LNG feasibility study
Retrofitting to meet new ECA requirements
© Det Norske Veritas AS. All rights reserved.
LNG feasibility study
20-06-2013
Ship owners must respond to gradually stricter regulations to
stay in business, while dedicated ECAs are introduced
2
2010: Sulphur < 1.0%
2015: Sulphur < 0.1%
ECA SOX REQUIREMENTS
Build after 2016: NOX Tier III, -80%
ECA NOX REQUIREMENTS
2020 / 2025*: SOX < 0.5%
Build after 2011: NOX Tier II, -20%
* Date TBD pending 2018 review
– but 2020 will apply in EU waters
GLOBAL REQUIREMENTS
© Det Norske Veritas AS. All rights reserved.
LNG feasibility study
20-06-2013
There are currently 74 confirmed LNG fuelled ship projects
globally
3
Updated 15.04.2013
Excluding LNG carriers and inland waterway vessels
© Det Norske Veritas AS. All rights reserved.
LNG feasibility study
20-06-2013
LNG consumption in Norway from 2004 - 2017
4
Kilde: NOx-fondet
© Det Norske Veritas AS. All rights reserved.
LNG feasibility study
20-06-2013
Status for the Norwegian LNG market
5
74%
19%
7%
Drivstoff solgt i Norge til
maritimt bruk 2011*
*Målt per energimengde
63%
13%
24%
Drivstoff forventet solgt i Norge
til maritimt bruk 2016*
MGO/MDO
HFO
LNG
Barents
Naturgass
5 %
Gasnor
50 %
Skangass
20 %
Skagerak
Naturgass
3 %
Naturgass Møre
3 %
AGA
3 %
Leverandør ikke
avklart
16 %
Suppliers of LNG in Norway from 2016
Kilde: NOx-fondet
© Det Norske Veritas AS. All rights reserved.
LNG feasibility study
20-06-2013
6
LNG?
SCRUBBER?
MGO?
© Det Norske Veritas AS. All rights reserved.
LNG feasibility study
20-06-2013
DNV has assessed the financial attractiveness and technical
risks of available ECA compliance measures for the case ship
7
The case ship
1. Switching to low sulphur fuel
2. Installing a scrubber system
3. Converting to Dual Fuel engines and
installing LNG tanks
Evaluated solutions
 LOA: 130-150 m
 Ship type: Container ship
 Cargo capacity: 700-900 TEU
© Det Norske Veritas AS. All rights reserved.
LNG feasibility study
20-06-2013
The total cost of DF conversion for the case ship is estimated
to $6,5 - 8,3 million
8
Cost estimate for DF configuration with 300 m3 LNG tank
Cost estimate for DF configuration with 600 m3 LNG tank
6.5
2.5
2.6
1.4
0 1 2 3 4 5 6 7
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Main engine DF conversion
LNG tank + gas equipment
Yard cost
TOTAL COSTS
Costs [MUSD]
8.3
3.0
3.9
1.4
0 1 2 3 4 5 6 7 8 9
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Main engine DF conversion
LNG tank + gas equipment
Yard cost
TOTAL COSTS
Costs [MUSD]
© Det Norske Veritas AS. All rights reserved.
LNG feasibility study
20-06-2013
Cumulated costs for 55% ECA operation
9
-$5
$0
$5
$10
$15
$20
2015 2020 2025 2030
Cumulative Total Cost [MUSD] compared to baseline with HFO
Baseline (HFO)
Realcosts[2012MUSD]
ENGINE AND OPERATION
Emission compliance ECASOX
Time in ECA 55%
Installed power ca. 8 000 kW
Baseline HFO
FINANCIAL
Discount rate 8%
Investment decision Retrofit
Tax regime None
FUEL PRICE
HFO 2012 Europe level
MGO 2012 Europe level
LNG
HFO equivalent and
2012 European gas
+ distribution cost
© Det Norske Veritas AS. All rights reserved.
LNG feasibility study
20-06-2013
Cumulated costs for 55% ECA operation
10
-$5
$0
$5
$10
$15
$20
2015 2020 2025 2030
Cumulative Total Cost [MUSD] compared to baseline with HFO
Fuel Switch
Baseline (HFO)
Realcosts[2012MUSD]
ENGINE AND OPERATION
Emission compliance ECASOX
Time in ECA 55%
Installed power ca. 8 000 kW
Baseline HFO
FINANCIAL
Discount rate 8%
Investment decision Retrofit
Tax regime None
FUEL PRICE
HFO 2012 Europe level
MGO 2012 Europe level
LNG
HFO equivalent and
2012 European gas
+ distribution cost
© Det Norske Veritas AS. All rights reserved.
LNG feasibility study
20-06-2013
Cumulated costs for 55% ECA operation
11
-$5
$0
$5
$10
$15
$20
2015 2020 2025 2030
Cumulative Total Cost [MUSD] compared to baseline with HFO
Fuel Switch
Scrubber
Baseline (HFO)
Realcosts[2012MUSD]
ENGINE AND OPERATION
Emission compliance ECASOX
Time in ECA 55%
Installed power ca. 8 000 kW
Baseline HFO
FINANCIAL
Discount rate 8%
Investment decision Retrofit
Tax regime None
FUEL PRICE
HFO 2012 Europe level
MGO 2012 Europe level
LNG
HFO equivalent and
2012 European gas
+ distribution cost
© Det Norske Veritas AS. All rights reserved.
LNG feasibility study
20-06-2013
Cumulated costs for 55% ECA operation
12
-$5
$0
$5
$10
$15
$20
2015 2020 2025 2030
Cumulative Total Cost [MUSD] compared to baseline with HFO
Fuel Switch
Scrubber
LNG High price w/600 m3 tank
Baseline (HFO)
Realcosts[2012MUSD]
LNG reference price w/600 m3 tank
ENGINE AND OPERATION
Emission compliance ECASOX
Time in ECA 55%
Installed power ca. 8 000 kW
Baseline HFO
FINANCIAL
Discount rate 8%
Investment decision Retrofit
Tax regime None
FUEL PRICE
HFO 2012 Europe level
MGO 2012 Europe level
LNG
HFO equivalent and
2012 European gas
+ distribution cost
© Det Norske Veritas AS. All rights reserved.
LNG feasibility study
20-06-2013
Cumulated costs for 55% ECA operation
13
-$5
$0
$5
$10
$15
$20
2015 2020 2025 2030
Cumulative Total Cost [MUSD] compared to baseline with HFO
Fuel Switch
Scrubber
LNG High price w/600 m3 tank
Baseline (HFO)
Realcosts[2012MUSD]
LNG reference price w/600 m3 tank
LNG High price w/300 m3 tank
LNG reference price w/300 m3 tank
ENGINE AND OPERATION
Emission compliance ECASOX
Time in ECA 55%
Installed power ca. 8 000 kW
Baseline HFO
FINANCIAL
Discount rate 8%
Investment decision Retrofit
Tax regime None
FUEL PRICE
HFO 2012 Europe level
MGO 2012 Europe level
LNG
HFO equivalent and
2012 European gas
+ distribution cost
© Det Norske Veritas AS. All rights reserved.
LNG feasibility study
20-06-2013
Cumulated costs for 100% ECA operation
14
-$5
$0
$5
$10
$15
$20
2015 2020 2025 2030
Cumulative Total Cost [MUSD] compared to baseline with HFO
Fuel Switch
Scrubber
LNG High price w/600 m3 tank
Baseline (HFO)
Realcosts[2012MUSD]
LNG reference price w/600 m3 tank
LNG High price w/300 m3 tank
LNG reference price w/300 m3 tank
ENGINE AND OPERATION
Emission compliance ECASOX
Time in ECA 100%
Installed power ca. 8 000 kW
Baseline HFO
FINANCIAL
Discount rate 8%
Investment decision Retrofit
Tax regime None
FUEL PRICE
HFO 2012 Europe level
MGO 2012 Europe level
LNG
HFO equivalent and
2012 European gas
+ distribution cost
© Det Norske Veritas AS. All rights reserved.
LNG feasibility study
20-06-2013
Safeguarding life, property
and the environment
www.dnv.com
15

More Related Content

What's hot

Future of Alternative Fuels in WI Showcase - Kwik Trip Presentation
Future of Alternative Fuels in WI Showcase - Kwik Trip PresentationFuture of Alternative Fuels in WI Showcase - Kwik Trip Presentation
Future of Alternative Fuels in WI Showcase - Kwik Trip PresentationWisconsin Clean Cities
 
Hydrogen policy regulations and standards
Hydrogen policy regulations and standardsHydrogen policy regulations and standards
Hydrogen policy regulations and standardsDr. Pradip Chanda
 
PV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline CasePV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline CaseFadi Maalouf, PMP
 
3. DNV GL - Koen Broess
3. DNV GL - Koen Broess3. DNV GL - Koen Broess
3. DNV GL - Koen BroessDutch Power
 
Ricardo total cost of ownership-economics of emerging fleet technologies
Ricardo total cost of ownership-economics of emerging fleet technologiesRicardo total cost of ownership-economics of emerging fleet technologies
Ricardo total cost of ownership-economics of emerging fleet technologiesCALSTART
 
Cabot Oil & Gas Presentation - March 21, 2016
Cabot Oil & Gas Presentation - March 21, 2016Cabot Oil & Gas Presentation - March 21, 2016
Cabot Oil & Gas Presentation - March 21, 2016Marcellus Drilling News
 
Alt fuels and hi efficiency vehicles update calstart - 4-24-13
Alt fuels and hi efficiency vehicles update   calstart - 4-24-13Alt fuels and hi efficiency vehicles update   calstart - 4-24-13
Alt fuels and hi efficiency vehicles update calstart - 4-24-13CALSTART
 
070317 THiiiNK-technical performance verification
070317 THiiiNK-technical performance verification 070317 THiiiNK-technical performance verification
070317 THiiiNK-technical performance verification www.thiiink.com
 
Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)
Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)
Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)Jolynn Kennedy, CIMS-GB
 
Natural gas and bio methane as fuel for transport h. aouad
Natural gas and bio methane as fuel for transport   h. aouadNatural gas and bio methane as fuel for transport   h. aouad
Natural gas and bio methane as fuel for transport h. aouadEuropean Commission
 
Which foundation type is the most cost-effective for larger wind turbines?
Which foundation type is the most cost-effective for larger wind turbines?Which foundation type is the most cost-effective for larger wind turbines?
Which foundation type is the most cost-effective for larger wind turbines?Torben Haagh
 
Modelling of offshore wind
Modelling of offshore windModelling of offshore wind
Modelling of offshore windIEA-ETSAP
 
130718 ditmeyer natural gas locomotives - trb
130718 ditmeyer   natural gas locomotives - trb 130718 ditmeyer   natural gas locomotives - trb
130718 ditmeyer natural gas locomotives - trb Stephanie Camay
 
Eaton Hybrid Solutions over 6,500 units deployed globally
Eaton Hybrid Solutions over 6,500 units deployed globallyEaton Hybrid Solutions over 6,500 units deployed globally
Eaton Hybrid Solutions over 6,500 units deployed globallyCALSTART
 
2014 December GSOO Stakeholder Presentation
2014 December GSOO Stakeholder Presentation2014 December GSOO Stakeholder Presentation
2014 December GSOO Stakeholder PresentationJoachim Tan
 
CALSTART Best practices for high-efficiency truck implementation
CALSTART Best practices for high-efficiency truck implementationCALSTART Best practices for high-efficiency truck implementation
CALSTART Best practices for high-efficiency truck implementationCALSTART
 
U.S. EIA's Drilling Productivity Report - August 2015
U.S. EIA's Drilling Productivity Report - August 2015U.S. EIA's Drilling Productivity Report - August 2015
U.S. EIA's Drilling Productivity Report - August 2015Marcellus Drilling News
 

What's hot (20)

Future of Alternative Fuels in WI Showcase - Kwik Trip Presentation
Future of Alternative Fuels in WI Showcase - Kwik Trip PresentationFuture of Alternative Fuels in WI Showcase - Kwik Trip Presentation
Future of Alternative Fuels in WI Showcase - Kwik Trip Presentation
 
Hydrogen policy regulations and standards
Hydrogen policy regulations and standardsHydrogen policy regulations and standards
Hydrogen policy regulations and standards
 
PV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline CasePV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline Case
 
3. DNV GL - Koen Broess
3. DNV GL - Koen Broess3. DNV GL - Koen Broess
3. DNV GL - Koen Broess
 
Ricardo total cost of ownership-economics of emerging fleet technologies
Ricardo total cost of ownership-economics of emerging fleet technologiesRicardo total cost of ownership-economics of emerging fleet technologies
Ricardo total cost of ownership-economics of emerging fleet technologies
 
Cabot Oil & Gas Presentation - March 21, 2016
Cabot Oil & Gas Presentation - March 21, 2016Cabot Oil & Gas Presentation - March 21, 2016
Cabot Oil & Gas Presentation - March 21, 2016
 
Fuel consumption chart
Fuel consumption chartFuel consumption chart
Fuel consumption chart
 
Alt fuels and hi efficiency vehicles update calstart - 4-24-13
Alt fuels and hi efficiency vehicles update   calstart - 4-24-13Alt fuels and hi efficiency vehicles update   calstart - 4-24-13
Alt fuels and hi efficiency vehicles update calstart - 4-24-13
 
070317 THiiiNK-technical performance verification
070317 THiiiNK-technical performance verification 070317 THiiiNK-technical performance verification
070317 THiiiNK-technical performance verification
 
Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)
Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)
Making the CNG Virtual Pipeline a Reality for Transportation Natural Gas (TNG)
 
presentation
presentationpresentation
presentation
 
Natural gas and bio methane as fuel for transport h. aouad
Natural gas and bio methane as fuel for transport   h. aouadNatural gas and bio methane as fuel for transport   h. aouad
Natural gas and bio methane as fuel for transport h. aouad
 
Which foundation type is the most cost-effective for larger wind turbines?
Which foundation type is the most cost-effective for larger wind turbines?Which foundation type is the most cost-effective for larger wind turbines?
Which foundation type is the most cost-effective for larger wind turbines?
 
Modelling of offshore wind
Modelling of offshore windModelling of offshore wind
Modelling of offshore wind
 
130718 ditmeyer natural gas locomotives - trb
130718 ditmeyer   natural gas locomotives - trb 130718 ditmeyer   natural gas locomotives - trb
130718 ditmeyer natural gas locomotives - trb
 
Eaton Hybrid Solutions over 6,500 units deployed globally
Eaton Hybrid Solutions over 6,500 units deployed globallyEaton Hybrid Solutions over 6,500 units deployed globally
Eaton Hybrid Solutions over 6,500 units deployed globally
 
2014 December GSOO Stakeholder Presentation
2014 December GSOO Stakeholder Presentation2014 December GSOO Stakeholder Presentation
2014 December GSOO Stakeholder Presentation
 
Wärtsilä LNG Solutions
Wärtsilä LNG SolutionsWärtsilä LNG Solutions
Wärtsilä LNG Solutions
 
CALSTART Best practices for high-efficiency truck implementation
CALSTART Best practices for high-efficiency truck implementationCALSTART Best practices for high-efficiency truck implementation
CALSTART Best practices for high-efficiency truck implementation
 
U.S. EIA's Drilling Productivity Report - August 2015
U.S. EIA's Drilling Productivity Report - August 2015U.S. EIA's Drilling Productivity Report - August 2015
U.S. EIA's Drilling Productivity Report - August 2015
 

Viewers also liked

Viewers also liked (7)

Shortsea oslofjord2012 tollpost_karin_hansesaetre
Shortsea oslofjord2012 tollpost_karin_hansesaetreShortsea oslofjord2012 tollpost_karin_hansesaetre
Shortsea oslofjord2012 tollpost_karin_hansesaetre
 
Velg sjøveien oslo 15.15 unifeeder -christian - velg sjoveien oslo
Velg sjøveien oslo 15.15 unifeeder -christian - velg sjoveien oslo Velg sjøveien oslo 15.15 unifeeder -christian - velg sjoveien oslo
Velg sjøveien oslo 15.15 unifeeder -christian - velg sjoveien oslo
 
Velg sjøveien oslo 15.45 schenker as - morten - velg sjoveien oslo
Velg sjøveien oslo 15.45 schenker as - morten - velg sjoveien osloVelg sjøveien oslo 15.45 schenker as - morten - velg sjoveien oslo
Velg sjøveien oslo 15.45 schenker as - morten - velg sjoveien oslo
 
Velg sjøveien larvik 5 tschudi
Velg sjøveien larvik 5 tschudiVelg sjøveien larvik 5 tschudi
Velg sjøveien larvik 5 tschudi
 
Velg sjøveien stavanger 06 katrine helle hodne, halliburton, 22082012 maritim...
Velg sjøveien stavanger 06 katrine helle hodne, halliburton, 22082012 maritim...Velg sjøveien stavanger 06 katrine helle hodne, halliburton, 22082012 maritim...
Velg sjøveien stavanger 06 katrine helle hodne, halliburton, 22082012 maritim...
 
Velg sjøveien larvik 3 unifeeder_ 1
Velg sjøveien larvik 3 unifeeder_ 1Velg sjøveien larvik 3 unifeeder_ 1
Velg sjøveien larvik 3 unifeeder_ 1
 
Sjølogistikkonferansen 201308 stavanger nho lt - jan håvard hatteland
Sjølogistikkonferansen 201308 stavanger   nho lt - jan håvard hattelandSjølogistikkonferansen 201308 stavanger   nho lt - jan håvard hatteland
Sjølogistikkonferansen 201308 stavanger nho lt - jan håvard hatteland
 

Similar to Seca seminar 2013 dn v - harald gundersen

Supporting an lng fuelled marine industry future across the entire gas value ...
Supporting an lng fuelled marine industry future across the entire gas value ...Supporting an lng fuelled marine industry future across the entire gas value ...
Supporting an lng fuelled marine industry future across the entire gas value ...Wärtsilä Marine Solutions
 
Offshore Cost of Energy NREL WESE Workship Bruce Valpy 14 Jan 2015
Offshore Cost of Energy NREL WESE Workship Bruce Valpy 14 Jan 2015Offshore Cost of Energy NREL WESE Workship Bruce Valpy 14 Jan 2015
Offshore Cost of Energy NREL WESE Workship Bruce Valpy 14 Jan 2015BVG Associates
 
The Role of Renewable Hydrogen in Clean Energy Transitions: Dr Ilkka Hannula,...
The Role of Renewable Hydrogen in Clean Energy Transitions: Dr Ilkka Hannula,...The Role of Renewable Hydrogen in Clean Energy Transitions: Dr Ilkka Hannula,...
The Role of Renewable Hydrogen in Clean Energy Transitions: Dr Ilkka Hannula,...OECD Environment
 
ITM Power: Mobilité HYDROGÈNE France
ITM Power: Mobilité HYDROGÈNE FranceITM Power: Mobilité HYDROGÈNE France
ITM Power: Mobilité HYDROGÈNE FranceRebecca Markillie
 
LNG fuelled ships recent development 2014 02
LNG fuelled ships recent development 2014 02LNG fuelled ships recent development 2014 02
LNG fuelled ships recent development 2014 02George Teriakidis
 
Energy benoit hood(iea) ccxg gf sep2014
Energy benoit hood(iea) ccxg gf sep2014Energy benoit hood(iea) ccxg gf sep2014
Energy benoit hood(iea) ccxg gf sep2014OECD Environment
 
Bvga hundleby icoe 2016
Bvga hundleby icoe 2016Bvga hundleby icoe 2016
Bvga hundleby icoe 2016BVG Associates
 
Renewable fuels for the transportation sector with focus on maritime industry...
Renewable fuels for the transportation sector with focus on maritime industry...Renewable fuels for the transportation sector with focus on maritime industry...
Renewable fuels for the transportation sector with focus on maritime industry...Wärtsilä Corporation
 
From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...
From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...
From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...Global CCS Institute
 
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...IEA-ETSAP
 
Michel Sacotte - Schneider Electric
Michel Sacotte - Schneider ElectricMichel Sacotte - Schneider Electric
Michel Sacotte - Schneider Electriccwiemeexpo
 
Brown Bag (Roy) - EEDI for LNG Tankers
Brown Bag (Roy) - EEDI for LNG TankersBrown Bag (Roy) - EEDI for LNG Tankers
Brown Bag (Roy) - EEDI for LNG TankersBiswajoy Roy
 
Opportunities in the journey to ‘subsidy free’
Opportunities in the journey to ‘subsidy free’ Opportunities in the journey to ‘subsidy free’
Opportunities in the journey to ‘subsidy free’ StephenGeoMills
 
Giovanetti Federico - Medium & Heavy Trucks Product Management - Iveco
Giovanetti Federico - Medium & Heavy Trucks Product Management - IvecoGiovanetti Federico - Medium & Heavy Trucks Product Management - Iveco
Giovanetti Federico - Medium & Heavy Trucks Product Management - IvecoWEC Italia
 
Aalborg industries presentation SCRUBBER
Aalborg industries presentation SCRUBBER Aalborg industries presentation SCRUBBER
Aalborg industries presentation SCRUBBER www.thiiink.com
 
UK offshore wind vision of the market and technology development Giles Hundl...
UK offshore wind  vision of the market and technology development Giles Hundl...UK offshore wind  vision of the market and technology development Giles Hundl...
UK offshore wind vision of the market and technology development Giles Hundl...BVG Associates
 

Similar to Seca seminar 2013 dn v - harald gundersen (20)

Supporting an lng fuelled marine industry future across the entire gas value ...
Supporting an lng fuelled marine industry future across the entire gas value ...Supporting an lng fuelled marine industry future across the entire gas value ...
Supporting an lng fuelled marine industry future across the entire gas value ...
 
Offshore Cost of Energy NREL WESE Workship Bruce Valpy 14 Jan 2015
Offshore Cost of Energy NREL WESE Workship Bruce Valpy 14 Jan 2015Offshore Cost of Energy NREL WESE Workship Bruce Valpy 14 Jan 2015
Offshore Cost of Energy NREL WESE Workship Bruce Valpy 14 Jan 2015
 
The Role of Renewable Hydrogen in Clean Energy Transitions: Dr Ilkka Hannula,...
The Role of Renewable Hydrogen in Clean Energy Transitions: Dr Ilkka Hannula,...The Role of Renewable Hydrogen in Clean Energy Transitions: Dr Ilkka Hannula,...
The Role of Renewable Hydrogen in Clean Energy Transitions: Dr Ilkka Hannula,...
 
ITM Power: Mobilité HYDROGÈNE France
ITM Power: Mobilité HYDROGÈNE FranceITM Power: Mobilité HYDROGÈNE France
ITM Power: Mobilité HYDROGÈNE France
 
Simon Bennett (International Energy Agency) presenting 'Air capture: What Wou...
Simon Bennett (International Energy Agency) presenting 'Air capture: What Wou...Simon Bennett (International Energy Agency) presenting 'Air capture: What Wou...
Simon Bennett (International Energy Agency) presenting 'Air capture: What Wou...
 
LNG fuelled ships recent development 2014 02
LNG fuelled ships recent development 2014 02LNG fuelled ships recent development 2014 02
LNG fuelled ships recent development 2014 02
 
Energy benoit hood(iea) ccxg gf sep2014
Energy benoit hood(iea) ccxg gf sep2014Energy benoit hood(iea) ccxg gf sep2014
Energy benoit hood(iea) ccxg gf sep2014
 
Bvga hundleby icoe 2016
Bvga hundleby icoe 2016Bvga hundleby icoe 2016
Bvga hundleby icoe 2016
 
Renewable fuels for the transportation sector with focus on maritime industry...
Renewable fuels for the transportation sector with focus on maritime industry...Renewable fuels for the transportation sector with focus on maritime industry...
Renewable fuels for the transportation sector with focus on maritime industry...
 
From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...
From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...
From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...
 
Result presentation Q314
Result presentation Q314Result presentation Q314
Result presentation Q314
 
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...
 
Michel Sacotte - Schneider Electric
Michel Sacotte - Schneider ElectricMichel Sacotte - Schneider Electric
Michel Sacotte - Schneider Electric
 
Brown Bag (Roy) - EEDI for LNG Tankers
Brown Bag (Roy) - EEDI for LNG TankersBrown Bag (Roy) - EEDI for LNG Tankers
Brown Bag (Roy) - EEDI for LNG Tankers
 
Opportunities in the journey to ‘subsidy free’
Opportunities in the journey to ‘subsidy free’ Opportunities in the journey to ‘subsidy free’
Opportunities in the journey to ‘subsidy free’
 
Giovanetti Federico - Medium & Heavy Trucks Product Management - Iveco
Giovanetti Federico - Medium & Heavy Trucks Product Management - IvecoGiovanetti Federico - Medium & Heavy Trucks Product Management - Iveco
Giovanetti Federico - Medium & Heavy Trucks Product Management - Iveco
 
LNG as fuel innovation 220618
LNG as fuel innovation 220618LNG as fuel innovation 220618
LNG as fuel innovation 220618
 
Aalborg industries presentation SCRUBBER
Aalborg industries presentation SCRUBBER Aalborg industries presentation SCRUBBER
Aalborg industries presentation SCRUBBER
 
Seca seminar 2013 wilh wilhelmsen - per brinchmann
Seca seminar 2013   wilh wilhelmsen - per brinchmannSeca seminar 2013   wilh wilhelmsen - per brinchmann
Seca seminar 2013 wilh wilhelmsen - per brinchmann
 
UK offshore wind vision of the market and technology development Giles Hundl...
UK offshore wind  vision of the market and technology development Giles Hundl...UK offshore wind  vision of the market and technology development Giles Hundl...
UK offshore wind vision of the market and technology development Giles Hundl...
 

More from Shortsea Promotion Centre Norway

Sjølogistikkonferansen 201308 stavanger shortsea promotion - gods fergen - ...
Sjølogistikkonferansen 201308 stavanger   shortsea promotion - gods fergen - ...Sjølogistikkonferansen 201308 stavanger   shortsea promotion - gods fergen - ...
Sjølogistikkonferansen 201308 stavanger shortsea promotion - gods fergen - ...Shortsea Promotion Centre Norway
 
Sjølogistikkonferansen 201308 stavanger samskip multimodal - bjørn waglen
Sjølogistikkonferansen 201308 stavanger   samskip multimodal - bjørn waglenSjølogistikkonferansen 201308 stavanger   samskip multimodal - bjørn waglen
Sjølogistikkonferansen 201308 stavanger samskip multimodal - bjørn waglenShortsea Promotion Centre Norway
 
Sjølogistikkonferansen 201308 stavanger norlog sjølogistikk - kurt ommundsen
Sjølogistikkonferansen 201308 stavanger   norlog sjølogistikk - kurt ommundsenSjølogistikkonferansen 201308 stavanger   norlog sjølogistikk - kurt ommundsen
Sjølogistikkonferansen 201308 stavanger norlog sjølogistikk - kurt ommundsenShortsea Promotion Centre Norway
 
Sjølogistikkonferansen 201308 stavanger maritimt forum - hege solbakken
Sjølogistikkonferansen 201308 stavanger   maritimt forum - hege solbakkenSjølogistikkonferansen 201308 stavanger   maritimt forum - hege solbakken
Sjølogistikkonferansen 201308 stavanger maritimt forum - hege solbakkenShortsea Promotion Centre Norway
 
Sjølogistikkonferansen 201308 stavanger bmc og scan shipping
Sjølogistikkonferansen 201308 stavanger   bmc og scan shippingSjølogistikkonferansen 201308 stavanger   bmc og scan shipping
Sjølogistikkonferansen 201308 stavanger bmc og scan shippingShortsea Promotion Centre Norway
 
Sjølogistikkonferansen 201308 stavanger baker huges - eivind borsheim
Sjølogistikkonferansen 201308 stavanger   baker huges - eivind borsheimSjølogistikkonferansen 201308 stavanger   baker huges - eivind borsheim
Sjølogistikkonferansen 201308 stavanger baker huges - eivind borsheimShortsea Promotion Centre Norway
 
Sjølogistikkonferansen 201308 stavanger fjord line - rune hetland
Sjølogistikkonferansen 201308 stavanger   fjord line - rune hetlandSjølogistikkonferansen 201308 stavanger   fjord line - rune hetland
Sjølogistikkonferansen 201308 stavanger fjord line - rune hetlandShortsea Promotion Centre Norway
 
Seca seminar 2013 wilhelmsen maritime fuels - øivind munthe-kaas
Seca seminar 2013   wilhelmsen maritime fuels - øivind munthe-kaasSeca seminar 2013   wilhelmsen maritime fuels - øivind munthe-kaas
Seca seminar 2013 wilhelmsen maritime fuels - øivind munthe-kaasShortsea Promotion Centre Norway
 
Seca seminar 2013 norges rederiforbund - tor christian sletner
Seca seminar 2013   norges rederiforbund - tor christian sletnerSeca seminar 2013   norges rederiforbund - tor christian sletner
Seca seminar 2013 norges rederiforbund - tor christian sletnerShortsea Promotion Centre Norway
 
Emd sustainable shipping by market based measures spc norway
Emd sustainable shipping by market based measures spc norwayEmd sustainable shipping by market based measures spc norway
Emd sustainable shipping by market based measures spc norwayShortsea Promotion Centre Norway
 

More from Shortsea Promotion Centre Norway (20)

Gods fergen logistikkforeningen_losby_20130910
Gods fergen logistikkforeningen_losby_20130910Gods fergen logistikkforeningen_losby_20130910
Gods fergen logistikkforeningen_losby_20130910
 
Sjølogistikkonferansen 201308 stavanger shortsea promotion - gods fergen - ...
Sjølogistikkonferansen 201308 stavanger   shortsea promotion - gods fergen - ...Sjølogistikkonferansen 201308 stavanger   shortsea promotion - gods fergen - ...
Sjølogistikkonferansen 201308 stavanger shortsea promotion - gods fergen - ...
 
Sjølogistikkonferansen 201308 stavanger samskip multimodal - bjørn waglen
Sjølogistikkonferansen 201308 stavanger   samskip multimodal - bjørn waglenSjølogistikkonferansen 201308 stavanger   samskip multimodal - bjørn waglen
Sjølogistikkonferansen 201308 stavanger samskip multimodal - bjørn waglen
 
Sjølogistikkonferansen 201308 stavanger norlog sjølogistikk - kurt ommundsen
Sjølogistikkonferansen 201308 stavanger   norlog sjølogistikk - kurt ommundsenSjølogistikkonferansen 201308 stavanger   norlog sjølogistikk - kurt ommundsen
Sjølogistikkonferansen 201308 stavanger norlog sjølogistikk - kurt ommundsen
 
Sjølogistikkonferansen 201308 stavanger maritimt forum - hege solbakken
Sjølogistikkonferansen 201308 stavanger   maritimt forum - hege solbakkenSjølogistikkonferansen 201308 stavanger   maritimt forum - hege solbakken
Sjølogistikkonferansen 201308 stavanger maritimt forum - hege solbakken
 
Sjølogistikkonferansen 201308 stavanger bmc og scan shipping
Sjølogistikkonferansen 201308 stavanger   bmc og scan shippingSjølogistikkonferansen 201308 stavanger   bmc og scan shipping
Sjølogistikkonferansen 201308 stavanger bmc og scan shipping
 
Sjølogistikkonferansen 201308 stavanger baker huges - eivind borsheim
Sjølogistikkonferansen 201308 stavanger   baker huges - eivind borsheimSjølogistikkonferansen 201308 stavanger   baker huges - eivind borsheim
Sjølogistikkonferansen 201308 stavanger baker huges - eivind borsheim
 
Sjølogistikkonferansen 201308 stavanger fjord line - rune hetland
Sjølogistikkonferansen 201308 stavanger   fjord line - rune hetlandSjølogistikkonferansen 201308 stavanger   fjord line - rune hetland
Sjølogistikkonferansen 201308 stavanger fjord line - rune hetland
 
Seca seminar 2013 wilhelmsen maritime fuels - øivind munthe-kaas
Seca seminar 2013   wilhelmsen maritime fuels - øivind munthe-kaasSeca seminar 2013   wilhelmsen maritime fuels - øivind munthe-kaas
Seca seminar 2013 wilhelmsen maritime fuels - øivind munthe-kaas
 
Seca seminar 2013 stena - per stefenson
Seca seminar 2013   stena - per stefensonSeca seminar 2013   stena - per stefenson
Seca seminar 2013 stena - per stefenson
 
Seca seminar 2013 spc - hans kristian haram
Seca seminar 2013   spc - hans kristian haramSeca seminar 2013   spc - hans kristian haram
Seca seminar 2013 spc - hans kristian haram
 
Seca seminar 2013 skangass - gunnar helmen
Seca seminar 2013   skangass - gunnar helmenSeca seminar 2013   skangass - gunnar helmen
Seca seminar 2013 skangass - gunnar helmen
 
Seca seminar 2013 nox-fondet - tommy johnsen
Seca seminar 2013   nox-fondet - tommy johnsenSeca seminar 2013   nox-fondet - tommy johnsen
Seca seminar 2013 nox-fondet - tommy johnsen
 
Seca seminar 2013 norges rederiforbund - tor christian sletner
Seca seminar 2013   norges rederiforbund - tor christian sletnerSeca seminar 2013   norges rederiforbund - tor christian sletner
Seca seminar 2013 norges rederiforbund - tor christian sletner
 
Seca seminar 2013 clean marine - nils høy-pettersen
Seca seminar 2013   clean marine - nils høy-pettersenSeca seminar 2013   clean marine - nils høy-pettersen
Seca seminar 2013 clean marine - nils høy-pettersen
 
Seca seminar 2013 rolls royce - stein ruben larsen
Seca seminar 2013   rolls royce - stein ruben larsenSeca seminar 2013   rolls royce - stein ruben larsen
Seca seminar 2013 rolls royce - stein ruben larsen
 
Gods fergen introduksjon_politisk_20130528
Gods fergen introduksjon_politisk_20130528Gods fergen introduksjon_politisk_20130528
Gods fergen introduksjon_politisk_20130528
 
Gods fergen fremtidens kysttransport nor lines 280513
Gods fergen fremtidens kysttransport   nor lines 280513Gods fergen fremtidens kysttransport   nor lines 280513
Gods fergen fremtidens kysttransport nor lines 280513
 
Emd sustainable shipping by market based measures spc norway
Emd sustainable shipping by market based measures spc norwayEmd sustainable shipping by market based measures spc norway
Emd sustainable shipping by market based measures spc norway
 
Velg sjøveien gardermoen_oppsummering
Velg sjøveien gardermoen_oppsummeringVelg sjøveien gardermoen_oppsummering
Velg sjøveien gardermoen_oppsummering
 

Recently uploaded

Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 

Recently uploaded (20)

Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 

Seca seminar 2013 dn v - harald gundersen

  • 1. Harald Gundersen 20-06-2013 LNG feasibility study Retrofitting to meet new ECA requirements
  • 2. © Det Norske Veritas AS. All rights reserved. LNG feasibility study 20-06-2013 Ship owners must respond to gradually stricter regulations to stay in business, while dedicated ECAs are introduced 2 2010: Sulphur < 1.0% 2015: Sulphur < 0.1% ECA SOX REQUIREMENTS Build after 2016: NOX Tier III, -80% ECA NOX REQUIREMENTS 2020 / 2025*: SOX < 0.5% Build after 2011: NOX Tier II, -20% * Date TBD pending 2018 review – but 2020 will apply in EU waters GLOBAL REQUIREMENTS
  • 3. © Det Norske Veritas AS. All rights reserved. LNG feasibility study 20-06-2013 There are currently 74 confirmed LNG fuelled ship projects globally 3 Updated 15.04.2013 Excluding LNG carriers and inland waterway vessels
  • 4. © Det Norske Veritas AS. All rights reserved. LNG feasibility study 20-06-2013 LNG consumption in Norway from 2004 - 2017 4 Kilde: NOx-fondet
  • 5. © Det Norske Veritas AS. All rights reserved. LNG feasibility study 20-06-2013 Status for the Norwegian LNG market 5 74% 19% 7% Drivstoff solgt i Norge til maritimt bruk 2011* *Målt per energimengde 63% 13% 24% Drivstoff forventet solgt i Norge til maritimt bruk 2016* MGO/MDO HFO LNG Barents Naturgass 5 % Gasnor 50 % Skangass 20 % Skagerak Naturgass 3 % Naturgass Møre 3 % AGA 3 % Leverandør ikke avklart 16 % Suppliers of LNG in Norway from 2016 Kilde: NOx-fondet
  • 6. © Det Norske Veritas AS. All rights reserved. LNG feasibility study 20-06-2013 6 LNG? SCRUBBER? MGO?
  • 7. © Det Norske Veritas AS. All rights reserved. LNG feasibility study 20-06-2013 DNV has assessed the financial attractiveness and technical risks of available ECA compliance measures for the case ship 7 The case ship 1. Switching to low sulphur fuel 2. Installing a scrubber system 3. Converting to Dual Fuel engines and installing LNG tanks Evaluated solutions  LOA: 130-150 m  Ship type: Container ship  Cargo capacity: 700-900 TEU
  • 8. © Det Norske Veritas AS. All rights reserved. LNG feasibility study 20-06-2013 The total cost of DF conversion for the case ship is estimated to $6,5 - 8,3 million 8 Cost estimate for DF configuration with 300 m3 LNG tank Cost estimate for DF configuration with 600 m3 LNG tank 6.5 2.5 2.6 1.4 0 1 2 3 4 5 6 7 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Main engine DF conversion LNG tank + gas equipment Yard cost TOTAL COSTS Costs [MUSD] 8.3 3.0 3.9 1.4 0 1 2 3 4 5 6 7 8 9 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Main engine DF conversion LNG tank + gas equipment Yard cost TOTAL COSTS Costs [MUSD]
  • 9. © Det Norske Veritas AS. All rights reserved. LNG feasibility study 20-06-2013 Cumulated costs for 55% ECA operation 9 -$5 $0 $5 $10 $15 $20 2015 2020 2025 2030 Cumulative Total Cost [MUSD] compared to baseline with HFO Baseline (HFO) Realcosts[2012MUSD] ENGINE AND OPERATION Emission compliance ECASOX Time in ECA 55% Installed power ca. 8 000 kW Baseline HFO FINANCIAL Discount rate 8% Investment decision Retrofit Tax regime None FUEL PRICE HFO 2012 Europe level MGO 2012 Europe level LNG HFO equivalent and 2012 European gas + distribution cost
  • 10. © Det Norske Veritas AS. All rights reserved. LNG feasibility study 20-06-2013 Cumulated costs for 55% ECA operation 10 -$5 $0 $5 $10 $15 $20 2015 2020 2025 2030 Cumulative Total Cost [MUSD] compared to baseline with HFO Fuel Switch Baseline (HFO) Realcosts[2012MUSD] ENGINE AND OPERATION Emission compliance ECASOX Time in ECA 55% Installed power ca. 8 000 kW Baseline HFO FINANCIAL Discount rate 8% Investment decision Retrofit Tax regime None FUEL PRICE HFO 2012 Europe level MGO 2012 Europe level LNG HFO equivalent and 2012 European gas + distribution cost
  • 11. © Det Norske Veritas AS. All rights reserved. LNG feasibility study 20-06-2013 Cumulated costs for 55% ECA operation 11 -$5 $0 $5 $10 $15 $20 2015 2020 2025 2030 Cumulative Total Cost [MUSD] compared to baseline with HFO Fuel Switch Scrubber Baseline (HFO) Realcosts[2012MUSD] ENGINE AND OPERATION Emission compliance ECASOX Time in ECA 55% Installed power ca. 8 000 kW Baseline HFO FINANCIAL Discount rate 8% Investment decision Retrofit Tax regime None FUEL PRICE HFO 2012 Europe level MGO 2012 Europe level LNG HFO equivalent and 2012 European gas + distribution cost
  • 12. © Det Norske Veritas AS. All rights reserved. LNG feasibility study 20-06-2013 Cumulated costs for 55% ECA operation 12 -$5 $0 $5 $10 $15 $20 2015 2020 2025 2030 Cumulative Total Cost [MUSD] compared to baseline with HFO Fuel Switch Scrubber LNG High price w/600 m3 tank Baseline (HFO) Realcosts[2012MUSD] LNG reference price w/600 m3 tank ENGINE AND OPERATION Emission compliance ECASOX Time in ECA 55% Installed power ca. 8 000 kW Baseline HFO FINANCIAL Discount rate 8% Investment decision Retrofit Tax regime None FUEL PRICE HFO 2012 Europe level MGO 2012 Europe level LNG HFO equivalent and 2012 European gas + distribution cost
  • 13. © Det Norske Veritas AS. All rights reserved. LNG feasibility study 20-06-2013 Cumulated costs for 55% ECA operation 13 -$5 $0 $5 $10 $15 $20 2015 2020 2025 2030 Cumulative Total Cost [MUSD] compared to baseline with HFO Fuel Switch Scrubber LNG High price w/600 m3 tank Baseline (HFO) Realcosts[2012MUSD] LNG reference price w/600 m3 tank LNG High price w/300 m3 tank LNG reference price w/300 m3 tank ENGINE AND OPERATION Emission compliance ECASOX Time in ECA 55% Installed power ca. 8 000 kW Baseline HFO FINANCIAL Discount rate 8% Investment decision Retrofit Tax regime None FUEL PRICE HFO 2012 Europe level MGO 2012 Europe level LNG HFO equivalent and 2012 European gas + distribution cost
  • 14. © Det Norske Veritas AS. All rights reserved. LNG feasibility study 20-06-2013 Cumulated costs for 100% ECA operation 14 -$5 $0 $5 $10 $15 $20 2015 2020 2025 2030 Cumulative Total Cost [MUSD] compared to baseline with HFO Fuel Switch Scrubber LNG High price w/600 m3 tank Baseline (HFO) Realcosts[2012MUSD] LNG reference price w/600 m3 tank LNG High price w/300 m3 tank LNG reference price w/300 m3 tank ENGINE AND OPERATION Emission compliance ECASOX Time in ECA 100% Installed power ca. 8 000 kW Baseline HFO FINANCIAL Discount rate 8% Investment decision Retrofit Tax regime None FUEL PRICE HFO 2012 Europe level MGO 2012 Europe level LNG HFO equivalent and 2012 European gas + distribution cost
  • 15. © Det Norske Veritas AS. All rights reserved. LNG feasibility study 20-06-2013 Safeguarding life, property and the environment www.dnv.com 15