights… IImage via Shutterstock
  • 106.
    …the experience 
 &business as a whole 
 From Adaptive Path - The Anatomy of an Experience Map http://www.adaptivepath.com/ideas/the-anatomy-of-an-experience-map/
  • 107.
    The site knows me
 & what I 
 want Delight Identify key points for experience goals Hygiene Feel good …& tied with 
 experience goals & business objectives 
 Awareness Consideration Purchase Post purchase
  • 108.
    Understanding those wework with & 
 how we communicate with them go a long way Image via Shutterstock
  • 109.
    If clients (orsomeone else) don’t get it,
 there is generally something to be improved in how we work with them & present our work www.flickr.com/photos/martinteschner/4569495912
  • 110.
  • 111.
    Thank you @annadahlstrom |anna.dahlstrom@gmail.com www.annadahlstrom.com