  1. 1. © Wärtsilä NOT YET CLASSIFIED WÄRTSILÄ LNG SOLUTIONS LNG18 April 2016 Fredrik Bonäs fi.linkedin.com/in/fredrikbonas #WartsilaKnowsGas #GasBassador 5.8.2016 Fredrik Bonäs/ Kenneth Engblom1
  2. 2. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom2 TABLE OF CONTENTS Overview of Wärtsilä’s LNG solutions Liquefaction plants Terminals Summary
  3. 3. © Wärtsilä NOT YET CLASSIFIED BEFORE: CONVENTIONAL LNG VALUE CHAIN 5.8.2016 Fredrik Bonäs/ Kenneth Engblom3
  4. 4. © Wärtsilä NOT YET CLASSIFIED AFTER: CONVENTIONAL + SMALL-SCALE VALUE CHAIN 5.8.2016 Fredrik Bonäs/ Kenneth Engblom4
  5. 5. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom5 WÄRTSILÄ LNG SOLUTIONS ONSHOREOFFSHORELIFECYCLE Small LNG liquefaction plants Mini LNG liquefaction plants Small/Medium LNG terminals LNG satellite & bunkering terminals LNG storage & regasification barge LNG regasification BOG reliquefaction Cargo Handling System Gas and LNG Carriers Fuel gas handling system Ship and Cargo Tank design Lifecycle services Start–up support Product and technical support Spares
  6. 6. © Wärtsilä NOT YET CLASSIFIED Wärtsilä offers products and services for modern, flexible and sustainable power generation and LNG infrastructure. WÄRTSILÄ SERVICES EPC Spares Maintenance Operation Project Development and Financial Services 5.8.2016 Fredrik Bonäs/ Kenneth Engblom6
  7. 7. © Wärtsilä NOT YET CLASSIFIED SHORTENING PROJECT DEVELOPMENT AND EPC LEAD TIME 5.8.2016 Fredrik Bonäs/ Kenneth Engblom7 YOU HAVE AN IDEA! Wärtsilä route • Design, Engineering, Cost Evaluations, Constructability reviews and Safety studies • Project execution and commissioning • Asset management and maintenance agreements Conventional route • Choose an engineering company • Conceptual design, Feasibility studies and FEED • Evaluate potential contractors • Bidding process, supplier selection and delivery contract(s) • Manage construction of LNG terminal and power plant • Arrange for operation maintenance and training Your shorter & quicker route to commercial operations! (10-20 months) Long process to FID, more time spent on administration, legal consultations and contractual setup... (20-30 months)
  8. 8. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom8 TABLE OF CONTENTS Overview of Wärtsilä’s LNG solutions Liquefaction plants Terminals Summary
  9. 9. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom9 MINI/SMALL SCALE LIQUEFACTION PLANTS INPUT OUTPUTPLANT Gas sources • Pipeline gas • Biogas • Landfill gas • Associated gas • Coal seam gas • Tight gas • Shale gas 2,000 – 300,000 TPA (3,400 – 510,000 GPD) Gas pre-treatment Liquefaction • Mixed Refrigerant: 2,000 - 30,000 TPA (3,400 – 51,000 GPD) • Reversed Brayton: 20,000 – 300,000 TPA (34,000 – 510,000 GPD) Storage tanks Jetty & Marine facilities Export systems LNG transport • Carriers • Tanker trucks • Containers • Rail cars Peak shaving gas send-out Ship bunkering TPA = Tonnes Per Year GPD = Gallons Per Day
  10. 10. © Wärtsilä NOT YET CLASSIFIED Bergen, Norway “Twice the capacity, half the footprint!” Kollsnes II Customer Gasnor Type Small scale liquefaction plant Tank net volume 4,000 m3 Capacity 230 TPD / 84,000 TPA Size of liquefaction unit 12 m x 38 m Gas source Pipeline gas. Inlet pressure typically 70 bar. Details Extension to Kollsnes I. Includes two truck loading stations and existing loading jetty for small LNG carriers. Scope of supply Complete plant, incl. • Gas pre-treatment • Cooling system (Seawater) • Double Reversed Brayton liquefaction process • Storage tank • Electrical and control systems • Civil works Delivery method EPCIC Delivered 2007 5.8.2016 Fredrik Bonäs/ Kenneth Engblom10
  11. 11. © Wärtsilä NOT YET CLASSIFIED Oslo, Norway “135 Oslo region buses will be able to run on biogas which means 10,000 tonnes emission reduction per year.” EGE Biogas Customer Cambi AS Type Mini liquefaction plant Tank net volume 180 m3 Capacity 11 TPD / 4,000 TPA Size of liquefaction unit 8 m x 14 m Gas source Biogas from 50,000 TPA of food waste Details Fuel production for 135 buses in the city of Oslo Scope of supply Complete plant, incl. • Gas pre-treatment • Cooling system (Ambient air) • MR liquefaction process • Storage tank • Electrical and control systems • Service agreement Excl. Civil works and installation Delivery method EPC Delivered 2013 5.8.2016 Fredrik Bonäs/ Kenneth Engblom11
  12. 12. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom12 TABLE OF CONTENTS Overview of Wärtsilä’s LNG solutions Liquefaction plants Terminals Summary
  13. 13. © Wärtsilä NOT YET CLASSIFIED SMALL/MID SCALE TERMINALS INPUT OUTPUTTERMINAL LNG transport • Carriers • Tanker trucks • Containers • Rail cars Tank capacity 100 – 160,000 m3 (26,400 – 42 Million gallons) Jetty & Marine facilities Unloading systems Storage tanks Boil-off gas handling Re-gasification • Up to 1,000 TPH (1,000 MMSCFD) Export systems LNG transport • Carriers • Tanker trucks • Containers • Rail cars Gas send-out Ship bunkering TPH = Tonnes Per Hour MMSCFD = Million Standard Cubic Feet per Day 5.8.2016 Fredrik Bonäs/ Kenneth Engblom13
  14. 14. © Wärtsilä NOT YET CLASSIFIED Tornio, Finland “Providing the only source of gas for industries in Northern Finland.” Tornio Manga LNG Customer Manga LNG Oy Type Small/Mid scale terminal Tank net volume 50,000 m3 Send out Max 40 tonnes per hour at 6.0 barg Scope of supply • Civil works and infrastructure • Full containment storage tank • Regasification & gas metering • BOG system • Electrical and control system • Unloading system • Bunkering and Truck loading Delivery method EPC Turnkey Delivered 2018 5.8.2016 Fredrik Bonäs/ Kenneth Engblom14
  15. 15. © Wärtsilä NOT YET CLASSIFIED San Pedro de Macoris, Dominican Republic “Power Plant and LNG supply system combined at the same site.” Los Origenes Customer César Iglesias Type Combined Power Plant and LNG tank yard Tank net volume 500 m3 Details LNG delivered by 3 trucks / day, 40 m3 each. Scope of supply • Complete Wärtsilä 34 dual- fuel power plant including civil works • Integration of customer’s LNG tank yard Delivery method EPC Delivered 2011 5.8.2016 Fredrik Bonäs/ Kenneth Engblom15
  16. 16. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom16 TABLE OF CONTENTS Overview of Wärtsilä’s LNG solutions Liquefaction plants Terminals Summary
  17. 17. © Wärtsilä NOT YET CLASSIFIED COMMITMENT TO CUSTOMER SATISFACTION • At Wärtsilä we know that every customer has unique expectations and priorities. We serve all of them with the same level of quality and excellence. • Projects are tailored to customer needs based on a set of pre-defined scopes and proven designs, that will provide a valuable asset with the highest possible quality at an affordable cost. 5.8.2016 Fredrik Bonäs/ Kenneth Engblom17
  18. 18. © Wärtsilä NOT YET CLASSIFIED SUPPORT FOR THE WHOLE LIFE CYCLE 24 h Technical Support Wärtsilä Services’ global network Widest range of offering and expertise Wärtsilä Services provides full service throughout the product lifecycle for both Marine and Energy solutions customers, and is constantly developing its network worldwide.  70 countries, 200 locations, 11,000 service professionals 5.8.2016 Fredrik Bonäs/ Kenneth Engblom18
  19. 19. © Wärtsilä NOT YET CLASSIFIED COMPLETE SOLUTIONS THAT BRING VALUE TO CUSTOMERS Project Development & Financing Technology EPC Operations & Maintenance LNG Terminal or Liquefaction Plant Gas / Dual-Fuel Power Plant 5.8.2016 Fredrik Bonäs/ Kenneth Engblom19

×