Presentation on
MS Project
Conart Engineers Limited
Introduction
• Microsoft Project is a project management software
developed and sold by Microsoft
• Design to assist project managers in developing
plans, assigning resources to task, tracking progress,
managing budgets and analyzing workloads,
• The application creates critical path schedules, and
critical chain which can be visualized in a Gantt chart.
• Available currently in two editions, Standard and
Professional.
• MS Project’s proprietary file format is *.mpp
Conart Engineers Limited
Scheduling Software Commonly Used
• Gantt Project
• Genius inside
• Liquid planner
• Micro planner X-pert
• Naval plan
• Open project
• Open workbench
• Primavera 3.1 / 6.2
• Project. Net
Conart Engineers Limited
Project Manager
Responsible for:
• Work
• Quality
• Human Resource
• Time
• Communications
• Costs
Conart Engineers Limited
Basic Settings of MS project
Conart Engineers Limited
Basic setting A: Create a new project plan
• On the file menu, click on new.
• Under new click on blank project.
• Project 2003 create a New Project, and the New
Project task pane is replaced by the task panes of the
project guide
Conart Engineers Limited
Conart Engineers Limited
Basic setting B: Create a Calendar for a task
•By default, tasks are scheduled based on the project
calendar.
•To define unique or specific exceptions, such as
machinery that runs during nonworking time, or an
office move that can occur only on a weekend, you can
create a task calendar for individual tasks that override
the project calendar.
Conart Engineers Limited
Using MS Project
Project
Management
Planning
task
Build the
plan
Set the project
start date
Enter task, name &
duration
Link task
fine tune the
plan
Monitoring &
Tracking task
Set a base
line
Enter actual
Track variables
Adjustschedules
Communicate
with team
Conart Engineers Limited
CRITICAL PATH
The sequence of the activities which have no float or
slack is called critical path.
Slack= Late start – Early start OR Late finish – Early
finish
• Add up to the longest overall duration. T
• Is the shortest time possible to complete the project.
Any Delay of an activity on the critical path directly
imparts the planned project completed date.
Conart Engineers Limited
TIME-COST TRADE-OFFS: CRASHING
• When they an activity will take a certain no. of days or weeks
what we really mean is this activity normally takes this many
days or weeks. We could make it take less time, but to do so
would cost more money.
Crashing is the process of expediting project schedule by
compressing the total project duration
• Key is attain maximum decrease in the schedule time with
minimum cost.
• More resources are needed to speed up a part of project.
• Depends on what slack is available in a non critical activity.
Conart Engineers Limited
Conart Engineers Limited
Other Settings of MS Project
Conart Engineers Limited
Conart Engineers Limited
Constraints type and
description
Description
As soon as possible This is default setting based. Start the task ASAP based upon the other
constraints & relationship. Do not enter a date for this constraint.
As late as possible Start the task as late as possible based upon the other constraints &
relationship. Used when scheduling a project from the project finish
date. Do not enter date for this constraint.
Finish no earlier than Finish the task on or after the date you specify.
Start no earlier than Start the task on or after the date you specify.
Finish no later than Finish the task on or before the date you specify.
Start no later than Start the task on or before the date you specify.
Must finish on Finish the task on specified date.
Must start on Start the task on specified date.
Other Settings A – SCHEDULING A TASK
Other Setting – B: DEPENDENCY – Finish to
Start
• Task 1 must finish before Task 2 can start. This is the By Default Dependency
created and very commonly used Relationship in Project.
Conart Engineers Limited
Other Setting – B: DEPENDENCY – Start to Start
• Task 1 and Task 2 must start at the same time.
Conart Engineers Limited
Other Setting – B: DEPENDENCY – Finish
to Finish
• Task 1 and Task 2 must finish at the same time.
• FF dependencies also reduce the overall amount of time in
Project, same as SS Dependency.
• If Task 1 will take 5 days to complete, and Task 2 will take 3
days to complete, with FS dependency the overall duration of
the two tasks is 8 days.
• If we set an FF dependency, the overall duration of the two
tasks is only 5 days.
Conart Engineers Limited
Other Setting – B: DEPENDENCY – Start to Start
• Task 2 cannot finish until the start of Task 1.This is
VERY RARE scenario of Task in any type of Project.
Conart Engineers Limited
Other Setting – C: UNLINKING
To unlink tasks:
• Using the Control key, select the tasks to unlink.
• Click the Unlink icon located on the ribbon menu.
Conart Engineers Limited
Other Setting – E: Activity Type: Milestone,
Flag, Bar
• When u enter a task or import a no. of task, they have
duration of 1 day as default
• To create a milestone select the task considered as milestone
and then right click. Select Task information. Put a check mark
on Milestone
• To create subtask, select the task considered & then select
Project/Outline/indent in the menu
• Link the selected task by selecting Edit/link task in the menu
Conart Engineers Limited
Conart Engineers Limited
Other Setting – G: Page set up
• Select file, page set up in the Menu bar.
• The “ Page set-up” dialog Box will appear showing
Paper sizes and other choices
• Customize the printed output By inserting additional
info Into the “Header” and
“ Footer”
Conart Engineers Limited
Conart Engineers Limited
Action Reflection
Conart Engineers Limited

More Related Content

What's hot

Successful Project Managers Use These 5 Ways to Represent Project Schedule
Successful Project Managers Use These 5 Ways to Represent Project ScheduleSuccessful Project Managers Use These 5 Ways to Represent Project Schedule
Successful Project Managers Use These 5 Ways to Represent Project SchedulePraveen Malik, PMP
 
Microsoft Office Project 2007 Tutorial
Microsoft Office Project 2007 TutorialMicrosoft Office Project 2007 Tutorial
Microsoft Office Project 2007 TutorialAnil Purushothaman
 
Project Management focused on Scheduling of a Project
Project Management focused on Scheduling of a ProjectProject Management focused on Scheduling of a Project
Project Management focused on Scheduling of a ProjectMeryem Yıldız
 
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...Kuldeep Kumar
 
Unit2 scheduling wbs_network Management
Unit2 scheduling wbs_network Management Unit2 scheduling wbs_network Management
Unit2 scheduling wbs_network Management Reetesh Gupta
 
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Charlie Jackson
 
How Project Network Diagram's Can Help You Become A Better Project Manager
How Project Network Diagram's Can Help You Become A Better Project ManagerHow Project Network Diagram's Can Help You Become A Better Project Manager
How Project Network Diagram's Can Help You Become A Better Project ManagerPraveen Malik, PMP
 
Ms project training ppt
Ms project training pptMs project training ppt
Ms project training pptglobalp7
 
Ms Project Workshop
Ms Project WorkshopMs Project Workshop
Ms Project WorkshopEder Alves
 
Ms project 2016 overview
Ms project 2016 overviewMs project 2016 overview
Ms project 2016 overviewMaher Almohamad
 
Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010B Sai Prasad
 
Work BreakDown Structure
Work BreakDown StructureWork BreakDown Structure
Work BreakDown StructureAbdul Aslam
 
Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides SlideTeam
 
44259126 ms-project-presentation
44259126 ms-project-presentation44259126 ms-project-presentation
44259126 ms-project-presentationFarrukh Raja
 
Ms project 2010 level 1&2
Ms project 2010 level 1&2 Ms project 2010 level 1&2
Ms project 2010 level 1&2 Rolf Kühnast
 

What's hot (20)

Successful Project Managers Use These 5 Ways to Represent Project Schedule
Successful Project Managers Use These 5 Ways to Represent Project ScheduleSuccessful Project Managers Use These 5 Ways to Represent Project Schedule
Successful Project Managers Use These 5 Ways to Represent Project Schedule
 
Microsoft Office Project 2007 Tutorial
Microsoft Office Project 2007 TutorialMicrosoft Office Project 2007 Tutorial
Microsoft Office Project 2007 Tutorial
 
Msp presentation
Msp presentationMsp presentation
Msp presentation
 
Project Management focused on Scheduling of a Project
Project Management focused on Scheduling of a ProjectProject Management focused on Scheduling of a Project
Project Management focused on Scheduling of a Project
 
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
 
Oracle Primavera Team member 8.3
Oracle Primavera Team member 8.3Oracle Primavera Team member 8.3
Oracle Primavera Team member 8.3
 
Unit2 scheduling wbs_network Management
Unit2 scheduling wbs_network Management Unit2 scheduling wbs_network Management
Unit2 scheduling wbs_network Management
 
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
 
Graphical Indicators in MS Project
Graphical Indicators in MS ProjectGraphical Indicators in MS Project
Graphical Indicators in MS Project
 
How Project Network Diagram's Can Help You Become A Better Project Manager
How Project Network Diagram's Can Help You Become A Better Project ManagerHow Project Network Diagram's Can Help You Become A Better Project Manager
How Project Network Diagram's Can Help You Become A Better Project Manager
 
Ms project training ppt
Ms project training pptMs project training ppt
Ms project training ppt
 
Ms Project Workshop
Ms Project WorkshopMs Project Workshop
Ms Project Workshop
 
Ms project 2016 overview
Ms project 2016 overviewMs project 2016 overview
Ms project 2016 overview
 
tcc primavera
tcc primaveratcc primavera
tcc primavera
 
Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010
 
Work BreakDown Structure
Work BreakDown StructureWork BreakDown Structure
Work BreakDown Structure
 
Schedule Updates
Schedule UpdatesSchedule Updates
Schedule Updates
 
Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides
 
44259126 ms-project-presentation
44259126 ms-project-presentation44259126 ms-project-presentation
44259126 ms-project-presentation
 
Ms project 2010 level 1&2
Ms project 2010 level 1&2 Ms project 2010 level 1&2
Ms project 2010 level 1&2
 

Viewers also liked

10. LSL-A NOVEL COST EFFECTIVE COVER SLIP HOLDER FOR IN SITU MICROSCOPY OF CO...
10. LSL-A NOVEL COST EFFECTIVE COVER SLIP HOLDER FOR IN SITU MICROSCOPY OF CO...10. LSL-A NOVEL COST EFFECTIVE COVER SLIP HOLDER FOR IN SITU MICROSCOPY OF CO...
10. LSL-A NOVEL COST EFFECTIVE COVER SLIP HOLDER FOR IN SITU MICROSCOPY OF CO...Ravindragouda Patil
 
Forschungsatlas Elektromobilität - Prioritäre Forschungsthemen und regionale ...
Forschungsatlas Elektromobilität - Prioritäre Forschungsthemen und regionale ...Forschungsatlas Elektromobilität - Prioritäre Forschungsthemen und regionale ...
Forschungsatlas Elektromobilität - Prioritäre Forschungsthemen und regionale ...Gerd Meier zu Koecker
 
AAS NGO - Bird's Eye View
AAS NGO - Bird's Eye ViewAAS NGO - Bird's Eye View
AAS NGO - Bird's Eye Viewaasindia
 
9-IJABR-OCCURRENCE AND ANTIBACTERIAL ACTIVITY OF ACTINOMYCETES against fish p...
9-IJABR-OCCURRENCE AND ANTIBACTERIAL ACTIVITY OF ACTINOMYCETES against fish p...9-IJABR-OCCURRENCE AND ANTIBACTERIAL ACTIVITY OF ACTINOMYCETES against fish p...
9-IJABR-OCCURRENCE AND ANTIBACTERIAL ACTIVITY OF ACTINOMYCETES against fish p...Ravindragouda Patil
 
CREACIÓN DE UNA ESTACIÓN DE RADIO COMUNITARIA POR ESTUDIANTES DE LA UNIVERSID...
CREACIÓN DE UNA ESTACIÓN DE RADIO COMUNITARIA POR ESTUDIANTES DE LA UNIVERSID...CREACIÓN DE UNA ESTACIÓN DE RADIO COMUNITARIA POR ESTUDIANTES DE LA UNIVERSID...
CREACIÓN DE UNA ESTACIÓN DE RADIO COMUNITARIA POR ESTUDIANTES DE LA UNIVERSID...Lisandro Galindez
 
Las TIC en la aula de clase
Las TIC en la aula de clase Las TIC en la aula de clase
Las TIC en la aula de clase angelita0516
 
STRUKTUR JARINGAN DALAM ADOPSI INOVASI: STUDI KONSEPTUAL
STRUKTUR JARINGAN DALAM ADOPSI  INOVASI: STUDI KONSEPTUALSTRUKTUR JARINGAN DALAM ADOPSI  INOVASI: STUDI KONSEPTUAL
STRUKTUR JARINGAN DALAM ADOPSI INOVASI: STUDI KONSEPTUALAn Nisbah
 
Clinical Dental Research Paper
Clinical Dental Research PaperClinical Dental Research Paper
Clinical Dental Research PaperSam Hammer
 
CALIFORNIA BROCHURE ESTELLE
CALIFORNIA BROCHURE ESTELLECALIFORNIA BROCHURE ESTELLE
CALIFORNIA BROCHURE ESTELLEEstelle Chough
 

Viewers also liked (19)

10. LSL-A NOVEL COST EFFECTIVE COVER SLIP HOLDER FOR IN SITU MICROSCOPY OF CO...
10. LSL-A NOVEL COST EFFECTIVE COVER SLIP HOLDER FOR IN SITU MICROSCOPY OF CO...10. LSL-A NOVEL COST EFFECTIVE COVER SLIP HOLDER FOR IN SITU MICROSCOPY OF CO...
10. LSL-A NOVEL COST EFFECTIVE COVER SLIP HOLDER FOR IN SITU MICROSCOPY OF CO...
 
Forschungsatlas Elektromobilität - Prioritäre Forschungsthemen und regionale ...
Forschungsatlas Elektromobilität - Prioritäre Forschungsthemen und regionale ...Forschungsatlas Elektromobilität - Prioritäre Forschungsthemen und regionale ...
Forschungsatlas Elektromobilität - Prioritäre Forschungsthemen und regionale ...
 
Presentation2
Presentation2Presentation2
Presentation2
 
AAS NGO - Bird's Eye View
AAS NGO - Bird's Eye ViewAAS NGO - Bird's Eye View
AAS NGO - Bird's Eye View
 
ARTICLE
ARTICLEARTICLE
ARTICLE
 
9-IJABR-OCCURRENCE AND ANTIBACTERIAL ACTIVITY OF ACTINOMYCETES against fish p...
9-IJABR-OCCURRENCE AND ANTIBACTERIAL ACTIVITY OF ACTINOMYCETES against fish p...9-IJABR-OCCURRENCE AND ANTIBACTERIAL ACTIVITY OF ACTINOMYCETES against fish p...
9-IJABR-OCCURRENCE AND ANTIBACTERIAL ACTIVITY OF ACTINOMYCETES against fish p...
 
Depresion4
Depresion4Depresion4
Depresion4
 
CREACIÓN DE UNA ESTACIÓN DE RADIO COMUNITARIA POR ESTUDIANTES DE LA UNIVERSID...
CREACIÓN DE UNA ESTACIÓN DE RADIO COMUNITARIA POR ESTUDIANTES DE LA UNIVERSID...CREACIÓN DE UNA ESTACIÓN DE RADIO COMUNITARIA POR ESTUDIANTES DE LA UNIVERSID...
CREACIÓN DE UNA ESTACIÓN DE RADIO COMUNITARIA POR ESTUDIANTES DE LA UNIVERSID...
 
Proses laktasi dan menyusui,ppt
Proses laktasi dan menyusui,pptProses laktasi dan menyusui,ppt
Proses laktasi dan menyusui,ppt
 
Proyecto esperanza y edith
Proyecto esperanza y edithProyecto esperanza y edith
Proyecto esperanza y edith
 
Las TIC en la aula de clase
Las TIC en la aula de clase Las TIC en la aula de clase
Las TIC en la aula de clase
 
Mining hub
Mining hubMining hub
Mining hub
 
STRUKTUR JARINGAN DALAM ADOPSI INOVASI: STUDI KONSEPTUAL
STRUKTUR JARINGAN DALAM ADOPSI  INOVASI: STUDI KONSEPTUALSTRUKTUR JARINGAN DALAM ADOPSI  INOVASI: STUDI KONSEPTUAL
STRUKTUR JARINGAN DALAM ADOPSI INOVASI: STUDI KONSEPTUAL
 
Ds 160 client form
Ds 160  client formDs 160  client form
Ds 160 client form
 
Clinical Dental Research Paper
Clinical Dental Research PaperClinical Dental Research Paper
Clinical Dental Research Paper
 
ARTICLE
ARTICLEARTICLE
ARTICLE
 
CALIFORNIA BROCHURE ESTELLE
CALIFORNIA BROCHURE ESTELLECALIFORNIA BROCHURE ESTELLE
CALIFORNIA BROCHURE ESTELLE
 
ARTICLE
ARTICLEARTICLE
ARTICLE
 
K3 and Patient Safety "Penanganan limbah di laboratorium"
K3 and Patient Safety "Penanganan limbah di laboratorium"K3 and Patient Safety "Penanganan limbah di laboratorium"
K3 and Patient Safety "Penanganan limbah di laboratorium"
 

Similar to Scheduling MS project 09.13.rev 1

7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..pptPedadaSaikumar
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterpreetidamakale
 
Yom Institute Presentations lecture notes of project management
Yom Institute Presentations lecture notes of project managementYom Institute Presentations lecture notes of project management
Yom Institute Presentations lecture notes of project managementAbebaw31
 
MICROSOFT PROJECT
MICROSOFT PROJECTMICROSOFT PROJECT
MICROSOFT PROJECTSmit Patel
 
Critical Path MethodIntroductionOnce you have the network diag.docx
Critical Path MethodIntroductionOnce you have the network diag.docxCritical Path MethodIntroductionOnce you have the network diag.docx
Critical Path MethodIntroductionOnce you have the network diag.docxannettsparrow
 
dokumen.tips_ms-project-presentation.pptx
dokumen.tips_ms-project-presentation.pptxdokumen.tips_ms-project-presentation.pptx
dokumen.tips_ms-project-presentation.pptxSunilHotkar2
 
ms-project-presentation.pptx
ms-project-presentation.pptxms-project-presentation.pptx
ms-project-presentation.pptxSunilHotkar2
 
Odoo project management_casestudy
Odoo project management_casestudyOdoo project management_casestudy
Odoo project management_casestudyRishi Pujara
 
Project charter sample
Project charter sampleProject charter sample
Project charter sampleGregory Weiss
 
Project 2007 full handout
Project 2007 full handoutProject 2007 full handout
Project 2007 full handoutZenawi Mehari
 
Extension of time Analysis
Extension of time AnalysisExtension of time Analysis
Extension of time AnalysisFarhan Moosa
 
Software project scheduling
Software project schedulingSoftware project scheduling
Software project schedulingMuntha Ulfat
 
construction project planing
 construction project planing construction project planing
construction project planingSANJEEV Wazir
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)ShudipPal
 

Similar to Scheduling MS project 09.13.rev 1 (20)

7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapter
 
1587310189-week6.pptx
1587310189-week6.pptx1587310189-week6.pptx
1587310189-week6.pptx
 
Yom Institute Presentations lecture notes of project management
Yom Institute Presentations lecture notes of project managementYom Institute Presentations lecture notes of project management
Yom Institute Presentations lecture notes of project management
 
MICROSOFT PROJECT
MICROSOFT PROJECTMICROSOFT PROJECT
MICROSOFT PROJECT
 
Gantt Charts.ppt
Gantt Charts.pptGantt Charts.ppt
Gantt Charts.ppt
 
Critical Path MethodIntroductionOnce you have the network diag.docx
Critical Path MethodIntroductionOnce you have the network diag.docxCritical Path MethodIntroductionOnce you have the network diag.docx
Critical Path MethodIntroductionOnce you have the network diag.docx
 
dokumen.tips_ms-project-presentation.pptx
dokumen.tips_ms-project-presentation.pptxdokumen.tips_ms-project-presentation.pptx
dokumen.tips_ms-project-presentation.pptx
 
ms-project-presentation.pptx
ms-project-presentation.pptxms-project-presentation.pptx
ms-project-presentation.pptx
 
Odoo project management_casestudy
Odoo project management_casestudyOdoo project management_casestudy
Odoo project management_casestudy
 
Project charter sample
Project charter sampleProject charter sample
Project charter sample
 
Project 2007 full handout
Project 2007 full handoutProject 2007 full handout
Project 2007 full handout
 
Microsoft Project.pptx
Microsoft Project.pptxMicrosoft Project.pptx
Microsoft Project.pptx
 
Extension of time Analysis
Extension of time AnalysisExtension of time Analysis
Extension of time Analysis
 
Project management
Project managementProject management
Project management
 
Software project scheduling
Software project schedulingSoftware project scheduling
Software project scheduling
 
ProMT
ProMTProMT
ProMT
 
construction project planing
 construction project planing construction project planing
construction project planing
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)
 
Pep
PepPep
Pep
 

Scheduling MS project 09.13.rev 1

  • 2. Introduction • Microsoft Project is a project management software developed and sold by Microsoft • Design to assist project managers in developing plans, assigning resources to task, tracking progress, managing budgets and analyzing workloads, • The application creates critical path schedules, and critical chain which can be visualized in a Gantt chart. • Available currently in two editions, Standard and Professional. • MS Project’s proprietary file format is *.mpp Conart Engineers Limited
  • 3. Scheduling Software Commonly Used • Gantt Project • Genius inside • Liquid planner • Micro planner X-pert • Naval plan • Open project • Open workbench • Primavera 3.1 / 6.2 • Project. Net Conart Engineers Limited
  • 4. Project Manager Responsible for: • Work • Quality • Human Resource • Time • Communications • Costs Conart Engineers Limited
  • 5. Basic Settings of MS project Conart Engineers Limited
  • 6. Basic setting A: Create a new project plan • On the file menu, click on new. • Under new click on blank project. • Project 2003 create a New Project, and the New Project task pane is replaced by the task panes of the project guide Conart Engineers Limited
  • 8. Basic setting B: Create a Calendar for a task •By default, tasks are scheduled based on the project calendar. •To define unique or specific exceptions, such as machinery that runs during nonworking time, or an office move that can occur only on a weekend, you can create a task calendar for individual tasks that override the project calendar. Conart Engineers Limited
  • 9. Using MS Project Project Management Planning task Build the plan Set the project start date Enter task, name & duration Link task fine tune the plan Monitoring & Tracking task Set a base line Enter actual Track variables Adjustschedules Communicate with team Conart Engineers Limited
  • 10. CRITICAL PATH The sequence of the activities which have no float or slack is called critical path. Slack= Late start – Early start OR Late finish – Early finish • Add up to the longest overall duration. T • Is the shortest time possible to complete the project. Any Delay of an activity on the critical path directly imparts the planned project completed date. Conart Engineers Limited
  • 11. TIME-COST TRADE-OFFS: CRASHING • When they an activity will take a certain no. of days or weeks what we really mean is this activity normally takes this many days or weeks. We could make it take less time, but to do so would cost more money. Crashing is the process of expediting project schedule by compressing the total project duration • Key is attain maximum decrease in the schedule time with minimum cost. • More resources are needed to speed up a part of project. • Depends on what slack is available in a non critical activity. Conart Engineers Limited
  • 13. Other Settings of MS Project Conart Engineers Limited
  • 14. Conart Engineers Limited Constraints type and description Description As soon as possible This is default setting based. Start the task ASAP based upon the other constraints & relationship. Do not enter a date for this constraint. As late as possible Start the task as late as possible based upon the other constraints & relationship. Used when scheduling a project from the project finish date. Do not enter date for this constraint. Finish no earlier than Finish the task on or after the date you specify. Start no earlier than Start the task on or after the date you specify. Finish no later than Finish the task on or before the date you specify. Start no later than Start the task on or before the date you specify. Must finish on Finish the task on specified date. Must start on Start the task on specified date. Other Settings A – SCHEDULING A TASK
  • 15. Other Setting – B: DEPENDENCY – Finish to Start • Task 1 must finish before Task 2 can start. This is the By Default Dependency created and very commonly used Relationship in Project. Conart Engineers Limited
  • 16. Other Setting – B: DEPENDENCY – Start to Start • Task 1 and Task 2 must start at the same time. Conart Engineers Limited
  • 17. Other Setting – B: DEPENDENCY – Finish to Finish • Task 1 and Task 2 must finish at the same time. • FF dependencies also reduce the overall amount of time in Project, same as SS Dependency. • If Task 1 will take 5 days to complete, and Task 2 will take 3 days to complete, with FS dependency the overall duration of the two tasks is 8 days. • If we set an FF dependency, the overall duration of the two tasks is only 5 days. Conart Engineers Limited
  • 18. Other Setting – B: DEPENDENCY – Start to Start • Task 2 cannot finish until the start of Task 1.This is VERY RARE scenario of Task in any type of Project. Conart Engineers Limited
  • 19. Other Setting – C: UNLINKING To unlink tasks: • Using the Control key, select the tasks to unlink. • Click the Unlink icon located on the ribbon menu. Conart Engineers Limited
  • 20. Other Setting – E: Activity Type: Milestone, Flag, Bar • When u enter a task or import a no. of task, they have duration of 1 day as default • To create a milestone select the task considered as milestone and then right click. Select Task information. Put a check mark on Milestone • To create subtask, select the task considered & then select Project/Outline/indent in the menu • Link the selected task by selecting Edit/link task in the menu Conart Engineers Limited
  • 22. Other Setting – G: Page set up • Select file, page set up in the Menu bar. • The “ Page set-up” dialog Box will appear showing Paper sizes and other choices • Customize the printed output By inserting additional info Into the “Header” and “ Footer” Conart Engineers Limited